26
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) January 13, 2010

ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

  • Upload
    demi

  • View
    34

  • Download
    1

Embed Size (px)

DESCRIPTION

ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) . January 13, 2010. Today’s Topics. Project Status Project Updates Role Mapping Upcoming Agency Tasks and Events. SMART. Improve the efficiency of the State of Kansas’ financial practices - PowerPoint PPT Presentation

Citation preview

Page 1: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

ASTRA Update

Sunflower ProjectStatewide Management, Accounting and Reporting Tool (SMART)

January 13, 2010

Page 2: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

2

Today’s Topics

•Project Status

•Project Updates

•Role Mapping

•Upcoming Agency Tasks and Events

Page 3: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

3

SMART

• Improve the efficiency of the State of Kansas’ financial practices

• Increase the quality and timeliness of information provided to decision makers

• Increase the quality and timeliness of financial management information to the public

• Provide “real-time” view of the financial situation of the State

• Reduce redundancies in the financial management systems being utilized by the State

Page 4: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

4

Project Timeline

December January February March April May June July

Pilot T

rainin

g

Testing Phase

Agenc

y Role

Map

ping

Comple

te Sys

tem Tes

ting a

nd

Begin

User A

ccep

tance

Testin

g

Cutover Phase

Contin

uity o

f Ope

ration

s

Exerci

se

Load

SMART an

d SHARP

with P

roduc

tion V

alues

Go-live forSMART & SHARP II

Agenc

y Rep

ort D

evelo

pmen

t

End U

ser T

rainin

g

Close S

TARS

Wor

kflow

Wor

ksho

ps

Train

the T

raine

r Kick

-off

Page 5: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

5

Project Status

• System Testing is on-going – team will be finishing Cycle 1(Simple end-to-end processing) at the end of this week

• Developing options for agency participation in User Acceptance Testing

• Continuing work on cutover plan – Peggy Hanna is State Lead

• Enrolling agencies in the Shared Service Center

• Developing Help Desk Procedures

• Train the Trainer Kick-Off is on January 27th

• Data Warehouse Advisory Group 4th meeting January 29th to develop prototype agency dashboards for HR/payroll data

• Developed strategy for securing sensitive data in the Data Warehouse

Page 6: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

6

Test Sequence & ScheduleTest Stage Start

DateFinish Date

Jul 09

Aug

09

Sep 09

Oct 09

Nov

09

Dec

09

Jan 10

Feb 10

Mar

10

Apr

10

May

10

Jun 10

Unit Test 7/1/09 10/23/09

Assembly Test 11/3/09 11/30/09

* Conversion Test

10/30/09 4/16/10

System Test 11/2/09 4/16/10

* Interface Test 9/1/09 2/1/10

Performance Test

11/2/09 4/16/10

* User Acceptance Test

1/1/10 4/30/10

Disaster Recovery Test

2/1/10 4/16/10

Operational Readiness Test

4/1/10 6/11/10

Functional Team

Dev. Team

Interface Team

Conversion Team

Technical Team

All Teams

* - Indicates a test stage that requires agency participation

Page 7: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

7

System Test Cycles

Ten testing cycles of increasing complexity. Test conditions and test scripts for each cycle

Cycle Description Cycle Description

0 Configuration 5 Complex End to End Processing w/ Converted Data

1 Simple End to End Processing 6 Security

2 Complex End to End Processing 7 Cross Functional Integration

3 Conversion 8 Reporting

4 Simple End to End Processing w/ Converted Data

9 Exception Processing

Page 8: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

8

Project Updates

Page 9: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

9

Sensitive Financial Data in the Data Warehouse

• Based on survey results, agency requirements to secure sensitive data within their agency are diverse, e.g. Account/Object Code, Program/PCA, Dept ID, and vendor

• Configuring and maintaining security necessary to enable each agency to restrict agency employees from accessing specific, sensitive data elements (within their agency) is not feasible.

• Bottom line…. a simpler solution is needed to restrict access to sensitive data within an agency

• Solution: Agencies will restrict employee access to sensitive data using restricted queries/reports/dashboards developed by agency designated Power Users

Page 10: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

10

Data Warehouse Power Users

• Depending on the size of the agency, each agency will designate 1-3 Power Users

• Agency Power Users:– must have a solid understanding of the data origins and data structures

– will develop queries/reports/dashboards for their agency

– will have unrestricted access to agency data in the data warehouse

– will be responsible for limiting access to sensitive data within their agency

– will be the contact point in their agency for issues and concerns related to the data warehouse

Page 11: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

11

P-Card Conversion and Set-Up

• In order to setup P-Cards in SMART, we need:– Name and employee ID of Cardholder, Reconciler, Reviewer, Approver– Card Number– Default chartfields

• Existing BPC Card data is incomplete– Not all cards are assigned to a cardholder– Default chartfields are not documented

• A&R will be leading the effort to gather the required data– If your agency has BPC cards, expect to hear from A&R soon– They will provide existing data that requires clean-up and detailed instructions– Completed list of BPC cards and associated data is needed by the end of January

• Important notes:– In SMART, each P-Card must be assigned to a person (i.e., Cardholder)– Role mapping for P-Card roles (Cardholders, Reconcilers, Reviewers, and

Approvers) will be completed based on this task, NOT the role mapping task

Note: This does not apply to the Universities or KCI.

Page 12: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

12

State Surplus Update

• How do agencies know what an asset will be sold for or if it was sold at all at State Surplus?

