29
Autonomic Microgrids ? Professor Phil Taylor Siemens Professor of Energy Systems Director of the EPSRC National Centre for Energy Systems Integration Niagara 2016 Symposium on Microgrids 20 – 21 st October 2016 Niagara on the Lake, Ontario

Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

AutonomicMicrogrids?

ProfessorPhilTaylorSiemensProfessorofEnergySystems

DirectoroftheEPSRCNationalCentreforEnergySystemsIntegration

Niagara2016SymposiumonMicrogrids20– 21st October2016

NiagaraontheLake,Ontario

Page 2: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Overview• AutonomicMicrogridsandSelf*Operation• TechnicalZoning• AlgorithmSelection• MarketZoning• SelfOrganisingArchitecturesandCyberSecurity

• NationalCentreforEnergySystemsIntegration

Page 3: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Drivers

Page 4: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

OverarchingResearchQuestion

Can a fully distributed intelligence and controlphilosophy deliver the future flexible gridsrequired to facilitate the low carbon transition,allow for the adoption of emerging game-changing network technologies and cope withthe accompanying increase in uncertainty andcomplexity?

Page 5: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Self*NetworkOperationandControlSchematic

Page 6: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

II.Howtozone?–(a)

§ Proximitymetric:definitionofdistanceamongbuses

§ Definitionof mergingcriteria

§ Clusteringvalidationcriteria

§ Zonalcentroididentification(pilotnode)

Zoningmethodology

Zoningmethodologies(examplesofexistingandownones):

§ Hierarchicalclustering–singledistance(HCSD)§ Hierarchicalclustering–MVArcontrolspace(HCVS)

§ SpectralClustering(SKC)§ FuzzyClustering(FCM)

Page 7: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

II.Howtozone?–(b)

Barbara AlimisisSeptember 2014

accurate data error 2% error 4% error 6% error 8% error 10%

82

84

86

88

90

92O

PI(%

)

HCVSSKCFCMHCSDRobustnessofazoningdecision

-testingtheeffectofuncertaintyonthemeasurements(e.g.imperfectprediction,noisyorcorrupteddata)

Performanceofazoningdecision

-agreaterperformancesignifiesreducedlosses&enhancedsecurity

HCSD HCVS SKC FCM80

85

90

95

100

OPI

(%)

Page 8: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

III.Staticvs.adaptivezoning..

Barbara AlimisisSeptember 2014

Questioningthefeasibility.

§ Fastenough(<1min)forlargescalenetwork(e.g.2383busestestnetwork)?

§ Availabilityofmeasurementandtelecommunicationinfrastructure?

Questioningthevalue.

§ Performanceenhancementvs.reconfigurationthreshold

100 101 102 103 104

FCM

SKC

HCVS

HCSD

Execution time (sec)

Zo

nin

g m

eth

od

olo

gie

s

HCSD HCVS SKC FMC-15

-10

-5

0

5

D(O

PI)

static PIthres=20 PIthres=10 PIthres=1

Page 9: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

AlgorithmSelection:WhyDoIt?

Potentialtoprovidebetterperformancebyselectingalgorithmsforeachstate,insteadofusingonealgorithmforallstates

Algorithm A best

Algorithm A best

Algorithm B best

Network states

Per

form

ance

A

B

Page 10: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

BuildingAlgorithmSelectors• Createanalgorithmselectortoexploitlinkbetweennetwork

stateandalgorithmperformance• Usemachinelearningtocreatetheselector

PerformanceData

Network State Measurements

Algorithm Selections

States Algorithms

Machine Learning

Algorithm Selector

OFFLINE (TRAINING) ONLINE (USE)

Different machine learning algorithms can beused, such as artificial neural networks (ANN),decision tree learners and random forests

Page 11: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

• Creationofalgorithmselectorsalreadyestablishedincomputerscienceapplications

• Twomaintypes:– Direct

– EPM-based(EmpiricalPerformanceModel)

BuildingAlgorithmSelectors

Network State Measurements

Algorithm Selections

Algorithm Selector

EPM for Algorithm A

EPM for Algorithm B

Network State Measurements

Predicts performances

Algorithm Selections

Selection based on predictions

Predicts which algorithm will

be best

Page 12: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Application:PowerFlowManagement

• AdditionalDistributedGenerators(DGs)cancauseoverloadednetworkbranches

• PowerFlowManagement:– Activeapproach(ActiveNetworkManagement)– ControlDGoutputstomitigateoverloads

• Ideally:minimiseoverloadswhileminimisingDGcurtailment

Page 13: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Application:PowerFlowManagement

5

Power flow management

algorithms

implemented & tested

4

Case study power

systems

used for testing

40k+

Varying system states

simulated per system

20k+

Algorithm selector designs

developed & evaluated

Page 14: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Application:PowerFlowManagement• Example:IEEE57-bussystem,10,000states

Algorithm / SelectorNo. of

overloads (count)

Curtailed energy (MWh)

Best Individual Algorithm (OPF) 1367 749,900Best Direct Selector 771 900,734Best EPM-based Selector 772 926,646Optimal Selections 768 821,087

• Algorithm selection reduces the number of overloads

Page 15: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

EconomicalandTechnicalLayers

Set points

Economical Layer

Technical Layer

Technical constraints:power voltage

Page 16: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

InteractionbetweenthetwoLayers

Technical)zoning)

Technical))constraints)violated)

Y

N Lowest cost

AuctionRuns

Economical)zoning)

Solution)

Economical)zoning)Economical zoning

Lowest possible cost

Page 17: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Anexample– initialzoning• 11biddersparticipatingin

theauction– sixdemands(D1-D6)andfivesuppliers(S1-S5).

