    Master Plan Scenario B:Closures and Consolidations

    October 21, 2010Ruby Bridges Elementary School

    Community Engagement andSpecial Board Meeting

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    2/50

    Master Plan Scenario B (Phase I and II)With failure of the Parcel Tax, the Board directed

    AUSD to plan for consolidation/closure of schools.Phase I

    The Superintendents implementation plan shall recommend restructuringand/or closure of one or more of the Districts secondary schools (middleand high schools). The plan shall also recommend the closure of one or

    more elementary schools for implementation at the commencement of the2011-2012 school year.

    Phase II

    Phase 2 of the Superintendents implementation plan shall recommendrestructuring and/or closure of additional elementary schools to realize themaximum cost savings for implementation at the commencement of the2012-2013 school year.

    The Board of Education decides on an option on December 14.

    Page 2

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    3/50

    Summary of AUSD Budget Deficit

    AUSD is experiencing a structural deficit. AUSD is surviving on one-time monies.

    Parcel taxes from Measure A and H expire in 2012-2013.

    Temporary categorical funding flexibility from the CaliforniaDepartment of Education is set to end in 2012-2013.

    Failure of parcel tax in June of 2010 AUSD multi-year budget

    0

    1

    23

    4

    5

    6

    7

    8

    2010-11 2011-12 2012-13

    Reduction In school Programs (Millions)

    Page 3

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    4/50

    Projected Revenue & Expenditure (as of 3/2010)

    Page 4

    REVENUE & EXPENDITURE

    $65,000,000

    $70,000,000

    $75,000,000

    $80,000,000

    $85,000,000

    $90,000,000

    $95,000,000

    2009-10 2010-11 2011-12 2012-13

    Expenditures

    Revenue

    $18.2M

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    5/50

    AUSD Budget CutsAhead (as of 10/6/2010)

    AUSD must still cut up to $5 million in 2011-2012.

    AUSD must cut another $8 million in 2012-2013.

    Thats $13 million on top of $7 million we just cut.

    Failure of the Parcel Tax in June 2010 along withsunset of Measure A and Measure H now force

    AUSD to plan and enact Master Plan Scenario B,wherein AUSD schools may be closed/consolidatedin a Phase I/II approach in 2011-12 and 2012-13.

    Page 5

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    6/50

    Key Criteria for Closure/Consolidation

    The following criteria list factors that must be consideredfor Phase I of the implementation plan according to theBoard Resolution 10-0083 adopted on June 29, 2010.

    Cost savings and economic benefits

    Quality of instructional program Facility needs and requirements

    Maintaining neighborhood schools where possible

    According to Board Resolution 10-0083, Phase II willrecommend closure/consolidation of additionalelementary schools to realize additional cost savings.

    Page 6

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    7/50

    Public Feedback

    September 29 Public Hearing

    This is the number of responses marked on the forms collected on 9/29.Since then, more forms have been submitted by other school PTAs, andthis public input will be included in future presentations.

    Online survey response to Option I: Alameda and Encinal High Schoolsreconfigured as 7-12 secondary schools (closing Wood and Lincoln MiddleSchools). All AUSD elementary schools would be reconfigured as K-6 schools.

    Page 7

    Feedback

    Forms

    Economic

    Benefit

    Facility

    needs

    Neighborhood

    schoolsQuality of

    instruction

    11 # 1 0

    #2 1

    #3 6

    #4 1

    #1 0

    #2 0

    #3 2

    #4 5

    #1 6

    #2 3

    #3 0

    #4 2

    #1 5

    #2 5

    #3 0

    #4 0

    I would consider this

    option 54%

    I would not consider

    this option 46%

    Total respondents 135

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    8/50

    Page 8

    Online

    Survey

    135

    responses

    MostImportant

    Important Somewhat

    Important

    Least

    Important

    Average

    Economic

    benefit/

    cost savings

    4 - 3% 24 - 18% 46 - 34% 45 - 33% 2.74

    Quality of

    Instruction78 - 58% 43 - 32% 3 - 2% 2 - 1% 1.34

    Facility needs

    and

    requirements

    1 - 1% 14 -10% 60 - 44% 46 - 34% 2.91

    Maintainingneighborhood

    schools if

    possible

    51 - 38% 43 - 32% 11 - 8% 22 - 16% 1.91

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    9/50

    Considerations for Closure/Consolidation

    Tonight the following information will be presented tohelp inform discussion and review the following:

