29
BOARD OF DIRECTORS AUGUST 2016 Executive Responsible John Grinnell, Deputy Chief Executive and Chief Finance Officer Paper prepared by (if different from above) Executive Directors Category of Item Strategic Direction and Development Performance and Governance Context Previous Board discussion Link to National Policy Link to Trust’s Strategic Objectives Risk if no action taken Executive Summary The Trust’s Month 4 Performance Report is detailed in the attached paper. Received or approved by Legal Implications None Recommendation It is recommended that the Board note: The performance during July 2016 (Month 4). Acronyms and Abbreviations VTE Venous Thromboembolism DVT Deep Vein Thrombosis PE Pulmonary Embolism CQUIN Commissioning for Quality and Innovation Payment Programme RTT Referral to Treatment UCL Upper Confidence Limit LCL Lower Confidence Limit BADS - British Association of Daycase Surgery I&E - Income and Expenditure C. difficile Clostridium difficile (bacterial infection) MRSA Methicillin-resistant Staphylococcus aureus (bacterial infection) STF Sustainability and Transformational Plan Subject/Title July (Month 4) Integrated Performance Report Nature of Report For Information For Discussion For Approval U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 1

B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

BBOOAARRDD OOFF DDIIRREECCTTOORRSS

AAUUGGUUSSTT 22001166

Executive Responsible John Grinnell, Deputy Chief Executive and Chief Finance Officer

Paper prepared by (if different from above)

Executive Directors

Category of Item Strategic Direction and Development

Performance and Governance

Context Previous Board discussion

Link to National Policy

Link to Trust’s Strategic Objectives

Risk if no action taken

Executive Summary

The Trust’s Month 4 Performance Report is detailed in the attached paper.

Received or approved by

Legal Implications None

Recommendation It is recommended that the Board note:

The performance during July 2016 (Month 4).

Acronyms and Abbreviations

VTE – Venous Thromboembolism DVT – Deep Vein Thrombosis PE – Pulmonary Embolism CQUIN – Commissioning for Quality and Innovation Payment Programme RTT – Referral to Treatment UCL – Upper Confidence Limit LCL – Lower Confidence Limit BADS - British Association of Daycase Surgery I&E - Income and Expenditure C. difficile – Clostridium difficile (bacterial infection) MRSA – Methicillin-resistant Staphylococcus aureus (bacterial infection) STF – Sustainability and Transformational Plan

Subject/Title July (Month 4) Integrated Performance Report

Nature of Report For Information

For Discussion

For Approval

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 1

Page 2: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

BOARD OF DIRECTORS

INTEGRATED PERFORMANCE REPORT

JULY 2016

1. Introduction 1.1 The integrated performance report has been developed in order to assist the Board

in monitoring the delivery of key performance metrics against local and national targets.

1.2 The report covers the five key domains of: - Patient Safety, Patient Experience, Resources, Efficiency and External Perception.

1.3 Performance measurement targets within these domains are based on the following

The core standards set nationally by Monitor, NHS England, Welsh Assembly Government and the Care Quality Commission

Any locally agreed Commissioner driven targets including CQUIN quality improvement

Internal performance targets in line with the Trust’s Annual Operating Plan objectives.

1.4 The scorecard format provides an overview of the performance within each domain

with further detail of specific metrics in graphical and tabular format.

1.5 The scorecard utilises two graphical presentation methods; line graphs and statistical process control (SPC) charts. SPC charts enable the analysis of the variability of a metric relative to average performance. Data points within the upper and lower limits are linked to natural variation in performance levels.

1.6 As agreed, a review of the scorecard is underway which will result in a revised format from Quarter 2 of 2016-17.

2. Overview 2.1 Month 4 saw the Trust maintain its excellent patient experience performance. Whilst

overall the safety domain performed well, we report a spinal wrong level surgery never event in the report.

2.2 Our RTT performance met trajectory however a growth in referrals and the impact of lower activity than planned during the summer holiday period is putting increasing pressure in delivering our plan. Theatre activity levels in July were lower than anticipated and have had an adverse impact on our finances. With similar challenges forecast in August, an executive led group to oversee performance has been initiated.

3. Performance Overview 3.1 Domain 1 – Patient Safety

3.1.1 Overview – Seven of the ten key metrics were rated as green in month. Although

the number of incidents remains low overall, the Trust continually scopes areas for improvement and ensures learning is communicated throughout all appropriate areas. The following exceptions are noted for month 4.

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 2

Page 3: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

3.1.2 Serious Incidents – The scorecard reports one serious incident in July where a patient on the care of the elderly ward fell and sustained a fracture. The incident has been reported to the relevant external bodies. A further incident occurred in July that has also been reported as a Never Event with STEIS in August, therefore will show on the August scorecard. A patient underwent spinal surgery and during post-procedure checks a CT scan showed that wrong level spinal surgery had been performed. The Consultant spoke to the patient and their family to explain the outcome and the correct level surgery was consented and carried out the following day.

3.1.3 Mortality Rates – There were no patient deaths in July.

3.1.4 Hospital Acquired VTE (DVT or PE) – A patient was diagnosed with hospital acquired deep vein thrombosis six days following a total knee replacement. The patient had been risk assessed on admission and following diagnosis of the DVT, the patient’s care plan was updated on the ward. One incident remains within the monthly tolerance levels.

3.1.5 Patients Falls (Harms) – Seventeen patient falls occurred in July with eight patients capable of receiving medical advice not complying with the medical advice given at the time of the incident. For Inpatients, there were sixteen falls that when compared to activity levels correlates to 2.50% of activity. There was one further fall in Outpatients. Five patients experienced low level harm of skin abrasion (2), loss of consciousness (1) and pain (2). One further patient experienced moderate pain. Although six incidents with harm is above the limit of two, it remains within normal variation levels.

3.1.6 Hospital Acquired Pressure Ulcers – Pressure Ulcers are graded on a scale from 1 to 4, with grade 1 relating to minimal harm and grade 4 being full skin loss and the highest level of harm.

There were no incidents to report in July.

3.1.7 Medication Errors (Harms) – The graph for this KPI within the scorecard displays the overall errors per month and those with harm. The performance rating is based on any harms. Twelve medication incidents relating to patient care at the hospital were recorded during July which were categorised as Prescribing (2), Administration (2), Dispensing (7) and the incorrect advice given to a patient (1). No patients experienced harm as a result of these errors.

3.1.8 28 day Readmission Rates to RJAH – Seven patients were readmitted as an emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission were wound issues (4), pain (1), query possible infection (1) and revision lumbar discectomy (1).

3.2 Domain 2 - Patient Experience

3.2.1 Overview – July was a positive month for patient feedback with three hundred and fifty five compliments received, the highest so far this year. The comments received frequently refer to the friendly and professional manner that staff demonstrate throughout all areas of the patient’s pathway of care. The following exceptions are noted for month 4.

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 3

Page 4: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

3.2.2 NHS Friends & Family Test – The Friends and Family metrics within the scorecard is a combined measure representing the percentage of both inpatients and outpatients that would and would not recommend the Trust. In line with the national metrics, passive responses are not included within calculations. The results for July indicate that 99.13% of patients would recommend the Trust. 0.70% stated they would not recommend the Trust. Those who were unlikely to recommend were from a cross-section of areas and left no specific comments. The latest national averages published for May 2016 indicate that 96% of inpatients recommend Trusts with 1% not recommending so our performance continues to exceed those levels.

