Upload
adam-cervantes
View
216
Download
2
Embed Size (px)
DESCRIPTION
v
Citation preview
Assignment 2: EMP03 - Plan Work to be performed at Workplace
Submission Date : 04th Dec 2015
Batch : NDQS 2014 – 2016
Task 1
You have been assigned as QS Member of a project to complete 3 stored building.
A) Using the knowledge in Planning of Activities, explain how you would accomplish the above task and support to Project Manager.
B) When Purchasing Materials for Construction of the building, you have to prepare specification. Explain the type of specifications you would choose for the task with examples.
C) When designing the building, why lay out management is important. Explain with example.
Submission of Report:
This task should be submitted as a report ( pages 7 -10).
Presentation should be prepared and submitted as an annexture.
Submission Date: 13th December 2015