Mansfield Shire Council – Ordinary Meeting of Council: 26 June 2018
ATTACHMENT 10.3.3
Mansfield Shire Sport Facilities Strategy 2018-2028
ATTACHMENTS: SPORTS FACILITY STRATEGY
BACKGROUND RESEARCH REPORT (92 PAGES)
Final Report – June 2018
Sport Facilities Strategy
1
2 | P a g e Sports Facilities Strategy: Final report
Contents 1. Introduction .................................................................................................................................... 3
2. Vision, Principles and Roles............................................................................................................. 4
Vision ................................................................................................................................................... 4
Guiding Principles ............................................................................................................................... 4
Defining Council's Role ........................................................................................................................ 5
3. Strategic Context ............................................................................................................................. 6
Location ............................................................................................................................................... 6
Population characteristics ................................................................................................................... 6
Planning Influences ............................................................................................................................. 6
Council Plan and Strategic Resource Plan ....................................................................................... 6
Other strategic documents and directions ..................................................................................... 7
Participation trends ........................................................................................................................ 7
4. Consultation Activities .................................................................................................................... 9
Community Survey .......................................................................................................................... 9
Club Survey ................................................................................................................................... 10
5. Existing Sport Facility Provision .................................................................................................... 12
6. Demand Assessment ..................................................................................................................... 21
7. Strategic Action Plan ..................................................................................................................... 22
8. Appendices .................................................................................................................................... 24
Appendix 1: Sport and Recreation Management Framework .......................................................... 25
Infrastructure Development and Maintenance Guide ................................................................. 25
Appendix 2: Draft Funding Framework ............................................................................................. 36
Introduction / Purpose .................................................................................................................. 36
Definitions ..................................................................................................................................... 36
Scope ............................................................................................................................................. 36
Requests for Capital Works Projects ............................................................................................. 36
Potential Funding .......................................................................................................................... 38
Appendix 3: Priority Project Indicative Concepts ............................................................................. 39
2
3 | P a g e Sports Facilities Strategy: Final report
1. Introduction Mansfield Shire Council recognises the health and wellbeing benefits that can be derived from
participation in a range of sports and physical activities. Sports facilities not only facilitate physical
activity participation opportunities that can contribute to individual health and wellbeing, they also
support broader positive community outcomes, including social connections, community belonging,
identity, social gatherings and community resilience.
The Sport Facilities Strategy builds on recent Council planning for recreation, leisure, health and
wellbeing. Specifically the aim of the project is to build upon the existing Mansfield Shire Sport and
Recreation Strategy (2014-2019) to better understand the current and likely future recreational
needs of the community and to develop a framework for the effective provision, management and
development of sporting facilities over the next ten years.
Whilst the primary focus of the study is on the Mansfield Township as the recognised central hub for
the municipality, the strategy also considers the sport facility and infrastructure needs of other
townships and settlements.
Quality sport facilities enable broad community use, events, tourism and contribute to the overall
economic sustainability of the communities in which they exist. Therefore sport and leisure facilities
contribute to physical health, mental health, community connectedness, character, general
wellbeing and economic sustainability.
Council is facing a number of significant challenges in relation to existing sports facilities and
recreation reserves throughout the Shire, including ageing infrastructure, increasing maintenance
and renewal costs, changing community needs, expectations and shifting physical activity
participation preferences.
The Sports Facilities Strategy has been developed having regard to a number of influences, including:
Relevant national, state and local policies, plans and strategies.
Demographic data and population forecasts.
Sport and physical activity participation trends.
Community and stakeholder consultation results.
Sport facility demand assessment.
The realistic capacity of Council and stakeholders to implement actions.
This document provides an overview of relevant background material and presents the vision,
principles, strategies and actions to guide Council priorities in supporting the sports facility needs of
the community over the next ten years.
3
4 | P a g e Sports Facilities Strategy: Final report
2. Vision, Principles and Roles
Vision Having regard to the research and consultation results, the vision for the Sport Facilities Strategy is
defined as:
Enhancing community health and wellbeing through sport, recreation and
leisure.
Council will contribute to all residents achieving a high level of physical and
mental wellbeing by ensuring sport facilities and services reflect community
needs and the realistic capacity of key stakeholders to sustainably support.
Guiding Principles The Vision is supported by the following guiding principles:
Equity of Access: o Council recognises that all residents should have access to an appropriate range of sport,
recreation and physical activity participation opportunities regardless of their socio-economic status, ethnicity, age, gender or ability.
o All new (or redeveloped) sport facilities and infrastructure will consider opportunities to incorporate Universal Design and Female Friendly Sport Infrastructure principles as standard practice in order to encourage access for all.
o Council will strive for an equitable allocation of resources that promotes inclusiveness and a balance between formal sport and informal recreation opportunities that reflect community needs.
Diversity and Choice: o Council encourages and supports a variety of physical activity participation options that
enable individuals to make choices based on their needs and interests.
Lifelong Involvement: o Council will support opportunities for participation in physical activities for individuals
and groups across all age groups and life stages, i.e. children, adults and seniors.
A Sustainable Approach: o The standard, scale and scope of sport facilities will primarily focus on servicing local
Shire residents. Therefore elite, specialist or low participation facilities that are designed to service larger catchments beyond the Shire’s population capacity are unlikely to be a priority within the life of this plan.
o Council encourages and supports the development of sustainable sport and recreation facilities and operational environments having regard to the financial capacity of Council, key stakeholders, demonstrated demand, lifecycle costs and effective asset maintenance capacity.
Research and Planning: o Council supports appropriate research and planning that identifies current and future
recreation needs and informs sound decision making. An ongoing commitment to community consultation, engagement and relationship building will be critical in this regard.
Shared Use and Flexibility: o The provision of open space settings (particularly active / formal sports reserves) and
leisure facilities shall maximise opportunities for shared use and in-built flexibility to adapt or change over time in order to respond to potential variations in community needs or aspirations.
4
5 | P a g e Sports Facilities Strategy: Final report
o Opportunities for co-location of leisure facilities with other compatible community facilities will be explored in order to create vibrant multi-use community activity hubs.
Defining Council's Role Council’s role in sport, recreation and leisure provision will vary depending on the issue/s being
addressed.
A key challenge (for Council and individual communities) continues to be effective and sustainable
asset maintenance and renewal of sports infrastructure.
Communities are increasingly being asked to consider their priorities in order to guide overall
resource allocation. Demand for new sport facilities across the Shire is likely to remain relatively low
(with some notable exceptions, including indoor sport provision and pavilion upgrades), rather the
focus will be on maintaining and improving existing assets to maximise usage, maintain safety and
meet contemporary user expectations.
Notwithstanding the challenge associated with ongoing asset maintenance and renewal, there is an
opportunity for Council to broaden its role in facilitating community wellbeing through the
promotion of active, healthy lifestyles in order to help address wider health objectives, National
trends (i.e. obesity, diabetes, heart disease, etc.) and an ageing community profile.
Council also has an ongoing interest in the health and sustainability of local sporting clubs and
groups in order to support participation opportunities for the community and maximise effective use
of existing facilities. Council’s role in supporting local sporting clubs and groups extends beyond
infrastructure provision and includes initiatives that promote well-governed, diverse, skilled and
sustainable organisations.
In general, Council's role will fall into one of the following four categories:
Plan:
Facilitate the planning and renewal of sport and leisure facilities, services and opportunities to
address identified (current and future) community needs.
Provide:
Support the provision and development of sport and leisure facilities, services and programs to
meet the needs of the current and future community.
Partner:
Work in partnership with other levels of Government, schools, clubs and community groups to
ensure that sport and leisure facilities, programs and services meet the diverse needs of the
community.
Support sporting clubs, groups and communities to help themselves by assisting capacity
building and community driven initiatives.
Support appropriate commercial operators to provide sport and leisure facilities or services in
response to market driven demands.
Advocate & Inform:
Advocate to other levels of Government and relevant stakeholders regarding issues and
opportunities that are likely to impact on physical activity and sport participation opportunities
in the Shire.
5
6 | P a g e Sports Facilities Strategy: Final report
Provide information to the community regarding the range of sport and leisure opportunities
available to residents, including promotion of the health and wellbeing benefits of participation
in physical activity.
3. Strategic Context
Location Mansfield Shire is located approximately two hours north east of Melbourne. The landscape is
dominated by the Great Dividing Range and includes the alpine resorts of Mt Buller and Mt Stirling.
The Shire boasts major river systems, lakes, mountains and broad productive valleys where
agriculture and rural living integrate. Lake Eildon is a dominant feature in the southern half of the
municipality and is recognised as one of Victoria’s most popular inland waterways for recreational
boating activities.
Population characteristics The Shire has experienced consistent population growth over the last decade, growing from
approximately 6,631 people in 2001 to an estimated 8,584 in 2016. Forecasts indicate that by 2031,
the population is expected to increase by around a further 1,000 people to approximately 9,596
residents1.
An increase of this size will not automatically require the provision of new or additional sport and
leisure facilities, however the standard, maintenance and capacity of existing facilities may need to
be improved in order to cater for modest increases in demand associated with population growth.
The age profile of the community continues to follow an ageing trend. In 2016, the median age of
residents in Mansfield Shire was 48 years. However between the 2011 Census and forecast profile in
2031, the proportion of 0-19 year olds and 20-65 year olds will be lower than it is currently, however
the proportion of those aged over 65 years will increase.
The ageing profile of the community will influence leisure participation demands. Whilst demand for
participation in traditional formal sports can be expected to experience modest growth associated
with population increases, demand for informal, non-club based leisure opportunities can be
expected to increase associated with the physical activity participation preferences of an ageing
community.
Planning Influences
Council Plan and Strategic Resource Plan Development of the Sports Facilities Strategy has been influenced by the strategic directions
outlined in a range of other higher order Council planning documents, in particular the Council Plan
2017-2021 which includes strategic objectives for supporting community health and wellbeing,
sustainability (economic, social and environmental), enhancing existing assets and forward planning
to meet the changing needs of the community.
1 Sources:
http://www.censusdata.abs.gov.au/census_services/getproduct/census/2016/quickstat/LGA24250?opendocument (accessed 3/7/2017)
http://www.mansfield.vic.gov.au/Libraries/Community_Development/Mansfield_2012.sflb.ashx (accessed 3/7/17)
Victoria in Future 2016, Mansfield Shire
6
7 | P a g e Sports Facilities Strategy: Final report
The Council Plan also incorporates the organisations Strategic Resource Plan (SRP) which outlines
resource requirements to support implementation of key initiatives and ongoing operations. Whilst
Council’s overall liquidity appears sound, the financial position and operating environment remains
significantly challenged. Opportunities for cost savings in services, operations and asset
management are actively being explored.
Council’s asset renewal deficit and backlog of required maintenance works remain a priority for
resource allocation within the capacity of the SRP. There is, on average, a 50:50% split between
renewal spend and new/upgrade spend of Council cash reserves. This focus will allow the forecast
asset renewal gap to close by 2021.
Therefore, recommendations developed as part of the Sports Facilities Strategy need to be cognisant
of the realistic financial capacity of Council and key stakeholders to implement resultant actions.
Potential recommendations for major infrastructure investment and new facilities are only likely to
be viable if significant external funding and partnerships can be achieved. This may impact on timing
of potential delivery (i.e. subject to external influences) and require ongoing advocacy in order to
secure funds.
Recommendations that may impact on programs and service delivery will generally be required to
be delivered within existing operational resources.
Other strategic documents and directions The Sports Facilities Strategy is also influenced by Federal and State Government directions including
the National Sport and Active Recreation Policy Framework and Sport & Recreation Victoria priority
areas – i.e. participation, sustainability and female sport – as these reflect potential external funding
opportunities.
Council has already recognised the importance of increasing physical activity and community
wellbeing through the Municipal Public Health and Wellbeing Plan. Understanding sport and
recreation trends, including participation preferences and sport facility needs is therefore integral to
targeting initiatives that support increasing participation.
Participation trends A comprehensive review of industry trends is included in the Background Research Report. For
example, we know that the average membership per sports club in Mansfield Shire has increased
from 108 in 2013 to 140 in 2017. The total combined membership of all clubs that responded to the
research survey has increased from 2,055 to 2,809. Increasing membership will continue to
contribute to greater demand for appropriate facilities and support infrastructure.
We also know that there are more junior members compared to seniors, i.e. 50% compared to 39%.
However, approximately 26% of all members are aged over 50 years. The research confirms that
regardless of club membership trends the most popular physical activities in terms of total
participation numbers are dominated by informal recreation as opposed to club based sports
participation.
Walking for exercise, fitness or recreation remains the most popular physical activity of choice for
Victorian adults.
Whilst acknowledging a broader preference for non-club based, informal recreation activities –
particularly by older adults - the Sports Facilities Strategy recognises the importance of sustaining
local sporting clubs. Sporting clubs not only provide physical activity participation opportunities for
7
8 | P a g e Sports Facilities Strategy: Final report
children and young adults, they provide a vital outlet for community expression, identity, belonging
and social gathering for all age groups, not just those participating on the field.
Across the State there is burgeoning interest and participation (both as players and officials) in a
range of sports by women and girls, including activities traditionally dominated by males, for
example Austrian Rules Football, cricket and soccer as well as ongoing participation interest in
netball and basketball.
Demand for organised sport opportunities, particularly for children aged 5-15 years and young adults
aged 15-24 years, will remain significant, including traditional activities undertaken in the Shire,
notably football, cricket, netball, basketball and to a lesser extent tennis and soccer.
8
9 | P a g e Sports Facilities Strategy: Final report
4. Consultation Activities The planning process for the Sports Facilities Strategy has involved a range of targeted consultation
activities, in particular:
On-line community survey 159 completed.
Sports Club / Group survey 30 completed.
Public submissions 5 individuals / groups.
School and stakeholder interviews
Key findings from the consultation activities are outlined in the Background Research Report.
Consultation findings have informed the vision and actions outlined later in this report. A number
notable findings are presented below.
Community Survey Survey respondents identified more than 35 different sports and activities that they regularly
participate in. This reflects a good level of diversity and opportunities available in the Shire – many
of which reflect the geographic characteristics of the Shire, for example snow sports, hiking, fishing,
mountain walking and equestrian activities.
Around half of the activities identified are club-based organised sports – including tennis, netball,
AFL football, cricket, basketball and golf as popular examples in Mansfield Shire - however the most
popular activities overall reflect a preference for casual and informal participation opportunities,
which is consistent with State and National trends, in particular the popularity of walking and
cycling.
A lack of facilities was identified as a key reason for non-participation in sport and recreation
activities across the Shire (i.e. 39.66% of respondents). Suggested facility gaps primarily related to a
lack of indoor courts, indoor aquatic and adequate change room/pavilion facilities. The poor
standard of existing facilities was identified by a further 10.34% of respondents – therefore half of all
respondents (39.66% + 10.34 = 50%) identified facilities as a major constraint to participation.
There is very strong support for the provision of quality sport and recreation facilities from the
survey respondents – over 95% identified them as extremely important or important.
The areas/activities where Council’s performance rated most highly (i.e. Good, Very good or
Excellent) included:
Provision of sport and recreation facilities and infrastructure (72.5%).
Sports field and court maintenance (72.7%).
Supporting local sporting clubs and recreation groups (62.9%).
Improving existing sport and recreation facilities (61.8%).
Areas/activities where Council’s performance rated most poorly (i.e. Poor or Very poor) included:
Developing new sport and recreation facilities (50.3%).
Providing a diverse range of sport and recreation facilities (36.6%).
Improving existing sport and recreation facilities (31.9%).
Pavilion, club rooms and building maintenance (29.1%).
Approximately 42.1% of respondents indicated that existing sport and recreation facilities usually or
always meet their needs. However, slightly over one quarter of respondents (27.1%) suggested that
facilities seldom or never meet their needs.
9
10 | P a g e Sports Facilities Strategy: Final report
Community survey respondents were asked to suggest priorities for Council in relation to current
and future sport and recreation facilities. This was an open ended question which attracted
considerable feedback. The most common suggested priorities (in order) included:
Facility improvements – upgrade, retain and refurbish existing facilities as well as create new
facilities where required.
Establish a year-round indoor aquatic and recreation centre.
Establish change room facilities at Lords Reserve.
Establish a new indoor sports facility (i.e. Basketball / Netball stadium).
Continue to support sports facilities in each major township.
Complete the soccer fields and facilities adjacent to the Secondary College.
Additional outdoor netball courts with lighting and shelter.
Club Survey A selection of key findings from the Club survey are presented below.
The survey responses confirm club membership has increased in recent years. Increasing club
membership will contribute to greater demand for sport facilities and associated infrastructure.
There are slightly more male club members than female (i.e. 51% compared to 42%). Similarly, there
are more junior members (under 18 years) compared to seniors (over 18years), i.e. 50% compared
to 39%. However, almost one quarter of all members are aged over 50 years (26%) which is
reflective of the age profile of the community.
Areas where Council performance rated highest included:
Responsiveness to user group enquiries/requests.
Sports field maintenance.
Keeping user groups up-to-date with information.
Areas where Council performance rated lowest included:
Developing new sport and recreation facilities.
Providing club development and management support.
Supporting initiatives to increase participation.
Meeting the needs of your club or group.
Meeting the needs of your sport or activity across the shire.