• OveralldemandinControlzoneAis12.5MWand10MWinControlzoneB.

Page 18: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

OffersandbidsinzoneAInitialzoningDemand MW Cost (pence/MW)

Demand 1 5 120

Demand 2 2.5 100

Demand 3 5 90

Suppliers MW Cost (pence/MW)

Supplier 1 2.5 140

Supplier 2 5 130

Supplier 3 7.5 130

Supplier 4 12.5 90

Supplier 4 2.5 80

Usingatwo-sideduniform-priceauction,Supplier4delivers12.5MWtoDemands1,2and3atapriceof90pence.Beforeusingtheflexiblezoningstructure,thecostinEconomiczoneAalonewouldbe1125pence(12.5MW*90pence).

Page 19: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

OffersandbidsinzoneBInitialzoningDemand MW Cost (pence/MW)

Demand 4 5 80

Demand 5 2.5 50

Demand 6 2.5 40

Suppliers MW Cost (pence/MW)

Supplier 5 12.5 50

Supplier 5 10 40

Supplier 5 10 40

Again,usingatwo-sideduniform-priceauctionSupplier5delivers10MWtoDemands4,5and6atapriceof40pence.Atthisprice,theenergycostinEconomiczoneBalonewouldbe400pence(10MW*40pence).TogetherwithEconomiczoneA,totalenergycostwouldbe1525pence.

Page 20: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Suggestion1– lowestoverallcostByreallocatingsomeDandSbetweenzonesZones MW Cost (pence/MW)

Economic Zone A (new zone)

Demand 1 5 120

Demand 3 5 90

Demand 5 2.5 50

Supplier 5 12.5 50

Economic Zone B (new zone)

Demand 2 2.5 100

Demand 4 5 80

Demand 6 2.5 40

Supplier 5 10 40

Total cost 1025

12.5*50+10*40=625+400=1025pence.

Page 21: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Suggestion2– second-lowestoverallcost(IfSuggestion1isnottechnicallyfeasible)

Zones MW Cost (pence/MW)

Economic Zone A (new zone)

Demand 1 5 120

Demand 2 2.5 100

Demand 4 5 80

Supplier 4 2.5 80

Supplier 5 10 40

Economic Zone B (new zone)

Demand 3 5 90

Demand 5 2.5 50

Demand 6 2.5 40

Supplier 5 10 40

Total cost 1400

12.5*80+10*40=1000+400=1400pence.

Page 22: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Decision• TheTechnicalLayerrejectsEconomicLayerSuggestion1.• EconomicLayerSuggestion2isfeasible.Suggestion2isacceptedbyTechnicalLayerbutis

animprovementoninitialsuggestion.

Page 23: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Self-OrganisingArchitectures• AnAgentbasedarchitecture• Self-Organisingpropertiesto

respondtoattacks• Operatesinthreestages

– Initialisation– PerformanceMonitoring– DecisionMakingandreconfiguration

• FuzzybasedDecisionmakingengine

• InterfaceswithMatpowerforloadflowcalculation

SmartMeterCustomerGeneratorEntity

LocalController/DataCollectionCentralServer

Page 24: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

NetworkConfiguration

• 340Customerswithprofiles• 4PVGeneratorswithprofiles

• 4ActiveAggregates(4Dormant)• 4CentralCoreAgents

Observer Architect Gateway ErrorGenerator

Page 25: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

AttackStrategies• Allattacksarebasedonlow-rate

DenialofServiceattacks• Selectedcustomeragentsactas

theattackers• AggregateAgentsascontrollers

arethetargets• Twolevelsofattacker

sophistication– Static:Lowlevelofsophistication,

attackerselectsafixedtarget– Adaptive:Anescalatedstate,attack

trafficredirectsafteranarchitecturetransition

29CombinationsofAttackStrategy,IntensityandSophistication

• BurstAttack:Attacktraffictransmittedfor250seconds

• ContinuousAttack:Attacktraffictransmittedoncetriggereduntiltheendofthesimulation

• SequentialAttack:TwoBurstinstancesatcriticalstagesofthecontrolprocess

Attackstimedtocoincidewithvoltagecontrolsignals

Page 26: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Respondingtoanattack• Thearchitectisinformedtheimpact

onperformancemetrics.• Allmetricsarecombinedtoforma

valueforComputationalBurden.• Afuzzybaseddecisionmakingengine

monitorstheburdenanditsrateofchange.

• Ifnecessaryarchitecturaltransitionsareinitiatedtoredistributeconnections,replaceagentsorincreaseaggregatecapacity

• Aimingtoimprovecontrolperformancethrougheasingloadonthecommunicationnetwork

Page 27: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Mathematics

Anthropology

ComputerScience

Geology

Economics

Physics MechanicalEngineering

ElectricalEngineering

Website : research.ncl.ac.uk/cesiTwitter : @cesienergyEmail : [email protected]

Page 28: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

TheUrbanMicrogridinNewcastle:DemonstratorsonScienceCentral

EVFillingstation

CHPsystemThermalStorageHeatandCoolNetwork

Page 29: Autonomic Microgridsmicrogrid-symposiums.org/wp-content/uploads/2016... · Demand 6 2.5 40 Suppliers MW Cost (pence/MW) Supplier 5 12.5 50 Supplier 5 10 40 Supplier 5 10 40 Again,

Conclusions

• AutonomicMicrogridsandSelf*promising– DynamicZones,AlgorithmSelection

• MultipleMicrogrids?• DecentralisedMarkets• CyberSecurityneedsmorework

– Modeltheattackers• MultiVectorMicrogrids