3.2.3 Complaints – Two complaints were received in July, below the tolerance level. One

of the complaints related to clinical care with reasons associated with the outcome of care. A further operational complaint related to appointment allocation following multiple DNAs. Each complaint is currently under review in line with the Trust’s Complaints Policy.

3.2.4 Delayed Discharges – The delayed discharges rate is reported as the total number

of delayed days against the total available bed days for the month. In July there were 250 delayed bed days. When compared to the available beds this gives a rate of 5.04% which is higher (being worse) than the 2.50% target. As with previous months, the delays are predominately Spinal Injuries patients who were awaiting care packages. As a Trust we are unable to directly control this so we continue to raise the issue with the relevant Commissioners.

3.2.5 Access to Bone Tumour Services – All cancer targets were achieved in July. Since last month’s scorecard a shared breach has been uploaded to the national cancer waits database against the 62 day standard so performance has been updated to 66.67% for June. The patient commenced a pathway at this Trust and was then referred to SaTH on day 32 of their pathway, however, SaTH did not commence their definitive treatment within target. We are currently challenging the breach share allocation, as the patient was transferred to SaTH in a timely manner.

3.2.6 Access to Services - English – Our July performance is 88.75% against the 92% open pathway performance for patients waiting 18 weeks or less to start their treatment. This is against a trajectory plan of 88.29%. The total number of breaches has increased by 63 from 687 to 750. It is important to note that overall list size has increased during the first quarter; we have seen an increase in the number of referrals received and have notified the Commissioners of the position.

3.2.7 Patients waiting over 52 weeks – At the end of July there were no hospital initiated 52 week waits for English patients. There were 10 English patients (10 patient choice) and 10 Welsh patients waiting over 52 weeks (10 BCU). All patients waiting over 40 weeks are being monitored on a weekly basis, with Clinical Commissioning Groups. Welsh long wait patients are being managed in line with revised contract instructions and we are currently in discussions regarding the reduction profile for 2016/17. Our ability to meet our demand for spinal disorder patients remains a key area of focus operationally.

3.3 Domain 3 – Efficiency Overview – July was a challenging month in terms of patient efficiency with a number of metrics rated as amber in month. Activity figures were lower than plan in July.

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 4

Page 5: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Internal theatre throughput levels fell below plan with 91.24% of theatre lists being utilised compared to a target of 96.60%. However, cases per session improved and exceeded target at 2.25. The following exceptions are noted for month 4:

3.3.1 Daycase Performance – July saw an improvement in the performance against the composite target for BADS with performance reported at 85.96% against the 84% target and is rated green in month. The July casemix was a contributory factor in this although a daycase working group does meet on a monthly basis where performance against this standard is monitored. The Daycase rate for July deteriorated to 46.42% against the 51% target so is rated amber in month. The new development will support improvement in this area with extended opening hours for the unit supported by additional therapy service provision.

3.3.2 Admission on Day of Surgery – The proportion of patients admitted on the day of surgery came back to the levels seen earlier in the year at 95.67%. The frequency of the forward look process is being reviewed to ensure there is continued focus on this measure.

3.3.3 Average Length of Stay – Although the average length of stay was maintained at 3.85 days, the metric is rated as amber due to the target step change. Sustained focus is required to ensure this reduces over the remainder of the year. Despite a dip, the proportion of Primary Hip and Knee patients discharged in three days or less continues to exceed its target at 64.02% in July.

3.3.4 Outpatient Productivity – The DNA rate decreased in July improving to 5.69% compared to 6.54% the previous month; however the target of 5.4% was not quite achieved. Areas of concern were added to the text reminder service and regular reviews will continue to make effective use of this system.

3.4 Domain 4 – Resources 3.4.1 Overview – We continue to adjust our Income and Expenditure performance to

reflect the criteria attached to the control total target set by NHS Improvement. This excludes performance driven by donated assets (depreciation and income) and sustainability and transformation funding (STF). Achievement of our control total target at each quarterly milestone is a key deliverable in being eligible to receive the £0.5m of Sustainability and Transformation funding included in our plan. We have received £125k of this to date based on our quarter 1 performance. Our adjusted surplus for July was £41k against a plan of £191k leaving us £150k adrift of target. The shortfall was driven by lower than planned levels of inpatient activity and income as a result of higher than anticipated consultant annual leave.

On a cumulative basis we have achieved a control total adjusted surplus of £341k (£507k including STF) which is £135k behind plan.

A further shortfall of activity and clinical income is expected for August. An executive led finance and RTT task and finish group has been set up to ensure appropriate booking of patients that optimises performance of both our key targets and to oversee a recovery of lost activity.

Our FSRR for July has remained at a 4 (lowest level of risk). Our EBITDA margin year to date is 4.9% which is lower than plan by 0.6%.

The key features of the financial performance for month 4 are detailed below:

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 5

Page 6: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

3.4.2 Income - Clinical income fell short of plan by £263k driven by:

Reduced theatre activity delivered internally £259k

Reduced levels of outsourcing to the independent sector and pass through drugs £154k (benefiting cost base)

Partly offset by:

Increased non surgical activity and outpatients £150k

Private patient income fell short of plan by £137k which was largely casemix driven.

3.4.3 Expenditure – Overall pay costs were £107k under plan in month driven by lower than planned levels of ‘out of job plan’ working. Agency spend remains a key area of focus for our regulator. In month our agency spend was £134k which was within our control limit. The number of agency agreements exceeding national price caps reduced by 2 to 13 and these continue to be reported to NHSI on a weekly basis. Non pay costs overall were £160k under plan linked to pass through items as reflected in the cost base.

3.4.4 Cost Improvements – Our efficiency plan has been set at £3.5m for the year and

full delivery of this is one of the core components of our ability to hit our control total. In month £201k was recognised against a plan of £266k whilst year to date we have achieved £698k against a plan of £759k leaving us £61k behind plan. The underperformance is largely linked to one of our key schemes (valued at £300k) associated with increased productivity in our theatres. As we have not met our planned internal activity levels this scheme has fallen behind plan. Delivery of remaining schemes is being closely monitored through our performance management framework and further mitigating schemes are currently being worked up and overseen by the task and finish group.

3.4.5 Capital Expenditure amounted to £0.83m in month and primarily related to the

construction of the new Theatres and Tumour unit. Year to date we have spent £2.9m which is £360k ahead of plan largely driven by an earlier than anticipated commencement of the equipment replacement programme. We anticipate staying within our overall capital plan of £5m.

3.4.6 Cash Balances reduced by £0.3m in month to £4.6m which is £0.2m behind planned

levels linked to the profile of the capital programme.

3.4.7 Sickness Absence – Sickness absence for July decreased to 3.33%, following a

reduction in short terms absences, stress and anxiety. The following exception report stating areas below the target is included for information. Medicine 4.11% Theatre 3.69% Surgery 3.35% -

3.4.8 Staff Stability Index – The stability index for July improved to 91.05% which is just above (better than) the 91% target. The following exception report stating areas below the target is included for information. Corporate 88% - Theatre 90% Medicine 90%

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 6

Page 7: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

3.4.9 Staff Appraisal – Following further focus on this area, staff appraisals in July increased to 93.30% Trust wide of staffing having undertaken an appraisal within the past 12 months, above the 90% target.