    Projected enrollment capacities to calculate and determine

    facility needs as well as anticipate required boundary changes

    Site facility modifications needed (if any) by site to implementOption 1 Phase 1 and requested consideration of K-8 schools

    Quality of Instructional Program

    Page 9

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    10/50

    Option 1 Assumptions Phase 1 Class sizes for grades 7-12 would be 32:1 for 7-8 and 35:1 for 9-12.

    Class size for K-6 would be 32:1. Cost for initial modifications to sites will represent one-time costs.

    Savings realized by closing a school or increasing class sizes willrepresent ongoing savings over time.

    Standard classroom is more than 700 square feet. *(Master Plan) Smaller classrooms (spaces) are less than 700 square feet.

    All elementary schools will be able to maintain a media center,multi-purpose area and computer lab.

    Some will have media center/computer lab (lab in media center).

    Some schools require a classroom to accommodate a computer lab.

    If a classroom is being used for child care, it will be noted.

    Negotiations with AEA will be required.Page 10

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    11/50

    1100

    1000

    900

    800

    700

    600

    500

    400

    300

    200

    100

    Elementary School Use vs. Capacity (class size 32:1)

    Washing

    ton

    484

    594

    417308

    420476

    478

    364

    641

    278

    4460 elementary students (10/15/10)7440 capacity @ 10 sites

    2980 seats (available)

    Page 11

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    12/50

    1100

    1000

    900

    800

    700

    600

    500

    400

    300

    200

    100

    Elementary School Use vs. Capacity

    Class size (K-3 25:1) (4-6 32:1)

    Washington

    543

    685

    485357

    493542

    541

    395

    723

    315

    4460 elementary students (10/15/10)

    6284 capacity @ 10 sitesK-3 @ 25:1 & 4-6 @ 32:1

    1824 seats (available)

    Page 12

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    13/50

    3000

    2750

    2500

    2000

    1750

    1500

    1250

    1000

    750

    500

    250

    Secondary School Use vs. Capacity (35:1 class size)

    projected for 7-12 (*EHS includes 8th grade Alameda Academy students)

    577

    925 1033

    1873*1500 (7-12)

    *2500 (7-12)

    EHS/AHS capacity 4090 students

    7-12 projected 4950 students

    Boundary conditions limit options forchanging AHS boundary(move from Union to Willow)

    Page 13

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    14/50

    Current school configuration

    EHS 9-12

    1,873

    1,033

    925

    594

    616

    308

    478

    278

    420

    364

    484

    476

    417

    AHS 9-12

    LMS 6-8

    WMS 6-8

    Earhart

    Bay Farm

    Otis

    Edison

    Lum

    Franklin

    Washington

    Haight

    Paden

    Ruby Bridges

    Elementary K-5

    577

    Page 14

    Based on projected enrollment numbers for 2011-12.Special Education enrollment included.

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    15/50

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    16/50

    Facilities: Option 1 Phase 1 B

    EHS 7-12

    2500

    1500

    AHS 7-12 Elementary K- 8

    Earhart

    Bay Farm

    Otis

    Edison

    Lum(AHS & EHS)

    Franklin

    Washington

    Haight

    (AHS & EHS)

    Paden

    Ruby Bridges

    Page 16

    7-12 boundary change to Willow

    Note: This new configuration envisions the potentialfor three (3) sites most conducive to K-8 configuration.Based on projected enrollment numbers for 2011-12.Special Education enrollment numbers are included.New boundaries would need to be drawn.

