Availability Check Shipping

Embed Size (px)

Citation preview

  • 8/14/2019 Availability Check Shipping

    1/7

  • 8/14/2019 Availability Check Shipping

    2/7

    Topics

    1. Introduction

    2. Availability control inShipping

    3. Prerequisites

    4. Scope of Check

    5. Process Flow

  • 8/14/2019 Availability Check Shipping

    3/7

    Introduction

    Availability check in Delivery is initiated during creationand check is done for the picking date.

    The check is carried out on the same criteria as in Salesorder processing.

    Availability check at delivery level is carried out forfollowing reasons Check may not have done for items at order level and hence

    needs to be done at delivery stage. Although check may have been carried out in order the

    availability situation may have changed due to various unknown

    reason. Dynamic check at this stage would ensure correct status in

    terms of availability so that further actions after delivery i.e.Picking, Packing etc are not affected.

  • 8/14/2019 Availability Check Shipping

    4/7

    Availability Control in

    Shipping

    Control elements for availability are same as in salesdocuments Checking Group

    Checking group specifies in combination with checking rule the

    scope of availability check. It is maintained in material master in

    Plant view and copied on to sales documents. Checking Rule

    A Checking rule is assigned to each transaction and in

    combination with checking group define what movements are

    considered for availability check. These are predefined in system

    Delivery Item category

    Additional check exists at delivery item category level to control

    if availability should be checked or not.

  • 8/14/2019 Availability Check Shipping

    5/7

    Prerequisites

    Following prerequisites need to be fulfilled for availabilitycheck to take place Control elements in Sales and Distribution are maintained in

    customizing and assigned.

    Availability check switched on at requirement class and delivery

    item category level. Plant should be defined at document item level.

    Checking group should be maintained in material master on

    Sales/plant screen in Availability check field.

  • 8/14/2019 Availability Check Shipping

    6/7

    Scope of Check

    Elements that can be included in availability check are Stock

    Safety Stock

    Stock in Transfer

    Quality Inspection stock

    Blocked Stock

    Inward/Outward movement of goods

    Purchase orders and requisitions

    Planned orders and Production orders

    Reservations

    Dependent requirements

    Sales and Delivery requirements

    The elements that need to be included depend on the

    scenario for which availability check is being set.

  • 8/14/2019 Availability Check Shipping

    7/7

    Process Flow

    System determines date for availability check on basis ofearliest material availability date of all schedule lines in

    delivery.

    If there is insufficient stock following is system behavior

    Sufficient quantity of material not available by materialavailability date, a delivery quantity 0 is entered in delivery. If

    item category of delivery permits 0 quantity then it would be

    included else item would not be allowed in delivery.

    Quantity available of material is lower than order quantity,

    system would enter available quantity as delivered quantity andorder would get updated accordingly. If partial delivery is not

    allowed, this would be noted in delivery creation log.