3.4.10 Staffing Establishment – The Trust monitor staffing levels twice daily and this is reported to NHS England monthly. As part of a review of our reporting of this indicator for this financial year we have changed the planned fill rate to be measured against a fixed establishment based on safer staffing levels and will provide a narrative on where we may vary from this in a planned way for example if we reduce bed numbers or for lower patient complexity. Previously the plan has been flexed to take account of these issues however it is felt to be clearer to fix the planned levels and narrate any variance.

3.4.11 All escalation processes have been followed to ensure patient safety is maintained with the shift fill rate of 97.8% above the target of 90%. The monthly Unify table is shown below.

The average fill rates fell below target in some areas throughout the month but Wards remained safely staffed and supporting data monitors the patient numbers on the Wards at these times and includes the monitoring of patient acuity levels.

3.5 Domain 5 – External Perception

3.5.1 As referenced in the resources section our financial performance and sustainability risk rating remained at a level 4 (lowest level of risk).

3.5.2 NHS Improvements’ governance rating shows the Trust being in breach of its licence

and is therefore rated as red on the scorecard.

4. Recommendation 4.1 It is recommended that the Board:

Note the performance for July (Month 4)

John Grinnell Deputy Chief Executive and Chief Finance Officer

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 7

Page 8: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Month Key Metric Actual YTD Change Forecast Month Key Metric Actual YTD Change Forecast

Jul-16 Infection Control g g same g Jul-16 Friends & Family Test g g same gJul-16 Serious Incidents a a same a Jul-16 Number of Complaints g g same gJul-16 Never Events g g same g Jul-16 Theatre Cancellations g a same gJul-16 Unexpected Deaths g g same g Jul-16 Delayed Discharges r r same aJul-16 Clinical Quality a a worse g Jul-16 Access to Bone Tumour Services g g same gJul-16 Safety Thermometer g a same g Jul-16 Access to Services - English r r worse gJul-16 Medication Errors and those with Harm g g same g Jul-16 Patients Waiting Over 52 Weeks r r same gJul-16 Pressure Ulcer Assessments g g same gJul-16 28 Day Emergency Readmission Rate a a worse gJul-16 VTE Assessments Undertaken g g same g

← →

Month Key Metric Actual YTD Change Forecast Month Key Metric Actual YTD Change Forecast

Jul-16 Sickness Absence a a same g Jul-16 Demand for Services a a same aJul-16 Staff Stability Index g a better g Jul-16 Activity - Surgery a g worse gJul-16 Staff Appraisal g a better g Jul-16 Activity - Medicine a g worse gJul-16 Safe Staffing - % Shift Fill Rate g g same g Jul-16 Daycase Performance g a better gJul-16 Net Surplus r r worse a Jul-16 Admission on Day of Surgery g g better gJul-16 CIP Delivery a a worse a Jul-16 Theatre Efficiency a a worse aJul-16 Capital Expenditure a a worse g Jul-16 Average Length of Stay g g same gJul-16 PSPP g g same g Jul-16 Bed Utilisation r a worse aJul-16 Cash Balance g g same g Jul-16 Outpatient Productivity a a better a

Jul-16 New to Follow Up Ratio (Consultant Led Activity) g g same g

Resources EfficiencyOverall Performance Overall Performance

Patient Safety Patient ExperienceOverall Performance Overall Performance

VISION

To be the leading centre for high quality, sustainable Orthopaedic and related care, achieving excellence in both experience and outcomes for our

patients

Month Key Metric Actual YTD Change Forecast

Jul-16 Monitor Risk Rating - Finance g g same a

Jul-16 Monitor Risk Rating - Organisational Health r r same r

Overall PerformanceExternal Perception

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 8

Page 9: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Safety

Infection Control

Period Target Actual Performance

Apr-16 0.00 0.00 g

May-16 0.00 0.00 g

Jun-16 0.00 0.00 g

Jul-16 0.00 0.00 g

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Hospital Acquired MRSA Bacteraemia

0.00

1.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Safety

Infection Control

Period Target Actual Performance

Apr-16 0.00 0.00 g

May-16 0.00 0.00 g

Jun-16 0.00 0.00 g

Jul-16 0.00 0.00 g

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Hospital Acquired C.Difficile

0.00

1.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Safety

Period Target Actual Performance

Apr-16 0.00 0.00 g

May-16 0.00 0.00 g

Jun-16 0.00 2.00 a

Jul-16 0.00 1.00 a

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Serious Incidents

0.00

1.00

2.00

3.00

4.00

5.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Safety

Period Target Actual Performance

Apr-16 0.00 0.00 g

May-16 0.00 0.00 g

Jun-16 0.00 0.00 g

Jul-16 0.00 0.00 g

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Never Events

0.00

1.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 9

Page 10: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Safety

Period Target Actual Performance

Apr-16 0.00 0.00 g

May-16 0.00 0.00 g

Jun-16 0.00 0.00 g

Jul-16 0.00 0.00 g

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Never Events

0.00

1.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Safety

Period Target Actual Performance

Apr-16 0.00 0.00 g

May-16 0.00 0.00 g

Jun-16 0.00 0.00 g

Jul-16 0.00 0.00 g

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Unexpected Deaths

0.00

1.00

2.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Safety

Clinical Quality

Period Target Actual PerformanceApr-16 3.00 0.00 gMay-16 3.00 0.00 gJun-16 3.00 4.00 aJul-16 3.00 1.00 g

Aug-16 3.00Sep-16 3.00Oct-16 3.00Nov-16 3.00Dec-16 3.00Jan-17 3.00Feb-17 3.00Mar-17 3.00

Hospital Acquired VTE (DVT or PE)

0.00

1.00

2.00

3.00

4.00

5.00

6.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Mean UCL LCL Actual

Patient Safety

Clinical Quality

Period Target Actual PerformanceApr-16 2.00 5.00 aMay-16 2.00 2.00 gJun-16 2.00 1.00 gJul-16 2.00 6.00 r

Aug-16 2.00Sep-16 2.00Oct-16 2.00Nov-16 2.00Dec-16 2.00Jan-17 2.00Feb-17 2.00Mar-17 2.00

Total Patient Falls and those with Harm

0.00

0.50

1.00

1.50

2.00

2.50

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Mean UCL LCL Actual

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Harms Total

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 10

Page 11: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Safety

Clinical Quality

Period Target Actual PerformanceApr-16 2.00 5.00 aMay-16 2.00 2.00 gJun-16 2.00 1.00 gJul-16 2.00 6.00 r

Aug-16 2.00Sep-16 2.00Oct-16 2.00Nov-16 2.00Dec-16 2.00Jan-17 2.00Feb-17 2.00Mar-17 2.00

Total Patient Falls and those with Harm

0.00

0.50

1.00

1.50

2.00

2.50

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Mean UCL LCL Actual

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

20.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Harms Total

Patient Safety

Clinical Quality

Period Target Actual Performance

Apr-16 1.00 0.00 g

May-16 1.00 0.00 g

Jun-16 1.00 0.00 g

Jul-16 1.00 0.00 g

Aug-16 1.00Sep-16 1.00Oct-16 1.00Nov-16 1.00Dec-16 1.00Jan-17 1.00Feb-17 1.00

Mar-17 1.00

Hospital Acquired Pressure Ulcers - Grade 2

0.00

1.00

2.00

3.00

4.00

5.00

6.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Safety

Clinical Quality

Period Target Actual Performance

Apr-16 0.00 0.00 g

May-16 0.00 1.00 r

Jun-16 0.00 0.00 g

Jul-16 0.00 0.00 g

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Hospital Acquired Pressure Ulcers - Grades 3 or 4

