Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Campus Capital Needs Sales Surtax Funded Attachment F Estimate Detail Report Condition Code Facility Manatee Elementary 1.59 $1,108,806 District School Security $30,675 1.00 Building Access Security Equipment $30,675 Public Access Control 1.00 $30,675 Educational Technology $243,699 1.83 Technology Building Cabling $12,781 Structured Cabling 4.00 $12,781 Technology Equipment Renewal $230,918 Computer Replacement 3.00 $128,796 Server Replacement 1.00 $48,083 Switch Replacement 1.00 $17,996 Telephone System Replacement 1.00 $24,361 Wireless Access Points Replacement 1.00 $11,682 Facility Renewal $834,432 1.50 Central Mechanical Plant Renewal $112,475 Booster Pumps, Chilled Water, VFD's and Recirculation pumps 1.00 $112,475 Cooling and Heating Control System Renewal $208,334 Building Automation System 1.00 $208,334 Air Conditioning and Air Distribution Equipment Renewal $140,593 HVAC Systems EPA NonͲCompliant Refrigerant 1.00 $140,593 Roofing System Renewal $134,400 Relocatable Covered Walkways (SREF) 1.00 $134,400 Exterior Building Wall Finish System Renewal $223,138 Exterior Finish 2.00 $179,890 Exterior Sealants 2.00 $43,249 Electrical System Components (Lightning Protection, Intercom and Generators) Renewal $15,492 Lightning Protection 1.00 $15,492 July 22, 2014

Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT

Facilities Services2700 Judge Fran Jamieson WayViera, Florida 32940-6601

Campus Capital Needs Sales Surtax Funded

Attachment F

Estimate

Detail ReportCondition CodeFacility

Manatee Elementary 1.59 $1,108,806District School Security $30,6751.00

Building Access Security Equipment $30,675Public Access Control 1.00 $30,675

Educational Technology $243,6991.83

Technology Building Cabling $12,781Structured Cabling 4.00 $12,781

Technology Equipment Renewal $230,918Computer Replacement 3.00 $128,796Server Replacement 1.00 $48,083Switch Replacement 1.00 $17,996Telephone System Replacement 1.00 $24,361Wireless Access Points Replacement 1.00 $11,682

Facility Renewal $834,4321.50

Central Mechanical Plant Renewal $112,475Booster Pumps, Chilled Water, VFD's and Recirculation pumps 1.00 $112,475

Cooling and Heating Control System Renewal $208,334Building Automation System 1.00 $208,334

Air Conditioning and Air Distribution Equipment Renewal $140,593HVAC Systems EPA Non Compliant Refrigerant 1.00 $140,593

Roofing System Renewal $134,400Relocatable Covered Walkways (SREF) 1.00 $134,400

Exterior Building Wall Finish System Renewal $223,138Exterior Finish 2.00 $179,890Exterior Sealants 2.00 $43,249

Electrical System Components (Lightning Protection, Intercom and Generators) Renewal $15,492Lightning Protection 1.00 $15,492

July 22, 2014

Hann.Susan
Highlight
Hann.Susan
Callout
Not included
Page 2: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT
Page 3: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT
Page 4: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT
Page 5: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT
Page 6: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT
Page 7: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT
Page 8: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT
Page 9: Attachment Feagendatoc.brevardschools.org/10-29-2019 School Board... · 2019-11-25 · Assignment and Notice to Proceed, and shall be completed by February 5, 2020. CONSULTANT'S PROJECT