A B
B A
B A 1 2 3
3 2 1
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
11
/ 11
Office of the Director
DEO LEO N. MANALO
Submitted by:
Reviewed by:Prepared by:
Director, PDS
ENGINEER IVARCHITECT IIIJULIUS C. CARLOSNIKKA P. ZARAGOZA DOTC 16TH FLOOR CONFERENCE ROOMS
RENOVATION AND UPGRADING OF EXISTING CONFERENCE ROOMS
A-77
07
INTERIOR ELEVATIONS
1
550 2100
2400
2100
300
400
250
900
1700
650
600
210024
00
1
550 2100
1500
400
800
350
400200
950
0
1000150
2100
900
2100
300
2400
100700
800
1
2100
300
500
500
500
100
2400
400
250
900
1
17005502100
650
600
210024
00
250
900
650
600
2400 10
0
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
11
/ 11
Office of the Director
DEO LEO N. MANALO
Submitted by:
Reviewed by:Prepared by:
Director, PDS
ENGINEER IVARCHITECT IIIJULIUS C. CARLOSNIKKA P. ZARAGOZA DOTC 16TH FLOOR CONFERENCE ROOMS
RENOVATION AND UPGRADING OF EXISTING CONFERENCE ROOMS
A-808
08
BLOW-UP PLAN - PANTRYDETAILED ELEVATIONSSTORAGE CABINET DETAILS
800
600
1200 900 10001350
2100 2350
2
1400
800
600
1400
1300 1550400 400
2100
300
2400
2
2100 24
00
2
900
900
575
325
300
900
2100
300
2400
900
300
900
2400
2100
900
300
900
2400
2100
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
11
/ 11
Office of the Director
DEO LEO N. MANALO
Submitted by:
Reviewed by:Prepared by:
Director, PDS
ENGINEER IVARCHITECT IIIJULIUS C. CARLOSNIKKA P. ZARAGOZA DOTC 16TH FLOOR CONFERENCE ROOMS
RENOVATION AND UPGRADING OF EXISTING CONFERENCE ROOMS
A-909
09
BLOW-UP PLAN - M&F TOILETDETAILED ELEVATIONS
7517
5
250
200
10
50
75
300
100
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
11
/ 11
Office of the Director
DEO LEO N. MANALO
Submitted by:
Reviewed by:Prepared by:
Director, PDS
ENGINEER IVARCHITECT IIIJULIUS C. CARLOSNIKKA P. ZARAGOZA DOTC 16TH FLOOR CONFERENCE ROOMS
RENOVATION AND UPGRADING OF EXISTING CONFERENCE ROOMS
A-1010
10
TERMINATION DETAILS
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
11
/ 11
Office of the Director
DEO LEO N. MANALO
Submitted by:
Reviewed by:Prepared by:
Director, PDS
ENGINEER IVARCHITECT IIIJULIUS C. CARLOSNIKKA P. ZARAGOZA DOTC 16TH FLOOR CONFERENCE ROOMS
RENOVATION AND UPGRADING OF EXISTING CONFERENCE ROOMS
A-1111
11
DOOR & WINDOW SCHEDULE
ELECTRICAL LEGEND:
Sa
POWER SERVICEENTRANCE
CIRCUIT BREAKER
DUPLEX CONVENIENCEOUTLET, 20A, 230V.
GROUND
CIRCUIT RUN ONCONCRETE OR SLAB
CIRCUIT RUN ON CEILING
SWITCHES
CIRCUIT HOMERUN
PANEL BOARD
5.0 TR PACU
PS
RA
F
NART
MT
OT
NE
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D S N OI T
MM
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
1
/ 2
Office of the Director
DEO LEO N. MANALO
Submitted by:
Reviewed by:Prepared by:
Director, PDS
ENGINEER IVENGINEER IIIJULIUS C. CARLOSSAINOR F. GARBIN RENOVATION OF 16TH FLOOR DOTC CONFERENCE ROOM
RENOVATION AND UPGRADING OF EXISTING CONFERENCE ROOMS
E- 11
1
ELECTRICAL PLAN
CKTNO. LOAD DESCRIPTION VOLT WATTS
CKTSIZE OF WIRES AND CONDUIT
PROTECTION
PBA
POLEØAB ØCA ØBC
IT = 13.83 x 3 + 26.10 + ( 0.25 x 26.10 )
= 56.58 AMPS
USE : 3 - 22.0mm ² THW
1 - 8.0mm ² THW
IN 32mm ∅ RSC
CB RATING :
USE : 100 AT, 3P , 240 , 60 Hz ECB
IF = 56.58 x 1.25
= 70.72 AMPS
3Ø
CKTNO. LOAD DESCRIPTION VOLT WATTS
CKTSIZE OF WIRES AND CONDUIT
PROTECTION
PBB
POLEØAB ØCA ØBC
IT = 11.22 x 3 + 26.10 + ( 0.25 x 26.10 )
= 52.06 AMPS
USE : 3 - 22.0mm ² THW
1 - 8.0mm ² THW
IN 32mm ∅ RSC
CB RATING :
USE : 100 AT, 3P , 240 , 60 Hz ECB
IF = 52.06 x 1.25
= 65.07 AMPS
3Ø
PBB
PBA
ELECTRICAL LEGEND:
Sa
POWER SERVICEENTRANCE
CIRCUIT BREAKER
DUPLEX CONVENIENCEOUTLET, 20A, 230V.
GROUND
CIRCUIT RUN ONCONCRETE OR SLAB
CIRCUIT RUN ON CEILING
SWITCHES
CIRCUIT HOMERUN
PANEL BOARD
5.0 TR PACU
PS
RA
F
NART
MT
OT
NE
O
O
CD
N
ATRA
NOIT
P
CIN
U
AE D S N OI T
MM
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
2
/ 2
Office of the Director
DEO LEO N. MANALO
Submitted by:
Reviewed by:Prepared by:
Director, PDS
ENGINEER IVENGINEER IIIJULIUS C. CARLOSSAINOR F. GARBIN RENOVATION OF 16TH FLOOR DOTC CONFERENCE ROOM
RENOVATION AND UPGRADING OF EXISTING CONFERENCE ROOMS
E- 21
1
LOAD SCHEDULEPANEL BOARD DETAILS
KSKS
CWL
The Columbia Tower, Ortigas Ave., Mandaluyong City, Metro Manila
Project Development Service
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS
Republic of the Philippines
Office of the Director
DEO LEO N. MANALO
Submitted by:
Reviewed by:Prepared by:
Director, PDS
ENGINEER IVJULIUS C. CARLOS 16TH FLOOR DOTC CONFERENCE ROOMS
RENOVATION AND UPGRADING OF EXISTING CONFERENCE ROOMS
LEGEND:
11
1
WATER SUPPLY LAYOUTSEWAGE LAYOUT
01
/ 1