• If proceeds >$500, Surplus returns 80% of the proceeds via interfund to the agency on a quarterly basis with an itemized listing of assets sold

• If proceeds <$500, Surplus retains all of the proceeds and the agency is not notified of the sell

Page 13: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

13

State Surplus Update (continued)

• How are we going to communicate with State Surplus, how will they communicate back, and how will asset dispositions be recorded in SMART?

• The agency will assign the Agency Adjustor, Transfer, Retirement Processor role to the individual authorized to record retirement transactions in SMART. In SMART, assets turned over to State Surplus for disposal shall be recorded as a retirement. The disposal code of “Retired to State Surplus” shall be selected when performing the retirement process.

• Agencies are expected to establish internal controls to ensure that all disposals are properly authorized and received by an agent of the entity accepting the property. An agency may develop an internal form that meets their needs or use the SMART Asset Disposition form to document physical disposals (draft form on slide 30). If required by the agency, State Surplus will sign as receiving surplus property for goods they actually receive. State Surplus will not sign for lost, stolen or property disposed under Local Disposal Authority.

Page 14: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

14

State of Kansas Agency Number ______________ Agy. Disposit ion No. _______________Department of Administration Agency Division ______________________________________Division of Accounts and Reports Contact Person ______________________________________Form # Phone Number ______________________________________

Approvals Disposal Code

A=Abandoned R=Scrap

C=Cannibal S=SaleP roperty Accountable Employee-Agency Date D=Disappear T=Trade-In

F=Theft Y=CasualtyReceiving Entity I=Inventory P=KS Surplus

M=Missing E=Rtn_FedP roperty Accountable Employee-Recipient Date N=Donated

Asset ID DescriptionAcquisition

Date Cost Fund Budget UnitCond. Code

Disp. Code

Date of Disposal

SMART Asset Disposition Form

Page 15: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

15

Role Mapping

Page 16: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

16

What is Role Mapping?

• Role mapping is where you will:1. Assign security roles to specific users2. Define row level security (agency level access) for your

agency’s users3. Setup workflow for your agency’s transactions

• Role mapping affects these systems:– SMART– Data Warehouse– Time & Labor module in SHARP

• To complete the role mapping task, you will use the Role Mapping Handbook as a reference to help you complete the User Role Workbook

Page 17: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

17

Why Role Mapping Matters

Role Mapping/ Workflow

Security Setup

TrainingAccess

to SMART

Access to SMART will only be granted to users after their security is configured and their required training is completed.

Page 18: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

18

Role Mapping – Task ID 68

• Role Mapping tasks submitted on time will have first opportunity to register for the required training 

• Late Role Mapping tasks place the agency at risk for being able to complete training and complete online function in SMART at go-live 

• Task Due Date– February 5

Page 19: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

19

Role Mapping Resources

• Business Process Workshop Presentations: http://www.da.ks.gov/smart/changeagentnetwork.html

• Change Agent Network Materials – Screen Prints http://www.da.ks.gov/smart/changeagentnetwork.html

Page 20: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

20

Upcoming Agency Tasks and Events

Page 21: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

21

Training DeploymentTimeline

Month Activity

January, 2010 Role Mapping Workshops (Task ID 68)

February, 2010 Sunflower Project prepares LMS (courses loaded, end users mapped)

March, 2010 Phase 1 Training – Level 1 and Level 2 WBT Released and Tracked (Task IDs 257 and 259)

March, 2010 Phase 2 Training – Enrollment in Level 3 WBT and ILT Training (Task IDs 88 and 89)

April – June, 2010 Phase 2 Training – Level 3 WBT and ILT Training Conducted (Task IDs 258, 101 and 102)

July – November, 2010 Follow-up Training As Needed

Page 22: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

22

Agency Tasks

Tasks that can be re-confirmed or submitted in Spring, 2010:

• 201 – SpeedChart Configuration Activity – AP• 145 – Entry Type/Reason Code Configuration Activity – AR• 154 – Program Code Configuration Activity – GL• 157 – Department ID Configuration Activity – GL• 211 – Agency Use – GL • 212 – Service Locations – GL• 166 – Grants Setup Activity – PC• 169 – Projects Setup Configuration Activity – PC• 178 – Complete Business Unit (BU) Default Configuration Activity – PO• 252 – Time and Labor Schedule Configuration Activity – T&L*• 253 – Confirm Time and Labor Workgroups – T&L*• 254 – Time and Labor Taskgroup Configuration Activity (Step 1 and 2) – T&L*• 255 – Manual Conversion of Time Reporter Data – T&L*• 264 – Time and Labor Task Profile Upload – T&L**selected agencies only

Page 23: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

23

Agency Tasks February-March 2009

• Complete Role Mapping Assignment– Task ID # 68 – Due Feb. 5th

• Complete Readiness Assessment #4 – Task ID # 86 – Due Feb. 22nd

Page 24: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

24

Upcoming Agency EventsJanuary 2010

14 – Role Mapping Workshop Remote Option available during one session on January 14, 201020 – Change Agent Network Meeting #827 - Train-the-Trainer Kickoff Meeting27 – Monthly Conversion Technical Meeting

February 2010

10- Monthly Interface Technical Meeting17 – Change Agent Network Meeting #925 – Monthly Conversion Technical Meeting

Page 25: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

25

Questions and Answers

Page 26: ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART)

26

Project Resources

• Sunflower Project website: http://www.da.ks.gov/smart/

• Sunflower Project Email Address: [email protected]

• Sunflower Project List-serv– Sunflower Infolist– Subscribe at http://www.da.ks.gov/smart/

• Sunflower Project Site: Sunflower Project, 915 SW Harrison, Room 1181, Topeka, Kansas  66612