0.00

1.00

2.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Safety

Safety Thermometer

Period Target Actual PerformanceApr-16 95.00 99.17 gMay-16 95.00 97.73 gJun-16 95.00 98.78 gJul-16 95.00 98.19 g

Aug-16 95.00Sep-16 95.00Oct-16 95.00Nov-16 95.00Dec-16 95.00Jan-17 95.00Feb-17 95.00Mar-17 95.00

Safety Thermometer - % with no new harms

92.00

93.00

94.00

95.00

96.00

97.00

98.00

99.00

100.00

101.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Mean UCL LCL Actual

92.00

93.00

94.00

95.00

96.00

97.00

98.00

99.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Mean UCL LCL Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 11

Page 12: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Safety

Safety Thermometer

Period Target Actual PerformanceApr-16 95.00 99.17 gMay-16 95.00 97.73 gJun-16 95.00 98.78 gJul-16 95.00 98.19 g

Aug-16 95.00Sep-16 95.00Oct-16 95.00Nov-16 95.00Dec-16 95.00Jan-17 95.00Feb-17 95.00Mar-17 95.00

Safety Thermometer - % with no new harms

92.00

93.00

94.00

95.00

96.00

97.00

98.00

99.00

100.00

101.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Mean UCL LCL Actual

92.00

93.00

94.00

95.00

96.00

97.00

98.00

99.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Mean UCL LCL Actual

Patient Safety

Safety Thermometer

Period Target Actual PerformanceApr-16 95.00 92.56 rMay-16 95.00 92.42 rJun-16 95.00 95.73 gJul-16 95.00 96.99 g

Aug-16 95.00Sep-16 95.00Oct-16 95.00Nov-16 95.00Dec-16 95.00Jan-17 95.00Feb-17 95.00Mar-17 95.00

Safety Thermometer - % of patients with harm free care

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Mean UCL LCL Actual

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Mean UCL LCL Actual

Patient Safety

Period Target Actual PerformanceApr-16 2.00 1.00 gMay-16 2.00 3.00 aJun-16 2.00 0.00 gJul-16 2.00 0.00 g

Aug-16 2.00Sep-16 2.00Oct-16 2.00Nov-16 2.00Dec-16 2.00Jan-17 2.00Feb-17 2.00Mar-17 2.00

Medication Errors and those with Harm

0.00

0.50

1.00

1.50

2.00

2.50

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Mean UCL LCL Actual

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

11.00

12.00

13.00

14.00

15.00

16.00

17.00

18.00

19.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Harms Total

Patient Safety

Period Target Actual PerformanceApr-16 99.00 100.00 g

May-16 99.00 99.90 g

Jun-16 99.00 100.00 g

Jul-16 99.00 100.00 g

Aug-16 99.00Sep-16 99.00Oct-16 99.00Nov-16 99.00Dec-16 99.00Jan-17 99.00Feb-17 99.00

Mar-17 99.00

Pressure Ulcer Assessments

98.40

98.60

98.80

99.00

99.20

99.40

99.60

99.80

100.00

100.20

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 12

Page 13: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Safety

Period Target Actual PerformanceApr-16 99.00 100.00 g

May-16 99.00 99.90 g

Jun-16 99.00 100.00 g

Jul-16 99.00 100.00 g

Aug-16 99.00Sep-16 99.00Oct-16 99.00Nov-16 99.00Dec-16 99.00Jan-17 99.00Feb-17 99.00

Mar-17 99.00

Pressure Ulcer Assessments

98.40

98.60

98.80

99.00

99.20

99.40

99.60

99.80

100.00

100.20

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Safety

28 Day Emergency Readmission Rate

Period Target Actual PerformanceApr-16 1.00 1.36 rMay-16 1.00 0.97 gJun-16 1.00 1.15 aJul-16 1.00 No Data g

Aug-16 1.00Sep-16 1.00Oct-16 1.00Nov-16 1.00Dec-16 1.00Jan-17 1.00Feb-17 1.00Mar-17 1.00

28 Days Emergency Readmissions to RJAH Following an

Overnight Stay

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

2.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Mean UCL LCL Actual

Patient Safety

Period Target Actual PerformanceApr-16 95.00 100.00 g

May-16 95.00 99.91 g

Jun-16 95.00 100.00 g

Jul-16 95.00 99.91 g

Aug-16 95.00Sep-16 95.00Oct-16 95.00Nov-16 95.00Dec-16 95.00Jan-17 95.00Feb-17 95.00

Mar-17 95.00

VTE Assessments Undertaken

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

102.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 13

Page 14: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Experience

Friends & Family Test

Period Target Actual PerformanceApr-16 90.00 98.71 g

May-16 90.00 98.76 g

Jun-16 90.00 98.72 g

Jul-16 90.00 99.13 g

Aug-16 90.00Sep-16 90.00Oct-16 90.00Nov-16 90.00Dec-16 90.00Jan-17 90.00Feb-17 90.00

Mar-17 90.00

Friends & Family - % Would Recommend (Inpatients and

Outpatients)

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

102.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Friends & Family Test

Period Target Actual PerformanceApr-16 0.00 0.16 a

May-16 0.00 1.06 a

Jun-16 0.00 0.92 a

Jul-16 0.00 0.70 a

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Friends & Family - % Would Not Recommend (Inpatients

and Outpatients)

0.00

0.20

0.40

0.60

0.80

1.00

1.20

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

0.50

1.00

1.50

2.00

2.50

3.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Period Target Actual PerformanceApr-16 9.00 10.00 aMay-16 9.00 9.00 gJun-16 9.00 7.00 gJul-16 9.00 2.00 g

Aug-16 9.00Sep-16 9.00Oct-16 9.00Nov-16 9.00Dec-16 9.00Jan-17 9.00Feb-17 9.00Mar-17 9.00

Number of Complaints

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Mean UCL LCL Actual

Patient Experience

Theatre Cancellations

Period Target Actual Performance

Apr-16 0.70 0.26 g

May-16 0.70 0.27 g

Jun-16 0.70 0.51 g

Jul-16 0.70 0.66 g

Aug-16 0.70Sep-16 0.70Oct-16 0.70Nov-16 0.70Dec-16 0.70Jan-17 0.70Feb-17 0.70

Mar-17 0.70

% Reportable Cancellations

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 14

Page 15: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Experience

Theatre Cancellations

Period Target Actual Performance

Apr-16 0.70 0.26 g

May-16 0.70 0.27 g

Jun-16 0.70 0.51 g

Jul-16 0.70 0.66 g

Aug-16 0.70Sep-16 0.70Oct-16 0.70Nov-16 0.70Dec-16 0.70Jan-17 0.70Feb-17 0.70

Mar-17 0.70

% Reportable Cancellations

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Theatre Cancellations

Period Target Actual Performance

Apr-16 0.00 0.00 g

May-16 0.00 1.00 r

Jun-16 0.00 0.00 g

Jul-16 0.00 0.00 g

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Cancellations Not Rebooked within 28 Days

0.00

0.50

1.00

1.50

2.00

2.50

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Experience

Delayed Discharges

Period Target Actual PerformanceApr-16 2.50 7.04 rMay-16 2.50 6.25 rJun-16 2.50 5.63 rJul-16 2.50 5.04 r

Aug-16 2.50Sep-16 2.50Oct-16 2.50Nov-16 2.50Dec-16 2.50Jan-17 2.50Feb-17 2.50Mar-17 2.50

