Click here to load reader
Upload
dotuyen
View
215
Download
2
Embed Size (px)
Citation preview
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
DELIVERY: PROMPT PAYMENT TERMS:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITY
UNITOF
MEASUREUNIT PRICE TOTAL PRICE
Failure to submit requested information/documentation may result in the automatic disqualification of the bid submittal.
As necessary, please attach separate sheets to provide details/description/explanation of services or prices.
Item # Description of Commodity and/or Services
1. Check County(s) your company services:
All Counties
Fairfield
Hartford
Litchfield
Middlesex
New Haven
New London
Tolland
Windham
2. List of certified public water treatment operators and associated licenses attached as Exhibit B-1.
3. Potable Water Treatment System per attached specifications:
a. 1 cu. ft. Filter Canisters Unit Unit Price
Equipment Manufacturer .........................................
Model #.....................................................................
Total System Cost .................................................... $
Installation Cost ....................................................... $
Routine Maintenance – single change out (including carbon disposal)......................................................... $
Routine Maintenance – double change out (including carbon disposal)...................................... $
Page 1 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
b. 1 ½ cu. ft. Filter Canisters
Equipment Manufacturer .........................................
Model #.....................................................................
Total System Cost .................................................... $
Installation Cost ....................................................... $Routine Maintenance – single change out (including carbon disposal)......................................................... $Routine Maintenance – double change out (including carbon disposal)......................................................... $
c. 2 cu. ft. Filter CanistersUnit Unit Price
Equipment Manufacturer..........................................
Model #.....................................................................
Total System Cost..................................................... $
Installation Cost ....................................................... $
Routine Maintenance – single change out (including carbon disposal)......................................................... $Routine Maintenance – double change out (including carbon disposal)................................... $
Removal, Decommissioning (including carbon disposal).................................................................... $
d. 3 cu. ft. Filter CanistersEquipment Manufacturer.........................................
Model #.....................................................................
Total System Cost .................................................... $
Installation Cost ....................................................... $Routine Maintenance – single change out (including carbon disposal).........................................................Routine Maintenance – double change out (including carbon disposal).......................................Removal, Decommissioning (including carbon disposal).................................................................... $
Page 2 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
e. Individual Components:
Filter Canister - 1 cu ft ............................................. $
Filter Canister - 1 ½ cu ft ........................................ $
Filter Canister - 2 cu ft ............................................. $
Filter Canister - 3 cu ft ............................................. $
Pre-filter Housing ..................................................... $
Flow Restrictor ......................................................... $
Flow Meter................................................................ $
Sampling Tap............................................................ $
Filter Blanket............................................................. Description of the filter blanket, including material used, attached, Exhibit B-2.
$
Pipe Insulation (per foot) ........................................ $
Identify any additional filter components and pricing on a separate attachment $
4. Replacement Sediment Filter Cartridges (Minimum of 6) including written instructions for installation (cost per pkg delivered; specify number of cartridges per pkg). A copy of the written instructions for replacement of sediment filter attached, Exhibit B-3
$ pkg $ total
5. Well PumpsIncluding control box and installation…………………………………...
a. 1/2 Horsepower Submersible Pump
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
b. 3/4 Horsepower Submersible Pump
Page 3 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
c. 1 Horsepower Submersible Pump
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
d. 1/2 Horsepower Jet Pump
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
e. 3/4 Horsepower Jet Pump
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
f. 1 Horsepower Jet Pump
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
Page 4 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
6. Pressure Tanks
Pre-pressurized tanks with associated fittings including installation…...
a. 14 Gallon Pressure Tank
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
b. 20 Gallon Pressure Tank
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
c. 32 Gallon Pressure Tank
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
a. 62 Gallon Pressure Tank
Equipment Manufacturer .........................................
Model #.....................................................................
Total Cost .................................................... $
Page 5 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
7. Pretreatment Systems
As needed, attach additional sheets to the bid proposal to identify additional components and/or alternative system configurations...........
a. Chemical Free Iron/Manganese Removal System
For each available system, a description including components, the range of iron/manganese concentrations the system is capable of removing and whether system requires backwashing must be submitted as a separate attachment to the bid proposal B-4.
Maintenance requirements for contractor and homeowner/ occupant including schedule must be submitted as a separate attachment to the bid proposal B-4.
Equipment Manufacturer........................................................
Model Number(s)....................................................................
Total System Cost .................................................................. $
Installation Cost...................................................................... $
Removal, Decommissioning................................................... $
Rebedding (including labor & material)................................. $
Supplemental/ Replacement Chemicals (cost including delivery)...................................................................................
$
Are portable exchange tanks available for iron/manganese removal.....................................................................................
Yes NoIf yes, a description of the service including pricing information must be submitted as a separate attachment to the bid proposal.
b. pH Adjustment System
For each available system, a description including list of components must be submitted as a separate attachment to the bid proposal B-5. Indicate if backwashing is necessary.
Maintenance requirements for contractor and homeowner/ occupant including schedule must be submitted as a separate
Page 6 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
attachment B-5 to the bid proposal.
Equipment Manufacturer .......................................................
Model Number(s) ...................................................................
Total System Cost................................................................... $
Installation Cost......................................................................$
Supplemental/ Replacement Chemicals, (cost including delivery) ................................................................................