    Elementary K-6

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    17/50

    Option 1Phase I 2011-2012 Overview

    Alameda High School opens as a 7-12 high school (2500) Encinal High School opens as a 7-12 high school (1500)

    Lincoln and Wood Middle Schools close

    All elementary schools open as K-6 grade schools

    If K-3 (25:1) and 4-6 (32:1)

    Franklin Elementary would require a portable if K-3 (25:1)

    If K-6 elementary school class sizes increase to 32:1

    Ongoing savings All elementary schools can support K-6 at class size of 32:1

    Attendance boundaries change at both K-6 and 7-12 schools

    Page 17

    No cost savings

    $1.1 million cost savings

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    18/50

    Option 1 Phase 1

    New Portables 7 $466,000

    Restrooms 2 $196,075

    Drinking Fountains 0 $0

    Special Education 8 $0

    Lockers 600 $104,000

    PE Facility (2 gyms)

    Lunch Capacity (considering 2 lunch periods)

    (grades 7-9 as closed campus & 10-12 open campus)

    Changes Required Cost

    enrollment09-10

    sitecapacity

    Boundary Changes: Union to Willow (Willow addresses would attend AHS)Transportation: AC Transit 20, 21, 51A, 631, 663

    Total one-time cost : $766,075

    Alameda High School 7-12 (projected enrollment 2500)

    1873

    2230Classrooms: 79 (35:1)

    Page 18

    Classrooms needed: 7

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    19/50

    Option 1 Phase 1

    Relocated Portables 7 $252,000

    Restrooms 2 $196,075

    Drinking Fountains 0 $0

    Special Education 8 $0 Lockers 600 $104,000

    PE Facility (2 gyms)

    Lunch Capacity (considering 2 lunch periods)

    (grades 7-9 as closed campus & 10-12 as open campus)

    Changes Required Cost

    enrollment09-10

    sitecapacity

    Boundary Changes: Union to Willow (Willow addresses attend AHS)Transportation: AC Transit 20, 21, 51A, 631, 663

    Total one-time cost : $552,075

    Alameda High School 7-12 (projected enrollment 2500)

    1873

    2230Classrooms: 79 (35:1)

    Page 19

    Classrooms needed: 7

    O ti 1 Ph 1

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    20/50

    Option 1 Phase 1

    Portables 0 $0

    Restroom 0 $0

    Drinking Fountain 0 $0

    Lockers 0 $0 PE Facility (gym & fields) 0 $0

    Added lunch rooms needed 1 $0

    Special Education 8 $0

    2 lunch periods (separating grades 7-9 and 10-12)

    Changes Required Cost

    enrollment09-10

    sitecapacity

    Boundary changes: Union to Willow (EHS takes in addresses west of Willow)Traffic : AC Transit 31, 631, 663

    Total Cost $ 0

    Encinal High School 7-12 (projected enrollment 1500)

    1033

    1860Classrooms: 62 (35:1)

    Page 20

    Classrooms available : 6

    B F El t S h l K 3 (25 1) 4 8 (32 1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    21/50

    Grade

    Level

    K-6 K-8

    K 3 3

    1 3 3

    2 3 3

    3 3 3

    4 3 3

    5 3 3

    6 3 3

    7 3

    8 3

    Day Care 1 1

    SPED 1 2

    Total 23 30

    Bay Farm Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 26 Media Center: 1 Multi-Purpose Room: 1 Computer Lab:

    within Media Center

    Changes required Cost

    K-6 0 0

    K-8 4 portables

    2 restrooms

    $ 266,000

    $ 196,000

    Total Cost

    K-6 0

    K-8 $ 462,000

    Boundaries: Current

    Page 21

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    22/50

    Edison Elementary School K 3 (25 1) 4 8 (32 1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    23/50

    Grade

    Level

    K-6 K-8

    K 3 3

    1 3 3

    2 3 3

    3 3 3

    4 2 2

    5 2 2

    6 2 2

    7 2

    8 2

    Day Care 1 1

    SPED 1 2

    Total 20 25

    Edison Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 20 Media Center: 1 Multi-Purpose Room: 1 Computer Lab: 1

    Changes required Cost

    K-6 0 0

    K-8 5 portables2 restrooms

    $ 321,000$ 196,000

    Total Cost

    K-6 0

    K-8 $ 517,000

    Page 23

    Boundaries: Current

    Franklin Elementary School K 3 (25:1) 4 8 (32:1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    24/50

