Atterbury-Muscatatuck
A Unique Urban Testing and Training Environment
Muscatatuck Center for Complex Operations Mission Support Element
MCCO
MSE
Business
Development
&
Capture
MCCO
Strategic
Plans
Government
&
Community
Outreach
Readiness at Best Value
Muscatatuck Urban Testing & Training Complex 68 Buildings With 851,031 Square Feet Under Roof
37 Buildings 2 to 5 Stories Tall Operational Utilities
Over 9 Miles of Roads Over 1 Mile of Tunnels
Muscatatuck Urban Training & Testing Complex
text
text
SDREN JTEN
TACLANE (Smithville)
Plans for dedicated
fiber
Joint Mission Environment Testing Capability(T&E)
Joint Training and Experimentation Network(Training)
(fe
de
rally
ow
ne
d a
sse
ts)
(sta
te o
wn
ed
ass
ets
)
Camp Atterbury Phase 1 Connectivity
via JTEN to
JMETC
15
COLSA OneSAF
Co-Development Lab (OCDL)
Presented by: Joe Kress – COLSA
July 2010
Information Briefing
Presented to:
Dr. Claudette Owens
PROJECT: TERRAIN DB CONVERSION Purpose: To add the ability would allow for the rapid conversion and building of terrain databases in-house instead of waiting for external sources (which often take 2 months or more). The immediate use would be to convert terrain, add buildings, and other objects to the terrain rapidly and accurately in order to support future testing events to be conducted by TSMO. One such event that would get immediate support would be the Muscatatuck Urban Training Center (MUTC) where TSMO is planning McNITR testing and other testing in the future. Camp Atterbury and the MUTC have thus far been unsuccessful in getting a good terrain database for OneSAF with buildings, primarily due to lack of funding and expertise.
Approach: COLSA will review existing terrain conversion tools (CityScape, Terra SIM, and Terra Vista are top candidates) that are available based on critical required capabilities. Once selected and approved, the tool will be purchased and the team will work with OneSAF to acquire the work they have already done for the MUTC and we will then complete the conversion and add the buildings to the site. Objects can then be added to create several potential “Standard” scenarios (with MUTC assistance) and testing against the newly converted terrain database can be conducted.
Main Product: Converted Terrain DB for Atterbury and MUTC; ability to convert other terrains in the future
Milestones: Terrain SW Training 19-26 July 2010
Terrain SW Install 26-30 July 2010
Complete MUTC Terrain DB 15 Sept 2010
Complete second Terrain DB 31 Dec 2010
Labor Categories: System Analyst IV – .2 LOE System Analyst III – 1 LOE System Analyst II – 1 LOE
21
Distribution Statement A: Approved for public release
Scripting Overview
• Scripts are statistically representative of
recorded theater data
ParserScript
Builder
Script
· Frequency
· Power
· Bandwidth
· Start Time
· Stop Time
· Signal ID
· File ID
Collect
· Recording
· Metadata
Statistical
Draw
Signal Catalog
· Time Stamp
· Frequency
· Power
· Bandwidth
Proposed Emitter Locations
1
2
3 4
5
6
7
8
9
10
Unclassified Page 24 MCNITR II Kick-Off
Unclassified
RF Coverage Sample, MUTC
Atterbury-Muscatatuck
Kenneth McCallister [email protected] (O) 812-526-1533 (C) 317-407-6615
CPT Chris Silbaugh [email protected] (O) 812-526-1533 (C) 317-607-6029