$
Rebedding (including labor & material)................................. $
Removal, Decommissioning................................................... $
c. Water Softener System
For each available system, a description including list of components must be submitted as a separate attachment, B-6 to the bid proposal. Indicate if backwashing is necessary.
Maintenance requirements for contractor and homeowner/ occupant including schedule must be submitted as a separate attachment, B-6 to the bid proposal.
Equipment Manufacturer .......................................................
Model Number(s) ...................................................................
Total System Cost................................................................... $
Installation Cost...................................................................... $
Supplemental/ Replacement Chemicals, (cost including delivery) ................................................................................
$
Rebedding (including labor & material)................................. $
Removal, Decommissioning...................................................$
Page 7 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
d. Nitrate Removal SystemFor each available system, a description including list of components must be submitted as a separate attachment B-7 to the bid proposal. Indicate if backwashing is necessary.Maintenance requirements for contractor and homeowner/ occupant including schedule must be submitted as a separate attachment B-7 to the bid proposal.
Equipment Manufacturer .......................................................
Model Number(s) ...................................................................
Total System Cost................................................................... $
Installation Cost...................................................................... $
Rebedding (including labor & material)................................. $
Supplemental/ Replacement Chemicals, (cost including delivery) ................................................................................
$
Removal, Decommissioning................................................... $e. UV System
For each available system, a description including list of components must be submitted as a separate attachment B-8 to the bid proposal. Indicate if backwashing is necessary.Maintenance requirements for contractor and homeowner/ occupant including schedule must be submitted as a separate attachment B-8 to the bid proposal.
Equipment Manufacturer .......................................................
Model Number(s) ...................................................................
Total System Cost................................................................... $
Installation Cost...................................................................... $
Bulb Replacement................................. $
Ballast Replacement…………............................... $
Quartz Sleeve Replacement…………............................... $
Removal, Decommissioning................................................... $
Page 8 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
f. Chlorine Injection System
For each available system, a description including list of components must be submitted as a separate attachment B-9 to the bid proposal. Indicate if backwashing is necessary.
Maintenance requirements for contractor and homeowner/ occupant including schedule must be submitted as a separate attachment B-9 to the bid proposal.
Equipment Manufacturer .......................................................
Model Number(s) ...................................................................
Total System Cost................................................................... $
Installation Cost...................................................................... $
Supplemental/ Replacement Chemicals, (cost including delivery)..................................................................………….
$
Removal, Decommissioning................................................... $
g. Reverse Osmosis Systems (point of entry)
For each available system, a description including list of components must be submitted as a separate attachment B-10 to the bid proposal. Indicate if backwashing is necessary.
Maintenance requirements for contractor and homeowner/ occupant including schedule must be submitted as a separate attachment B-10 to the bid proposal.
Equipment Manufacturer .......................................................
Model Number(s) ...................................................................
Total System Cost................................................................... $
Installation Cost...................................................................... $
Membrane Replacement.........................................…………. $
Removal, Decommissioning...................................................$
Page 9 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
h. Reverse Osmosis Systems (point of use)
For each available system, a description including list of components must be submitted as a separate attachment B-11 to the bid proposal. Indicate if backwashing is necessary.
Maintenance requirements for contractor and homeowner/ occupant including schedule must be submitted as a separate attachment B-11 to the bid proposal.
Equipment Manufacturer .......................................................
Model Number(s) ...................................................................
Total System Cost................................................................... $
Installation Cost...................................................................... $
Membrane Replacement.........................................…………. $
Removal, Decommissioning................................................... $
8. Aeration System (Point-of-Entry type)
For each available system, a description including components, identification of water quality parameter levels which would require pretreatment in order for the aeration system to function properly, range of volatile organics and range of concentrations the system will remove must be submitted as a separate attachment B-12 to the bid proposal.
Equipment Manufacturer .......................................................
Model Number(s) ....................................................................
Total System Cost ................................................................... $
Installation Cost ....................................................................... $
Maintenance (contractor\homeowner) requirements must be submitted as a separate attachment to the bid proposal ............
9. Leaching System
Leaching system to be constructed for the sole purpose of discharging backwash. The system will be sized according to the backwash volume of the treatment system. Leaching system installation will include excavation, installation of the leaching trenches, internal and external
Page 10 of 11
EXHIBIT B, SP-16PRICE SCHEDULE
SOLICITATION NO: 18PSX0016
BIDDER NAME:
ITEM # DESCRIPTION OF COMMODITY AND/OR SERVICES QUANTITYUNIT
OFMEASURE
UNIT PRICE TOTAL PRICE
plumbing materials, foundation core hole, backfilling excavation with native soil, and lawn restoration. Leaching system to be priced on a leaching chamber unit basis, assuming a two leaching chamber minimum.
Equipment Manufacturer .......................................................
Model Number(s) ....................................................................
Unit Cost ................................................................... $
10. Well Water Sample Collection
The contractor is responsible for scheduling well water sample collection with a laboratory listed on State Contract No. 978-a-0-0271C and handling sample until it is relinquished to the laboratory.
A. Cost per sampling event when sampling at the time of treatment system installation or at the time of treatment system maintenance. $
B. Hourly rate for sample collection when only sampling is to be conducted during site visit $_______/hr.
11. Emergency Repair Service:
A. Labor Charge:
1. Normal Work Day..................................................... $_______/hr.
2. After hours, weekends, holidays............................... $_______/hr.
B. Emergency phone # ( ) -
Page 11 of 11