    Grade

    Level

    K-6 K-8

    K 2 2

    1 2 2

    2 2 2

    3 3 3

    4 2 2

    5 2 2

    6 2 2

    7 2

    8 2

    Day Care 1 1

    SPED 0 0

    Total 16 20

    Franklin Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 14 Media Center: 1 Multi-Purpose Room: 1 Computer Lab: 1

    Changes required Cost

    K-6 2 portables $ 140,000

    K-8 6 portables

    2 restrooms

    $ 376,000

    $ 196,000

    Total Cost

    K-6 $ 140,000

    K-8 $ 572,000

    Page 24

    Boundaries: Current

    Haight Elementary School K 3 (25:1) 4 8 (32:1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    25/50

    Grade

    Level

    K-6 K-8

    K 3 3

    1 3 3

    2 3 3

    3 3 3

    4 2 2

    5 2 2

    6 3 3

    7 2

    8 3

    Day Care 1 1

    SPED 1 2

    Total 21 27

    Haight Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 27 Media Center: 1 Multi-Purpose Room: 1 Computer Lab:

    in Media Center

    Changes required Cost

    K-6 0 0

    K-8 0 0

    Total Cost

    K-6 0

    K-8 0

    Page 25

    Boundaries: Current

    Lum Elementary School K 3 (25:1) 4 8 (32:1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    26/50

    Grade

    Level

    K-6 K-8

    K 3 3

    1 3 3

    2 3 3

    3 4 4

    4 2 2

    5 2 2

    6 3 3

    7 2

    8 2

    Day Care 1 1

    SPED 1 2

    Total 22 27

    Lum Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 26 Media Center: 1 Multi-Purpose Room: 1 Computer Lab:

    Within Media

    Center

    Changes required Cost

    K-6 0 0

    K-8 1 portable $ 70,000

    Total Cost

    K-6 0

    K-8 $ 70,000

    Page 26

    Boundaries: Current

    Otis Elementary School K 3 (25:1) 4 8 (32:1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    27/50

    Grade

    Level

    K-6 K-8

    K 3 3

    1 3 3

    2 4 4

    3 4 4

    4 3 3

    5 3 3

    6 2 2

    7 2

    8 2

    Day Care 1 1

    SPED 1 2

    Total 24 29

    Otis Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 23 Media Center: 1 Multi-Purpose Room: 1 Computer Lab: 1

    Changes required Cost

    K-6 1 portable $ 70,000

    K-8 6 portables

    2 restrooms

    $ 376,000

    $196,000

    Total Cost

    K-6 $ 70,000

    K-8 $ 572,000

    Page 27

    Boundaries: Current

    Paden Elementary School K-3 (25:1) 4-8 (32:1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    28/50

    Grade

    Level

    K-6 K-8

    K 3 3

    1 2 2

    2 2 2

    3 2 2

    4 2 2

    5 2 2

    6 2 2

    7 2

    8 2

    Day Care 0 0

    SPED 2 3

    Total 17 22

    Paden Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 22 Media Center: 1 Multi-Purpose Room: 1 Computer Lab: 1

    Changes required Cost

    K-6 0 0

    K-8 0 0

    Total Cost

    K-6 0

    K-8 0

    Page 28

    Boundaries: Current

    Ruby Bridges Elementary School K-3 (25:1) 4-8 (32:1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    29/50

    Grade

    Level

    K-6 K-8

    K 4 4

    1 5 5

    2 4 4

    3 4 4

    4 4 4

    5 3 3

    6 3 3

    7 2

    8 2

    Day Care 1 1

    SPED 2 2

    Total 30 34

    Ruby Bridges Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 34 Media Center: 1 Multi-Purpose Room: 1 Computer Lab: 1

    Changes required Cost

    K-6 0

    K-8 0

    Total Cost

    K-6 0

    K-8 0

    Page 29

    Boundaries: Current

    Washington Elementary School K-3 (25:1) 4-8 (32:1)

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    30/50

    Grade

    Level

    K-6 K-8

    K 2 2

    1 1 1

    2 2 2

    3 2 2

    4 1 1

    5 2 2

    6 1 1

    7 2

    8 1

    Day Care 0 0

    SPED 4 5

    Total 15 19

    Washington Elementary School K-3 (25:1) 4-8 (32:1)

