Wonders of Wildlife / Bass Pro Shop Campus Renovations & Expansions
Flagship Campus Springfield, MO
July 15th 2011 Weekly Construction Progress Photos
Prepared For: Bass Pro Shops & Wonders of Wildlife
Prepared By:
THE WHITING.TURNER CONTRACTING COMPANY 5323 Millenia Lakes Boulevard, Suite 160
Orlando, FL 32839 Phone: 407(370(4500
Fax: 407(370(4499
August 5th, 2011
& Wonders of Wildlife
Wonders of Wildlife
Wonders of Wildlife /
Wonders of Wildlife
August 12th, 2011August 19th, 2011September 2nd, 2011September 9th, 2011September 16th, 2011September 23rd, 2011September 30th, 2011
Table of Contents
Section 1 Expo / CEC Progress Photos Section 2 Wonders of Wildlife Building ‘A” Section 3 Wonders of Wildlife Building ‘B’ Section 4 Wonders of Wildlife Building ‘C’ Section 5 Connector Mall Section 6 Bass Pro Shops Boat Showroom Expansions/Renovations Section 7 Bass Pro Shops Hunting Hall Expansions Section 8 Grand Entry & Wildlife Galleries Section 9 Exterior Structure
Section 1
Expo / CEC
Progress Photographs
Wonders of Wildlife / Bass Pro Shops Progress Photos
North Elevation View of Expo/CEC
Installation of Shiplap Ceiling and Trim in Prefunction E136
Wonders of Wildlife / Bass Pro Shops Progress Photos
Installation of Drywall in Warming Kitchen E123
b
Installation of Operable Partition Pockets in Expo Hall E133
Wonders of Wildlife / Bass Pro Shops Progress Photos
Installation of Beam & Chink in Expo Halls E133, E134 & E135
Snapshot of Expo Halls E133, E134 & E135
Wonders of Wildlife / Bass Pro Shops Progress Photos
Pouring of Walk-In-Cooler Concrete Pad
I
Painting of Decking & Trusses in Holding & Quarantine E153
Wonders of Wildlife / Bass Pro Shops Progress Photos
Installation of Tile Wainscot in Restroom E141
Snapshot of Prefunction E136 With Shiplap Ceiling Installed
Wonders of Wildlife / Bass Pro Shops Progress Photos
Installation of Micro-topping in Lobby E137
Installation of Plywood on Ceiling in Lobby E102
Wonders of Wildlife / Bass Pro Shops Progress Photos
Installation of Decorative Rock on Chimney in Multipurpose Room E103
Installation of Stamped Concrete on Covered Porch
Section 2
Wonders of Wildlife Building ‘A’
Progress Photographs
Wonders of Wildlife / Bass Pro Shops Progress Photos
Roof Demolition
Roof Demolition
Wonders of Wildlife / Bass Pro Shops Progress Photos
Basement Cleanup
Roof Debris Removal
Wonders of Wildlife / Bass Pro Shops Progress Photos
Truss Removal
Truss Removal
Section 3
Wonders of Wildlife Building ‘B’
Progress Photographs
Wonders of Wildlife / Bass Pro Shops Progress Photos
Manatee Tank Walls
Water Proofing at Column Line 172
Wonders of Wildlife / Bass Pro Shops Progress Photos
Manatee Tank Wall Forms
Rebar Tying At Manatee Tank Walls
Wonders of Wildlife / Bass Pro Shops Progress Photos
Concrete Wall Preparation For Waterproofing
Shake Out of Structural Steel
Wonders of Wildlife / Bass Pro Shops Progress Photos
Rebate for Acrylic at Manatee Tank
Back of House Snap Shot
Section 4
Wonders of Wildlife Building ‘C’
Progress Photographs
Wonders of Wildlife / Bass Pro Shops Progress Photos
Back of House LSS Pipe Installation
Excavation for LSS Pipe
Wonders of Wildlife / Bass Pro Shops Progress Photos
Snap Shot of South West Building Corner
Stingray Tank Layout
Wonders of Wildlife / Bass Pro Shops Progress Photos
Slab Cut!out for LSS Pipe Installation
LSS Pipe Installation
Section 5
Connector Mall
Progress Photographs
Wonders of Wildlife / Bass Pro Shops Progress Photos
Snapshot of the Connector Excavation
Snapshot of Connector Excavation
Wonders of Wildlife / Bass Pro Shops Progress Photos
Snapshot of Connector Excavation
Snapshot of Connector Excavation