% Delayed Discharges Rate

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Mean UCL LCL Actual

Patient Experience

Access to Bone Tumour Services

Period Target Actual PerformanceApr-16 93.00 100.00 g

May-16 93.00 95.24 g

Jun-16 93.00 100.00 g

Jul-16 93.00 93.94 g

Aug-16 93.00Sep-16 93.00Oct-16 93.00Nov-16 93.00Dec-16 93.00Jan-17 93.00Feb-17 93.00

Mar-17 93.00

Cancer Two Week Wait

88.00

90.00

92.00

94.00

96.00

98.00

100.00

102.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 15

Page 16: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Experience

Access to Bone Tumour Services

Period Target Actual PerformanceApr-16 93.00 100.00 g

May-16 93.00 95.24 g

Jun-16 93.00 100.00 g

Jul-16 93.00 93.94 g

Aug-16 93.00Sep-16 93.00Oct-16 93.00Nov-16 93.00Dec-16 93.00Jan-17 93.00Feb-17 93.00

Mar-17 93.00

Cancer Two Week Wait

88.00

90.00

92.00

94.00

96.00

98.00

100.00

102.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Access to Bone Tumour Services

Period Target Actual PerformanceApr-16 96.00 100.00 g

May-16 96.00 100.00 g

Jun-16 96.00 100.00 g

Jul-16 96.00 100.00 g

Aug-16 96.00Sep-16 96.00Oct-16 96.00Nov-16 96.00Dec-16 96.00Jan-17 96.00Feb-17 96.00

Mar-17 96.00

31 Days First Treatment (Tumour)

94.00

95.00

96.00

97.00

98.00

99.00

100.00

101.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Access to Bone Tumour Services

Period Target Actual PerformanceApr-16 94.00 100.00 g

May-16 94.00 100.00 g

Jun-16 94.00 100.00 g

Jul-16 94.00 100.00 g

Aug-16 94.00Sep-16 94.00Oct-16 94.00Nov-16 94.00Dec-16 94.00Jan-17 94.00Feb-17 94.00

Mar-17 94.00

31 Day Subsequent Treatment (Tumour)

91.00

92.00

93.00

94.00

95.00

96.00

97.00

98.00

99.00

100.00

101.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Access to Bone Tumour Services

Period Target Actual PerformanceApr-16 85.00 100.00 g

May-16 85.00 100.00 g

Jun-16 85.00 66.67 r

Jul-16 85.00 100.00 g

Aug-16 85.00Sep-16 85.00Oct-16 85.00Nov-16 85.00Dec-16 85.00Jan-17 85.00Feb-17 85.00

Mar-17 85.00

Cancer Plan 62 Days Standard (Tumour)

0.00

20.00

40.00

60.00

80.00

100.00

120.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 16

Page 17: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Experience

Access to Bone Tumour Services

Period Target Actual PerformanceApr-16 85.00 100.00 g

May-16 85.00 100.00 g

Jun-16 85.00 66.67 r

Jul-16 85.00 100.00 g

Aug-16 85.00Sep-16 85.00Oct-16 85.00Nov-16 85.00Dec-16 85.00Jan-17 85.00Feb-17 85.00

Mar-17 85.00

Cancer Plan 62 Days Standard (Tumour)

0.00

20.00

40.00

60.00

80.00

100.00

120.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Access to Bone Tumour Services

Period Target Actual PerformanceApr-16 85.00 100.00 g

May-16 85.00 100.00 g

Jun-16 85.00 100.00 g

Jul-16 85.00 100.00 g

Aug-16 85.00Sep-16 85.00Oct-16 85.00Nov-16 85.00Dec-16 85.00Jan-17 85.00Feb-17 85.00

Mar-17 85.00

Cancer 62 Day Consultant Upgrade

75.00

80.00

85.00

90.00

95.00

100.00

105.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Access to Services - English

Period Target Actual PerformanceApr-16 92.00 88.57 r

May-16 92.00 88.90 r

Jun-16 92.00 89.21 r

Jul-16 92.00 88.75 r

Aug-16 92.00Sep-16 92.00Oct-16 92.00Nov-16 92.00Dec-16 92.00Jan-17 92.00Feb-17 92.00

Mar-17 92.00

18 Weeks RTT Open Pathways

80.00

82.00

84.00

86.00

88.00

90.00

92.00

94.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Access to Services - English

Period Target Actual PerformanceApr-16 99.00 99.94 g

May-16 99.00 99.77 g

Jun-16 99.00 99.73 g

Jul-16 99.00 99.89 g

Aug-16 99.00Sep-16 99.00Oct-16 99.00Nov-16 99.00Dec-16 99.00Jan-17 99.00Feb-17 99.00

Mar-17 99.00

6 Week Wait for Diagnostics - English Patients

98.40

98.60

98.80

99.00

99.20

99.40

99.60

99.80

100.00

100.20

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 17

Page 18: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Patient Experience

Access to Services - English

Period Target Actual PerformanceApr-16 99.00 99.94 g

May-16 99.00 99.77 g

Jun-16 99.00 99.73 g

Jul-16 99.00 99.89 g

Aug-16 99.00Sep-16 99.00Oct-16 99.00Nov-16 99.00Dec-16 99.00Jan-17 99.00Feb-17 99.00

Mar-17 99.00

6 Week Wait for Diagnostics - English Patients

98.40

98.60

98.80

99.00

99.20

99.40

99.60

99.80

100.00

100.20

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Patient Experience

Patients Waiting Over 52 Weeks

Period Target Actual Performance

Apr-16 0.00 4.00 r

May-16 0.00 4.00 r

Jun-16 0.00 9.00 r

Jul-16 0.00 10.00 r

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Patients Waiting Over 52 Weeks - English

0.00

5.00

10.00

15.00

20.00

25.00

30.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Patient Experience

Patients Waiting Over 52 Weeks

Period Target Actual Performance

Apr-16 0.00 35.00 r

May-16 0.00 24.00 r

Jun-16 0.00 20.00 r

Jul-16 0.00 10.00 r

Aug-16 0.00Sep-16 0.00Oct-16 0.00Nov-16 0.00Dec-16 0.00Jan-17 0.00Feb-17 0.00

Mar-17 0.00

Patients Waiting Over 52 Weeks - Welsh

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 18

Page 19: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Resources

Period Target Actual PerformanceApr-16 3.00 3.47 aMay-16 3.00 3.39 aJun-16 3.00 3.53 aJul-16 3.00 3.30 a

Aug-16 3.00Sep-16 3.00Oct-16 3.00Nov-16 3.00Dec-16 3.00Jan-17 3.00Feb-17 3.00Mar-17 3.00

Sickness Absence

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Mean UCL LCL Actual

Resources

Period Target Actual PerformanceApr-16 91.00 91.31 g

May-16 91.00 90.89 a

Jun-16 91.00 90.39 a

Jul-16 91.00 91.05 g

Aug-16 91.00Sep-16 91.00Oct-16 92.00Nov-16 92.00Dec-16 92.00Jan-17 92.00Feb-17 92.00

Mar-17 92.00

Staff Stability Index

89.00

89.50

90.00

90.50

91.00

91.50

92.00

92.50

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Resources

Period Target Actual PerformanceApr-16 90.00 83.48 a

May-16 90.00 83.60 a

Jun-16 90.00 89.63 a

Jul-16 90.00 93.30 g

Aug-16 90.00Sep-16 90.00Oct-16 90.00Nov-16 90.00Dec-16 90.00Jan-17 90.00Feb-17 90.00

