AV-ME-WI-13 Cleaning and Assembly of Compression Machine

  • Upload
    jfejfe

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

  • 7/27/2019 AV-ME-WI-13 Cleaning and Assembly of Compression Machine

    1/3

    Department: MaintenanceDOC. No. : AV/ME/WI/013

    Page No. : Page 1 of 3

    Issue Date: 01.03.06Revision No. Date : !00)-01.03.06

    "u#$ect %&eaning an' assem#&ing o( %ompression Mac)ine

    REVISIONS

    Revision

    No.

    Revised

    Pages

    Revision Description Date of Revision

    00 0 Original Issue 01.03.06.06

    Prepare' *+ Approve' *+ Aut)ori,e' #+

    Maintenance officer Management Representative Factor Manager

    !C"#$$%F%&D: %nterna' (se On' !

  • 7/27/2019 AV-ME-WI-13 Cleaning and Assembly of Compression Machine

    2/3

    Department: MaintenanceDOC. No. : AV/ME/WI/013

    Page No. : Page of 3

    Issue Date: 01.03.06Revision No. Date : !00)-01.03.06

    "u#$ect %&eaning an' assem#&ing o( %ompression Mac)ine

    Procedure:

    As soon as the compression of a particular batch is over, clean the entire exterior of the

    machine as well as the room. Following proceure ahere to!1. "isconnect the electric #uppl$.

    %. "ismantle carefull$ the following parts

    a. Fee &oppers

    b. Acr$lic 'uarsc. Fee Frames

    . (urret 'uars

    e. )over plate of worn shaft.

    f. *$lon brea+ plugs along with the spring steel strips.g. "ie screws

    h. (ablet collecting chutesi. "ust collecting hoo assemblies.

    )lean all the above mentione part along with relevant bolts thoroughl$ with hot tap

    water an +eep them asie.1. emove carefull$ all the lower punches in a speciall$ esign tra$, seriall$

    arrange. #imilarl$ remove all the upper punches an +eep tem in a separate tra$

    seriall$ arrange. emove all the ies with the help of a ## ro an +eep them

    seriall$ arrange in one of the above tra$s.%. )lean all the interior area of the machine li+e base plate on which the turret is

    fitte, cam trac+s, ie seats, upper an lower punch holes, turret surface, first witha r$ n$lon brush an then with special enature spirit. )are shoul be ta+enwhile cleaning the punch hole an ie seats so that the$ are free from particular

    matter.

    3. -ipe clean the exterior of the machine with a lint free uster soa+e in specialenature spirit.

    . 'et the entire area cleane b$ /anitor.

    . )leaning an fitting of ies an punches.

    (a+e about % liter of hot tap water, 10 teepol mixture an cleane all thepunches b$ ipping each in hot water teepol mixture an then cleaning thoroughl$

    with hot tap water. After cleaning, all the punches an ies put seriall$ in the

    clean tra$s meant for storing them.6. 2se 1 liters of istille water to give couple of washes to the cleane parts an

    ismantle punches an ies. Inspect the final rinse water for absence of an$

    suspene matter. If reuire, use aitional istille water to get the clear rinsewater.

    Prepare' *+ Approve' *+ Aut)ori,e' #+

    Maintenance officer Management Representative Factor Manager

    !C"#$$%F%&D: %nterna' (se On' !

  • 7/27/2019 AV-ME-WI-13 Cleaning and Assembly of Compression Machine

    3/3

    Department: MaintenanceDOC. No. : AV/ME/WI/013

    Page No. : Page 3 of 3

    Issue Date: 01.03.06Revision No. Date : !00)-01.03.06

    "u#$ect %&eaning an' assem#&ing o( %ompression Mac)ine

    4. -ipe all the cleane parts from step 6 with a clean r$ lint free cloth.

    Fitting of "ies! 5efore the ies are fitte, ensure all the ie seats are free from an$foreign matter. lace the ie face ownwars on the ie hole. Appl$ light pressure

    with fingers on the top phase of the ie to locate centrall$ over the ie hole. After

    locating the ie correctl$, rive the ie into its position with the help of ## ro

    introuce through the upper punch guie holes. Once the ie is fitte, the top portionof the ie flush with the turret surface. *ow introuce all the ies screw an tighten

    again. )hec+ whether the ie surface flush with the turret surface.

    Fitting of 7ower unches!

    (a+e a lower punch. -ipe it r$, smear with liui paraffin an introuce it throughthe lower punch ie hole ta+ing care that each numbere punch goes into its

    corresponing compression station. All the lower punches thus introuce movefreel$ up an own. ut the plug bac+ into its position. Fix all the cleane an rie

    n$lon plugge with spring steel trips.

    Fitting of upper unches!

    (he cleane an r$ upper punches smeare with liui paraffin an introuce into

    their corresponing holes.

    1. ut bac+ all the turret guars after wiping them r$. Fit the cleane an rie feeframe at their respective position. Install the cleane an rie acr$lic guars an

    hoppers in their relevant positions.%. Assemble the cleane ust collecting hoo assemblies.3. )over the cleane machine with a clean cloth cover. Affix a cleaning tic+et

    inicating the following.

    Equipment Name:

    Last Product:

    Next Product

    !eaned "#:

    Date:

    Supervisor Signature!

    Prepare' *+ Approve' *+ Aut)ori,e' #+

    Maintenance officer Management Representative Factor Manager

    !C"#$$%F%&D: %nterna' (se On' !