PRE FEASIBILITY REPORT Ambada Stone Quarry Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area – 1.00Hectare Proponent Name Shri Upendra Suryawanshi S/o Shri Natthu Prasad Suryawanshi Resi.- Chandra Shekhar Ward Sadar Betul, District- Betul, M.P.

At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PRE FEASIBILITY REPORT

Ambada Stone Quarry

Of

Shri Upendra Suryawanshi

At

Khasra No. 413/1, 413/3

Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.)

Production Capacity: Max 6,320 Cu.mt/year

Area – 1.00Hectare

Proponent Name

Shri Upendra Suryawanshi S/o Shri Natthu Prasad

Suryawanshi

Resi.- Chandra Shekhar Ward Sadar Betul, District-

Betul, M.P.

Page 2: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 2

1. EXECUTIVE SUMMARY

Ambada Stone mine project covering an area of 1.00Hect for mining of minor

mineral Stone at village-Ambada, Tehsil-Amla, District-Betul.

The mining plan has been approved by Directorate of Geology & Mining M P

vides letter no. 21748 on dtd. 19/12/2017. The Collector office (Khanij Shakha)

Betul vide letter No. /Khanij/1/17/1553, dated- 29/11/2017.

� SALIENT FEATURES OF THE PROJECT:

Particulars Details

Name of the project Ambada Stone Quarry

Mineral Basalt (Deccan Trap)

Mining Lease area 1.00Hect

Khasra No. 413/1, 413/3 Land Use Pvt. Land

Lease Validity 10 Years

Production Capacity Stone Production: Max 6,320 Cu.mt/year

Village Ambada

Tehsil Amla

District Betul

Latitude& Longitude (A) 21°51'17.18"N 78° 2'44.13"E

(B) 21°51'18.55"N 78° 2'48.92"E

(C) 21°51'16.40"N 78° 2'48.92"E

(D) 21°51'14.77"N 78° 2'42.78"E

Estimated project cost 25 Lacs

Man Power 10-15

Water demand and supply 3-8 KLD

Nearest habitation/town The nearest village is Ambada which is about

0.80Km from mine site.

Nearest Airport The nearest Airport is Nagpur which is about

131KMS from mine site.

Nearest Connectivity SH-26 Road, which- is about 0.25km from mine.

Nearest Railway Station The nearest Railway Station is Amla which is

about 11 KMS from mine site.

Power Supply No electricity is required.

Page 3: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 3

2. INTRODUCTION

Proposed production of Stone is Max 6,320 Cu.mt/year, Khasra No. 413/1,

413/3, Area-1.00Hect at Village- Ambada, Tehsil- Amla, District-Betul (M P) of

Shri Upendra Suryawanshi

� Identification of project:

Name : Ambada Stone Quarry

Location : Near Village – Ambada, Tehsil – Amla, Distt.–Betul,

Proposed

Production

: Max 6,320 Cu.mt/year Stone

Applied Area : 1.00Hect

� Identification project proponent:

Name : Shri Upendra Suryawanshi S/o Shri Natthu Prasad

Suryawanshi

Address : Resi.- Chandra Shekhar Ward Sadar Betul,, District-Betul,

M.P.

Designation : Individual Owner

� Brief description of nature of the project:

Mining of Stone is proposed in the lease area 1.00Hect (Pvt. Land) at village-

Ambada, Tehsil– Amla, District–Betul. Mining will be carried out by Semi

Mechanized opencast method. The total mineable reserve Available is 69,300

Cu.mt. Proposed production of Stone is Max 6,320 Cu.mt/year. The Gazette of

India, Department of MoEF & CC dated 15/01/2016 and SEIAA O.M. No. –

12576, Date 24/03/2016 the project comes under B2 Category and

Environmental Clearance is required from DEIAA.

� Need for the project and its importance to the country and or region:

The basic objective of the project is to effective utilization of material in the

region. Stone is the most commonly used in road, building construction etc. and

will be sold to nearby markets to fulfill the requirements of local people.

� Demand – Supply gap:

Page 4: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 4

Considering the demand of mineral sufficient availability of the mineral in the

area, it is essential to have Stone mine to sustain the supply of mineral for

various purposes.

� Imports v/s Indigenous production:

This is indigenous production. This will neither exported nor imported.

� Export Possibility:

Not Exported.

� Employment Generation (Direct and Indirect) due to the project:

The total number of persons engaged in the mining operation will be 10-15

persons including skilled and unskilled and these are deployed from nearby

villages.

3. PROJECT DESCRIPTION

� Type of project including interlinked and interdependent projects:

No Interlinked or Interdependent project. Product from this mine will be used in

road, rail or building construction project.

� Location:

• State : Madhya Pradesh

• District : Betul

• Tehsil : Amla

• Village : Ambada

• Khasra No. : 413/1, 413/3

Page 5: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 5

• Khasra Map:

Page 6: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 6

• Satellite Image of the Mining Area:

� Details of Alternate Site Considered and the Basis of Selecting the

Proposed Site, Particularly the Environmental Considerations Gone Into

Should Be Highlighted:

Mining is site specific project hence no alternate site is considered.

� Size/Magnitude of Operation:

The proposed production of Stone is Max 6,320 Cu.mt/year from the area of

1.00Hectares by open cast Semi Mechanized method of mining.

