ATLAS & D0 ATLAS & D0 D0: Status, software & analysis Frank Filthaut & Silke Duensing ATLAS: Software & analysis Stan Bentvelsen Silicon trackerSimon Peeters -spectrometer End-cap toroids MDT chambers Electronics Alignment Detector control Data-acquisition F. Linde, 14-December-2001, Amsterdam

ATLAS & D0

  • Upload
    kaipo

  • View
    62

  • Download
    0

Embed Size (px)

DESCRIPTION

ATLAS & D0. D0: Status, software & analysisFrank Filthaut & Silke Duensing ATLAS: Software & analysisStan Bentvelsen Silicon trackerSimon Peeters  -spectrometer End-cap toroids MDT chambers Electronics Alignment Detector control Data-acquisition. - PowerPoint PPT Presentation

Citation preview

ATLAS & D0ATLAS & D0D0:

Status, software & analysis Frank Filthaut & Silke Duensing

ATLAS:Software & analysis Stan BentvelsenSilicon tracker Simon Peeters-spectrometer

End-cap toroidsMDT chambers

ElectronicsAlignmentDetector controlData-acquisition F. Linde, 14-December-2001, Amsterdam

End-cap Toroids: CoilsEnd-cap Toroids: CoilsHMA power systems

Job: wind & impregnate 28 coils Status: prototype coil existsOutlook: end-cap # 1: 2004? end-cap # 2: 2005?

cost overrun claims}

End-cap Toroids: VesselsEnd-cap Toroids: VesselsSchelde Exotech

Job: 2 vacuum vessels Status: end-cap # 1 delivered to CERNOutlook: end-cap # 2: summer 2002

Drift TubesDrift Tubes

MDT ChambersMDT ChambersBOL-0 BOL-2 BOL-3

r.m.s. Z 15 m 12 m 13

mr.m.s. Y 13 m 17 m 14

m

X-ray tomography

r.m.s. wire sag contribution

Electronics: AlignmentElectronics: Alignment

MasterMux

USA15Mux

on-chamber off-chamber

mask

CCD multiplexer

Job: 5,000 RASNIK alignment systems + DAQ + software Status: masks, lenses and CCDs distributed DAQ & software prototyped and in use “everywhere” Outlook: complete in 2004 (not critical)

lens

Electronics: Detector ControlElectronics: Detector Control

T-sensors30/chamber

T0.2 oCB-sensorsB/B10-4

CAN Network digital busses

to MDT front-end

extra bus(insurance

)

on-chamber

Job: 1,200 CAN based detector control systems + DAQ + software Status: T-sensors delivered; 3D B-sensors prototyped CAN nodes pre-series to be distributed DAQ & software prototyped Outlook: complete in 2003 (not critical)

Electronics: Data-AcquisitionElectronics: Data-Acquisition

1.28 Gbit/s S-Link to ROB6 x

CSM-Link

CSM-Link

TDC 1

TDC 18CSM18 x

on MDT chambers

MROD(NIKHEF)

(256)

USA15

ROB

(256)

Surface

ROD or ROB “IN”

ROD or ROB “OUT”CSM

TDC 1

TDC 18CSM18 x

off MDT chambers

Cosmic-Ray TestCosmic-Ray TestObjectives: system test! Develop:

DCS, DAQ C++ software

Merry ChristmasMerry Christmas