In addition, 1 in 3 clubs indicated that facilities do not meet their needs and almost half of all club
responses (47.6%) indicated that facilities only meet their needs ‘sometimes’ – common suggested
reasons for not meeting needs included comments related to the age, condition and standard of
existing buildings, with many comments noting their lack of suitability for female use.
Clubs were asked to nominate the biggest challenges they are facing. Common responses generally
fell into three themes, specifically – Facilities and Infrastructure; Club Support and Operations; and
Participation.
Clubs were then asked to nominate the top three priorities for sport and recreation facilities across
the entire Shire over the next ten years. This was an open ended question which attracted
considerable feedback, however the highest priorities suggested by clubs (in order) were:
Maintenance and refurbishment of existing facilities;
Establish pavilion and change room facilities at Lords Oval;
10
11 | P a g e Sports Facilities Strategy: Final report
2-court indoor multi-use indoor sports stadium at MSC, potentially including a permanent
gymnastics area; and
Complete the Additional Playing Fields at the High School to cater for soccer and potentially
junior football/cricket.
11
12 | P a g e Sports Facilities Strategy: Final report
5. Existing Sport Facility Provision Council provides and supports a diverse range of sports facilities and infrastructure across the Shire. The main sports facilities, user groups,
usage, asset age, ownership and recent capital works in each major township are identified below.
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
Mansfield
1. Mansfield Recreation Reserve – Sports Complex
Highett Street Mansfield
Single court indoor stadium. Indoor court.
Multi-use indoor sports and activities, including school use. Basketball Club Gymnastics Club Mansfield Badminton Association Social Badminton Lifeball group Mansfield Secondary School
Sports Complex at capacity Monday-Friday during school terms. At 30% capacity out of term and mostly unused on weekends. 350 members. 65% male, 35% female. 80% aged under 18 years. Usage: 20-30 hours per week. Weekday - After 4pm and Sundays 80-100% of total use. 65 members. 30% male, 70% female. All aged under 18 years. Usage: Approx. 2.5 hours per week during school terms. Approx. 1.5. hours per week, year-round. Approx. 1.5. hours per week, year-round. Approx. 1.5. hours per week, year-round.
45 years Council 12/13 - $ 45,257.54 - Asbestos removal and replacement & general maintenance & annual recoat 13/14 - $19,904.09 - Door/Wall between toilets & complex, general maintenance & annual recoat 14/15 - $10,991.38 - Stormwater & water mains works, general maintenance & annual recoat 15/16 - $10,642.04 - External door and spectator seating repairs, general maintenance and annual recoat 16/17 - $8,278.05 - Seating area & vent repairs, general maintenance and annual recoat 5 year average - $95,073.10 ($19,014.62 per year)
12
13 | P a g e Sports Facilities Strategy: Final report
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
Mansfield Primary School
Approx. 12 hours per week during school term. Approx. 6 hours per week during school term.
2. Mansfield Recreation Reserve – Swimming Pool Complex
Highett Street Mansfield
33m x 6 lane outdoor pool, 10m learners’ pool
Swimming club, schools and community.
Pool has approx. 20,000 visits per season.
Change Rooms 30 Years. Main Pool 60 years. Learner Pool 30 years. Kiosk 30 years. Plant Room 23 Years. Toddler Pool 30 Years. Hazchem Shed 15 years. Swim Club Shed 15 years.
Council (facility contracted to the YMCA from November to March)
12/13 - $265,173 - Whole pool refurb including lining and pipe work for filtration, redirect backwash to sewer 13/14 - $20,673 - Painting of changerooms, preseason and general maintenance. 14/15 - $7,795 - Preseason and general maintenance. 15/16 - $15,281 - Repairs to solar, preseason and general maintenance. 16/17 - $27,942 - Change sand in filters, replace loose tiles in learner pool, new shade sail, solar repairs, preseason and general maintenance. 5 year total = $336,864 5 year average = $67,372 p.a.
3. Mansfield Recreation Reserve – Sports Oval
Highett Street Mansfield
Football / cricket oval and associated infrastructure – e.g. clubrooms, electronic scoreboard, timekeepers and corporate box facility.
Mansfield Football-Netball Club
70% weekend oval use year round for football and cricket. 70% usage midweek due to school use, football/cricket training Football Netball Club: Approx. 700 members in 2017, up from 590 in 2013 (includes non-playing members). 75% are male, 90% are aged over 18 years. Average 20-30 hours per week In-Season use and 5-10 hours Out of Season.
Not in Council asset register
Council Approx. 650k for the recreation reserve redevelopment. Total project cost was 2.2m. Works included realigning oval, tiered seating, construction of 2 netball courts and netball pavilion, installation of lighting for oval and netball courts.
13
14 | P a g e Sports Facilities Strategy: Final report
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
Mansfield Junior Cricket Association Other users:
30 members (down from 50 in 2015). 95% are male and all aged under 18 years. In 'Season': 5-10 hours per week. Weekday - After 4pm 80-100% of total use. Mansfield Soccer Club Mansfield Junior Football Club Mansfield Secondary College Mansfield Primary School Auskick
4. Mansfield Recreation Reserve – Netball facilities
Highett Street Mansfield
Netball pavilion. 2 outdoor netball courts/one with multipurpose basketball/netball rings
Mansfield Football-Netball Club (senior) Mansfield Junior Netball Club
Football Netball Club: Football/Netball Club combined membership approx. 700 members in 2017, up from 590 in 2013 (includes non-playing members). 75% are male, 90% are aged over 18 years. Average 20-30 hours per week In-Season use and 5-10 hours Out of Season. 150 (up from 110 in 2013). All aged under 18 years. 99% female. In 'Season': 20-30 hours per week. Out of 'Season': Less than 5 hours per week. Weekday - After 4pm 80-100% of total use Saturday & Sunday 10-20% of total use.
Not in Council asset register
Council As above
14
15 | P a g e Sports Facilities Strategy: Final report
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
5. Mansfield Recreation Reserve – Skate Park
Highett Street Mansfield
Skate park Community Informal use Not in Council asset register
Council $100,000 capital for Youth Hub (skatepark) development
6. Lords Reserve Cnr. Victoria & Apollo Streets Mansfield
Cricket oval (fenced), basic (old) clubroom and public toilets
Delatite Cricket Club Mansfield Junior Football Club Mansfield District Soccer Club Croquet Club Little Athletics Other uses:
45-55 members. 75% are male and aged over 18 years. In 'Season': 20-30 hours per week. Out of 'Season': 5-10 hours per week. 150-165 members. 90% are male. All aged under 18 years. In 'Season': 10-20 hours per week. Out of 'Season': Less than 5 hours per week. Saturday 60-80% of total use. 3 hours per week in season, approx. 80 players. 60-64 members. 73% are female and aged over 50 years. Usage: 5-10 hours per week year round. 3 hours per week in season Mansfield Primary School
Clubroom 30 years, Public toilet 20 years. Oval not in council asset register
Council manage oval, user groups manage clubroom
Nil
7. Mansfield Bowling Club
Ailsa Street Mansfield
2 greens (1 turf, 1 synthetic), lighting, clubrooms
Mansfield Bowling Club Inc
N/A Not in Council asset register
Private Nil
15
16 | P a g e Sports Facilities Strategy: Final report
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
8. Mansfield Golf Club
Kidston Parade Mansfield
18 hole golf course, licensed bistro & gaming
Member and public access.
452 members. 29 under the age of 18/
Unknown Private Nil
9. Mansfield Tennis Centre
Elvins Street Mansfield
10 sand-filled grass courts (4 with lighting), clubroom
Mansfield Tennis Association
175-185 members. 50% male, 50% female. 70% aged over 18 years. 35% aged over 50 years. In 'Season': 30-40 hours per week. Out of 'Season': 10-20 hours per week. Weekday - After 4pm 60-80% of total use.
25 years for club rooms and toilets
Council. User group CoM
$20,000 in the 16-17 financial year for development of All-ages development area (Hot shot Courts).
10. Mansfield Botanic Park
High Street Mansfield
Junior cricket oval (not fenced)
Junior cricket N/A Not in Council asset register
Council Nil
11. Additional Playing Fields
Reynolds Street Mansfield
Large rectangular playing surface suitable for multiple soccer fields (site partially irrigated). Joint use with MSC.
Soccer (playing fields not available for use until late 2018) MSC
N/A 430 students. 50% male, 50% female. Usage: 10-20 hours per week. Weekday - daytime 80-100% of total use.
Not in Council asset register
Dept. of Education / Council
Council contribution to original development works approx. $500,000. Council contribution to rectification works $350,000.
12. Mansfield Showgrounds
Mt Battery Road Mansfield
Pavilions, arenas etc. for A&P Society show
Mansfield Agricultural & Pastoral Society Mansfield Pony Club
N/A 50 members (down from 65 in 2013). 98% are female and aged under 18
Not in Council asset register
Jointly owned by private owners and Crown / CoM
Nil
16
17 | P a g e Sports Facilities Strategy: Final report
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
MADEC (Mansfield and District Equestrian Club) Other uses:
years. Usage less than 5 hours per week, year round. Sunday 80-100% of total use. 46 members (up from 35 in 2013). 93% are female. 98% are aged over 18 years. Usage less than 5 hours per week, year round. 20% are aged over 50 years. Sunday 60-80% of total use. Mansfield District Scouts
13. Mansfield Race Course
Mansfield-Whitfield Road, Mansfield
Racecourse, car parking, change rooms
Mansfield Racing Club
200 members (up from 90 in 2013). 60% male, 40% female. 40% aged over 18 years. 60% aged over 50 years. In 'Season': 5-10 hours per week. Out of 'Season': Less than 5 hours per week.
Not in Council asset register
Crown Land / CoM
Nil
14. St Mary’s Primary School (Mercy Centre)
Malcolm St Mansfield
Indoor single court basketball stadium.
Mansfield Basketball Association, suitable for Junior use only
N/A Not in Council asset register
St Mary's Primary
Nil
15. Riffle Butts Reserve
Riffle Butts Road, Mansfield
Riflebutts Reserve for MTB. 'Home' facilities for road events is local roads, mainly Mansfield-Whitfield Road. No 'home' facilities at all for BMX.
Mansfield Mt Buller Cycling Club
139 members (up from 89 in 2014). 80% are male. 33% under 18 years. 67% over 18 years. 28% over 50 years. 10-20 hours per week, year round. Weekday - daytime 10-20% of total use. Weekday - After 4pm 60-80% of total use.
Not in Council asset register
Parks Vic Nil
17
18 | P a g e Sports Facilities Strategy: Final report
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
Saturday 20-40% of total use. Sunday 20-40% of total use.
Other areas
16. Bonnie Doon Recreation Reserve
Zimmerman Avenue, Bonnie Doon
Sports oval, 1 netball, 1 tennis court (noncompliant size) and clubrooms.
Football, netball, tennis.
Bonnie Doon Football/Netball Club: 250 members. 37% are female. 6% are under 18 years. 94% are aged over 18 years. Tennis: 31 members (up from 18 in 2013). 70% are female. 60% are under 18 years. 30% are aged over 50 years. In 'Season': 5-10 hours per week. Out of 'Season': Less than 5 hours per week. Saturday 60-80% of total use.
Not in Council asset register
Crown Land / CoM
2015-16 - Council contribution to short term netball court rectification works - approx. $10k. Netball court project management and investigation work fees paid for by Council approx. $5k. 2015 Maintenance agreement between Council and CoM $2k.
17. Tolmie Recreation Reserve
Old Tolmie Road Tolmie
Multi-purpose grassed field with concrete cricket pitch Wood-chopping area
Annual Tolmie Sports Day Tolmie Riding & Equestrian Committee Farmers Market
Annual Tolmie Sports Day Not in Council asset register
Crown Land / CoM
Nil
18
19 | P a g e Sports Facilities Strategy: Final report
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
2 hard surface tennis courts
Tolmie Tennis Club
18. Merton Recreation Reserve
Euroa Road, Merton
Racecourse, cricket ground
Merton Racing Club
1 race day per year. 18 years for public toilet
Crown Land / CoM
Nil
19. Jamieson Tennis Court
Perkins Street Jamieson
Concrete surface tennis court
Casual community and school use
N/A Not in Council asset register
Crown Land / CoM
Nil
20. Jamieson Recreation Reserve
Licola Road Jamieson
Sports oval, concrete cricket pitch
Social sports, school programs, community events
N/A Not in Council asset register
Crown Land / Jamieson Community Group
Nil
21. Merrijig Primary School
Mt Buller Road, Merrijig
Tennis Courts, located in school grounds
Merrijig Primary and informal community use
N/A Not in Council asset register
Merrijig Primary
Nil
22. McCormack Park
McCormack Road, Merrijig
Rodeo grounds; campdrafting.
Merrijig Campdraft Association
230-250 member. 50% male, 50% female. 80% aged over 18 years. 40% over 50 years. In 'Season': 5-10 hours per week. Out of 'Season': Less than 5 hours per week. Saturday & Sunday 80-100% of total use.
Not in Council asset register
Private CoM Nil
19
20 | P a g e Sports Facilities Strategy: Final report
Ref. Facility Location Description User groups Usage Asset Approx. Age
Ownership / Management
Recent significant Council capital / renewal costs
23. Mansfield Clay Target Club
416 Pikes Rd Mansfield
Trap and other forms of clay target shooting
Mansfield Clay Target Club
40-45 members, 90% male, 95% over 18 years, 50% over 50 years old. Usage 5-10 hours per week year round. 80% weekday (before 4pm) and Sunday use.
Not in Council asset register
Private CoM Nil
24. Gough's Bay Gough's Bay Boat Club
Boating, Fishing Gough's Bay Boat Sport & Recreation Club
340 members (up from 180 in 2013). 60% male, 40% female. 70% aged over 50 years. In 'Season': 20-30 hours per week. Out of 'Season': 10-20 hours per week. Weekday - After 4pm 40-60% of total use. Saturday 20-40% of total use.
Not in Council asset register
Crown Land / CoM
Nil
25. Pistol Range Quarry lane, Mansfield
Pistol range and small clubroom.
Mansfield Pistol Club
Approx. 30 shooters. Activities conducted on weekends.
Crown Land Nil
20
21 | P a g e Sports Facilities Strategy: Final report
6. Demand Assessment In undertaking an assessment of likely future demand for sport facilities, consideration has been
given to the Strategic Context outlined in the previous section (i.e. population characteristics,
forecast growth, sport participation trends and planning influences) as well as the community
consultation results.
In addition, existing facility provision for a selection of popular sport facilities has been compared to
industry planning ratios and other similar townships. The use of ratios is not an exact science, nor is
it a one-size-fits-all approach. However in the absence of any specific industry 'authorised'
standards, the use of ratios continue to provide an effective guide to likely future sport facility
needs.
The table below identifies ratios that are commonly used across the local government industry and
compares current provision in Mansfield to two similar townships in terms of population size, ageing
community profile, regional service hubs and towns that receive seasonal or regular tourism influxes
similar to Mansfield.
Benchmark Ratio
Mansfield Kyneton Woodend
Sport facility : population
Population: 8,584 Existing actual ratio
Population: 8,923 Population 7,650
AFL Oval 1:4,500 2 1:4,292 2 2
Cricket Oval 1:3,000 3 1:2,861 3 2
Tennis courts 1:1,500 10 (4 lit) 1:858 10 (4 lit) 12 (7 lit)
Outdoor netball court
1:5,000 2 1:4,292 1 3
Indoor courts 1:7,500 1 1:8,584 2 1
Soccer 1:5,000 3 (inc MSC and Additional Fields)
1:2,861 2 0
Lawn Bowls Green
1:10,000 2 1:4,292 3 2
Aquatics 1:50,000 (indoor)
1 (outdoor) 1:8,584 1 (indoor) 1 (outdoor)
BMX track N/A 0 0 1 0
Analysis of the table highlights that with the exception of indoor courts, the level of core sport
facility provision within Mansfield is higher than benchmark ratios. The level of provision is also
directly comparable to both Kyneton and Woodend which both have similar populations and
characteristics.
Analysis reinforces that Mansfield is well serviced by existing facilities and that these generally have
the capacity to accommodate additional use, however this will require ongoing asset renewal,
refurbishment and careful management and maintenance in order to ensure all facilities are capable
of accommodating future demands for community use.
With the possible exception of indoor courts – which are operating at or near capacity - existing
sport facilities (with appropriate refurbishment or renewal) should be capable of accommodating
the community’s needs over the next ten years.
However, when coupled with an ageing community profile and changing participation preferences,
demand for activities that cater for adults and indoor activities can be expected to increase,
including non-club based, informal recreation participation opportunities.
21
22 | P a g e Sports Facilities Strategy: Final report
7. Strategic Action Plan The Sports Facilities Strategy has been developed to build on the existing Mansfield Shire Sport and
Recreation Strategy (2014-2019) to better understand the current and likely future sport facility
needs of the community and to develop a framework for future management and resource
allocation.
Appendix 1: Sport and Recreation Management Framework outlines Council’s recommended role in
supporting sport and recreation and defines asset maintenance, development, improvement and
replacement responsibilities.
Appendix 2: Draft Funding Framework outlines a recommended approach for the assessment and
prioritisation of sport or recreation based Capital Works projects in order to assess relative priority
and outlines a number of potential external funding sources.
