AWMA – Georgia ChapterAir Permitting Update
April 16, 2013
Eric Cornwell
Stationary Source Permitting Program
SSPP Structure
• 4 Units - 28 permit engineers, 2 admin– Chem Unit – Glass, engineered wood– NOx Unit – Landfills, engines– VOC Unit – Wood pellets, lumber kilns– Min Unit – Military, rendering, asphalt
Permit Application Timeliness:
• Pending Application Count (April 2013):– 202 permit applications– 12 (non TV-renewal) apps older than six months – 500 permit apps processed in past 12 months
• Processing time– Title V significant modifications……161 days– 502(b)10…………………………….…...66 days – Synthetic Minor…………………..……62 days
Expedited Permits
• In response to Senate Bill 427 O.C.G.A 2-2-2(c)(1)(A).
• Implemented no later than July 1, 2013• Two stakeholder meetings (Oct and Dec)• http://www.georgiaair.org/airpermit/html/
sspp/expeditedssppmeeting.htm
Expedited Permits, Cont.
• No rulemaking – Director to implement procedures.
• Fee-based and optional for applicants• Reviews done by EPD – no third party review• TV-I, TV-R, MAWO not eligible
PSD Resources• PSD Guidance for Industry – now available
• Pre-processed met data – now available
• Background ambient concentrations – now available
• Statewide NAAQS and PSD Increment inventory (aka Off-site Emissions inventory)– Not yet…EPD intends to do this if funding is
available
PSD Guidance for Industry
• Provides up-front expectations for a complete PSD application – BACT, Modeling, Submittals– Emphasizes early resolution of issues.
• http://www.georgiaair.org/airpermit/html/sspp/psd_guidance_document.htm
8
Meteorological Data• GA EPD has developed 5-years of
meteorological data for each ASOS surface and upper air pairing– Pairing based on distance, climatological zone, and data
completeness criteria– Last updated on April 4, 2013
• All data sets are available on-line– http://www.georgiaair.org/airpermit/html/sspp/modeling/
aermetdata.htm
9
Surface/Upper Station PairingsKCHA/KFFC
KGVL/KFFC
KRMG/KFFC
KVPC/KFFC
KFFC/KFFC
KATL/KFFC
KAHN/KFFC
KDNL/KFFC
KMCN/KFFC
KCSG/KFFC
KABY/KTLH
KAMG/KJAX
KSAV/KCHS
KSSI/KJAX
KVLD/KTLH
KTLH/KTLH
10
Surface Roughness Update• Previously, EPD provided data sets with three different
surface roughness values (0.05, 0.5, 1.0) and the applicant ran AERSURFACE at the project site to find the most representative value.
• Now, meteorological data is processed using the surface roughness at the airport
– 12 different sectors
• Applicant will provide a justification for representativeness in modeling protocol
11
Background Concentrations
• GA EPD has develop background concentrations for each county based on the 2009-2011 design values– PM10, PM2.5, SO2, NO2, CO, Pb
• Will update to 2010-2012 design values by the end of April
• All data sets are available on-line– http://www.georgiaair.org/airpermit/html/sspp/modeling.htm
12
Permit Modeling Guidance
• Guideline for Modeling PM10 Ambient Concentration in Areas Impacted by Quarry Operation Producing Crushed Stone - August 7, 2012 – http://www.georgiaair.org/airpermit/downloads/
sspp/modeling/quarryguideline_august2012.pdf
GHG Permitting
• July 20, 2014 – Biomass deferral set to end. – GHG-major sources with non-PSD permits must
“begin actual construction” prior to this date; otherwise permit invalid.
• US EPA has recently proposed revised “Global Warming Potential (GWP) for Part 98. 78 FR 19809, Table 2
Boiler MACT and GACT
• Final standards published in FR Feb 2013• SSPP slowly rolling details into permits
– Adding to already pending applications– Companies can request revisions– Conditions as specific as practical– No mass “open for cause”
Wood Pellet Emission Factors
• Process – Log chipper, dryer (usually direct-contact), hammermill, pelletizer, and pellet cooler.
• Downstream testing showed VOC previously unaccounted for.– Plants over ~120,000 tpy production may be PSD major
without downstream controls.
• Manny Patel developed default wood pellet emission factors from AP-42 and testing
EPD switching email systems
– Novell to Outlook– Air Branch transition this week– Email addys to remain the same
• [email protected]• [email protected]• [email protected]