    Standard Classrooms: 24 Media Center: 1 Multi-Purpose Room: 1 Computer Lab:

    within Computer

    Lab

    Changes required Cost

    K-6 0 0

    K-8 0 0

    Total Cost

    K-6 0

    K-8 0

    Page 30

    Boundaries: Current

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    31/50

    Options School Modifications Needed Total Cost

    K-6 Elementary 3 portables (if K-3 is maintained 25:1)

    Franklin 2 portables

    Otis 1 portable

    $210,000

    K-8 Elementary 23 portables

    4 sets of bathrooms

    Bay Farm 4 portables

    1 set of bathrooms

    Earhart 1 portable

    Edison 5 portables1 set of bathrooms

    Franklin 6 portables

    1 set of bathrooms

    Lum 1 portable

    Otis 6 portables1 set of bathrooms

    $2,263,000

    7-12 Secondary AHS 7 portables

    1 set of bathrooms

    600 lockers

    New: $666,075

    Used: $552,075

    Page 31

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    32/50

    Option 1: Facility Needs and Requirements

    We continue to review projected enrollment capacities and

    facility needs as we analyze changes in attendance boundariesrequired of closures/consolidations.

    We have worked to account for facility needs and requirementsresulting from the implementation of Scenario B Option 1.

    The next part of the presentation provides a review ofconsiderations of the impact made by Scenario B Option 1 onthe quality of instructional program.

    Stakeholders from AUSD secondary schools were included in aworking group to discuss the potential for a 7-12 configurationand plan for how Scenario B Option 1 could be implemented.

    Page 32

    Option 1: Quality of Instructional Program

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    33/50

    Option 1: Quality of Instructional Program

    This is an important time to look at alternative options that provide a

    sound educational opportunity for students based on research while

    we also look to maximize our limited resources.

    A review of the literature in various educational research studiesreveals that the United States is currently the only nation whereelementary students spend time in a middle or junior high schoolbefore entering high school.

    John Hatti: Research analysis revealed that the least impacts onstudent achievement were those related to the physical attributes

    (e.g., class size or grade configurations) of the school structure.Meanwhile, the greatest impact on student achievement was foundto be teacher feedback, a students prior cognitive ability andimprovements in instructional quality.

    Page 33

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    34/50

    Key Criteria for Closure/Consolidation

    Quality of instructional program (continued)

    Combs: In a summary of research on instruction vs. configuration,most researchers agreed that generally the quality of the schooland the quality of instruction (as well as the educational level ofteachers) were more important than the grade configuration in

    viewing academic progress of students.

    Gregg: Multiple grade spans and increasing number of studentsper grade increase students transitions from school to school,thereby negatively impacting student achievement.

    Moffitt: Various studies show more time spent at the same schoolincreases students sense of community and connection.

    Page 34

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    35/50

    Key Criteria for Closure/Consolidation

    Quality of instructional program (continued)

    Renchler: Multiple transitions cause other negative psychosocialoutcomes. Transitions impose stress on students and negativelyinfluence both sense of school identity and sense of community.

    Alspaugh: Significant achievement loss results in each additional

    transition year. Students with fewer transitions need fewer yearsto make up for achievement losses caused by transitions.

    Alspaugh: All things being equal, the dropout rate is found to belower in 7-12 configurations and higher in 10-12 configurationswhen considering the impact of increased transitions.

    Alspaugh, Alspaugh & Harting: Research indicates that numerousschool transitions over time may have a negative effect onacademic achievement, resulting in more high school drop-outsand lower attendance rates once children reach high school.

    Page 35

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    36/50

    Gaining Ground in the Middle Grades:

    Why Some Schools Do Better (EdSource Study, 2010)

    FindingsOne domain was the strongest in differentiating higher-performingschools and dominated in every analysis we ran: a schoolwide,comprehensive, intense focus on improving student outcomes.

    One domain dominated; six domains were strong but varied in effect.