The following section provides a prioritised Action Plan to guide future capital resource allocation
above and beyond existing ongoing operational maintenance activities. The Action Plan outlines
potential investment of in excess of $8.6million in community sport facilities over the next ten years
– subject to availability of both internal and external funding.
Two ‘major’ sport facility projects are included as priorities in the Action Plan, specifically
development of a new multi-use sports pavilion to service Lords Oval (@ $750k) and joint
development of a new 2-court indoor sports stadium in partnership with Mansfield Secondary
College (@ $7.5mil) – both of these projects have the capacity to attract external funding and
therefore these figures do not represent the total cost to Council.
The existing facilities servicing Lords Oval are grossly inadequate, are nearing the end of their useful
asset life and fail to meet contemporary provision standards. It is recommended existing assets (i.e.
public toilets and club room) be replaced with a new shared use pavilion (i.e. single building) on the
same site. The same site is preferred as it allows for effective connection to existing services;
provides close proximity to the primary school, enhances reserve functionality and allows retirement
of outdated assets.
Development of a new 2-court sports stadium is recommended (subject to detailed feasibility study)
as the existing single court facility is at capacity. Basketball and school activities dominate existing
usage. Development of a 2-court facility will increase programming flexibility and operational
sustainability - for basketball and other sports - including freeing space at the existing single court
stadium to allow new programming options to service community needs.
The Action Plan on the following pages outlines the recommended sport facility improvement
projects over the next ten years.
Council’s Sport and Recreation Officer will play a lead role in leading the implementation of these
actions, however a collaborative approach to implementation is likely to be required depending on
specific projects, including internal and external partnerships. This includes other Council
departments, community clubs, groups, service providers and agencies of state and possibly federal
government.
Council will need to actively pursue internal and external funding opportunities to support
implementation as required. Ultimately funding and timing of implementation will be subject to
Council’s financial capacity, competing demands, partnership opportunities and availability of
22
23 | P a g e Sports Facilities Strategy: Final report
external grants. Individual projects will be considered each year for resource allocation as part of
Council’s annual budget preparation process.
23
Ref. Facility Recommended directions Summary Rationale Priority Comment
2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 Total External funding opportunities noted where
relevant
1 Mansfield
Secondary College
Undertake a feasibility study, including design concept,
site master plan and joint use agreement arrangement
with Mansfield Secondary College / Department of
Education for development of a multi-use 2-court indoor
stadium adjacent to the Additional Playing Fields
(potentially incorporate change rooms and storage
facilities to service the playing fields).
The existing single court facility is at capacity. Basketball
dominates existing usage. 2-courts will increase programming
flexibility and operational sustainability (for basketball and other
sports).
Freeing space at the existing single court stadium will allow new
programming options to service community needs.
High $40,000 $4,000,000 $3,500,000 $7,540,000 Subject to feasibility study outcomes and detailed
designs. Possible funding mix:
Council - $2-$2.3mil
DEET - $2.25mil
SRV - $3mil
2 Mansfield
Recreation Reserve
(Netball Courts)
Retain and maintain the existing facilities. No major new
works proposed.
Work with the club to address minor request, e.g. storage and
surface protection.
Additional courts are not supported having regard to site spatial
constraints and overall demand (additional use of the existing
stadium court for training may be available if a new joint use 2-
court facility established).
High $5,000 N/A N/A N/A N/A N/A N/A N/A N/A N/A $5,000 Allowance for surface protection and possibly
additional storage (pending confirmation with
Netball club).
Undertake works as required as part of existing
asset maintenance programs.
3 Lords Reserve Develop a multi-use sports pavilion to service Lords
Reserve (demolish and replace existing club room and
public toilets and replace with an all new facility on the
same site) - High priority.
Upgrade/replace cricket nets - Low priority.
Existing facilities are grossly inadequate, are nearing the end of
their useful asset life and fail to meet contemporary provision
standards. Replace the existing assets with a new shared use
pavilion (i.e. single building) on the same site. The same site is
preferred as it allows for effective connection to existing services;
provides close proximity to the primary school, functionality and
allows retirement of outdated assets.
Existing cricket nets are adequate, however will require
replacement in the longer-term.
High $400,000 $350,000 N/A N/A N/A N/A N/A $60,000 N/A N/A $810,000 Spread pavilion construction over two years.
Potential external funding (SRV) $300k.
Cricket net replacement in 2025/26.
4 Additional Playing
Fields
Complete establishment of the Additional Playing Fields. Soccer to be relocated to the Additional Playing Fields from Lords
Reserve.
High TBC TBC TBC TBC TBC TBC TBC TBC TBC TBC $0
5 Mansfield
Showgrounds
Improve the surface of the grass arena / oval (i.e. top
dressing, leveling).
Support club efforts for building maintenance (refer to
responsibilities in Appendix), including establishment of
joint-use facilities for the Pony Club and MADEC.
Investigate options to improve water facilities and toilet
block refurbishment.
Support female participation sports/activities. High N/A $25,000 $50,000 $50,000 N/A N/A N/A N/A N/A N/A $125,000 Allowance for arena re-surfacing, water facilities,
toilet block refurbishment and minor works to
existing buildings to allow joint use.
6 Mansfield Race
Course
Facilitate discussions with the CoM to support the Cycling
Club use of the reserve, including establishment of a BMX
track, start/finish for road racing and club room facility as
part of broader pavilion improvement works.
Work with the CoM to scope power and water (irrigation)
upgrade requirements and explore possible funding
sources.
Support facility upgrades that encourage multi-use. Cycling has a
high participation rate and adds to the diversity of opportunities
to participate in physical activities in the Shire.
High $20,000 $50,000 $15,000 N/A N/A N/A N/A N/A N/A N/A $85,000 Allowance for BMX track, pavilion renovations
and service upgrades.
Undertake works as required as part of existing
asset maintenance programs.
7 Riffle Butts Reserve Advocate / partner with Parks Vic to establish appropriate
public toilet and trail head facilities at Riffle Butts reserve
to support ongoing MTB use.
Riffle Butts Reserve provides a unique MTB facility servicing the
region. Appropriate support facilities and basic infrastructure is
required to support use and discourage environmental damage
from inappropriate activity.
High N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A $0 Ongoing maintenance will be required by Parks
Vic.
8 Bonnie Doon
Recreation Reserve
Support CoM efforts to implement the Strategic Plan, in
particular development of a Master Plan for the entire
reserve; tennis/netball court renewal; and ongoing
maintenance of the oval and surrounds.
Support multi-use facilities and community recreation/social hub. High $15,000 $60,000 $60,000 N/A N/A N/A N/A N/A N/A N/A $135,000 Allowance ($15k) for contribution to
development of a Master Plan for the reserve.
Allowance ($120k) for tennis / netball court
upgrade /replacement over two financial years.
Undertake works as required as part of existing
asset maintenance programs.
Future asset development costs to be determined
via the Master Planning process.
Mansfield Shire Sport Facilities Strategy - Action Plan Indicative Council Capital Costs - beyond existing/ongoing maintenance
24
Ref. Facility Recommended directions Summary Rationale Priority Comment
2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 Total External funding opportunities noted where
relevant
9 Gough's Bay Sport
& Recreation Club
Consider options to improve external lighting and building
security.
Work with the club to scope facility upgrade requirements
and suitability of the project for possible external funding
(e.g. SRV, RDV), including roads, car parking and access
improvements as required.
Strong club membership. Mixed gender use. High proportion of
older age groups.
High $5,000 N/A N/A N/A $100,000 N/A N/A N/A N/A N/A $105,000 Allowance for immediate security
lighting/improvements and refurbishment of
kitchen/social facilities in future years.
Undertake works as required as part of existing
asset maintenance programs.
10 Mansfield
Swimming Pool
Retain and maintain the existing aquatic facilities for
broad community use.
Undertake modest upgrade of existing change room
facilities to help extend the asset life and improve user
amenity.
Undertake a feasibility study (and concept plan) for future
asset renewal or replacement.
Explore options with the venue operator (i.e. YMCA) to
improve play options and appeal - e.g. inflatables and
programming for youth.
Despite development of an indoor aquatic facility being identified
as a community priority in current and previous planning projects,
it is beyond the current financial capacity of the Shire to provide.
Capital development and ongoing operating costs associated with
contemporary indoor aquatic facilities are significant and
generally require catchment populations of in excess of 50,000
people to provide a level of financial return (whilst still operating
at significant ongoing cost to Councils).
Closely monitor useful asset life - Council should start planning
(i.e. establish capital reserve fund) for complete asset
replacement in the foreseeable future (e.g. 10-15 years). Future
replacement will need to consider contemporary aquatic facility
needs (e.g. warm water, indoor) having regard to the
organisations financial capacity to develop and operate.
Medium $20,000 $20,000 $20,000 $20,000 $120,000 $25,000 $25,000 $25,000 $75,000 $25,000 $375,000 Based on existing average annual maintenance
costs.
Allowance ($100k) for change room renewal in 5-
years, plus allowance ($50k) for new facility
planning commencing in 2026.
11 Lords Reserve Install lights for sports training - Medium priority. Training lights will help spread wear and tear from the main
recreation reserve. As a winter sport, opportunities for club
training are limited without lighting.
Medium N/A N/A N/A N/A $40,000 $40,000 N/A N/A N/A N/A $80,000 Allowance for training lights.
12 McCormack Park Work with the Campdraft Association to scope options for
power upgrade and basic amenities provision.
Explore possible external funding support.
Ensure the access road is included on Council's
maintenance program and consider additional service
before and after major events.
Strong club membership and profile (age and gender).
Equestrian activities remain popular in the Shire.
Ensure there are appropriate legal arrangements (e.g. lease,
license) securing appropriate tenure/access to the site for
ongoing use for rodeo and campdrafting prior to considering
asset development or financial support on private land.
Medium N/A N/A N/A N/A N/A $15,000 $15,000 N/A N/A N/A $30,000 Allowance for contribution to power and toilet
provision.
Undertake works as required as part of existing
asset maintenance programs.
13 Mansfield Tennis
Centre
Retain and maintain the existing facilities.
Establish Hot-Shots Court area.
Upgrade/formalise car parking - Low priority.
Upgrade toilets / amenities - Medium/Low priority.
Despite changing participation preferences, tennis remains a
popular sport for both males and females in the Shire and is
suitable for all ages. Existing toilets/amenities are ageing and
require refurbishment to meet contemporary expectations and
standards.
Low N/A N/A N/A N/A N/A N/A $100,000 $50,000 N/A N/A $150,000 Allowance for amenities and car parking
refurbishment.
14 Mansfield Clay
Target Club
The club advised that they have recently received a Govt.
grant of $20,000 to undertake a number of small
improvements.
Council to meet with the club to confirm future priorities
for possible Council support - including encouraging
participation.
Shooting sports remain popular within the Shire, particularly for
older males - thereby providing an avenue for ongoing
involvement in community sport.
Ensure there are appropriate legal arrangements (e.g. lease,
license) securing appropriate tenure/access to the site for
ongoing use for shooting club activities prior to considering asset
development or financial support on private land.
Low N/A N/A N/A N/A N/A N/A N/A $10,000 $10,000 N/A $20,000 Allowance to support facility improvements.
Undertake works as required as part of existing
asset maintenance programs.
15 Mansfield Sports
Complex
Retain and maintain the existing sports complex for multi-
purpose use.
Facility is suited to servicing the ageing population profile and
changing participation preferences (i.e. indoor activities, less
formal sport).
Ongoing $20,000 $20,000 $20,000 $20,000 $20,000 $25,000 $25,000 $25,000 $25,000 $25,000 $225,000 Based on existing average annual maintenance
costs.
16 Mansfield Sports
Complex
(Gymnastics)
Pending outcomes from the feasibility study, relocate
basketball to a new joint-use 2-court facility, thereby
increasing flexibility for alternative uses and programming
of the existing stadium (including gymnastics).
Consideration could be given to including a dedicated space for
gymnastics at the new stadium, however gymnastics usage is
currently fairly low (i.e. 65 members, approx. 2.5 hours per week)
and unlikely to increase significantly associated with population
growth or demographic profile of the community. Therefore it is
recommended that gymnastics remain at the existing Sporting
Complex and continue to share space with other activity
programming.
Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A It is acknowledged that packing up and setting up
equipment can be a constraint to further usage
and programming options at the existing shared
use venue.
Indicative Council Capital Costs - beyond existing/ongoing maintenance
25
Ref. Facility Recommended directions Summary Rationale Priority Comment
2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 Total External funding opportunities noted where
relevant
17 Mansfield
Recreation Reserve
(Social and Change
Rooms)
Retain and maintain the existing facilities. No major new
works proposed during the life of this strategy.
Redevelopment/renewal of the social room and change rooms
are not considered a financial priority for Council contribution
during the life of this plan (i.e. investment is required in other
facilities to service community needs having regard to Council's
overall financial capacity).
Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
Planning consideration could be given to joint
use/development of future aquatic facilities and
recreation reserve social rooms and change
rooms as part of a single consolidated facility on
the site in the future (i.e. consider as part of
future Aquatic Facility Master Planning/Feasibility
study included above).
18 Mansfield Bowling
Club
No works proposed. Provide Club development and training support as required. Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
19 Mansfield Golf Club No works proposed. Provide Club development and training support as required. Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
20 Mansfield Botanic
Park
Retain and maintain the existing facilities. No major new
works proposed.
Provide Club development and training support as required. Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
21 Tolmie Recreation
Reserve
No works proposed.
Provide support to the CoM for the Annual Sports Day as
required.
Provide Club development and training support as required. Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
22 Merton Recreation
Reserve
Retain and maintain the existing facilities. No major new
works proposed.
Provide Club development and training support as required. Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
23 Jamieson Tennis
Court
Retain and maintain the existing facilities. No major new
works proposed.
Provide Club development and training support as required. Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
24 Jamieson
Recreation Reserve
Retain and maintain the existing facilities. No major new
works proposed.
Provide Club development and training support as required. Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
25 Mansfield
Recreation Reserve
Retain and maintain the existing facilities. No major new
works proposed.
Provide Club development and training support as required. Ongoing N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Undertake works as required as part of existing
asset maintenance programs.
$525,000 $525,000 $4,165,000 $3,590,000 $280,000 $105,000 $165,000 $170,000 $110,000 $50,000 $9,685,000
Indicative Council Capital Costs - beyond existing/ongoing maintenance
26
24 | P a g e Sports Facilities Strategy: Final report
8. Appendices The following appendices are included:
Appendix 1: Sport and Recreation Management Framework
o Outlines capital development, improvement and replacement responsibilities.
o Defines maintenance responsibilities for sports facilities and playing fields.
Appendix 2: Draft Funding Framework
o Outlines Council’s approach for the assessment and prioritisation of sport or recreation
based Capital Works projects and potential external funding sources.
Appendix 3: Priority Project Indicative Concepts
o Illustrative concepts to be developed – confirmation of functional brief required.
27
25 | P a g e Sports Facilities Strategy: Final report
Appendix 1: Sport and Recreation Management Framework The following appendix outlines a management framework to guide Council’s future involvement in
sport and recreation facility, infrastructure and service provision.
Infrastructure Development and Maintenance Guide The following section has been developed as a template to guide Council service levels and
responsibilities for sport and recreation facility management having regard to industry best practice
and the realistic capacity of key stakeholders, community groups and reserve users.
The guide recognises that there are shared responsibilities between Council and the community for
the development and maintenance of sporting and recreation facilities.
The guide also assists to enhance positive user attitudes, responsibility and ownership towards
publicly-owned sport facilities, especially where users have contributed to their development and
maintenance.
The service guide applies to all publicly-owned sporting and recreation facilities or spaces located
within Mansfield Shire, including outdoor facilities, playing surfaces (ovals, courts, greens), buildings,
other supporting infrastructure (car parks, flood lights, fences, etc.) and the open space areas within
or immediately surrounding the designated sport or recreation facility.
The following statements provide a framework, or context, for the establishment and application of
the Infrastructure Development and Maintenance Guide.
i. Council acknowledges that it has a responsibility for the provision of core infrastructure
at public recreation reserves that supports community participation in a range of sports
and physical activities. In this context, core responsibility areas relate to the playing
surface/area, change amenities and safe access to/from the facility.
ii. Council will aim to maintain playing surfaces to a level commensurate with the level of
competition that the user group(s) participates in, and the level of use that the ground
receives.
iii. Sporting and recreation facilities will have a basic range of infrastructure suitable for a
sport to be played at the level consistent with local sport association requirements or
relevant standards.
iv. All new (or modified) sporting and recreation facilities will incorporate Universal Design
Principles.
v. Council recognises the value of - and may provide incentives for - user group
contributions to the capital development of facilities, the maintenance of facilities, and
the periodic replacement of playing surfaces over the asset lifecycle.
vi. User groups will generally be expected to (at least partially) finance any approved
Capital Works designed primarily for the clubs to raise revenue as a result of that
infrastructure. Examples may include reserve perimeter fences (for the purpose of
charging a ground admittance), advertising or sponsor signage, extensions to canteens
beyond basic robust kitchen facilities or the development or upgrade of club social
areas.
vii. Council will enhance the long term viability of sports facilities (and user groups), by
ensuring that:
28
26 | P a g e Sports Facilities Strategy: Final report
o Clubs do not over-capitalise on developments.
o Clubs are able to demonstrate a sound history of fiscal responsibility and provide
evidence of appropriate financial planning prior to approval being granted for large
capital improvement projects.
o Facilities are located and designed in order to maximise opportunities for broad
community use where appropriate to do so.
o Facilities are developed and maintained in a safe state.
viii. Clubs undertaking minor maintenance works must comply with relevant building codes
and regulations.
ix. Prior to commencement of any significant capital improvement projects, user groups
will require written approval/support from all other regular users of the reserve/facility
and from Council.
x. The responsibility of curating turf cricket wickets and practice pitches (where available)
will be the sole responsibility of the user group, and shall be undertaken in accordance
with relevant industry guidelines.
xi. Council may choose to close any sports field as a result of wet weather or hard surfaces
(or for other safety reasons) if damage to the ground or injury is likely to occur as a
result of use, and/or if additional cost will be incurred by Council by that use.
xii. Floodlights will be approved (subject to Town Planning approval) where an increase in
sports participation is likely to result and/or to minimise risk of injury through improved
management of the use of playing fields.