� Geology:

Detailed regional geology and local geology are given in mining plan.

� Raw material required along with estimated quantity, likely source,

marketing area of final products, mode of transport of raw material and

finished product:

Page 7: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 7

The proposed mining is Stone Mining Lease. The mineral will be used for various

purposes. No raw material will be required to dependent industries.

� Resource optimization/ recycling and reuse envisaged in the project, if

any, should be briefly outlined:

Not applicable.

� Availability of water its source, energy/power requirement and source:

The total water requirement for the project is estimated 3-8 KLD for mining,

spraying and domestic uses and will be sourced from nearby villages. No

electricity is required.

� Equipment & Machineries:

Mining/excavation will be done according to the proposed manner of Semi

Mechanized Method workings and some machineries i.e. Hydraulic Excavator,

Dumpers, Tractor & Water Tank, Jack Hammer, Wagon Drill will be required to

deploy on hire basis for transport purpose.

4. SITE ANALYSIS

� Connectivity:

The village-Ambada, nearest population center is 0.80 km away from the mining

area, it is connected by roads. The District Headquarters of Betul is at a distance

of 17 km by road.

� Land form, land use and land ownership:

The land covers under the mining lease area as under:

District &

State

Tehsil Village Khasra No. Area in hect. Mineral

Name

Betul, MP Amla Ambada 413/1,

413/3

1.00 Basalt

(Deccan

Trap)

� Topography:

Surface & Geological Plan has been prepared on a scale of 1:1000 and contours

have been shown at an interval of 2.0 mts. The general natural drainage of the

Page 8: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 8

area is south direction. The highest elevation of the area is 772.5 mRL. No Nallah/

water bodies exist in the core area.

� Existing Land use Pattern:

The mining lease area is Pvt. Land. There is no village or hutments within the

mining area.

� Existing Infrastructure:

No infrastructure is existing within lease area.

� Soil Classification:

Light pale yellow soil with 0.2 meters average thickness above the Sand

occupying the undulating ground. The soil, overburden and mineral reject, so

generated during the course of quarry operation will be stacked near the

southern lease boundary for reclamation purpose.

� Social Infrastructure:

The infrastructure like, toilets, first aid stations etc. will be developed at mine site.

The nearest village is Ambada, health & educational facilities (in the form of

primary and secondary schools) are available there.

Communication services like post office and telephones are available in the

nearby village. Most of the villagers are having mobile phones.

5. PLANNING BRIEF

� Planning Concept:

It is propose to produce Stone is Max 6,320 Cu.mt/year materials from the mining

area. It is situated in Betul District of M P.

� Population Projection:

Man power requirement for mining is estimated to be 10-15 Nos. Most of the

employees will be recruited from neighboring village depending upon the

availability of skilled & unskilled people. No significant influx of people is

anticipated in the area.

Page 9: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 9

� Land use Planning:

The mining lease area is Pvt. Land.

� Assessment of infrastructure demand (physical and social):

Lessee will assess the demand of infrastructure (Physical & Social) in nearby area

of the proposed mine site and same will be developed under social work.

� Amenities/Facilities:

The mine site office, first aid room & rest shelter are existing in the lease area.

Workers are provided with rest shelters and no houses are provided to any

worker as they are deployed from nearby village. Clean drinking water is

provided.

6. PROPOSED INFRASTRUCTURE

S. No. Particulars Details

1. Lease Area 1.00Hect

2. Residential Area Not applicable

3. Road Connectivity

The village- Ambada, nearest population center

is 0.80km away from the mining area, it is

connected by roads.

The District Headquarters of Betul is at a

distance of 17 km by road.

4. Green Belt

Green belt development program will be made

in successive phase depending upon the

immediate need, priority, availability of land

and sufficient ground water. A total no of

proposed plantation is 30 saplings per year.

5. Social Infrastructure

Physical & Social Infrastructure is provided, and

if necessary other facilities will also be provided

by mine’s proponent.

6. Water Management 3-8 KLD, Source: nearby village

7. Sewerage System N.A.

8. Industrial Waste

Management

N.A.

9. Solid Waste

Management

No waste will be generated.

Page 10: At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla ...environmentclearance.nic.in/writereaddata/District/pfr/191220171O4… · SALIENT FEATURES OF THE PROJECT: Particulars Details

PFR Ambada Stone Quarry

Page 10

10. Power Requirement N.A.

7. REHABILITATION & RESETTLEMENT PLAN

There is no human settlement within the mining area. No human settlement will be

disturbed due to the mining activity. So, no Rehabilitation and Resettlement is

proposed.

8. PROJECT SCHEDULE

� Proposed schedule and approval for implementation

The Proposed project shall be established after getting the Environmental

Clearance from DEIAA.

� Project cost estimation

Estimated Project Cost for the proposed project is Rs. 25 Lacs.

9. ANALYSIS OF PROPOSAL

� Project will create direct & indirect employment opportunities within the

surrounding region. Unit will use good faith efforts to employ local people

from the nearby villages depending upon the availability of skilled & un-

skilled man power surrounding the project site.

� Distribution of plants among the local villagers to plan to plant more and

more tree species so, as raised the aesthetic beauty of the area.

� To provide stationary to the poor or needful children of the area.