    Focuson

    Out

    comes

    Co

    heren

    tInst

    ruc

    tion

    Superin

    ten

    de

    ntLea

    ders

    hip

    Teac

    her

    Compe

    tence

    Princ

    ipa

    lLea

    ders

    hip

    Ex

    tens

    ive

    Useo

    fDa

    ta

    Aca

    dem

    icInterven

    tions

    Page 36

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    37/50

    Strongest Finding According to EdSource Research:

    An Intense Schoolwide Focus on Student Outcomes

    The significant practices in this domain reflected a strong,integrated, comprehensive approach that clearly made improvedoutcomes Job #1 for higher performing schools:

    setting measurable goals on standards based tests

    a shared school mission that is future-oriented to prepare students

    academically for a rigorous high school curriculum

    adults accept accountability for improved student outcomes

    the school expects students and parents will share the responsibilityfor student learning

    Page 37

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    38/50

    Key Finding (EdSource): Extensive Use of Assessment

    and Other Student Data to Inform Improved Instruction

    Districts strong leadership role regarding provision and use of data

    Facility with and frequent use of data as changing role for principals

    Extensive use of assessment data by teachers as a culture shiftwith student outcomes at the center of instructional practice

    Researchers found no clear, consistent or significant associationbetween schoolwide outcomes on California Standards Tests and

    school grade configuration: a focus on instructional outcomes isclearly indicated as key to improvement of student performance

    Page 38

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    39/50

    How Leaders Envision Strong 7-12 School Communities

    AUSD instructional leaders at middle school and high school levels

    all agree that building a strong school community matters greatly.

    These practitioners view 7-12 as a potential opportunity to creategrade level advisories where students are grouped by grade level tocontribute to efforts aimed at promoting a strong school community.

    Grade level advisory period objectives would include the following:

    Developing a strong school cultureDelivering better communication to studentsSupporting student activities and upcoming eventsHelping students with individual course selectionIncluding character development in the school dayFocusing instruction through particular learning strategiesProviding grade level specific information/needs

    Page 39

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    40/50

    How 7-12 Could Provide Increased School Articulation

    AUSD instructional leaders at middle school and high school levels

    all agree a 7-12 configuration could provide increased opportunitiesfor articulation between curricula and practice in numerous areas.

    Currently articulation between middle schools and high schools isproblematic because of a separation of sites and their practitioners.

    This impacts the transition from middle school to high school asstudents enter high school having completed introductory coursesin mathematics and world languages while actually receiving fewerinstructional minutes and less content coverage in those courses

    because a 7-period day schedule in middle school offers lessclasstime than a 6-period schedule typically offered in high school.

    Leaders view 7-12 as an opportunity to address articulation needs.

    Page 40

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    41/50

    How 7-12 Will Still Provide Key Aspects of Middle School

    Grade 7-8 athletics could still be supported by AEF and stillprepare students for a better transition to high school teams.

    Grade 7-8 activities and events can be structured to include

    grade level assemblies, dances for a younger age group,talent shows and science faires expected at middle school.

    Grade 7-8 participation could also be carefully structured to

    include early experiences in high school dramatic productionsand musical programs, athletic events, schoolwide spirit daysand ongoing inclusion in Alamedas Close-Up excursions.

    Page 41

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    42/50

    How 7-12 Will Still Provide Key Aspects of High School

    Grades 9-12 would still benefit from high school activitiesthat the Alameda community has come to expect for students.

    A 7-12 secondary school would still provide for assemblies,

    athletics, dances, dramatic productions, musical programsand other activities that would be specifically geared to olderAUSD students as is currently the case.

    Reconfiguring Alameda and Encinal High Schools would stillallow students a wide range of Advanced Placement coursesand interscholastic athletic team participation opportunitiesstudents benefit from as part of their high school experience.

    Page 42

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    43/50

    Highlighting the Advantages of a 7-12 Program

    Encinal High School recently spent time reviewing the

    potential for a new 7-12 secondary school program with theEHS Principals Council and the EHS School Site Council.

    Some advantages included: increased parental involvement

    (six years instead of just three or four), career awarenessactivities and intro courses in Career Technical Education,more access to technology courses for younger students,longer relationships over time with teachers and counselors,increased opportunities for college and career advising,

    mentoring by students through Link Crew or other programs,continuity in programs for Special Education students,increased exposure at an earlier age to community service,and earlier awareness to college preparation requirements.

