10
June 2015

August 2012

Embed Size (px)

DESCRIPTION

August 2012. What Types Of Infrastructure Will Envision TM Rate?. ENERGY Geothermal Hydroelectric Nuclear Coal Natural Gas Oil/Refinery Wind Solar Biomass. WATER Potable water distribution Capture/Storage Water Reuse Storm Water Management Flood Control. WASTE Solid waste - PowerPoint PPT Presentation

Citation preview

Page 1: August 2012

June 2015

Page 2: August 2012

ENERGYGeothermal

Hydroelectric

Nuclear

Coal

Natural Gas

Oil/Refinery

Wind

Solar

Biomass

WATERPotable water distribution

Capture/Storage

Water Reuse

Storm Water

Management

Flood Control

WASTESolid waste

Recycling

Hazardous Waste

Collection & Transfer

TRANSPORTAirports

Roads

Highways

Bikes

Pedestrians

Railways

Public Transit

Ports

Waterways

LANDSCAPEPublic Realm

Parks

Ecosystem Services

INFORMATIONTelecommunications

Internet

Phones

Satellites

Data Centers

Sensors

What Types of Infrastructure Will Envision Rate?

Page 3: August 2012

60 Credits in 5 Categories

Purpose, Community, Wellbeing

Siting, Land and Water, Biodiversity

Materials, Energy, Water

Collaboration, Management, Planning

Emission, Resilience

QUALITYOF LIFE

LEADERSHIP

RESOURCEALLOCATION

NATURALWORLD

CLIMATEAND RISK

Page 4: August 2012

Levels of Achievement

0

5

10

15

20

25

30

Improved Enhanced Superior Conserving Restorative

Poin

ts

QL1.1 IMPROVE COMMUNITY QUALITY OF LIFE

No Negative Impact

Non-linear Scale

Page 5: August 2012

Online Scoresheet

Table Continues for All of Your Projects

Page 6: August 2012

Online Scoresheet

Table Continues for All 60 Credits

Page 7: August 2012

Scoring Summary

Page 8: August 2012

Award Levels

AwardMinimum Applicable

Points

Bronze

Silver

Gold

Platinum

30%

40%

50%

20%

Page 9: August 2012

Fee Schedule

Project Size ($) Non-Member Price ISI Member Price

Up to 2M $3000 $2400

2-5M $8500 $7000

5-25M $17,000 $14,000

25-100M $25,000 $21,000

100-250M $33,000 $28,000

Over 250M$5000 per 100M above base price of $20,000

3. Optional Appeals Fee: $500 per credit

1. Registration Fee: $1000

2. Verification Fee:

Page 10: August 2012

www.sustainableinfrastructure.org