Mar-17 90.00

Staff Appraisal

78.00

80.00

82.00

84.00

86.00

88.00

90.00

92.00

94.00

96.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Resources

Period Target Actual PerformanceApr-16 90.00 94.20 g

May-16 90.00 95.70 g

Jun-16 90.00 95.50 g

Jul-16 90.00 97.80 g

Aug-16 90.00Sep-16 90.00Oct-16 90.00Nov-16 90.00Dec-16 90.00Jan-17 90.00Feb-17 90.00

Mar-17 90.00

Safe Staffing - % Shift Fill Rate

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

102.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

20.00

40.00

60.00

80.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 19

Page 20: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Resources

Period Target Actual PerformanceApr-16 90.00 94.20 g

May-16 90.00 95.70 g

Jun-16 90.00 95.50 g

Jul-16 90.00 97.80 g

Aug-16 90.00Sep-16 90.00Oct-16 90.00Nov-16 90.00Dec-16 90.00Jan-17 90.00Feb-17 90.00

Mar-17 90.00

Safe Staffing - % Shift Fill Rate

84.00

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

102.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

20.00

40.00

60.00

80.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 20

Page 21: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Efficiency

Demand for Services

Period Target Actual PerformanceApr-16 8500.00 10061.00 rMay-16 8500.00 10354.00 rJun-16 8500.00 10461.00 rJul-16 8500.00 10805.00 r

Aug-16 8500.00Sep-16 8500.00Oct-16 8500.00Nov-16 8500.00Dec-16 8500.00Jan-17 8500.00Feb-17 8500.00Mar-17 8500.00

Total Open Pathways

0.00

2000.00

4000.00

6000.00

8000.00

10000.00

12000.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.0

2000.0

4000.0

6000.0

8000.0

10000.0

12000.0

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Demand for Services

Period Target Actual PerformanceApr-16 2908.00 2850.00 a

May-16 2908.00 2996.00 g

Jun-16 2908.00 3013.00 g

Jul-16 2908.00 No Data g

Aug-16 2618.00Sep-16 2908.00Oct-16 2908.00Nov-16 2908.00Dec-16 2327.00Jan-17 2908.00Feb-17 2908.00

Mar-17 2908.00

Referrals Received for Consultant Led Services

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

3500.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

500.00

1000.00

1500.00

2000.00

2500.00

3000.00

3500.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Activity - Surgery

Period Target Actual PerformanceApr-16 1039.00 1064.00 g

May-16 969.00 988.00 g

Jun-16 1071.00 1057.00 a

Jul-16 1057.00 977.00 a

Aug-16 1005.00Sep-16 1096.00Oct-16 1085.00Nov-16 1093.00Dec-16 956.00Jan-17 1085.00Feb-17 1032.00

Mar-17 1129.00

Surgical Division Activity - Inpatient Contract

0.00

200.00

400.00

600.00

800.00

1000.00

1200.00

1400.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

200.00

400.00

600.00

800.00

1000.00

1200.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Activity - Surgery

Period Target Actual PerformanceApr-16 6493.00 6221.00 a

May-16 6055.00 6846.00 g

Jun-16 6689.00 7629.00 g

Jul-16 6604.00 6327.00 a

Aug-16 6279.00Sep-16 6848.00Oct-16 6776.00Nov-16 6828.00Dec-16 5971.00Jan-17 6776.00Feb-17 6449.00

Mar-17 7050.00

Surgical Division Activity - Outpatient Contract

0.00

1000.00

2000.00

3000.00

4000.00

5000.00

6000.00

7000.00

8000.00

9000.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

1000.00

2000.00

3000.00

4000.00

5000.00

6000.00

7000.00

8000.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 21

Page 22: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Efficiency

Activity - Surgery

Period Target Actual PerformanceApr-16 6493.00 6221.00 a

May-16 6055.00 6846.00 g

Jun-16 6689.00 7629.00 g

Jul-16 6604.00 6327.00 a

Aug-16 6279.00Sep-16 6848.00Oct-16 6776.00Nov-16 6828.00Dec-16 5971.00Jan-17 6776.00Feb-17 6449.00

Mar-17 7050.00

Surgical Division Activity - Outpatient Contract

0.00

1000.00

2000.00

3000.00

4000.00

5000.00

6000.00

7000.00

8000.00

9000.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

1000.00

2000.00

3000.00

4000.00

5000.00

6000.00

7000.00

8000.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Activity - Medicine

Period Target Actual PerformanceApr-16 173.00 190.00 g

May-16 162.00 152.00 a

Jun-16 179.00 191.00 g

Jul-16 176.00 164.00 a

Aug-16 168.00Sep-16 183.00Oct-16 181.00Nov-16 182.00Dec-16 159.00Jan-17 181.00Feb-17 172.00

Mar-17 188.00

Medicine Division Activity - Inpatient Contract

0.00

50.00

100.00

150.00

200.00

250.00

300.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

50.00

100.00

150.00

200.00

250.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Activity - Medicine

Period Target Actual PerformanceApr-16 1577.00 1676.00 g

May-16 1471.00 1567.00 g

Jun-16 1625.00 1819.00 g

Jul-16 1604.00 1495.00 a

Aug-16 1525.00Sep-16 1663.00Oct-16 1646.00Nov-16 1659.00Dec-16 1451.00Jan-17 1646.00Feb-17 1566.00

Mar-17 1713.00

Medicine Division Activity - Outpatient Contract

0.00

200.00

400.00

600.00

800.00

1000.00

1200.00

1400.00

1600.00

1800.00

2000.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

500.00

1000.00

1500.00

2000.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Daycase Performance

Period Target Actual PerformanceApr-16 83.00 81.84 a

May-16 83.00 83.28 g

Jun-16 84.00 81.94 a

Jul-16 84.00 85.96 g

Aug-16 85.00Sep-16 85.00Oct-16 86.00Nov-16 86.00Dec-16 87.00Jan-17 87.00Feb-17 88.00

Mar-17 88.00

BADS Activity

70.00

72.00

74.00

76.00

78.00

80.00

82.00

84.00

86.00

88.00

90.00

92.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 22

Page 23: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Efficiency

Daycase Performance

Period Target Actual PerformanceApr-16 83.00 81.84 a

May-16 83.00 83.28 g

Jun-16 84.00 81.94 a

Jul-16 84.00 85.96 g

Aug-16 85.00Sep-16 85.00Oct-16 86.00Nov-16 86.00Dec-16 87.00Jan-17 87.00Feb-17 88.00

Mar-17 88.00

BADS Activity

70.00

72.00

74.00

76.00

78.00

80.00

82.00

84.00

86.00

88.00

90.00

92.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Efficiency

Daycase Performance

Period Target Actual PerformanceApr-16 50.00 51.46 g

May-16 50.00 46.51 a

Jun-16 50.00 47.63 a

Jul-16 51.00 46.62 a

Aug-16 51.00Sep-16 51.00Oct-16 52.00Nov-16 52.00Dec-16 52.00Jan-17 53.00Feb-17 53.00

Mar-17 53.00

Overall Daycase Rate

42.00

44.00

46.00

48.00

50.00

52.00

54.00

56.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

39.00

44.00

49.00

54.00

59.00

64.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Efficiency

Admission on Day of Surgery

Period Target Actual PerformanceApr-16 93.00 95.53 g

May-16 93.00 94.59 g

Jun-16 93.00 92.58 a

Jul-16 93.00 95.67 g

Aug-16 93.00Sep-16 93.00Oct-16 94.00Nov-16 94.00Dec-16 94.00Jan-17 95.00Feb-17 95.00

