18
Audited Project Financial Statements The audited project financial statements are documents owned by the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. These documents are made publicly available in accordance with ADB’s Access to Information Policy and as agreed between ADB and the Bangladesh Gas Fields Company Limited. Project Number: 45203-006 Loan Number: 3461 / 3462 / 8318 Period covered: 1 July 2017 to 30 June 2018 BAN: Natural Gas Infrastructure and Efficiency Improvement Project Prepared by Bangladesh Gas Fields Company Limited For the Asian Development Bank Date received by ADB: 31 December 2018

Audited Project Financial Statements · 2019. 4. 5. · Compressors At Location-A of Titas Field Project" Financed Under ADB Loan No.3461-BAN, 3462-BAN(SF) & LN 000015-1-BGD(8318-BAN)

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Audited Project Financial Statements

    The audited project financial statements are documents owned by the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. These documents are made publicly available in accordance with ADB’s Access to Information Policy and as agreed between ADB and the Bangladesh Gas Fields Company Limited.

    Project Number: 45203-006 Loan Number: 3461 / 3462 / 8318 Period covered: 1 July 2017 to 30 June 2018

    BAN: Natural Gas Infrastructure and Efficiency Improvement Project

    Prepared by Bangladesh Gas Fields Company Limited For the Asian Development Bank Date received by ADB: 31 December 2018