The following table identifies infrastructure items and the group(s) with the whole or partial
responsibility for their initial provision, and for their subsequent development and improvement.
The capacity of Council to deliver its infrastructure components will be dependent upon annual
budget allocations.
As such, Council will place a priority on meeting its obligations to provide basic sporting and
recreation infrastructure as outlined below – “Council only” before assisting with “Shared” or “User
Group” responsibilities.
For infrastructure where Council has no whole or partial responsibility for its provision or funding,
Council may support an application by a user group to an external funding source where there will
be demonstrable community benefits.
General conditions for all development projects:
No fixtures, alterations or additions may be made to any part of a pavilion, playing surface or
surrounding open space without written consent of Council.
All works and improvements to any part of a pavilion, playing surface or surrounding open space
must be authorised in writing by Council.
29
27 | P a g e Sports Facilities Strategy: Final report
Capital Development, Improvement and Replacement Responsibilities
Infrastructure Component Council Only User Group
Responsibility Shared Responsibility
Pavilion and surrounds
Player change rooms, toilets, showers
Basic provision as determined by Council having regard to industry standards
Additions / extensions
Social Rooms
Additions / extensions
Club contributions encouraged
Canteen & Equipment
Basic provision of facility (not equipment) as determined by Council
Equipment and consumables
Meeting Room
Council may contribute where general community usage may be applicable
Office
Umpires/Referees change room (provision for males/females)
Basic provision as determined by Council
Additions
Storage room
Basic provision as determined by Council
Beyond basic provision
Covered area for spectators
Basic provision to be included in design as determined by Council
Public toilets
Reserve fencing
As determined by Council
In circumstances where tenant club is sole beneficiary of works
In circumstances where personal safety is a consideration, e.g. roads
Access paths and car parking
Playing Area
Sports fields (includes basic sub-surface irrigation and drainage infrastructure)
Centre cricket pitch
For new cricket oval developments
Surface replacement
As determined by Council, e.g. renewal, relocation, extension
Cricket practice nets
30
28 | P a g e Sports Facilities Strategy: Final report
Infrastructure Component Council Only User Group
Responsibility Shared Responsibility
Perimeter fencing on sports fields
For new oval developments as determined by Council
For existing ovals where a fence is required by a club
Replacement of existing fences as determined by Council.
Scoreboard
Initial basic level of provision
Asset upgrade and renewal
Coaches boxes
For new playing field developments as determined by Council
Maintenance and renewal of existing
Goal posts/nets
For new playing field developments as determined by Council
Maintenance and replacement as required
Goal post padding as required.
Tennis courts/netball association courts (i.e. that hold weekly multi-club competition)
New courts as determined by Council
Maintenance and renewal
Flood lighting – training standard
New multi-use locations
Upgrades to meet recommended standards
Flood lighting – competition standard
Council may consider a contribution where broad community benefit is achieved
Outdoor netball courts at football grounds
As determined by Council
Additional courts, or conversion to synthetic surface
Equestrian Facilities
Jumps and arena, etc.
Basic club room and secure storage facilities
All other sporting facilities
Considered on a case by case basis
31
29 | P a g e Sports Facilities Strategy: Final report
Delineation of Responsibilities for the Maintenance of Sports Infrastructure
The following table clarifies and refines existing maintenance responsibilities for sporting and
recreation infrastructure and equipment. Council’s responsibilities are subject to resource and
program allocations.
A general condition for all maintenance projects is that no fixtures, alterations or additions may be
made to any part of a pavilion, playing surface or surrounding open space without written consent of
Council.
Sports Pavilions - Club Rooms & Change Rooms
ITEM COUNCIL RESPONSIBILITY USER GROUP RESPONSIBILITY
ELECTRICAL ** Any works undertaken must have written Council approval prior to works beginning and be
carried out by a qualified contractor
Electric wiring and fittings in
building All building wiring from the main supply
to and including the switchboard
No responsibility
Light fittings and globes Repair or replace faulty fittings Keep clean
Replace globes/lamps (energy efficient
‘bulbs’ recommended)
Cost of repairs if damage caused by misuse
Cost of any additional light fittings required
by group
Ceiling fans No responsibility Purchase, maintenance, installation, repair
and replacement costs
Exhaust fans Initial installation of basic equipment
only
Keep clean and maintain in operable
condition
Cost of repair and replacement as required
Power Points Repair or replace faulty power points Cost of any additional power points
required by group
Tag & Testing of non-
hardwired electrical equipment No responsibility Tag & Testing as per legislation by a
licensed contractor
PLUMBING** Any works undertaken must have written Council approval prior to works beginning and be
carried out by a qualified contractor
Internal toilets Installation, maintenance, repair and
replacement costs due to unit age or
fault
Internal repairs due to misuse
Keep clean and maintain in operable
condition
Supply toilet paper
Plumbing and fixtures,
including hot water services Major maintenance
Repair or replacement due to item age
or fault
Internal repairs due to misuse, includes
shower drains blocked by dirt, grass
clippings and other debris
All costs associated with additional fixtures
not standard within the building
ESSENTIAL SERVICES
Fire Extinguishers, hydrants
and hose reels Initial installation and servicing Cost of replacement due to misuse
Emergency and exit lighting Installation, maintenance, repair and
replacement costs
Report any faults to Council
32
30 | P a g e Sports Facilities Strategy: Final report
ITEM COUNCIL RESPONSIBILITY USER GROUP RESPONSIBILITY
Essential Services
(incl. smoke alarms, fire exit
doors)
Maintenance of essential safety
measures to an operational level
Ensure emergency floor plans are
current
Induction of facility users
Ensure emergency floor plans are visible at
all times
SECURITY
External Locks and Keys Require access to the building
Require access to electrical switchboard
and meter boxes
Purchase, installation, maintenance, repair
and replacement costs
Cost of additional and replacement of lost
keys
Ensure Council is provided a key to access
the building, switchboard and meter boxes
Any change to external locks/ door
hardware must be approved in writing by
Council prior to works to ensure that
Building Code requirements are met
Security System No responsibility Purchase, installation, service and
maintenance
Key or PIN number must be supplied to
Council
Security lighting around
pavilion Initial installation in new ore
redeveloped facilities
Maintenance, repair or replacement due
to age or structural fault
Cost of any enhancements
Vandalism (internal) No responsibility except where damage
exceeds Council’s excess (approx.
$3000). Council to submit claim
Cost of all repairs up to Council’s insurance
excess
Vandalism (external) Structural repairs Maintenance, cleaning and painting as
required
BUILDING FABRIC
Windows Major structural maintenance
Repair or replacement due to item age
or fault
Keep clean
Repairs due to misuse
Painting of ceilings, walls and
other surfaces Initial painting as part of pavilion
construction
External painting
Internal painting
Ceilings Major structural maintenance Repairs due to misuse
Doors
Major structural maintenance (excluding
cupboard doors and fittings)
Maintenance, repair and replacement of
all external doors
Replacement of all internal doors due to
age
Regular cleaning and repair due to misuse
Maintenance and repair of all internal
doors including cupboard and storeroom
doors
Any change to external locks/ door
hardware must be approved in writing by
Council prior to works to ensure that
Building Code requirements are met
Floor surfaces and coverings Initial installation of floor covering as
part of pavilion construction
Major structural maintenance
Any repair, maintenance, upgrade and
replacement costs subject to Council
approval
33
31 | P a g e Sports Facilities Strategy: Final report
ITEM COUNCIL RESPONSIBILITY USER GROUP RESPONSIBILITY
Roofs All maintenance and repair costs No responsibility
Skylights Maintenance, repair or replacement due
to age or structural fault
Repair if damaged through misuse
Guttering Maintenance, repair or replacement due
to age or structural fault
No responsibility
External & internal walls Structural maintenance
External painting
Regular cleaning
Internal repainting as required
Repair if damaged through misuse
Building alterations Assessing all requests and if approved,
ensuring satisfactory completion of
work, even when totally funded by the
user group
Scope and document the specific
requirements of project associated with
building or facility alterations
Seek Council approval
INTERNAL FITTINGS
Window coverings No responsibility Purchase, installation, cleaning, repair and
replacement
Heating /Cooling fixtures Initial installation as part of capital
development or major renewal
Installation of additional (or new) heating
or cooling
Repair, replacement and maintenance
costs including annual inspections
Payment of all running costs
Other permanent fixtures Initial installation of basic equipment as
part of pavilion construction
Regular cleaning of all fixtures and
repair/replacement
CANTEEN / KITCHENS (where applicable)
Food handling areas Initial installation of basic cupboards,
sink and bench tops as part of pavilion
construction
Keep clean and maintain in accordance
with the Health Act
Upgrade and replacement costs
Stoves and cooking equipment Initial installation of basic equipment as
part of pavilion construction
Keep clean and maintain in operable
condition
Repairs, maintenance, upgrade and
replacement costs
Refrigerators and dishwashers No responsibility Purchase, installation, repair, replacement
and maintenance costs
UTILITIES
Water Initial installation of water supply as part
of pavilion construction
Any required maintenance, repair,
replacement or upgrade to the facilities
water supply
All usage and supply costs
Electrical Initial installation of electrical supply as
part of pavilion construction
Any required maintenance, repair,
replacement or upgrade to the facilities
electrical supply (including main
switchboard)
All usage and supply costs
Gas Initial installation of gas supply as part of
pavilion construction
All usage and supply costs
34
32 | P a g e Sports Facilities Strategy: Final report
ITEM COUNCIL RESPONSIBILITY USER GROUP RESPONSIBILITY
Any required maintenance, repair,
replacement or upgrade to the facilities
gas supply
Telephone and
communications No responsibility
All installation, connection, maintenance,
repair, replacement, upgrade and
usage/equipment costs
Rubbish
(within Council garbage
collection district)
Weekly emptying of reserve rubbish bins
as part of Council’s waste services
Picking up of rubbish around the pavilion
and reserve
Putting out bins for collection
All costs associated with garbage collection
including any additional bins
Rubbish
(outside Council garbage
collection district)
No responsibility Picking up of rubbish around the pavilion
and reserve
Removal of all rubbish
All costs associated with garbage collection
OTHER
Pavilion cleaning No responsibility Regular cleaning of the facility including all
associated costs
Covered areas for spectators –
attached to building Maintenance responsibility as per rest of
building
Cleaning
Signage Install, maintain and replace all essential
signage
Install, maintain and replace all Council
branded signage
Seek Council approval before installation of
signage
Install, maintain and replace all Club
branded signage
Pest Control All structural pest control i.e.: termites All other pest control as required
i.e.: mice, spiders, wasps etc.
Other equipment / facilities
added to pavilion by a Group
(incl. furniture)
No responsibility All maintenance, repair and replacement
costs
Insurance of equipment and contents
No Smoking Advise user groups of Council’s No
Smoking Policy
Ensure no smoking occurs in the building or
within 5m of any doorway or window
Notes:
Misuse: Use incorrectly, mistreat or abuse.
Working at Height: Club are not permitted to undertake any works above 2.1 meters without
meeting the appropriate OH&S requirements.
Approval: No work may begin until written approval has been received from Council.
Qualified trades: Any approved works undertaken must be carried out by a suitably qualified
contractor approved by Council.
Asset maintenance: If Clubs allow any installations to deteriorate to a condition that is a danger
to the community or is inappropriate for a built structure in a Council reserve, it will be removed
by Council and the Club will be charged accordingly.
35
33 | P a g e Sports Facilities Strategy: Final report
OVAL AND GENERAL RESERVE
ITEM COUNCIL RESPONSIBILITY USER GROUP RESPONSIBILITY
SPORTING OVAL
Oval fencing Fences around playing surface
Preference for black powder coated
cyclone fences
Major and minor maintenance where
funds allow
Undertake regular inspection of oval
fencing during season
Report any major structural damage to
Council
Damage caused by misuse
Fencing around reserve
Sponsorship signage Approval of location and type Seek Council approval before installation
Purchase, maintenance, repair and
replacement costs
Costs for installation and removal
Coaches boxes Approval of location and design Maintenance, repair and replacement costs
Scoreboards Approval or location and design Seek Council approval before installation
Purchase, installation, maintenance, repair
and replacement costs
All utility costs where applicable
Goal posts / goals No responsibility Purchase, installation, maintenance, repair
and replacement costs
Netting behind goals No responsibility Purchase, installation, maintenance, repair
and replacement costs
Cricket pitches – covering and
uncovering Covering and uncovering of the pitches
between seasons
Notify Council of the end/start of their
season
Levelling of soil during the season and
matches to maintain safety
Storage of covers at Council approved
location
Synthetic cricket pitches Installation and removal of rubber fleck
required for all season synthetic covers
Purchase, installation of pitch/cover,
maintenance, repair and replacement costs
Turf cricket pitches No responsibility All maintenance, including shaving of turf
tables if required
Ground lighting and poles
Some assistance with funding first set of
training lights
Some assistance with funding upgraded
set of training lights
No maintenance responsibility
Purchase, installation, maintenance, repair
and upgrade costs. Any works are to have
prior written approval from Council and be
undertaken by professional contractors in
accordance with all legislation and Council
requirements.
All utility costs
Any structural concerns or cracking should
be reported to Council immediately
Oval playing surface Grass cutting – to support playability
Turf restoration works
Top dressing
Weed control
Sports Ground Suitability Checks at the
beginning of the Summer and Winter
sports seasons
Undertake inspection of playing surface
before each use
Report any safety issues to Council
In partnership with Council preserve the
oval playing surface during periods of
extreme weather conditions
36
34 | P a g e Sports Facilities Strategy: Final report
ITEM COUNCIL RESPONSIBILITY USER GROUP RESPONSIBILITY
Additional mowing or maintenance to
improve playing surface
Ensure no vehicles (other than emergency
vehicles) are permitted on the playing area
unless prior permission is obtained from
Council
Irrigation & drainage Installation, upgrade, repairs and
maintenance
Operation of irrigation system
Report any malfunctions to Council
immediately
Line marking of sports field No responsibility Purchase and application (suitable non-
toxic, non-permanent materials only)
RESERVE GROUNDS (Area surrounding Oval)
Landscaping Develop, install and maintain Club / community projects to improve
general amenity – subject to Council
approval
Grass Cutting Basic maintenance to support amenity
and safety
Additional grass cutting
Pathways Develop, install and maintain No responsibility
Trees Tree inspections
Any tree works as required
Report any dangerous trees to Council
Rubbish Weekly emptying of reserve rubbish bins
as part of Council’s service contract
Picking up of rubbish around the pavilion
and reserve
Putting out bins for collection
All costs associated with garbage collection
including any additional bins
Reserve roads and car parks Development, upgrade, repairs and
maintenance
Reporting maintenance issues to Council
Public toilets Cleaning of public toilets as part of
Council service schedule
Development, upgrade, repairs and
maintenance
Club to advise Council of any additional
requirements due to large crowds –
additional cleaning may be required
HARD COURTS (Tennis, Netball, Basketball)
Hard courts Consideration of assistance with funding
initial development of courts, surface
upgrade and repair of structural defects
Seek Council approval for development of
any new courts or upgrade of existing court
Installation, maintenance, repair,
resurfacing and upgrade costs
Inspect and sweep court surface before use
Coaches boxes Initial installation as part of capital
development
Maintenance, repair and renewal as
required
Scoreboards No responsibility Seek Council approval before installation
Purchase, installation, maintenance, repair
and replacement costs
All utility costs where applicable
Goal posts / nets Initial installation as part of capital
development
Maintenance, repair and renewal as
required
37
35 | P a g e Sports Facilities Strategy: Final report
ITEM COUNCIL RESPONSIBILITY USER GROUP RESPONSIBILITY
Netting behind goals Initial installation as part of capital
development – if considered necessary
for public safety
Purchase, installation, maintenance, repair
and renewal as required
Sponsorship signage Approval of location and type Seek Council approval before installation
Purchase, maintenance, repair and
replacement costs
Costs for installation and removal as
required
Court lighting
Initial installation as part of capital
development
Maintenance, repair and upgrade as
required.
All utility costs
Any structural concerns or cracking should
be reported to Council immediately
OTHER ASSOCIATEDSPORTING FACILITIES
Cricket practice nets Approval of location and design
Some assistance with funding initial
installation
Seek Council approval before development
Purchase, installation, maintenance, repair
and renewal as required
Other equipment / facilities
added to the reserve grounds
by a group
No responsibility All maintenance, repair and renewal as
required
Insurance of equipment and contents
Notes:
Misuse: Use incorrectly, mistreat or abuse.