Mar-17 95.00

% of Elective NHS Inpatients Admitted on Day of Surgery

86.00

88.00

90.00

92.00

94.00

96.00

98.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Efficiency

Theatre Efficiency

Period Target Actual PerformanceApr-16 96.00 94.44 a

May-16 95.90 96.11 g

Jun-16 95.50 96.57 g

Jul-16 96.60 91.24 r

Aug-16 92.00Sep-16 96.70Oct-16 96.90Nov-16 97.90Dec-16 90.40Jan-17 96.80Feb-17 95.80

Mar-17 90.10

% Staffed Theatre Lists Utilised

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 23

Page 24: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Efficiency

Theatre Efficiency

Period Target Actual PerformanceApr-16 96.00 94.44 a

May-16 95.90 96.11 g

Jun-16 95.50 96.57 g

Jul-16 96.60 91.24 r

Aug-16 92.00Sep-16 96.70Oct-16 96.90Nov-16 97.90Dec-16 90.40Jan-17 96.80Feb-17 95.80

Mar-17 90.10

% Staffed Theatre Lists Utilised

86.00

88.00

90.00

92.00

94.00

96.00

98.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

50.00

55.00

60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Efficiency

Theatre Efficiency

Period Target Actual PerformanceApr-16 2.20 2.23 g

May-16 2.20 2.18 a

Jun-16 2.20 2.10 a

Jul-16 2.20 2.25 g

Aug-16 2.20Sep-16 2.20Oct-16 2.20Nov-16 2.20Dec-16 2.20Jan-17 2.25Feb-17 2.25

Mar-17 2.30

Theatre Cases Per Session

1.95

2.00

2.05

2.10

2.15

2.20

2.25

2.30

2.35

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Average Length of Stay

Period Target Actual Performance

Apr-16 4.00 3.65 g

May-16 3.90 3.76 g

Jun-16 3.90 3.85 g

Jul-16 3.80 3.85 a

Aug-16 3.80Sep-16 3.70Oct-16 3.60Nov-16 3.50Dec-16 3.50Jan-17 3.50Feb-17 3.50

Mar-17 3.50

Average Length of Stay - Elective Excluding Daycase

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Average Length of Stay

Period Target Actual PerformanceApr-16 55.00 73.00 g

May-16 55.00 63.73 g

Jun-16 55.00 70.69 g

Jul-16 60.00 64.02 g

Aug-16 60.00Sep-16 60.00Oct-16 65.00Nov-16 65.00Dec-16 65.00Jan-17 70.00Feb-17 70.00

Mar-17 70.00

% of Primary Hip and Knee Patients Discharged in 3 days or

less

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

42.00

47.00

52.00

57.00

62.00

67.00

72.00

77.00

82.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 24

Page 25: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Efficiency

Average Length of Stay

Period Target Actual PerformanceApr-16 55.00 73.00 g

May-16 55.00 63.73 g

Jun-16 55.00 70.69 g

Jul-16 60.00 64.02 g

Aug-16 60.00Sep-16 60.00Oct-16 65.00Nov-16 65.00Dec-16 65.00Jan-17 70.00Feb-17 70.00

Mar-17 70.00

% of Primary Hip and Knee Patients Discharged in 3 days or

less

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

42.00

47.00

52.00

57.00

62.00

67.00

72.00

77.00

82.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Efficiency

Bed Utilisation

Period Target Actual PerformanceApr-16 78.00 63.51 rMay-16 80.00 69.42 rJun-16 80.00 75.34 gJul-16 81.00 71.98 r

Aug-16 82.00Sep-16 83.00Oct-16 84.00Nov-16 85.00Dec-16 86.00Jan-17 87.00Feb-17 87.00Mar-17 87.00

Bed Occupancy - Adult Orthopaedic Wards

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

%

Target Actual

Efficiency

Outpatient Productivity

Period Target Actual Performance

Apr-16 5.50 5.84 r

May-16 5.50 5.67 a

Jun-16 5.50 6.54 r

Jul-16 5.40 5.69 a

Aug-16 5.40Sep-16 5.40Oct-16 5.40Nov-16 5.30Dec-16 5.30Jan-17 5.20Feb-17 5.10

Mar-17 5.00

Outpatient DNA Rate

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

Efficiency

Period Target Actual Performance

Apr-16 2.90 2.34 g

May-16 2.90 2.23 g

Jun-16 2.80 2.37 g

Jul-16 2.80 2.22 g

Aug-16 2.70Sep-16 2.70Oct-16 2.60Nov-16 2.60Dec-16 2.60Jan-17 2.50Feb-17 2.50

Mar-17 2.50

New to Follow Up Ratio (Consultant Led Activity)

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 25

Page 26: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Balanced Scorecard - Trust

July 2016 - Month 4

Efficiency

Period Target Actual Performance

Apr-16 2.90 2.34 g

May-16 2.90 2.23 g

Jun-16 2.80 2.37 g

Jul-16 2.80 2.22 g

Aug-16 2.70Sep-16 2.70Oct-16 2.60Nov-16 2.60Dec-16 2.60Jan-17 2.50Feb-17 2.50

Mar-17 2.50

New to Follow Up Ratio (Consultant Led Activity)

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

Apr

-15

May

-15

Jun

-15

Jul-

15

Aug

-15

Sep

-15

Oct

-15

Nov

-15

Dec

-15

Jan-

16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Mar

-17

Nu

mb

er

Target Actual

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 26

Page 27: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Finance Dashboard 31st July 2016Robert Jones and Agnes Hunt Orthopaedic Hospital NHS Foundation Trust

Commentary

Income - Requires agreement of recovery plan to address YTD shortfall and further shortfalls are expected for August. Expenditure - Cost pressures in excess of reserves. CIP - Further mitigating schemes are being scoped and will in all likelihood be required to fully deliver plan.

Category Jun-16 Jul-16 Movement Drivers

Fixed Assets 66,416 66,804 389Capital investment above depreciation and impairment of Theatre 7

and HDU.

Non current receivables 653 642 (11)

Total Non Current Assets 67,069 67,447 378

Inventories (Stocks) 1,142 1,097 (45)

Receivables (Debtors) 5,966 5,911 (55) Reduction in contract over performance

Cash at Bank and in hand 4,895 4,601 (294)

Total Current Assets 12,003 11,608 (395)

Payables (Creditors) (9,983) (10,295) (312) PDC £0.1m and an increase in deferred income £0.2m.

Borrowings (1,030) (1,226) (196) Reclassification of loan repayment to current liability.

Current Provisions (526) (419) 107

Total Current Liabilities (< 1 year) (11,538) (11,940) (401)

Total Assets less Current Liabilities 67,533 67,115 (418)

Non Current Borrowings (9,045) (8,849) 196 Reclassification of loan repayment to current liability.

