Automatic Turbine Tester Ee

  • Upload
    sam

  • View
    228

  • Download
    0

Embed Size (px)

Citation preview

  • 7/31/2019 Automatic Turbine Tester Ee

    1/17

    AUTOMATIC TURBINE TESTER

    BY

    ASHUTOSH DWIVEDI

  • 7/31/2019 Automatic Turbine Tester Ee

    2/17

    SALIENT FEATURES OF ATT

    INDIVIDUAL TESTING OF EACH PROTECTIVEDEVICE AND STOP AND CONTROL V/V.

    PROTECTION OF TURBINE DURING ATT ISPROVIDED BY SPECIAL TEST PROTECTIVE

    DEVICES. AUTOMATIC FUNCTONAL PRETESTING OF

    SUBSTITUTE DEVICES THAT PROTECTTURBINE DURING TESTING.

    MONITORING OF ALL PROGRAM STEPS FOREXECUTION WITHIN A PREDEFINED TIME.

    INTERUPTION IF RUNNING TIME EXCEEDEDOR ACTUAL TRIP INITIATED.

    AUTO RESET OF TEST PROGRAM AFTER A

    FAULT.

  • 7/31/2019 Automatic Turbine Tester Ee

    3/17

    AUTOMATIC TURBINE TESTER

    HEALTHINESS OF FOLLOWING COMPONENTS ARE

    CHECKED ONLINE (WITHOUT TRIPPING OF TURBINE)

    PROTECTION DEVICES

    - FUNCTIONING OF REMOTE TRIP SOLENOID- FUNCTIONING OF OVERSPEED TRIP FLYBOLTS

    - FUNCTIONING OF HYDRUALIC LOW VACUUM TRIP

    TURBINE STOP & CONTROL VALVE

    - OPERATION OF ALL HP / IP STOP VALVES

    - FREE MOVEMENT OF ALL HP / IP CONTROL VALVES

  • 7/31/2019 Automatic Turbine Tester Ee

    4/17

    TESTING OF PROTECTION DEVICES

    RTS 1 /2

    O/S TRIP

    LOW VACCUM

    SEQUENCE OF OPERATION

    SELECT SUB GROUP

    SELECT SAFTY DEVICE

    TEST PROG ON

    PRETEST STARTS

    PRETEST COMPLETE

    MAIN TEST ON

    MAIN TEST COMPLETE

    RESETTING PROG ON

    RESETTING COMPLETE

    TEST COMPLETE

  • 7/31/2019 Automatic Turbine Tester Ee

    5/17

    C/O VALVE

    & TEST SOL

  • 7/31/2019 Automatic Turbine Tester Ee

    6/17

    PRETEST

    TEST SOLENOIDS ENERGISE( OPEN)

    PRESSURE BEFORE CHANGEOVER V/V > 5 Ksc

    TEST SOLs DE ENERGISE (CLOSE)

    PR BEFORE CHANGEOVER V/V & BETWEEN TESTSOLs < 2 Ksc

    TEST SOLs ENERGISE

    PR BEFORE CHANGEOVER V/V > 5 Ksc

    OPERATING SOL OF CHANGEOVER V/V ENERGISE CHANGEOVER V/V MOVES TO TEST POSITION

    ALTERNATE SUPPLY OF TRIP OIL ESTABLISHED

    FROM CONTROL FLUID

  • 7/31/2019 Automatic Turbine Tester Ee

    7/17

    RESET SOL

    O/S TRIP DEVICE

    O/S TRIP

    TESTER

    RTS

  • 7/31/2019 Automatic Turbine Tester Ee

    8/17

    MAIN TEST

    REMOTE TRIP SOLENOID 1 /2

    RTS 1 OR 2 ENERGISE

    AUX TRIP OIL DRAINS MAIN TRIP V/V TO TRIP POSITION

    TRIP OIL BEFORE CHANGEOVER V/V DRAINS

    TEST COMPLETE

  • 7/31/2019 Automatic Turbine Tester Ee

    9/17

    MAIN TEST

    OVERSPEED TRIP DEVICE O/S TEST MOTOR ON

    TEST OIL PRESSURE BUILDS UP

    O/S BOLTS 1 & 2 OPERATE

    AUX TRIP OIL DRAINS

    MAIN TRIP V/V TO TRIP POSITION

    TRIP OIL BEFORE CHANGEOVER V/V DRAINS

    TEST COMPLETE

  • 7/31/2019 Automatic Turbine Tester Ee

    10/17

  • 7/31/2019 Automatic Turbine Tester Ee

    11/17

    LOW

    VACUUM

    TRIP

  • 7/31/2019 Automatic Turbine Tester Ee

    12/17

    MAIN TEST

    LOW VACCUM TRIP DEVICE LOW V/C TEST SOL ENERGISE

    V/C ABOVE DIAPHRAGM FALLS

    MAIN PILOT MOVES DOWN

    SECOND PILOT MOVES DOWN

    AUX TRIP OIL DRAINS

    MAIN TRIP V/V TO TRIP POSITION

    TRIP OIL BEFORE CHANGEOVER V/V DRAINS

    TEST COMPLETE

  • 7/31/2019 Automatic Turbine Tester Ee

    13/17

    RESETTING PROGRAMME RTS/ LOW VAC SOL DEENERGISE/OVERSPEED MOTOR REVERSES

    TO OPERATING POSITION

    RESET SOLs ENERGISE

    AUX STARTUP OIL BUILDS UP (FROM CONTROL FLUID)

    MAIN TRIP V/V & O/S TRIP DEVICE RESET

    AUX TRIP OIL & TRIP OIL BUILD UP

    RESET SOLs DEENERGISE AUX START UP COLLAPSE

    OPERATING SOL OF CHANGEOVER V/V DEENERGISE

    CHANGEOVER V/V MOVES TO OPERATING POSITION

    TRIP OIL CIRCUIT ESTABLISHES THROUGH MAIN TRIP V/V

    TEST SOLs DEENERGISE

    RESETTING COMPLETE

    TEST COMPLETE

  • 7/31/2019 Automatic Turbine Tester Ee

    14/17

    TESTING

    OF

    STOP AND CONTROL VALVE

  • 7/31/2019 Automatic Turbine Tester Ee

    15/17

    CHANGE

    OVER V/V

    AND TEST

    & RESETSOL

    ATT

    MOT

    OR

    TT T T /

  • 7/31/2019 Automatic Turbine Tester Ee

    16/17

    ATT OF STOP AND CONTROL V/VSEQUENCE OF OPERATION

    ATT MOTOR OF CONTROL V/V STARTS

    CONTROL V/V SLOWLY CLOSES FULLY

    ATT MOTOR STOP WITH SLIGHT OVERTRAVEL TEST SOL OF STOP V/V ENERGISE

    SLIDE V/V OF TEST V/V MOVES TO UPPER POSITION

    TRIP OIL BELOW PISTON CONNECTED TO DRAIN

    STOP V/V CLOSE

    RESET SOL ENERGISE

    TRIP OIL IS ADMITTED ABOVE PISTON

    SPRING IS TIGHTEND

    TEST SOL DE-ENERGISE

    RESET SOL DE-ENERGISE

    STOP V/V OPENS SLOWLY TO 100%

    ATT MOTOR OF CONTROL V/V ROTATES IN REVERSE DIRECTION

    CONTROL V/V OPENS SLOWLY TO NORMAL POSITION

    ATT MOTOR STOPS AFTER SLIGHT OVER TRAVEL

    TEST COMPLETE

  • 7/31/2019 Automatic Turbine Tester Ee

    17/17