Upload
akelalife
View
220
Download
0
Embed Size (px)
Citation preview
8/22/2019 automation of boiler
1/15
Boiler PerformanceAutomation
for Boilers
Chris Golden
Senior AccountManager
Nalco Company
8/22/2019 automation of boiler
2/15
for Boilers
Performance Management for Boiler Systems
for Boilers
3D TRASAR for Boilers3D TRASAR for boilers
delivers maximummaximum
performanceperformance. Safer operation
Improved system
reliability Lowest Cost of Operation
Technology scope
Advanced monitoring &control
Performance sensors New chemistry
Software
Wireless communication
Performance Management for Boiler Systems
8/22/2019 automation of boiler
3/15
for Boilers
Performance Management for Boiler Systems
3D TRASAR Boiler Basic System
Controller &Fluorometer
@T ORPTM
BoilerSample
8/22/2019 automation of boiler
4/15
for Boilers
Performance Management for Boiler Systems
3D TRASAR Internal Treatment
Automatically responds
Maintain optimum treatment levels
Keeps your boiler clean
pp
m
22310
0
5
10
15
20
25
30
35
40
45
01/10/99 01/20/99 01/30/99 02/09/99 02/19/99 03/01/ 99 03/11/99 03/21/99
Date
Optimum Operation
Detect
System
Upsets
TRASAR Automation
1/20/99 01/30/99 02/09/99 02/19/99 03/
Date
0
5
10
15
20
25
30
35
40
45
10/11/1997 20/11/1997 30/11/1997 10/12/1997 20/12/1997 30/12/1997 09/01/1998 19/01/1998
Date
ppm
22310
TRASAR Automation
Good for Boilers from 10 psig toover 2400 psig
8/22/2019 automation of boiler
5/15
for Boilers
Performance Management for Boiler Systems
Starter Controller &T3 Fluorometer
@T ORP 3D TRASAR Preboiler CorrosionControl
3D TRASAR Preboiler Corrosion Control
BoilerSample
8/22/2019 automation of boiler
6/15
for Boilers
Performance Management for Boiler Systems
Preboiler Corrosion Control Vision
Today:
Test Oxygen
Test ScavengerResidual
Inspect
Equipment
Tomorrow:
Continuous, Real-
Time Measurementof CorrosionPotential
Automation ofOxygen ScavengerFeed
8/22/2019 automation of boiler
7/15
for Boilers
Performance Management for Boiler Systems
-100
-600
-700 -600
-500
-400
-300
-200
-100
0
-200
-300
-400
-500
@
Temp
Orp
(mv)
RTORP
(mv
)
Time (hrs)
@T ORP vs RT ORP(at Temp vs Room Temp 200 MW Coal Fired Plant)
@T ORP more sensitive than RT ORP too timize CHZ feed
8/22/2019 automation of boiler
8/15
for Boilers
Performance Management for Boiler Systems
ORP Cell Internal
Configuration
@T ORP vs Dissolved O2
-0.4
-0.3
-0.2
-0.1
0
0
100
200
300
400
500
@TORPvsEP
BRE(V)
D
O(ppb)
20 Minutes @T ORP faster response than DO monitor
3D TRASAR P b il C i
8/22/2019 automation of boiler
9/15
for Boilers
Performance Management for Boiler Systems
Potential
High
Low
ChemicalTreatment
Low
High
Typical Corrosion Control
Underfeed Results in Corrosion
Overfeed leads to Excess Treatment Costs
3D TRASAR Preboiler CorrosionMonitoring
Today we have fixed feed rates regardless of
the boilers waters potential to corrode
8/22/2019 automation of boiler
10/15
for Boilers
Performance Management for Boiler Systems
New Best Practice forPreboiler Corrosion Control
@T ORP Performance based control of corrosion stress
Maintains Reduced Conditions
Minimizes corrosion
Promotes passivation
Customer Value Safety, Reliability
Mitigates failures
Reduce boiler iron deposits
Minimize Cost
Asset protection Minimize downtime
Maximize Availability
Improve turbine efficiency
-0.8
-0.6
-0.4
-0.2
0
0.2
1/23/20060
:00:00
2/2/20060
:00:00
2/12/20060
:00:00
2/22/20060
:00:00
3/4/20060
:00:00
3/14/20060
:00:00
3/24/20060
:00:00
4/3/20060
:00:00
4/13/20060
:00:00
4/23/20060
:00:00
5/3/20060
:00:00
5/13/20060
:00:00
5/23/20060
:00:00
6/2/20060
:00:00
6/12/20060
:00:00
LP#3AT-TORPvsEPBRE
(V)
Phase 2: LP #3 AT-T ORP Controlled
Feed Of Eliminox
Phase 1: AEPCO Controlled Feed Of Eliminox
Baseline Monitoring LP #3 AT-T ORP
LP #3 AT-T ORP Set Point = -350 mV
Figure 1: LP #3 AT-T ORP Results During Phase 1 and 2 of AEPCO Trial
8/22/2019 automation of boiler
11/15
for Boilers
Performance Management for Boiler Systems
3D Boiler StarterPerformance Automation
WebInterface
WebServer
Boiler Optimizer
Boiler Configurator
Pretreatment Preboiler
WebInterface
WebServer
Boiler Configurator
At -T ORP probeAt -T ORP probe
Pretreatment Preboiler
Controller Host Module
TRASAR 3 probeTRASAR 3 probe
TRASAR 1 probe
TRASAR 3 probe
TRASAR 1 probe
ConductivitypHpH NCM
&
LCM
Particle counterParticle counterNCM
&
LCM
Boiler Condensate
pHpH Level sensor
or other 4 -20
mA inputs
Misc.
Level sensor
or other 4 -20
mA inputs
Level sensor
or other 4 -20
mA inputs
Misc.
ISE Breakthrough
Detection
ISE Breakthrough
Detection
8/22/2019 automation of boiler
12/15
for Boilers
Performance Management for Boiler Systems
Performance Automation
Dynamic Control - Expanded MOC Approach
8/22/2019 automation of boiler
13/15
for Boilers
Performance Management for Boiler Systems
3D TRASAR WebSystem Performance Monitoring
3D TRASAR Web is... A convenient way for Nalco Reps
and Customers to monitor systemperformance, and the value of 3DTRASAR control
View performance summary of all
systems Display performance detail for asingle system
Generate, print, and schedulegraphs and reports
Download data to your PC for
advanced analysis and reportingwith Vantage V100
Alarming
8/22/2019 automation of boiler
14/15
for Boilers
Performance Management for Boiler Systems
3D Boiler Starter
@T ORP
Controller & Fluorometer
@T ORPPreboiler
corrosion
stress
Monitoring
& Control
TRASAR
Treatment
Control
+
3D TRASARWeb
data analysis, reportingand alarming
8/22/2019 automation of boiler
15/15
Performance Management for Boiler Systems
3D TRASAR for boilers delivers maximum
performance under pressure, resulting in a
safer operation, improved system reliability,and reduced total operating costs.
for Boilers
Safety Reliability
for Boilersfor Boilers
Safety
TCO
Reliability
performanceperformanceperformanceperformanceperformance
Performance Under Pressure