    Page 43

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    44/50

    Some Concerns Raised About a 7-12 Program

    Parents and the public have raised potential concerns about

    reconfiguring middle and high schools to 7-12 programs.

    Some concerns included: space limitations that could impactprograms (like PE on rainy days), risks of negative influences

    on younger students, worries over appropriate school attire,different social/emotional needs for the younger students,increased traffic/transportation concerns of bigger schools,and potential for increased risk of bullying by older students.

    Secondary leaders have brainstormed alternative scheduleswhereby younger (7-9) and older (10-12) students could havedifferent start and stop times for the school day along withdifferent facilities set aside to structure positive interactions.

    Page 44

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    45/50

    Addressing Concerns Raised About a 7-12 Program

    Alameda and Encinal High School administrators have beenworking to brainstorm facility and scheduling alternatives topromote safe transitions for younger grades to high school.

    Both AHS and EHS have identified buildings on campusesthat can serve as grade-specific wings to both help alleviateovercrowding and provide students with grade-level spaces.

    Meanwhile, alternative scheduling can also actually help

    alleviate existing traffic and transportation concerns also byproviding staggered schedules that promote better flow oftraffic than is currently experienced at both school sites.

    Page 45

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    46/50

    Developmental Concerns Raised About a 7-12 Program

    Some have raised concerns about potential risks associatedwith delinquency and gangs at a 7-12 secondary school.

    While it is hard to speculate about criminogenic effects of a7-12 secondary model, research by the Rand Institute (2004)on national school safety statistics actually shows thatphysical conflict is especially problematic in middle schoolsand that the concerns about safety in the middle gradespredict emotional distress that can compromise academic

    performance. Their research indicates that middle schooldisengagement and social alienation not only are related tolow academic achievement but also predict dropping out.Thus, alternatives to middle schools are now encouraged.

    Page 46

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    47/50

    General Advantages from Another Point of View

    Alameda High School leaders met with East Bay ROP staff

    to discuss advantages of a 7-12 model from that perspective.

    These advantages included: fewer transitions (specificallythe difficult transition from middle to high school), consistency

    of curriculum and opportunities for teachers to createsequenced project-based courses that build over the years,increased leadership opportunities for older students andincreased learning opportunities for younger students, andincreased awareness of college and career earlier on in life.

    Meanwhile, a 7-12 secondary school allows for opportunitiesto see firsthand what college and career readiness activitieslook like as younger students see what older students can do.

    Page 47

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    48/50

    General Advantages from A CTE Point of View

    Currently students are not exposed to awareness activities

    promoting Career Technical Education until high school.Research shows school and career planning in grades 7-8greatly reduces negative behaviors and increases studentaspirations to college and career attainment (Chaplin, 2010).

    Thus, the 7-12 configuration allows for new opportunities:Systematic, progressive college and career explorationthrough East Bay ROPs online Career Planning SystemCreation of a lifelong career development portfolio

    Creation of a 6-year college and career educational planJunior membership in Career Technical Educationstudent organizations like DECA, HOSA and HEROCreation of a Work Ready Certificate of Achievement

    Page 48

    O ti Ch t S h l F t

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    49/50

    Options: Charter School Facts

    school configuration enrollment current site

    BASE 9-12 115 students WEC

    Lease agreement

    ACLC 7-12 270 students EHS

    (added 2 rooms in 2009-10)

    NEA K-10 350 students Longfellow

    AUSD still maintains use of some rooms as well as mutual space.

    Academy 6-8 479 Alameda students Chipman

    AUSD still maintains use of some rooms as well as mutual space.

    Page 49

    Prop 39 proposals are due November 1, 2010 for the 2011-12 year.

    Next Steps

  • 8/8/2019 AUSD October 21, 2010 School Closure Presentation

    50/50

    Next Steps

    At the 11/23 Board of Education meeting,

    final recommendations for Option 1 will bepresented by staff for the Boards review.

    On 11/23 we will present detailed analyses

    on savings and costs that can be anticipatedfrom Option 1s 7-12 school reconfiguration.

    At the December 14 BOE meeting, the

    Board will decide upon any final Phase I/IIclosure/consolidation options planned for the2011-2012 and 2012-2013 school years.