Working at Height: Club are not permitted to undertake any works above 2.1 meters without
meeting the appropriate OH&S requirements.
Approval: No work may begin until written approval has been received from Council.
Qualified trades: Any approved works undertaken must be carried out by a suitably qualified
contractor approved by Council.
Asset maintenance: If Clubs allow any installations to deteriorate to a condition that is a danger
to the community or is inappropriate for a built structure in a Council reserve, it will be removed
by Council and the Club will be charged accordingly.
38
36 | P a g e Sports Facilities Strategy: Final report
Appendix 2: Draft Funding Framework
Introduction / Purpose The Sport and Recreation Facility Development Funding Framework has been established to provide
a strategic and transparent approach for the assessment and prioritisation of sport or recreation
based Capital Works projects either generated internally or submitted to Council for consideration
by a club, community group, Councillor or other means.
Requests for Capital Works will be reviewed, evaluated, prioritised and implemented having regard
to the criteria outlined below and Council’s long-term strategic goals, operational requirements and
overall financial capacity.
Definitions 1. Capital Works for Council-owned assets with a Council contribution >$5,000:
o Purchase or construction of new assets.
o Capital renewal of existing assets which increases the service potential or extends the
life of an asset.
o Capital expansion which extends the standard and service capability of an existing asset.
2. Capital Works for Non Council-owned asset with a Council contribution >$5,000:
o Contribution to another organisation’s (public or private) capital project, where such a
project provides tangible benefits to the Mansfield Shire community.
Scope This funding framework will apply to all requests for Council funds required to partially or wholly
fund Capital Works projects (as defined above) to create, establish or improve sport and recreation
facilities or spaces, including open space areas, recreational or sporting buildings, sports playing
areas and associated infrastructure.
Requests for Capital Works Projects Requests for projects to be considered for inclusion in Council’s Capital Works Program may be
generated by one of the following ways:
By resolution of Council.
From a Councillor.
Internally from Council based on recommendations or principles outlined in adopted planning
documents.
From the community, either by a resident or by a community organisation.
As a result of mutually beneficial partnerships or funding opportunities.
Preliminary Review
All submissions will be initially reviewed to establish whether a project proposal:
Is a Mansfield Shire Council responsibility.
Is consistent with the definition of a Capital Works project.
Formal Review of Eligible Submissions
Eligible projects will be reviewed and prioritised by Council’s Recreation Office (or equivalent) and
relevant senior management using the following evaluation criteria and weightings.
39
37 | P a g e Sports Facilities Strategy: Final report
1. Fit with Endorsed Corporate Planning Strategies and Reports 25%
Does the project help Council achieve its Vision?
Is the project consistent with the Vision, Objectives and Principles outlined in the Sport
Facilities Strategy (2017)?
Is the specific project identified in an endorsed Strategy, Master Plan or other relevant
Council document, and what is its priority?
Will the project enhance operational efficiency and sustainability?
Is the project a responsibility of Council?
2. Participation / Involvement 25%
Will the project improve opportunities for residents to increase participation in physical
activity?
Will the project allow additional participation programming or activities to be undertaken?
Will the project increase opportunities for complementary multi-use?
Will the project improve opportunities for participation in governance, management or
involvement in sporting clubs or community groups?
Will the project increase the capacity for spectators and other non-player/participants (i.e.
contribute to social and community development benefits)?
Will the project cater for disadvantaged groups and/or target groups including females,
juniors and older adults?
3. Identified Need 25%
Is there evidence of community demand?
Is there evidence of a facility gap that the project addresses?
Does the project address issues of safety, risk management, Universal Design Principles
and/or Environmentally Sustainable Design?
Does the project maximise opportunities for multi-use, including by women, girls and older
adults?
Are there other community or private facilities nearby that could satisfy the identified need?
Will the project add value to existing facilities and improve the capacity to address identified
demands?
4. Financial Issues 15%
Is external funding committed, or is the likelihood of attracting future external funding high,
including government and non-government sources?
What is the cost/benefit of the project having regard to recurrent income, expenditure and
ongoing operational costs to Council?
Does an economic analysis of the project confirm viability (where applicable)?
What impact will the project have on the life of an asset?
What impact will the project have on ongoing maintenance obligations for Council and
community groups?
Does the project demonstrate adequate planning/consideration for eventual asset renewal
and lifecycle replacement?
Have any significant project risks been identified?
40
38 | P a g e Sports Facilities Strategy: Final report
What is the funding mix for the project? Does the project maximise leveraging opportunities
in the funding mix, including community contributions?
5. Urgency 10%
Is the project urgent due to contractual, safety or legislative requirements?
Will the project satisfy a government initiative or attract external support funding?
Is there an existing Council commitment to the project?
Does the project respond to environmental considerations or a natural disaster?
Potential Funding At the conclusion of the formal review process, a priority listing of all potential projects will be
established. Priority projects (based on the assessment results) will be considered for possible
external funding opportunities including the State Government Sport and Recreation Victoria (SRV)
annual Community Sports Infrastructure Fund (or equivalent).
The remaining projects and their priority order will be referred to Council’s annual budget process
for consideration for inclusion in Council’s annual Capital Works Program.
41
39 | P a g e Sports Facilities Strategy: Final report
Appendix 3: Priority Project Indicative Concepts High level schematic concept plans have been developed for the recommended pavilion/change
rooms at Lords Reserve – allowing potential staging of construction if required – and proposed two-
court stadium in collaboration with Mansfield Secondary College.
The concept plans are indicative / illustrative only with the primary purpose of supporting possible
external funding applications. More detailed site and facility specific planning will be required prior
to implementation.
Costs for construction of the stadium has been estimated at approximately $6.58mil, however this
excludes car parking, landscaping, external security lighting or escalation beyond 12 months.
Completed construction is not likely until at least 2022, therefore a total project cost of $7.5million is
included in the Action Plan.
Lords Pavilion has been costed in two stages in line with the indicative concept design. Initial cost
estimates have been provided for each stage based on traditional on-site commercial construction.
The indicative costs are $754,000 for stage one (i.e. change rooms and amenities) and $664,000 for
stage two (i.e. social/club rooms). The Action Plan includes an allowance of $750,000 for Lords
Pavilion as a high priority item. Future stages will be subject to available funding and/or
opportunities to deliver the project at a lower cost.
Recent industry experience from other LGA’s (e.g. City of Moreland) has seen success in the use of
modular, pre-fabricated sport pavilions and change room facilities being delivered for significantly
lower cost than traditional building approaches (i.e. 50-60% lower cost). Council may wish to further
investigate the possible use of modular construction options for the proposed facilities at Lords
Reserve. Such facilities have been shown to meet community need in the City of Moreland without
compromising on quality, functionality and asset life (i.e. buildings reportedly come with a 30
guarantee).
42
141 BURNLEY STREET, RICHMONDI N F O @ M A N T R I C . C O M . A UP : 0 3 9 4 2 1 6 2 6 6
WWW.MANTRIC.COM.AU
MANSFIELD SECONDARY COLLEGEOPTION 2a
1 : 5 0 0 @ A 3 . 1 3 M A R C H 2 0 1 8
3 4 7 C O P Y R I G H TF S - 1 1
0 ?? ?? ??
Stadium Stage 2
Hard Courts
Residential
Future Public Carpark
Change RoomsApprox. 120m2
Acc.Foyer
FA
Store65m2
Future Gym
AdminClnSt.
Entry
School Alternate Entry
Seating blocks indicated would suit 200 seat demand
43
Mansfield Secondary College(For Discussion)Mansfield Secondary College - Indoor Stadium
Preliminary - Opinion of Probable Cost
Preliminary Areas Analysis
AREA RATE ALLOWANCE
ZONE 1 128.00 $3,000.00 $384,000.00
ZONE 2 88.00 $2,500.00 $220,000.00
ZONE 3 2,042.00 $1,800.00 $3,675,600.00
ZONE 4 0.00 $2,800.00 $0.00
ZONE 5 SPARE 0.00 $0.00 $0.00
ZONE 6 14.00 $2,800.00 $39,200.00
Wall Grossing 113.60 $2,800.00 $318,080.00
Circulation 43.00 $2,800.00 $120,400.00
Sub-Total 2,428.60 $4,757,280.00 Rate : $1,958.86
Demolition $0.00
Car Parking (?? Spaces) allow $0.00
Covered Spetator Area 0 $750.00 $0.00
Mech plant platforms 45 $750.00 $33,750.00
Landscaping $0.00
Audio Visual Equip $5,000.00
Furniture & Equip $25,000.00
Lift & Stairs (Optional) If req'd?
Site Service $100,000.00
Authority $10,000.00
Sub-total $173,750.00
Design Contingency (5%) $246,551.50
Professional Fees (12%) $591,723.60
Construction Contingency (10%) $493,103.00
Escalation (12 month only 3%) $183,409.74
ESD Allowance (3%) $142,718.40
Construction Total $6,588,536.24 Rate : $2,712.89
Exclusions:
GST Demolition
Bored Piers & piles Hazardous Material Removal
Retaining wall Contaminated Soil
Up-grade to site service
Works beyond site
Qualification
The above opinion of probable cost has been prepared for initial discussion and budgetting only.
Further investigation and design analysis is required to verify this opinion. Verification should be
undertaken by a suitably qualified Quantity Surveyor.
28-May-18
44
141 BURNLEY STREET, RICHMONDI N F O @ M A N T R I C . C O M . A UP : 0 3 9 4 2 1 6 2 6 6
WWW.MANTRIC.COM.AU
LORDS PAVILIONOPTION 3 Stage 1
1 : 4 0 0 @ A 3 . 8 M A R C H 2 0 1 8
2 0 1 C O P Y R I G H TF S - 0 3 . 1
0 ?? ?? ??
8sq
mP
ublic A
cc
WC
20sq
mA
men
ity 2
55sq
mC
han
ge 2
55sq
mC
han
ge 1
20sq
mA
men
ities
1
8sq
m
Acc
Chan
ge
45
141 BURNLEY STREET, RICHMONDI N F O @ M A N T R I C . C O M . A UP : 0 3 9 4 2 1 6 2 6 6
WWW.MANTRIC.COM.AU
LORDS PAVILIONOPTION 3 Stage 2
1 : 4 0 0 @ A 3 . 8 M A R C H 2 0 1 8
2 0 1 C O P Y R I G H TF S - 0 3 . 2
0 ?? ?? ??
8sq
mP
ublic A
cc
WC
20sq
mA
men
ity 2
55sq
mC
han
ge 2
55sq
mC
han
ge 1
20sq
mA
men
ities
1
8sq
m
Acc
Chan
ge
28sq
mK
iosk
103sq
mS
ocial
3sq
mW
C2
3sq
mW
C1
15sq
mFirst A
id
13sq
mR
ef 1
4sq
mS
erv
13sq
mR
ef 2
10sq
mA
cc WC
18sq
mO
ffice
Service
cupbo
ards
46
j~åëÑáÉäÇ=pÜáêÉ=`çìåÅáä=Ecçê=aáëÅìëëáçåFiçêÇë=m~îáäáçå=cÉ~ëáÄáäáíó
mêÉäáãáå~êó=J=léáåáçå=çÑ=mêçÄ~ÄäÉ=`çëí
mêÉäáãáå~êó=^êÉ~ë=^å~äóëáë pí~ÖÉ=N pí~ÖÉ=O
^ob^ o^qb ^iilt^k`b
wlkb=N MKMM AMKMM AMKMM
wlkb=O pí~ÖÉ=N NSSKMM APIMMMKMM AQVUIMMMKMM AQVUIMMMKMM
wlkb=P pí~ÖÉ=O NQTKMM AOIRMMKMM APSTIRMMKMM APSTIRMMKMM
wlkb=Q pí~ÖÉ=O VQKMM AMKMM AMKMM
wlkb=R pm^ob MKMM AMKMM AMKMM
wlkb=S pí~ÖÉ=O NMKMM AOIRMMKMM AORIMMMKMM AORIMMMKMM
t~ää=dêçëëáåÖ OMKUR AOIRMMKMM AROINORKMM AOVINVMKMM AOOIVPRKMM
`áêÅìä~íáçå= MKMM AOIRMMKMM AMKMM
pìÄJqçí~ä QPTKUR AVQOISORKMM AROTINVMKMM AQNRIQPRKMM
råÇÉêÅçîÉê=~êÉ~ PP ANIOMMKMM APVISMMKMM APVISMMKMM
råÇÉêÅçîÉê=~êÉ~=ëí~ÖÉ=O SQ ANIOMMKMM ATSIUMMKMM ATSIUMMKMM
`~ê=m~êâáåÖ=EQM=pé~ÅÉëF bñÅäìÇÉÇ AMKMM
cìêåáíìêÉ=C=bèìáé AORIMMMKMM AORIMMMKMM
mêçÑÉëëáçå~ä=cÉÉë=ENRBF ANQVIPPSKQQ AUPISOUKQN ASRITMUKMP
^ìíÜçêáíó bñÅäìÇÉÇ AMKMM
aÉëáÖå=`çåíáåÖÉåÅó=ERBF AROIVRNKOR AOVISROKTM AOPIOVUKRR
`çåëíêìÅíáçå=`çåíáåÖÉåÅó=ENMBF AVQIOSOKRM AROITUTKMM AQNIQTRKRM
bëÅ~ä~íáçå=ENO=ãçåíÜ=çåäó=PBF APTIVORKOS AONIOPUKNQ ANSISUTKNN
bpa=^ääçï~åÅÉ=ESBF AMKMM
`çåëíêìÅíáçå=qçí~ä ANIQNUIRMMKQQ ATRQIMVSKOR @ ASSQIQMQKNV
bñÅäìëáçåëW
dpq aÉãçäáíáçå
i~åÇëÅ~éáåÖ e~ò~êÇçìë=j~íÉêá~ä=oÉãçî~ä
e~êÇ=m~îáåÖ=C=êÉí~áåáåÖ=ï~ää `çåí~ãáå~íÉÇ=pçáä
réJÖê~ÇÉ=íç=ëáíÉ=ëÉêîáÅÉ
bñíÉêå~ä=tçêâë
bñÅäìëáçåëW
qÜÉ=~ÄçîÉ=çéáåáçå=çÑ=éêçÄ~äÄÉ=Åçëí=Ü~ë=ÄÉÉå=éêÉé~êÉÇ=Ñçê=áåáíá~ä=ÇáëÅìëëáçå=~åÇ=ÄìÇÖÉííáåÖ=çåäóK
cìêíÜÉê=áåîÉëíáÖ~íáçå=~åÇ=ÇÉëáÖå=~å~äóëáë=áë=êÉèìáêÉÇ=íç=îÉêáÑó=íÜáë=çéáåáçåK==sÉêáÑáÅ~íáçå=ëÜçìäÇ=ÄÉ=
ìåÇÉêí~âÉå=Äó=~=ëìáí~Ääó=èì~äáÑáÉÇ=nì~åíáíó=pìêîÉóçêK
OUJj~óJNU
47
Draft Report V4, December 2017
Sport Facilities Strategy Background Research Report
48
PAGE
2
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Contents
Community Survey Results ..................................................................................................................... 3
Sports Club Survey Results .................................................................................................................... 12
Consultation Notes ............................................................................................................................... 25
Public Submissions: ................................................................................................................................. 25
Background Documents: ....................................................................................................................... 28
Demographic Characteristics and Profile .............................................................................................. 35
Industry Trends ..................................................................................................................................... 37
Financial Capacity ................................................................................................................................. 41
Demand Assessment / Needs Analysis ................................................................................................. 43
49
PAGE
3
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Community Survey Results Q1: The majority of the 159 respondents identified as a member of an existing sport or recreation club
in the Shire (i.e. 76.3% Yes; 23.7% No).
The most common clubs identified included Netball clubs 25.42%, Mansfield Tennis 15.25%, Delatite
Cricket Club 11.02%, Basketball clubs 10.17%, and the Mansfield District Equestrian Club 8.47%.
76.3%
23.7%
Are you currently a member of any specific sport or recreation clubs/groups based in Mansfield Shire?
Yes
No
50
PAGE
4
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q2: The majority of survey respondents regularly participate in sport and recreation activities (i.e.
83.6%)
Q3: Respondents identified more than 35 different sports and activities that they regularly patriciate in.
This reflects a good level of diversity and opportunities available in the Shire – many of which reflect the
geographic characteristics of the Shire, for example snow sports, hiking, fishing, mountain walking and
equestrian activities.
The top 20 most common activities are identified below. Around half of the activities are club-based
organised sports – including tennis, netball, AFL football, basketball and golf as popular examples -
however the most popular activities overall reflect a preference for casual and informal participation
opportunities, which is consistent with State and National trends, in particular the popularity of walking
and cycling.
83.6%
16.4%
Do you regularly participate in any sport or recreation activities in the Shire?
Yes
No
51
PAGE
5
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
52
PAGE
6
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q4: A lack of facilities was identified as a key reason for non-participation in sport and recreation
activities across the Shire (i.e. 39.66% of respondents). The poor standard of existing facilities was
identified by a further 10.34% of respondents – therefore half of all respondents identified facilities as a
major constraint to participation.
Other reasons reflect industry trends, including lack of time, age and lack of motivation. Distances and
affordability were also identified by a number of respondents (i.e. 13.79% and 10.34% respectively).