Non Current Provisions (143) (134) 10

Non Current Liabilities (> 1 year) (9,188) (8,983) 206

Total Assets Employed 58,344 58,133 (212)

Public Dividend Capital (33,260) (33,260) 0

Revenue Position (1,007) (795) 212 Small in month surplus £41k offset by impairment (£253k)

Retained Earnings (6,766) (7,019) (253) Impairment of Theatre 7 & HDU

Revaluation Reserve (17,312) (17,059) 253 Impairment of Theatre 7 & HDU

Total Taxpayers Equity (58,344) (58,133) 212

Statement of Financial Position £'000s

Jul-16 YTD

Debtor Days 26 24

Creditor Days 42 41

Plan Actual Variance

Clinical Income from activity 88,800 29,114 28,975 (139) (263)

Private Patient income 4,870 1,580 1,149 (431) (137)

Other income 6,130 2,059 2,135 76 (37)

Pay (55,452) (18,274) (18,068) 206 107

Non-pay (38,585) (12,668) (12,600) 68 160

EBITDA 5,764 1,811 1,590 (220) (171)

Finance Costs (4,348) (1,342) (1,243) 99 24

Capital Donations 1,000 500 700 200 0

Operational Surplus 2,416 969 1,048 79 (146)

Remove Capital Donations (1,000) (500) (700) (200)0

Add Back Donated Dep'n 571 174 160 (14) (4)

Remove STF Funding (500) (167) (167) 0 0

Control Total 1,487 476 341 (135) (150)

STF Earnt 500 167 167 0 0

Planned Surplus 1,987 643 507 (135) (150)

EBITDA margin 5.8% 5.5% 4.9% -0.6%

Income and Expenditure £'000s

Movement In

Variance From

Prior Month

CategoryAnnual

Plan

Year To Date Position

Debt Service Cover 4 I&E Margin 4

Liquidity (days) 3 Variance in I&E Margin 4

Overall FSRR 4

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17

C

a

s

h

£

M

Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17

Monitor Plan £M 5.4 4.7 4.9 4.8 4.7 4.6 4.9 5.1 5.2 5.4 4.8 4.2

Actual £M 4.8 4.7 4.9 4.6

Forecast £M 4.8 4.7 4.9 4.8 4.4 3.6 4.4 4.8 5.1 5.2 4.8 4.2

Cash Flow

Risks

Income Risk High

Expenditure Risk Low

CIP Risk Medium

(£200)

£0

£200

£400

£600

£800

£1,000

£1,200

£1,400

£1,600

Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17

S

u

r

p

l

i

u

s

/

(

D

e

f

i

c

i

t)

Period

Monthly Surplus/Deficit

Plan

Actual

(£600)

(£500)

(£400)

(£300)

(£200)

(£100)

£0

Clinical Income fromactivity

Private Patient income Other income Pay Non-pay

V

a

r

i

a

n

c

e

Cumulative Variances £'000s

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 27

Page 28: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

RAG of Total Schemes Being Tracked

2,387 68.2% g

857 24.5% a

256 7.3% r

3,500 100.0%

Ca

pit

al

Co

mm

issio

ne

r P

erf

orm

an

ce

In Month CIP Achievement £000's Year To Date CIP Achievement £000's

CIP

by T

he

me

Year To Date Commissioner Income against Plan £m

CIP

by D

ivis

ion

Year to date capital programme £000's

Robert Jones and Agnes Hunt Orthopaedic Hospital NHS Foundation TrustFinance Dashboard 31st July 2016

Cost Improvement Programme

In Month CIP Achievement £000's Year To Date CIP Achievement £000's Trust YTD Achievement Against YTD Plan £000's

(10) 0 10 20 30 40 50 60 70 80

Bring Forward FYE

Capacity Alignment

Productivity

Procurement

Transformation

Workforce Redesign

Income

Miscellaneous

Jul Plan Jul Actual

0

100

200

300

400

500

600

700

800

Total

YTD Plan YTD Actual

0 50 100 150 200 250

Bring Forward FYE

Capacity Alignment

Productivity

Procurement

Transformation

Workforce Redesign

Income

Miscellaneous

YTD Plan YTD Actual

0 20 40 60 80 100

Surgery

Medicine

Diagnostics

Estates & Facilities

Corporate

Theatres

Jun Plan Jul Actual

0 50 100 150 200 250 300 350

Surgery

Medicine

Diagnostics

Estates & Facilities

Corporate

Theatres

YTD Plan YTD Actual

- 2.00 4.00 6.00 8.00 10.00 12.00

Shropshire

BCU

Specialist

Other English Contracted

Powys

Telford

Other

Uncontracted

YTD actual YTD plan

ProjectAnnual

Plan

Year to

date Plan

Year to

date

Completed

Year to

date

Variance

In Month

Actual

Forecast

Outturn

Outturn

Variance

Backlog Maintenance 430 108 103 5 79 800 -370

Medical equipment 400 0 332 -332 137 400 0

Plated Meal Trollies 200 200 195 5 0 200 0

IT 300 40 60 -20 29 300 0

Project Management 170 80 59 21 13 170 0

Contingency 300 33 0 33 0 224 76

Theatre and Tumour Development 2,440 2,099 2,162 -63 417 2,516 -76

Outpatients Department Upgrade 300 0 9 -9 0 300 0

Increased Theatre Capacity 500 0 0 0 0 130 370

NHS Capital Expenditure 5,040 2,560 2,920 -360 675 5,040 0

Theatre and Tumour Equipment 0 0 150 -150 150 150 -150

Donated Capital Funding 0 0 150 -150 150 150 -150

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 28

Page 29: B F DD A T 22001166 · 2020. 8. 27. · emergency within 28 days of initial discharge in June 2016 giving a readmission rate of 1.15% against the 1% limit. The reasons for readmission

Month 4

Achieved / Not Met

Referral to treatment time, 18 weeks in aggregate, incomplete pathways 92% 1.0 Yes Not met

Cancer 62 Day Waits for first treatment (from urgent GP referral) 85% 1.0 No Achieved

Cancer 62 Day Waits for first treatment (from NHS Cancer Screening Service

referral)90% 1.0 No Not relevant

Cancer 31 day wait for second or subsequent treatment - surgery 94% 1.0 No Not relevant

Cancer 31 day wait for second or subsequent treatment - drug treatments 98% 1.0 No Not relevant

Cancer 31 day wait for second or subsequent treatment - radiotherapy 94% 1.0 No Not relevant

Cancer 31 day wait from diagnosis to first treatment 96% 0.5 No Achieved

Cancer 2 week (all cancers) 93% 0.5 No Achieved

Clostridium Difficile -meeting the C.Diff objective 2 1.0 No Achieved

Risk of, or actual, failure to deliver Commissioner Requested Services N/A No No

CQC enforcement action within last 12 months (as at 31 Mar 2015) N/A No No

CQC enforcement action (including notices) currently in effect (as at 31 Mar

2015)N/A No No

CQC enforcement action (including notices) currently in effect N/A No No

Moderate CQC concerns or impacts regarding the safety of healthcare provision N/A No No

Major CQC concerns or impacts regarding the safety of healthcare provision N/A No No

Unable to maintain, or certify, a minimum published CNST level of 1.0 or have in

place appropriate alternative arrangementsN/A No No

Score of 7 or less in standard 1 assessment at last NHSLA CNST inspection

(maternity or all services)N/A No No

Trust unable to declare ongoing compliance with minimum standards of CQC

registrationN/A No No

0

RED

Appendix 1

Indicative Risk Rating

Declaration of risks against healthcare targets and indicators for 2016/17

Target or Indicator (per Risk Assessment Framework)

Threshold

or target

YTD

Scoring

Risk

declared at

Annual Plan

Overall Score

Report by

Exception

U:\Trust Board & Committees\Public Trust Board\2016-17\August 2016\Month 04 Integrated Performance Report 29