2
Locogen – Edinburgh Office Mitchell House, 5 Mitchell Street, Edinburgh EH6 7BD Tel. +44 (0)131 555 4745 Locogen – Cardiff Office Cardiff Gate Business Park, Malthouse Avenue, Cardiff CF23 8RU Tel. +44 (0)2920 789031 Locogen – York Office Popeshead Court Offices, Peter Lane, York YO1 8SU Tel. +44 (0)1904 406 865 Locogen – Dijon Office 8 Rue Du 19 Mars 1962, 21600 Dijon, Longvic, France Tel. +33 (0)7836 67148 www.locogen.com [email protected] Find us on LOCATION Milton of Fisherie farm, Banff, Scotland SYSTEM SIZE 4.6 MW EXPECTED ANNUAL GENERATION 14,300 MWh Locogen were originally commissioned to project-manage the installation of Milton of Fisherie wind farm, consisting of two Enercon E70 turbines, on behalf of developers Milwind Ltd. After successfully delivering the project, Locogen were contracted to undertake the ongoing Asset Management for the development. “I contacted Locogen as we received our planning consent as they had installed several Enercon projects near us. They were professional from the outset and the installation went very smoothly. I was pleased to appoint their Asset Management Team to oversee the project’s operation. They are dealing with everything quickly and efficiently, and both turbines are performing well.” Dianne Wiseman, Owner The project was commissioned in March 2016. Locogen have regularly monitored the performance of the turbines since then, responding proactively to any issues which arise. Using the latest SCADA (Supervisory Control and Data Acquisition) software, Locogen check project status several times daily, with any faults investigated immediately. Actual production data is compared daily with the published power curve and expected generation figures. This means that subtle evidence of turbine underperformance is flagged up early. Any onsite maintenance required, whether scheduled or reactive, is co-ordinated by Locogen via contacts with the turbine manufacturer and other key stakeholders. Locogen also act on the client’s behalf to negotiate the best possible terms for operational contracts, including electricity supply, Power Purchase Agreement (PPA) and insurance. In addition to ongoing contact with the client, Locogen produce a monthly written report giving a comprehensive overview of the project’s performance. ASSET MANAGEMENT MILTON OF FISHERIE

ASSET MANAGEMENT MILTON OF FISHERIE

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Locogen – Edinburgh Office Mitchell House, 5 Mitchell Street, Edinburgh EH6 7BD Tel. +44 (0)131 555 4745

Locogen – Cardiff Office Cardiff Gate Business Park, Malthouse Avenue, Cardiff CF23 8RU Tel. +44 (0)2920 789031

Locogen – York Office PopesheadCourtOffices,PeterLane,YorkYO18SU Tel.+44(0)1904406865

Locogen – Dijon Office 8RueDu19Mars1962,21600Dijon,Longvic,France Tel.+33(0)783667148

www.locogen.com

[email protected]

Find us on

LOCATION Milton of Fisherie farm, Banff, Scotland SYSTEM SIZE 4.6 MW EXPECTED ANNUAL GENERATION 14,300 MWh

Locogenwereoriginallycommissionedtoproject-managetheinstallationofMiltonofFisheriewindfarm,consistingoftwoEnerconE70turbines,onbehalfofdevelopersMilwindLtd.Aftersuccessfullydeliveringtheproject,LocogenwerecontractedtoundertaketheongoingAssetManagementforthedevelopment.

“I contacted Locogen as we received our planning consent as they had installed several Enercon projects near us. They were professional from the outset and the installation went very smoothly. I was pleased to appoint their Asset Management Team to oversee the project’s operation. They are dealing with everything quickly and efficiently, and both turbines are performing well.”

Dianne Wiseman, Owner

TheprojectwascommissionedinMarch2016.Locogenhaveregularly

monitoredtheperformanceoftheturbinessincethen,responding

proactivelytoanyissueswhicharise.

UsingthelatestSCADA(SupervisoryControlandDataAcquisition)

software,Locogencheckprojectstatusseveraltimesdaily,withanyfaults

investigatedimmediately.

Actualproductiondataiscompareddailywiththepublishedpowercurve

andexpectedgenerationfigures.Thismeansthatsubtleevidenceof

turbineunderperformanceisflaggedupearly.

Anyonsitemaintenancerequired,whetherscheduledorreactive,is

co-ordinatedbyLocogenviacontactswiththeturbinemanufacturerand

otherkeystakeholders.

Locogenalsoactontheclient’sbehalftonegotiatethebestpossibleterms

foroperationalcontracts,includingelectricitysupply,PowerPurchase

Agreement(PPA)andinsurance.

Inadditiontoongoingcontactwiththeclient,Locogenproduceamonthly

writtenreportgivingacomprehensiveoverviewoftheproject’s

performance.

ASSET MANAGEMENT MILTON OF FISHERIE

Locogen – Edinburgh Office Mitchell House, 5 Mitchell Street, Edinburgh EH6 7BD Tel. +44 (0)131 555 4745

Locogen – Cardiff Office Cardiff Gate Business Park, Malthouse Avenue, Cardiff CF23 8RU Tel. +44 (0)2920 789031

Locogen – York Office PopesheadCourtOffices,PeterLane,YorkYO18SU Tel.+44(0)1904406865

Locogen – Dijon Office 8RueDu19Mars1962,21600Dijon,Longvic,France Tel.+33(0)783667148

www.locogen.com

[email protected]

Find us on

LocogenprovidecomprehensiveAssetManagementservicesforwind,

solar,anaerobicdigestionandhydroelectricinstallations.Werecognise

thatonesizeveryrarelyfitsall,soweofferbespokesolutionstomatch

theneedsofeachspecificschemeandclient.

Ourprojectsrangefromsmallindividualsolarandhydrosystemsthrough

tomultiple-turbinewindfarmswhichoperateaspartofnational

portfolios.Alistisprovidedbelow.Pleasecontactusifyouwouldlike

furtherinformation.

PROJECTS

Name Size (kW) Location

Milton of Fisherie 4,600 Aberdeenshire

Skeddoway 1,500 Fife

Benthead 330 Ayrshire

Blackhouse 500 Scottish Borders

Dowhill 500 Ayrshire

Glenhead 500 Falkirk

EastMemus 400 Angus

WhiteTop 500 Angus

Pickerton 500 Angus

Wellgreen 500 SouthLanarkshire

Name Size (kW) Location

Creed 225 IsleofLewis

Wheedlemont 500 Aberdeenshire

WesterPlymuir 500 EastRenfrewshire

Harmeston 500 Pembrokeshire

Castlerigg 500 Cumbria

Hunday 500 Cumbria

Bennacott 500 Cornwall

HillFarm 500 Pembrokeshire

LittleHolloborough 500 Cornwall

Damhead 1,500 NorthLanarkshire

ASSET MANAGEMENT EXPERIENCE