53
PAGE
7
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q5: There is very strong support for the provision of quality sport and recreation facilities from the
survey respondents – over 95% identified them as extremely important or important. Only three
individual responses suggested that quality facilities were not important.
Q6: The areas/activities where Council’s performance rated most highly (i.e. Good, Very good or
Excellent) included:
Provision of sport and recreation facilities and infrastructure (72.5%).
Sports field and court maintenance (72.7%).
Supporting local sporting clubs and recreation groups (62.9%).
Improving existing sport and recreation facilities (61.8%).
Areas/activities where Council’s performance rated most poorly (i.e. Poor or Very poor) included:
Developing new sport and recreation facilities (50.3%).
Providing a diverse range of sport and recreation facilities (36.6%).
Improving existing sport and recreation facilities (31.9%).
Pavilion, club rooms and building maintenance (29.1%).
54
PAGE
8
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
55
PAGE
9
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q7: Approximately 42.1% of respondents indicated that existing sport and recreation facilities usually or
always meet their needs. However, slightly over one quarter of respondents (27.1%) suggested that
facilities seldom or never meet their needs.
Q8: Respondents were asked to suggest priorities for Council in relation to current and future sport and
recreation facilities. This was an open ended question which attracted considerable feedback. The most
common suggested priorities included:
Facility improvements – upgrade, retain and refurbish existing facilities as well as create new
facilities where required.
Establish a year-round indoor aquatic and recreation centre.
Establish change room facilities at Lords Reserve.
Establish a new indoor sports facility (i.e. Basketball / Netball stadium).
Continue to support sports facilities in each major township.
Support establishment of a public access equestrian facility.
Complete the soccer fields and facilities adjacent to the Secondary College.
Additional outdoor netball courts with lighting and shelter.
56
PAGE
10
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q9: The majority of respondents were aged 35-49 years (42.1%).
Q10: Females were more represented in survey respondents than males (i.e. 61% compared to 38%).
57
PAGE
11
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q12: The vast majority of respondents identified Mansfield as their home town (i.e. 73.5%), followed by
Bonnie Doon (7.3%). A range of other townships were also represented in survey respondents including:
Barwite 2.94%,
Merrijig 2.94%,
Tolmie 2.21%,
Boorolite 1.47%,
Maindample 1.47%, and
Barjarg 1.47%.
58
PAGE
12
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Sports Club Survey Results
Q1: A total of 30 responses were received. Club/groups represented included:
Mansfield Clay Target Club
Delatite Cricket Club
Mansfield Croquet Club Inc
Mansfield Junior Cricket Association
Bonnie Doon Tennis Club
Mansfield Junior Football League
Goiugh's Bay Boat Sport & Recreation Club
Mansfield Pony Club
Mansfield Basketball
Mansfield junior netball and football
Mansfield Croquet Club
Mansfield and District Equestrian Club
MADEC
Mansfield & District Equestrian Club
Mansfield Tennis Association
Bonnie Doon Recreation Reserve Inc.
Mansfield Mt Buller Cycling Club
Merrijig Campdraft Association
GOJU-RYU AUSTRALIA
Mansfield basketball association
Mansfield Junior Netball Club
Mansfield netball club
Mansfield Race Club
Mansfield Secondary College
Mansfield gymnastics Club
Q2: Sports and activities represented included:
Trap and other forms of clay target shooting
Cricket
Croquet
Tennis
AFL Football
Boating and Fishing
Horse Riding
Basketball
Netball
Equestrian
Recreation Reserve Committee
Cycling (road, mountain bike and BMX)
Campdrafting
Karate
Gymnastics
Q3: Main facilities used included:
416 Pikes Rd Mansfield
Lords Reserve
Mansfield Recreation Reserve
Bonnie Doon Recreation Reserve
Gough's Bay Boat Club
Mansfield Show Grounds
Cummins Reserve, Mansfield
Mansfield Reserve netball courts
Mansfield Showgrounds
Riflebutts Reserve for MTB. 'Home' facilities
for road events is local roads, mainly
Mansfield-Whitfield Road. No 'home'
facilities at all for BMX.
McCormack Park
St Andrews Uniting Church Hall
Mansfield Stadium
Mercy Centre St Marys
Mansfield Recreation Reserve
Mansfield Race Course
Sports Complex, Main Oval
Mansfield Sporting complex main hall
59
PAGE
13
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q4: Based on club responses, the average membership per club has increased from 108 in 2013 to 140
in 2017. Total combined membership has increased from 2,055 in 2013 to 2,809 in 2017. Increasing
membership will contribute to greater demand for facilities and support infrastructure.
60
PAGE
14
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q5: According to survey results, there are slightly more male club members than female (i.e. 51%
compared to 42%). Similarly, there are more junior members (under 18 years) compared to seniors
(over 18years), i.e. 50% compared to 39%. However, almost one quarter of all members are aged over
50 years (26%) which is reflective of the age profile of the community.
Q6: All respondents expected membership to either remain stable or increase over the next 3-5 years,
with the majority expecting a 10-20% increase.
61
PAGE
15
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q7: According to clubs, key drivers of membership change (i.e. increases) will be due to club initiatives
to recruit members, increasing popularity of the sport/activity, growing resident population,
development of new facilities and/or due to the quality of existing facilities and positive competition
results.
Key challenges to membership growth include distance barriers, ageing population, changing sport
participation preferences and lack of appropriate facilities.
62
PAGE
16
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q8: The majority of clubs (57.1%) utilise their ‘home’ facilities up to 10 hours per week in season and
less than 5 hours per week out of season. However a large proportion utilise their facilities more than
these amounts, for example almost one in five clubs use their facilities either 10-20 hours or 20-30 hours
per week in season.
63
PAGE
17
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q9: Clubs were asked to nominate the main times/periods that they use their home facilities. Not
surprisingly, the results indicate that weekends and weekdays after 4pm account for the majority of
facility usage, however the graph below also highlights that usage is spread across the weekdays as well
as weekends. For example, although 60% of clubs indicated that weekday usage (before 4pm) accounts
for less than 20% of their total facility usage, 30% of club also indicated that this period accounts for 80-
100% of their usage.
64
PAGE
18
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q10: Approximately 1 in 5 clubs/groups indicated that facilities meet their needs, however 1 in 3
indicated that do not meet their needs. Almost half of all responses (47.6%) indicated that facilities only
meet their needs ‘sometimes’.
A sample of comments as to why facilities are not meeting needs include:
Lords Oval - the rooms are in poor condition, this has prevented us from hosting bigger cricket
events, as there is no change room facilities to speak of, and the poor one that exists is only suitable
for one person let alone two teams, or a team containing females, it is an embarrassment,
considering the magnificent way the actually playing field is kept!! The practice nets are also of a
poor quality, and need replacing.
The synthetic pitch at the Mansfield Recreation Reserve needs replacing.
The tennis court is co-located on the net ball court thus limited use available in netball season. No
net able to be left in situ. Multiple lines and limited side space on side due to netball layout.
Lack of club room facilities and poor quality of playing surface.
Limited availability to access indoor courts/facilities after school hours - insufficient courts available.
Lack of adequate car parking.
Surface of the oval is sub-standard for running events and/or rallies.
Riflebutts is good enough for the MTB part of the club but facilities for Road and BMX are non-
existent! We have no "club room" facilities, storage of equipment is a significant issue. The cub has
been trying to establish a competition BMX track for over 6 years.
No permanent power or toilet facilities available.
We have to set up and pack up heavy gymnastics equipment as it is a shared facility.
65
PAGE
19
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q11: Clubs were asked who maintains facilities. The results (below) highlight that both Council and
individual clubs play a key role in maintaining facilities. The results suggest that there may be
opportunities to improve the clarity in roles and responsibilities between Council and clubs in order to
enhance overall efficiencies and resource allocation. The results also suggest that there may be
inconsistencies in responsibilities across asset types (for example, why is Council maintaining some
playing fields, but not all. The same question applies to the other asset categories listed).
66
PAGE
20
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q12: The majority of clubs (52.6%) spend up to $5,000 on annual maintenance activities, however 1 in 5
are spending $5,000-$10,000p.a. A number of clubs (15) either skipped this question or provided no
response, therefore suggesting the results are somewhat inconclusive/indicative only.
Q13: In addition to direct financial costs required to maintain facilities, 68.4% of clubs contribute up to
10 hours of volunteer time per week in maintaining facilities. 1 in 5 clubs contribute 10-20 hours per
week and a further 10% of clubs contribute 20-30 hours of volunteer time per week in maintaining
facilities.
67
PAGE
21
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q14: Areas where Council performance rated highest included:
Responsiveness to user group enquiries/requests.
Sports field maintenance.
Keeping user groups up-to-date with information.
Areas where Council performance rated lowest included:
Developing new sport and recreation facilities.
Providing club development and management support.
Supporting initiatives to increase participation.
Meeting the needs of your club or group.
Meeting the needs of your sport or activity across the shire.
68
PAGE
22
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q15: What are the biggest challenges facing your club or group? Common responses have been
grouped into the following three themes, specifically:
Theme: Common challenges:
Facilities & Infrastructure New Club Room/Change Rooms - Lords Oval
Demand for additional indoor courts
Facilities – upgrade, refurbish
Establishing a BMX facility
Lighting at Lords Oval
Poor playing surface conditions, including school ovals
Maintenance of existing buildings
Club Support & Operations Operational costs and capital funding
Maintaining cooperation with other user groups in shared use facilities
Set up and pack up of equipment (e.g. gymnastics)
Attracting and retaining volunteers
Promoting our sport or activity
Participation Membership – retaining, increasing
Transition of juniors to club competition
Lack of players
Rider safety (road cycling)
Recruiting coaches
Distances / travelling
Keeping the 18 - 30 age group actively involved
Obtaining permits for road cycle racing
Growing events like Mansfield Tour and Vic Downhill Series - cycling
Q16: How would you like Council to assist you in addressing these challenges and supporting your club /
group? Common responses included:
Greater support from Council – direct funding, services (e.g. rubbish removal), promotion of our
club/sport, building and facility maintenance.
Greater acknowledgment and recognition of the benefits sporting clubs provide the community.
Ensure adequate access to grounds and facilities.
Build new pavilion and change rooms at Lords Oval.
Assistance in replacing the pitch at the Mansfield Rec Reserve.
Support tennis – facilities and promotion.
Establish new basketball courts, potentially in partnership with MSC
Reduce costs for indoor courts.
Improve condition of playing fields.
Assist in establishing a BMX track.
Assist in supporting road cycling events and activities, including permits.
Make it easier to build facilities on reserves as needed (e.g. toilets and storage facilities).
69
PAGE
23
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Q17: Thinking about the entire Shire, what do you think should be the top three priorities for sport and
recreation facilities over the next ten years? This was an open ended question which attracted
considerable feedback, however the most common priorities suggested by clubs are identified below:
Highest priorities Medium priorities Low priorities
Maintenance and refurbishment of existing facilities
Ensuring there will be sufficient land for sporting facilities as the population increases
Improve playground amenities
Establish pavilion and change room facilities at Lords Oval
Parking and road upgrades within reserves
Toilet upgrades - disabled
2-court indoor multi-use indoor sports stadium at MSC, potentially including a permanent gymnastics area
Playing surface improvements Extension/renovation of MDRC clubrooms
Complete the Additional Playing Fields at the High School, including soccer and potentially football/cricket
Safer, user friendly roads for cycling
Cricket site screens at Lords
BMX track Shared off-road track/loop around Mansfield, linking GVRT to MDRC and Riflebutts Reserve and back down Monkey Gully Road to town.
Update shooting traps and provide drainage
Q18: Thinking about your Home venue / facility, what do you think should be the top priorities for
facility or infrastructure improvements over the next ten years? This was an open ended question which
attracted considerable feedback, however the most common priorities suggested by clubs are identified
below:
Common shire-wide priorities / themes Venue / facility specific suggested priorities
Club rooms / Change rooms upgrades New Club Rooms/Change Rooms – Lords Oval
More indoor courts - 2 court Indoor Basketball stadium at MSC
Introduce further types of shooting sports in Mansfield (skeet and sporting clays)
Upgrade facilities and toilets BMX track at MDRC
Resurfacing playing fields Enable road racing to use MDRC as start/finish to enhance feel of 'home' venue
Improve facility security Amenities at Rifle Butts reserve
Car parking and access road improvements Construction of 3rd cricket practice wicket/nets at Lords
Sports lighting 3rd playing oval which is usable and safe in Mansfield
Support social gathering – upgrade kitchen and bar facilities in sports clubs
Power and water supply (Merrijig Campdraft Association)
More shedding/storage Replace/ upgrade current tennis court (Bonnie Doon Tennis Club)
General maintenance improvements Build our own clubrooms (Mansfield Pony Club)
Safer, user friendly roads for cyclists Update shooting traps and provide drainage
Toilet upgrades - disabled (Mansfield Tennis)
70
PAGE
24
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Common shire-wide priorities / themes Venue / facility specific suggested priorities
Parking and roads upgrades (Goiugh's Bay Boat Sport & Recreation Club)
Improve water facilities and toilet block (Mansfield Pony Club)
Surface protection (Mansfield Junior Netball Club)
Additional land (Mansfield & District Equestrian Club)
Extension/renovation of MDRC clubrooms (Mansfield Mt Buller Cycling Club)
Cricket site screens at Lords
Improved services (i.e. power and sprinkler system) (Mansfield Race Club)
Extend the Mansfield Sporting complex main hall (Mansfield Gymnastics Club)
71
PAGE
25
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Consultation Notes
Public Submissions:
From: Key comments, issues or suggestions Implications for the Strategy
Jean Shannon President Bonnie Doon Tennis Club
Ours is a small club with only a few adult members. However we have strong junior membership and are able to make available junior coaching via Danny Cahill with an average of 12/14 children attending. The coaching is available from November until end March each year. The club is able to subsidise these lessons making the coaching affordable for parents and saves those parents travelling to Mansfield each Saturday morning. We are able to do this through fund raising efforts and memberships.
We currently share the facility with netball, the tennis lines being marked out on the netball training court not the actual netball competition court.
It is important that we always have availability of a tennis court here in Bonnie Doon especially for the juniors, as more and more families are moving to Bonnie Doon on a permanent basis. This should enable continuity of children attending.
Support retention of at least one tennis court in Bonnie Doon for club and community use.
Irene Omera Mansfield Croquet Club Inc
The Club was formed in March 2011 without any grants or hand-outs, and we have maintained a membership of around 60 – 65 players.
We play on Monday and Wednesday mornings on the Lord’s Ground, Mansfield.
Our Club is able to operate this way due to the co-operation of Council who own and maintain the ground, Apex from whom we rent the pavilion and MACE to whom we pay Insurance.
Club activities are enjoyed by visitors, school children, special needs and elderly members (over 80 years). We encourage and support physical activity and social interaction.
We have never received any monetary grants from the Shire, however if possible we would appreciate a small shed at the back or side of the Apex Pavilion.
Consider opportunities to incorporate a small storage space for the croquet club as part of any change room/pavilion upgrades at Lords Reserve.
Colleen Reynolds Year-Round Aquatic Facility for Mansfield Inc
Year-round Aquatic Facility for Mansfield (YAFM) Inc is a community group established to develop and drive the project for an indoor aquatic facility for Mansfield district. Formed in 2003 as a result of pressure from the community and a need to quantify support, YAFM quickly attracted over 350 members from all geographical regions in the shire, and Melbourne, and all demographics, with a significant representation from the senior sector, who had long felt the need for hydrotherapy/warm water exercise facilities.
Following numerous recreation, feasibility and strategic planning studies, all of which acknowledged
Aquatic Facility Provision to be discussed with the Project Steering Committee.
72
PAGE
26
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
From: Key comments, issues or suggestions Implications for the Strategy
the need for an indoor aquatic facility, in 2011 council commissioned a report into Future Options for Aquatics in Mansfield, which again overwhelmingly supported the need for an indoor aquatic facility, and demonstrated viability of the project. Council then undertook a consultation process to determine community acceptance of a financial model, and in light of that a direction for the future.
The resulting vote in Council failed to endorse the project for a year-round aquatic facility by the narrowest of margins – a hung vote with the mayor’s deciding vote made on the basis of the federal and state funding climate of the time.
We ask that the need for a year-round aquatic facility again be included in the current Sports Facilities Strategy Plan being developed.
Stakeholder / Group Key issues, comments or suggestions Implications for the Strategy
Mansfield Secondary College Tim Hall - Principal
The following information is derived from conversation and written submission from the MSC.
Mansfield Secondary College has a long, established history of working in partnership with Mansfield Shire Council (e.g. existing joint use agreements for the additional playing fields and the Performing Arts Centre.
With respect to the sporting facilities within our community, I note in particular the pressure on our basketball stadium and the netball courts. We would like to restate our desire for a sporting hub to be developed on our site. As noted our facilities masterplan is, in part, built around this opportunity.
MSC is eligible for a single court stadium. Whilst funding is not currently available to support the construction, I am confident that there will come a time in the near future when we will be able to achieve this. o A partnership with the Shire Council
to build a facility supports the town as well as the school.
o In partnership with the shire council there is the potential to build:
o A double court stadium, with associated infrastructure
o A double court outdoor training facility.
Consider opportunities to establish a new 2-court stadium adjacent to the Additional Playing Fields and reinforce the precinct as a multi-use community hub.
73
PAGE
27
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Stakeholder / Group Key issues, comments or suggestions Implications for the Strategy
o A physical and aesthetic link between the stadium and the additional playing fields.
o A suitable car park and associated entrance-way.
Mansfield Primary School Julie McInnes - Principal
The Primary School (MPS) has very open space/outdoor play space at the current site, including no sporting oval. The school also lacks an indoor court/stadium or assembly space.
The school therefore relies on access to Lords Oval for recreational and curricula use.
The Shire restricts access to the Mansfield Recreation Reserve in order to preserve the playing surface condition. The school is required to book the oval if required and is subject to approval. Therefore the recreation reserve oval is rarely used.
The Sports Complex is currently used by the school approximately 8 hours per week. The PS would like to increase use of this facility, including possibly for weekly school assemblies.
The original (1986) Sports Complex joint use agreement between the PS, Secondary College and Shire may need to be reviewed to explore opportunities to better accommodate each groups needs.
The PS would like to convert the grassed area behind the Sports Complex (i.e. school land) to a synthetic multi-use playing surface (potentially incorporating Hockey) for school and community use. A partnership with the Shire would be welcomed.
Review the 1986 Sports Complex joint use agreement to consider opportunities to improve outcomes.
Support ongoing school use of Lords Oval.
Consider opportunities to partner with the PS to establish a multi-use synthetic playing surface (e.g. to support hockey, soccer or general community use).
74
PAGE
28
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Background Documents:
Document Key findings and possible implications for the Strategy
Recreation and Leisure Strategy, 2006
Summary of previous recommendations (status in red): Outdoor playing fields 1. Identify a preferred site and plan for the development of one additional full-size sports oval in/around Mansfield township. Additional Playing Fields. 2. Plan for the development of one additional soccer/rugby/hockey size rectangular playing field in conjunction with the master plan for the site adjacent to Mansfield Secondary College. Completed. 3. Support Bonnie Doon Recreation Reserve Committee of Management’s plans for realigning/extending the Bonnie Doon Recreation Reserve ground and upgrading associated amenities. Ongoing. 4. Mansfield Football Club’s seasonal tenure of the oval be continued - Completed; and − upgrading of the sub-base, drainage, irrigation and turf of the Mansfield Recreation Reserve oval (with or without extension of the ground size) be reconsidered in the light of conditions prevailing following development of the recommended new oval in Mansfield – Works completed, ground extension not supported. 5. Develop a consistent policy for the application of user fees for outdoor playing facilities, based on a target recovery of 20% to 25% of recurrent costs. Ongoing Indoor sports facilities 6. It is recommended that Council note the possibility that the existing indoor sports complex may become redundant at some future time. To be confirmed – support re-use/re-purposing. 7. Pending a decision on the feasibility and long-term strategy to relocate the indoor sports complex as part of an integrated sports, fitness and aquatic centre at the site adjacent to Mansfield Secondary College, it is recommended that an immediate assessment be made of the potential to seal the insulation batts inside the sports hall to prevent the escape of dust particles. Completed. 8. It is recommended that quotations be obtained for the installation of a sprung (resilient) floor to the sports hall. Completed Year-round aquatic facilities 9. It is recommended that Council nominate the land between Mansfield Secondary College and Malcolm Street as the preferred site for development for any indoor heated aquatic centre in Mansfield. Rejected on further investigation – refer below.
75
PAGE
29
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Document Key findings and possible implications for the Strategy
10. It is recommended that a master planning study be commissioned to confirm the capacity of the site to accommodate an indoor sports, aquatic and fitness centre, a soccer/rugby/hockey size rectangular pitch and associated car parking and landscaping; and to identify staging opportunities for the total proposed development. The master planning study should also take account of the prospect of locating a proposed shared community facility on the site, subject to final determination of availability of the preferred site for that facility (ie the Bindaree site in Highett Street). Rejected on further investigation – refer below. 11. It is recommended that Council moves to acquire control of the entire site between Mansfield Secondary College and Malcolm Street, through purchase of the private land and either transfer of title or long-term tenure agreement with the Education Department for the government-owned land. Rejected on further investigation – refer below. 12. Subject to confirmation of the adequacy of the site adjacent to Mansfield Secondary College through the master planning study, it is recommended that a detailed feasibility and planning study be commissioned to: − identify the elements to be included in the first stage of development of an indoor sports, aquatic and fitness centre, soccer/rugby/hockey size rectangular pitch and associated car parking and landscaping; − produce an architectural brief for design of stage 1; − obtain capital cost estimates based on the architectural brief; − develop an outline business plan including management structures, programming, operating budget forecasts and capital funding strategies. Rejected on further investigation – refer below. Other expressed needs 13. It is recommended that Council endorse in principle the proposal to develop squash courts at the Elvins Street tennis complex; and support/assist the squash club committee in the preparation and submission of applications for State Government funding assistance. Status of squash courts? 14. It is recommended that Council prepare and endorse a policy covering the planning for and provision of walking and bicycle routes within townships and throughout the broader Shire. Engineering Department developed a draft Footpath Strategy in 2016.
Future Improved Aquatic Facility Options Assessment Summary April 2011
The 5 previous studies (conducted between 1996 and 2007) have all indicated strong support and need for new Mansfield aquatic facilities but the high capital and operational costs have restricted recommended projects progressing.
One: Existing Mansfield Swimming Centre to Be Replaced o The project findings indicate the existing aged Mansfield Swimming
Centre is located on a small land locked site without appropriate car parking/access and therefore limited in the future facility improvements possible and not recommended as the best site for aquatic development that can meet resident’s year round needs.
Two: Preferred Future Aquatic Development Option
76
PAGE
30
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Document Key findings and possible implications for the Strategy
o In line with the seven options reviewed, compared and analyzed that the project team recommends the Option 4 Buller Ski Hire Site as the best long term (40 years plus life) future aquatic development option that can cater for all year round use at the lowest development cost and the best operational use and return for Mansfield Shire.
Three: Discuss/Negotiate Potential Part Facility and Site Acquisition o That Mansfield Shire Council commence discussions with the site
owner to determine a likely purchase cost and future site management agreement under a joint body corporate model to enable the final project cost to be determined
Four: Detailed Concept Design and Capital Cost Estimates o That Mansfield Shire provide a budget of $30,000 for detailed
concept design on the recommended option to enable more detailed planning and certified Quantity Surveyor costing to be calculated on the final concept.
Five: Shared Funding Strategy o Taking into account the limited capacity of Council and its residents
to fund such a proposed facility it is essential that a partnership funding program be investigated further and implemented.
Six: Council Contribution to Part Fund the Project o That Council needs to determine the best way of funding the
proposed $3M capital contribution proposed from Mansfield Shire Council to enable the funding strategy and likely rate increase to be finalized.
Seven: Development Only Proceed if all Parties Contribute o That Council resolve that If capital contributions cannot be achieved
then the project is likely to be financially unsustainable for a community the size of Mansfield Shire and Council not proceed with the development until required contributions can be secured or alternative funding is achieved.
o The project $7M funding target could be funded under the following shared partnership model:
o Mansfield Shire Council $3.0M o Vic State Better Pools Grant (maximum) $2.5M o Federal Government Grant $0.5M o Community fund raising/bequests $1.0M o Total Funding $7.0M
Eight: Testing Community Response for Rate Increases to part Fund Project and Support for the Project to Proceed
o That due to this project being of high community interest and also significant capital funding and rate impacts Council should set up a community consultation program to test community attitudes to the recommended project. This consultation to also test attitudes to a projected 3% to 6% rate increase to fund part capital loans, annual operational and asset renewal costs for the proposed development (subject to final funding strategy agreed by MSC)
A consultation program was conducted and fee model rejected by the community. In line with the report recommendation, development of an indoor aquatic facility may therefore be considered unviable for Council to pursue.
77
PAGE
31
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Document Key findings and possible implications for the Strategy
Mansfield Shire Sport and Recreation Strategy 2014 –2019
Objectives of the Recreation and Leisure Strategy were to:
Facilitate and develop a vision for recreation and leisure in Mansfield and the smaller communities within the Shire;
Develop an inventory of facilities;
Identify strategies and priorities for facility development;
Develop strategies and priorities for recreation and leisure programs Key themes emerged from consultations included:
Individuals – preference for informal recreation opportunities as opposed to formal sport.
Facilities - lack of facilities, standard of facilities, limited availability of the Mansfield Sports Complex and poor condition of oval playing surfaces raised as key issues.
Paths and tracks for walking and cycling - improvements to the network local walking/cycling paths and tracks are necessary to address current and future community demands.
Volunteers - the majority of clubs and groups were challenged with recruiting and retaining volunteers to assist run the clubs.
Strategic planning - few clubs have strategic plans in place and do not have the capacity to undertake such planning.
Aquatic facility - a desire for a year-round aquatic facility.
Gymnasiums – desire for access to adequate public health/fitness facility. Sport facility actions that are yet to be implemented include:
2.1 Work with user groups to consider options for the development of club/change rooms at the Lords Reserve.
2.2 Continue to investigate the feasibility of additional stadiums within the Shire
2.3 Work with communities to strategically plan for and develop outdoor exercise opportunities such as walking tracks and paths (MHWBP)
2.4 Identify opportunities to increase the number of public BBQ’s located at the Shire’s reserves and facilities to increase recreational opportunities Medium
2.5 Review the Future Improved Aquatic Facility Options Assessment Report 2011 and the Mansfield Aquatic Facility Community Engagement Final Report 2011 and refer to any past investigations and consultations to inform an investigation for feasible financial models for provision of indoor aquatic facilities.
Council Plan 2017-21
The Council Plan outlines a commitment to working in partnership with the community and relevant stakeholders to achieve the overarching aspiration for the Shire. Specifically the Aspiration for our Shire and its community:
We live, work and play in an inclusive, dynamic and prosperous place where community spirit is strong and people are empowered to engage in issues that affect their lives.
The plan suggests that Council’s role within the community and as a third tier of government has changed significantly in recent times. Therefore strategic priorities and actions are guided by what Council can control, influence or have an interest in. Strategic priorities have been identified under the following themes:
78
PAGE
32
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Document Key findings and possible implications for the Strategy
Participation and partnerships
Financial sustainability
Community resilience & connectivity
Enhanced likeability
Responsible Leadership Specific actions included in the Council plan relevant to this project include:
Strategic Objective 1.4 We have high levels of community participation, with growing levels of engagement from our senior citizens and people of all abilities.
o Develop and implement an Active Ageing Strategy. o Actively communicate volunteering opportunities and benefits
through the Shire’s website, Facebook page and the media. o Deliver and support a diverse events program that offers numerous
accessible and affordable opportunities for participation.
Strategic Objective 2.3 We prudently manage our asset maintenance and capital works programs in line with our long term financial plan.
o Adopt a ‘whole of life costing’ approach to asset management as part of a cost benefit analysis to inform decisions around the creation of any new asset.
Strategic Objective 2.7 Mansfield’s economy is diverse, with the agility to respond to changing consumer demands.
o Develop a strategic plan to optimise economic benefits from cycling based tourism in partnership with businesses operating within this sector and our tourism partners such as Tourism North East and the Great Victorian Rail Trail.
Strategic Objective 3.3 Mansfield Shire is a welcoming, supportive and inclusive place to be.
o Promote volunteering opportunities across the Shire and develop a process to increase opportunities for residents to contribute to community life.
Strategic Objective 4.1 We have long term strategies and capital works programs in place to respond to changing community needs.
o Develop and implement a new Sports Facility Strategy in consultation with sporting groups and funding bodies.
o Advocate for and, where possible, implement the recommendations from Lake Eildon Land and On- Water Management Plan and Lake Eildon Recreational Boating Facilities Improvement Plan.
Strategic Objective 4.3 Our community proactively manages its health and wellbeing.
o Establish a database of physical activity opportunities for senior citizens, distributing this information through a range of channels tailored to their preferred method of communication.
o Build on the Active Mansfield initiative and campaign to promote healthy, active lifestyles and increasing the use of Council’s leisure facilities.
Council faces a number of challenges in achieving its strategic objectives. These include:
A large rural road network and aged drainage infrastructure
79
PAGE
33
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Document Key findings and possible implications for the Strategy
Limited financial resources exacerbated by government funding not keeping pace with cost increases
Increasing Community expectations for services and new facilities/works
Need for adequate capital renewal expenditure investment
Increasing maintenance requirements due to increasing asset base
Population growth
Increasing requirements of other levels of government
Introduction of rate capping (Fair Go Rates) legislation
Municipal Public Health and Wellbeing Plan 2013-17
Selected characteristics: o Around 46.0% of the population in Mansfield are overweight or
obese, compared to 49.8% in Victoria o 16.2% of the population of Mansfield smoke which is slightly higher
than the Victorian average of 15.7% o Around one in five people (23.5%) did not meet physical activity
guidelines, compared to 32.1% for Victoria. We already know the most popular activity for exercise in Mansfield is walking
o 54.1% of people in Mansfield consume alcohol in a way that could lead to short term harm, compared to 45.3% across Victoria
o Mansfield has a much higher percentage of people who volunteer (31.8%) than Victoria (19.3%) and is ranked 16 out of 79 LGAs, although many of our volunteers are ageing
o The percentage of residents who feel safe walking alone during the day is 97.8%. The percentage that feel safe on the streets alone after dark is 92.0%, which is much higher than the Victorian average of 63.9%.
o People in the community with a disability who need for assistance with core activity is 5.0% which is the same as the Victorian average.
o The percentage of persons reporting fair or poor health is 14.7% which is 4% lower than the state average.
Key priorities for Mansfield Shire were identified as: o Strong and effective partnerships and networks o Ensure that health planning and service delivery is reflective of
current health and community data o Continue to collaboratively plan and deliver integrated, high quality
community facilities that meet a range of health, cultural, education and community needs
o Increase the available support, services and opportunities to participate in community life for people who are disadvantaged
o Identify and focus initiatives to areas of high disadvantage o Facilitate the retention and expansion of businesses and
organisations to increase local employment opportunities and healthy living
o Enhance the built environment to contribute to liveability and opportunities for social interaction
o Improve the amenity of open spaces and streetscapes o Prepare for current and future climate change and look after our
environment for future generations o Promote healthy living and lifestyle choices o Promote and support a safe and inclusive community o Plan for the needs of an ageing community
80
PAGE
34
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Document Key findings and possible implications for the Strategy
o To enhance mental health and wellbeing, provide opportunities for people to be involved, connected and engaged
Improving our built and natural environment - Natural and built environments that enhance our health and safety - what we hope to achieve:
o Improved access to our community infrastructure and buildings o More opportunities for exercise out of doors o Protection of our natural environment from the impacts of
development and recreation o A continued focus on high quality recreation facilities o Resilient and self-sufficient communities
Priority 3.1: Enhance the built environment to contribute to liveability and opportunities for social interaction – Actions:
o Develop a Sport and Recreation Plan that addresses the needs of sporting clubs and groups
o Work with communities to strategically plan for and develop outdoor exercise opportunities such as walking tracks and pathways
o Undertake continuous improvement to the accessibility of our infrastructure and open spaces
o Ensure all new infrastructure and maintenance and upgrades include compliance with DDA and AS for access and mobility including the ongoing repair and maintenance of the existing footpath network
81
PAGE
35
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Demographic Characteristics and Profile In the 2016 Census, there were 8,584 people in Mansfield Shire. Of these 49.8% were male and 50.2%
were female. Aboriginal and/or Torres Strait Islander people made up 0.7% of the population.
The median age of people in Mansfield Shire was 48 years. Children aged 0 - 14 years made up 17.9% of
the population and people aged 65 years and over made up 24.0% of the population.
In Mansfield Shire 79.5% of people were born in Australia. The most common countries of birth were
England 3.5%, New Zealand 1.0%, Germany 0.9%, Scotland 0.5% and Netherlands 0.4%.
The median weekly household income in Mansfield Shire was $1,062, which is considerably below the
Victorian and National average ($1,419 and $1,438 respectively). 27.4% of households had a weekly
household income of less than $650.
Of the families in Mansfield Shire, 36.3% were couple families with children, 50.1% were couple families
without children and 12.5% were one parent families.
The population of the Shire is growing, however at rates below the Victorian average. The forecast
population is expected to grow to approximately 9,595 people by 2031. An increase of around 1,000
people. An increase of this size will not be a significant contributor to demand for additional formal
sport facilities, with the possible exception of indoor courts, existing facilities should have the capacity
to accommodate additional users – particularly with the pending completion of the Additional Fields
(multi-use playing fields) in Mansfield.
The profile of the community is expected to continue to follow an ageing trend. When compared to the
2011 Census it is forecast that the proportion of 0-19 years and 20-65 years will be lower than it is
currently, however the proportion of those aged over 65 years will increase. These figures are shown
below:
Age group Proportion of the Mansfield Shire population
2011 Census 2031 Forecast
0-19 years 25.7% 24.0%
20-64 years 55.3% 49.0%
65+ years 18.9% 27.0%
Mansfield has a low rate of family incidents, a high percentage that feel safe on the street alone and
high levels of citizen engagement. Individual and household incomes are below average, and mortgage
stress is relatively high, although rental stress is lower than average. Less than 4% of the population is
near to public transport, and the number of dwellings with no motor vehicles is half the Victorian
average.
Year 9 students in Mansfield score well on education indicators, with the percentages of students
attaining minimum standards in reading, writing and numeracy being among the highest in the state.
The percentage of children developmentally vulnerable in one or more domains is the lowest in the
state.
The proportion of the female population who are current smokers is well above average, as is the
percentage of the population at risk of short-term harm from alcohol consumption. The rates of
82
PAGE
36
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
intentional and unintentional injury are lower than average. While avoidable deaths due to
cardiovascular disease are the lowest of all LGAs, avoidable deaths due to respiratory disease are the
third highest. Emergency Department presentations and primary care-type presentations occur at one
of the lowest rates in the state, and GP attendances are also lower than average.
Sources:
http://www.censusdata.abs.gov.au/census_services/getproduct/census/2016/quickstat/LGA24250?opendocument
(accessed 3/7/2017)
http://www.mansfield.vic.gov.au/Libraries/Community_Development/Mansfield_2012.sflb.ashx
(accessed 3/7/17)
Victoria in Future 2016, Mansfield Shire
83
PAGE
37
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Industry Trends The Australian Sports Commission released a paper titled 'The Future of Australian Sport, Megatrends
shaping the sport sector over coming decades' in April 2013. The paper identified six megatrends that
are likely to shape the sport sector over the next 30 years. Megatrends were described as important
patterns of social, economic or environmental change. The megatrends identified are summarised
below:
1. A Perfect Fit:
A rise in personalised sport and fitness activities for individual health and fitness.
2. From Extreme to Mainstream:
The rise of lifestyle, adventure and alternative sports - particularly popular with younger
generations.
3. More Than Sport:
Increasing recognition (by Government and stakeholders) of the broader benefits of sport,
including mental and physical health and community wellbeing.
4. Everybody's Game:
Evidence of Australians embracing sport participation into old age.
5. New Wealth, New Talent:
On an international scale, population and income growth, particularly within Asia, will create
tougher competition and new business opportunities for Australians.
6. Tracksuits to Business Suits:
Emergence of new market pressures and business models, resulting in pressure for community
sport organisations to adopt more formal corporate structures and governance systems. The
cost of participating in sport is also on the rise.
In addition to the Megatrends identified above, two important elements have been considered when
identifying trends that are likely to influence future leisure provision in Mansfield Shire. Specifically,
sport and physical activity participation trends and leisure facility development trends.
Australian adults are significantly less physically active than is recommended for good health. Being
physically active is essential for health and wellbeing and can help reduce the risk of chronic disease.
Not being sufficiently active is the leading contributor to preventable illness and morbidity among
women. Despite most women recognising the range of benefits to being physically active, when they
exercise they do so at a lower level of intensity and have higher amounts of sedentary time than young
men1.
Physical activity also decreases with age (though not uniformly) with a clear turning point identified in
the late teen years, particularly amongst females. Many young women do not feel they can be
physically active. They face a number of additional barriers not experienced by young men. In response
to this public health issue the Australian Government (through the Department of Health) has
developed the “Girls make your move” campaign featuring real girls playing sport and being physically
1 VicHealth: Female participation in sport and physical activity, Aug 2015. Publication # P-PA-283.
84
PAGE
38
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
active. The campaign aims to establish sport and physical activity as a natural part of young women’s
lives – to be enjoyed, not endured.
The Victorian Government’s Inquiry into Women and Girls in Sport and Active Recreation (2014) resulted
in the release of A Five Year Game Plan for Victoria, in November 2015. The report outlines a vision of
the future, where women and girls in all roles in sport and active recreation are the norm, and where
females and males have the same choices and opportunities to lead and to participate. The inquiry has
resulted in a number of new State Government programs and funding to support improvement
initiatives, including establishment of the Female Friendly Facilities Fund.
The research urges a shift in focus from creating “equal” opportunities for females to determining how
best to support women and girls so they have equitable opportunities to participate. In this context,
“equity” requires consideration of the unique needs, interests and experiences of the target group when
developing and delivering services and allocating resources.
At a State level, walking for exercise, fitness or recreation remains the most popular physical activity of
choice for Victorian adults (regardless of gender) with a regular participation rate approaching one
quarter of the population (i.e. 24.3%). When combined with jogging/running (7.8%), almost one third
(32.1%) of all Victorian adults either walk, jog or run for exercise, fitness or recreation2.
The most popular physical activities are dominated by informal recreation as opposed to club based
sports participation. This has increased demand for greater diversity in recreation participation
opportunities, both in terms of activities and times available. It has also led to an increase in
commercial use of public facilities and open space for leisure participation programs (e.g. personal
trainers).
Industry trends also reflect emerging changes in sports products and programming, for example 20:20
cricket, mid-week night tennis competitions, veterans/masters competitions, etc. These changes reflect
growth in social sports participation, often combining skill levels in recognition of preferences for social
outcomes.
Across the State there is also burgeoning interest and participation (both as players and officials) in a
range of sports by women and girls, including activities traditionally dominated by males, for example
Austrian Rules Football, Cricket and Soccer as well as ongoing participation interest in Netball and
Basketball to name a few.
Many sports peak bodies are also increasing the emphasis and delivery of introductory sports
participation programs aimed at junior development and recruitment (e.g. Auskick, Small Sided Games
(Soccer), Net-Set-Go Netball, etc.).
There are a number of trends impacting on formal sports clubs, most notably declining volunteerism and
increasing professionalism (driven by a desire for competitive advantage and regulatory requirements).
Both of these factors impact on the capacity of clubs to provide participation opportunities for the
community.
2 ABS, Participation in Sport and Physical Recreation, Australia, 2011-12 – Victoria
85
PAGE
39
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
The general trends noted above are influencing contemporary leisure facility design and development.
It is now more common to design facilities that can be configured to meet a variety of different needs
and uses (i.e. in-built design flexibility for adaptive reuse over time).
The importance of providing facilities that support a high level of social interaction and engagement are
also increasingly being recognised. Examples include under-cover external viewing areas attached to
sports pavilions and the design of meeting and social spaces within sport and leisure facilities.
Facility developments are increasingly adopting a hierarchal approach to infrastructure provision which
reflects different service levels, usage and standards of provision. This includes the establishment of
major regional sport/leisure facility hubs that offer a wide variety of co-located activities/sports and
ancillary services at a higher level.
Industry trends also highlight increasing environmental awareness and climate change impacts,
including water and energy conservation initiatives. There is also an emergence of new playing surface
technologies which allow Councils to maximise the use of existing assets (e.g. synthetic playing
surfaces).
Planning Implications
Greater consideration will need to be given to opportunities to enhance informal recreation
participation opportunities within open space as these account for the largest proportion of overall
physical activity participation by the community including walking, cycling and running. This
reinforces the importance of quality walking paths, trails and accessible open space facilities.
Supporting non-organised physical activities (through infrastructure, services and programs) will
help facilitate increased physical activity participation by the community, in particular by girls,
women and older age groups. Opportunities to support walking, jogging and cycling should be
considered a priority.
It can be expected that the use of parks and open space by personal trainers is likely to increase
associated with a growing preference for ‘pay as you go’ activities and increasing recognition of the
health benefits of regular physical activity participation.
Demand for organised sport opportunities, particularly for children aged 5-15 years and young
adults aged 15-24 years, will remain significant (and growing), including soccer, football, cricket,
netball, basketball and aerobic/fitness.
Greater consideration will need to be given to initiatives that support participation in formal sport
and club based physical activities by women and girls.
Future facility and service provision will need to maximise opportunities for multi-use, including the
development of ‘service hubs’ and the establishment of a hierarchical approach to facility provision
that is linked to defined service levels and asset management planning.
New and refurbished facility provision should consider opportunities to support social gathering
spaces, multi-use and incorporating a high degree of environmental sustainability in design,
development and operation. Facilities development or improvement must consider Universal
Design principles, including female friendly design3.
Ensure future residential areas ‘embrace’ open space reserves and encourage casual surveillance to
support informal recreational use.
3 Refer to www.sport.vic.gov.au/female -friendly-sport-infrastructure-guidelines
86
PAGE
40
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Plan, provide and maintain walking paths and linear connections to/from recreation reserves and
key destinations as a high priority.
87
PAGE
41
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Financial Capacity Source: Council Plan / Strategic Resource Plan 2017-2021
The asset renewal gap is the gap (shortfall in funding) between existing renewal expenditure and
recommended expenditure that is required to maintain assets in a condition capable of providing levels
of service set by Council in conjunction with community expectations. These assets include but are not
limited to roads, bridges, footpaths, kerb and channel, buildings and stormwater drainage.
In February 2017, a report was presented to Council which included long term (10 year) financial
modelling containing Council’s asset renewal estimates, forecast income and expenditure and
unrestricted cash levels. The report indicated that, on average over the next 4 years, Council is unable
to fund its required asset renewal by an average of $700,000 per annum and this gap will continue to
grow beyond 2020-21, if left unaddressed.
The SRP seeks to address the $700,000 gap through a combination of cost efficiencies and service
reduction. Further community consultation will be undertaken over the next 12 months to assess
further service reductions or the potential for Council to apply to the Minister for a variation to the
mandated rate cap.
Capital spend for 2017-18 is restricted primarily to asset renewal.
As a general principle Council will:
Reduce the renewal gap in roads, bridges, buildings and other assets.
Complete building renewal as funding becomes available.
Maintain the current annual expenditure for the reseal and resheet programs in accordance with
renewal gap analysis.
Implement the Four Year Capital plan as created and modified as new projects are identified.
Operating surpluses are forecast each year until 2020-21 as a result of significant capital grant
revenue being received to fund the capital works program.
Capital expenditure over the four year period of the SRP will be approximately $30 million.
Whilst Council’s overall liquidity appears sound, the financial position and operating environment
remains significantly challenged. Opportunities for cost savings in services, operations and asset
management are actively being explored.
Council’s asset renewal deficit and backlog of required maintenance works remain a priority for
resource allocation within the capacity of the SRP. There is, on average, a 50% / 50% split between
renewal spend and new/upgrade spend of Council cash. This focus will allow the forecast asset renewal
gap to close by 2021.
Therefore, recommendations developed as part of the Sports Facilities Strategy need to be cognisant of
the realistic financial capacity of Council and key stakeholders to implement. Potential
recommendations for major infrastructure investment and new facilities are only likely to be viable if
significant external funding and partnerships can be achieved. This may impact on timing of potential
delivery (i.e. subject to external influences) and require ongoing advocacy in order to secure funds.
88
PAGE
42
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Recommendations that may impact on programs and service delivery will generally be required to be
delivered within existing operational resources. This may require a review of service delivery in order to
identify possible cost savings, re-allocation or realignment to reflect the priorities identified in this
report. Aside from Parks & Gardens maintenance staff, Council currently employs one full time
Recreation Officer. Key priorities will therefore need to be allocated to annual work plans having regard
to existing capacity.
89
PAGE
43
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Demand Assessment / Needs Analysis Population:
The population of the Shire is expected to increase by approximately 1,000 people over the next fifteen
years (i.e. increasing from 8,584 (2016) to approx. 9,596 (2031) people). An increase of this size will not
automatically require the provision of new or additional facilities, however the standard, maintenance
and capacity of existing facilities may need to be improved in order to cater for modest increases in
demand associated with population growth.
The age profile of the community continues to age. Residents aged 45 to 84 are overrepresented
compared to the state average and those aged 15 to 44 are underrepresented. Demand for activities
that cater for adults can be expected to increase, including non-club based, informal recreation
participation opportunities.
Participation trends:
According to club survey results, the average membership per club has increased from 108 in 2013 to
140 in 2017. Total combined membership has increased from 2,055 in 2013 to 2,809 in 2017. Increasing
membership will contribute to greater demand for facilities and support infrastructure.
There are more junior members (under 18 years) compared to seniors (over 18years), i.e. 50%
compared to 39%. However, almost one quarter of all members are aged over 50 years (26%) which is
reflective of the age profile of the community.
Walking for exercise, fitness or recreation remains the most popular physical activity of choice for
Victorian adults (regardless of gender) with a regular participation rate approaching one quarter of the
population (i.e. 24.3%). When combined with jogging/running (7.8%), almost one third (32.1%) of all
Victorian adults either walk, jog or run for exercise, fitness or recreation4.
The most popular physical activities are dominated by informal recreation as opposed to club based
sports participation. This has increased demand for greater diversity in recreation participation
opportunities, both in terms of activities and times available.
Across the State there is also burgeoning interest and participation (both as players and officials) in a
range of sports by women and girls, including activities traditionally dominated by males, for example
Austrian Rules Football, Cricket and Soccer as well as ongoing participation interest in Netball and
Basketball to name a few.
Demand for organised sport opportunities, particularly for children aged 5-15 years and young adults
aged 15-24 years, will remain significant (and growing), including soccer, football, cricket, netball,
basketball and aerobic/fitness.
Consultation results:
Respondents identified more than 35 different sports and activities that they regularly patriciate in. This
reflects a good level of diversity and opportunities available in the Shire – many of which reflect the
4 ABS, Participation in Sport and Physical Recreation, Australia, 2011-12 – Victoria
90
PAGE
44
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
geographic characteristics of the Shire, for example snow sports, hiking, fishing, mountain walking and
equestrian activities.
Around half of the activities identified are club-based organised sports – including tennis, netball, AFL
football, basketball and golf as popular examples in Mansfield Shire - however the most popular
activities overall reflect a preference for casual and informal participation opportunities, which is
consistent with State and National trends, in particular the popularity of walking and cycling.
A lack of facilities was identified as a key reason for non-participation in sport and recreation activities
across the Shire (i.e. 39.66% of respondents). The poor standard of existing facilities was identified by a
further 10.34% of respondents – therefore half of all respondents identified facilities as a major
constraint to participation.
Furthermore, 1 in 3 clubs indicated that facilities do not meet their needs and almost half of all club
responses (47.6%) indicated that facilities only meet their needs ‘sometimes’. Key priorities for facility
and infrastructure improvements were identified as follows:
Highest priorities Medium priorities Low priorities
Maintenance and refurbishment of existing facilities
Ensuring there will be sufficient land for sporting facilities as the population increases
Improve playground amenities
Establish pavilion and change room facilities at Lords Oval
Parking and road upgrades within reserves
Toilet upgrades - disabled
2-court indoor multi-use indoor sports stadium at MSC, potentially including a permanent gymnastics area
Playing surface improvements Extension/renovation of MDRC clubrooms
Complete the Additional Playing Fields at the High School, including soccer and potentially football/cricket
Safer, user friendly roads for cycling
Cricket site screens at Lords
BMX track Shared off-road track/loop around Mansfield, linking GVRT to MDRC and Riflebutts Reserve and back down Monkey Gully Road to town.
Update shooting traps and provide drainage
Sport facility gaps:
Mansfield Shire is generally well serviced by a range of sport facilities that provide a variety of activity
and participation opportunities for the community. Potential sport facility gaps identified through the
research and consultation as part of this project include:
Demand for additional indoor court/stadium facilities.
Demand for access to year round heated indoor swimming pool.
Increasing demand for safe walking and cycling routes and associated infrastructure, including BMX
track.
Demand for improved playing fields (i.e. playing surface upgrades).
91
PAGE
45
© Insight Leisure Planning 2017
Sport Facilities Strategy Background Research Report Mansfield Shire Council
Completion of the Additional Playing Fields in order to provide an alternative venue particularly for
soccer and potentially as an overflow training location when other ovals require resting or
maintenance. This also requires provision of adequate multi-use change rooms and sports pavilion
to support social gathering and community use.
Desire for a permanently set-up gymnastics facility.
Township / site specific gaps:
Township and site specific gaps or suggested improvements identified in the consultation included:
Mansfield:
Build new pavilion and change rooms at Lords Oval.
Assistance in replacing the pitch at the Mansfield Rec Reserve.
Establish new basketball courts, potentially in partnership with MSC
Establish club room facilities (i.e. home) for cycling, including BMX track and adequate storage
facilities (Mansfield Mt Buller Cycling Club).
Year round access to a heated indoor swimming pool.
Desire for a permanently set-up gymnastics facility (Mansfield Gymnastics Club).
Completion of the Additional Playing Fields – playing surfaces and support infrastructure.
Build our own clubrooms and improve the water facilities and toilet block (Mansfield Pony Club)
Toilet upgrades - disabled (Mansfield Tennis)
Surface protection (Mansfield Junior Netball Club)
Additional land (Mansfield & District Equestrian Club)
Cricket site screens at Lords
Improved services (i.e. power and sprinkler system) (Mansfield Race Club)
Improve playground amenities (Mansfield Secondary College)
Other Areas:
Improve condition of playing fields.
Paths and tracks for walking and cycling - improvements to the network of local walking/cycling
paths and tracks.
Retain access to tennis courts for casual use.
Maintenance and refurbishment of existing facilities.
Volunteers - the majority of clubs and groups across the Shire are challenged with recruiting and
retaining volunteers to assist running existing clubs.
Power and water supply (Merrijig Campdraft Association)
Replace/ upgrade current tennis court (Bonnie Doon Tennis Club)
Update shooting traps and provide drainage
Parking and roads upgrades (Goiugh's Bay Boat Sport & Recreation Club)
Safer, user friendly roads for cyclists
92