BACC Ship Finance_2

Embed Size (px)

Citation preview

  • 7/26/2019 BACC Ship Finance_2

    1/17

    PETROBRASOpportunitiesfor

    theOffshore

    Industry

    June18,2013

  • 7/26/2019 BACC Ship Finance_2

    2/17

    DISCLAIMER

    The presentation may contain forward-looking We undertake no obligation to publicly update

    FORWARD-LOOKING STATEMENTS

    of Section 27A of the Securities Act of 1933, as

    amended, and Section 21E of the SecuritiesExchange Act of 1934, as amended, that are notbased on historical facts and are not assurances offuture results. Such forward-looking statements

    or revise any forward-looking statements,whether as a result of new information orfuture events or for any other reason. Figuresfor 2013 on are estimates or targets.

    mere y re ec e ompany s curren v ews anestimates of future economic circumstances,industry conditions, company performance andfinancial results. Such terms as "anticipate",

    "believe", "expect", "forecast", "intend", "plan","project", "seek", "should", along with similar or

    All forward-looking statements are expresslyqualified in their entirety by this cautionarystatement, and you should not place relianceon any forward-looking statement containedin this presentation.

    analogous expressions, are used to identify suchforward-looking statements. Readers are cautionedthat these statements are only projections and maydiffer materially from actual future results orevents. Readers are referred to the documents filedby the Company with the SEC, specifically the

    NON-SEC COMPLIANT OIL AND GASRESERVES:

    CAUTIONARY STATEMENT FOR US INVESTORS

    Companys most recent Annual Report on Form 20-F, which identify important risk factors that couldcause actual results to differ from those containedin the forward-looking statements, including,among other things, risks relating to generaleconomic and business conditions includin crude

    ,

    such as oil and gas resources, that we are notpermitted to present in documents filed withthe United States Securities and ExchangeCommission (SEC) under new Subpart 1200 toRegulation S-K because such terms do not

    oil and other commodity prices, refining marginsand prevailing exchange rates, uncertainties

    inherent in making estimates of our oil and gasreserves including recently discovered oil and gasreserves, international and Brazilian political,

    ,reserves under Rule 4-10(a) of Regulation S-X.

    2

  • 7/26/2019 BACC Ship Finance_2

    3/17

    InvestmentsintheCountryCatalyzetheShipbuildingandOffshoreIndustry:

    US$

    107.6

    billion

    Refining, Transportation and CommercializationUS$ 71.6 billion

    Exploration and ProductionUS$ 131.5 billion

    2.9(4%)

    3.5(5%)

    1.0(1%)

    21.1(16%)

    31.2(44%)16.3

    5.6(8%)

    25.4(19%)

    US$83.6.

    (21%)

    12.117

    89.9(68%)

    .

    Petrochemicals

    Expansion of FleetExpansion of Refining Park

    Operational improvementProduction Development

    Biofuels

    Allocation of National Oil

    Compliance with Internal MarketInfrastructure and Support

    Exploration

  • 7/26/2019 BACC Ship Finance_2

    4/17

    Constructionof132Units:DrillingRigs,Stationary

    ProductionUnits(SPU)andTankers

    Priority: OIL PRODUCTION, Brazil: 2.022 4.200 mbpd

    38 SPU by 2020: 65% < Local Content < 80%45 Rigs by 2020: 15 without local content 3

    2SPU

    bpd)

    30 with 55% < Local Content < 70%

    49 Tankers by 2020: 65% < Local Content < 74%7

    SPU

    8SPU

    7Rigs

    2Rigs

    4.200ctionCurve(

    1/1

    SPU

    3/7SPU

    3SPU

    1SPU

    SPU

    7

    7Rigs

    5Rigs

    2

    5

    Tankers

    6Tankers

    ndNGLProdu

    10/104/42/2Rigs

    1/1Rig

    88

    Tankers

    5Tankers

    Tankers

    2.500

    2,022

    Oil

    1 Tanker3/3Tankers 3

    TankersTankers

    (4 unitsdelivered

    2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

    (1 unitdelivered) (11) (11) (9) (23) (20) (16) (17) (10)

    delivered)

    delivered)

  • 7/26/2019 BACC Ship Finance_2

    5/17

    MajorShipyardsandGantriesw/TradeRelationswithPetrobras

  • 7/26/2019 BACC Ship Finance_2

    6/17

    MainShipyardsinBrazil

    Flexibilityinconcessionagreements

    MarMediterrneoPartners:CamargoCorraandQueirozGalvo(since2005)

    TechnologyPartner: Ishikawajima

    Atlntico Sul (PE)

    UnitUnderConstruction:

    P62

    Contracts:

    6drillingrigs(Sete Brasil)

    Onwnership /Technology:KeppelFELS Singapore(inBrazilsince2000)

    RecentUnitsbuilt:P57,P56andFPSOCidade deSoPaulo

    UnitsUnderConstruction:

    FPSOCidade de

    Paraty

    Contracts:

    6drillingrigs(Sete Brasil)

    Modulesintegrationofthe

    FPSOs forthePresalt

    Partners:EcovixEngevix

    (created in2010)

    UnitsUnderConstruction:

    RioGrande

    Shipyard

    Partners:QueirozGalvo,UTCEngenharia

    and Iesa (since 2005)

    Recent unit built:P53

    Quip

    8FPSOHulls(forthePresalt)

    P55(Topside)

    Contractsfor

    3drilling

    rigs

    (Sete

    Brasil)

    P55(modulesintegration)

    P62

    P63

    P58

    Deckmating

    conclusion

    performed

    by

    QUIP

    in

    Rio

    GrandeShipyard.Theoperationwastheheaviest

    structureeverliftedintheworld(17thousandtons)6

  • 7/26/2019 BACC Ship Finance_2

    7/17

    MainShipyardsinBrazilNewshipyardsthatwillincreasetheBraziliancapacity

    MarMediterrneo 17 new shipyards currently under construction, getting license or

    financing approved by FMM (some capable of building platforms, rigs

    and tankers)

    PetrobrasleasedInhama shipyard to

    Companhia Brasileira deDiquesCDB for

    20years.

    EstaleiroInhauma (RJ)

    Partners:Odebrecht,OAS andUTC(70%)

    Technology:KawasakiJapan(30%)

    Contracts:

    EnseadadoParaguau(BA)

    Contracts forthe Transfer of Rights (with

    Odebrecht,OASand UTC):

    P74:hull

    P75:hull

    P60

    6 drillingrigs

    Jurong Aracruz ES

    Ownership:SembCorp Marine(SCM)from Singapore

    ConstructionworksstartedinDec/11.

    Ex erience:Sembcor Marinealread o eratesinBrazil

    P76:hull

    P77:hull

    inexisting

    shipyards

    for

    nearly

    14

    years

    ,having

    built

    P

    50, P54,P43,P40,P38

    Contracts with Petrobras:

    7drillingrigs

    P74

    Source:SINAVAL7

  • 7/26/2019 BACC Ship Finance_2

    8/17

    Rio Grande Shipyard ERG1 - RS

    7

    5

    1

    3

    3

    4

    2

    Aerial View of the Estaleiro Rio Grande ERG1 - RS (09/03/12).

    (1) Ecovix's Sheets Yard; (2) Sub-blocks Yard of Ecovix's replicating hooves; (3) QUIP's modules gantry for topside and integration of the P-55; (4 ) IESA's modules gantry; (5) Pre-constructionarea, with detail to the yellow blocks of Konecranes Goliath type portico (largest crane in the world: 210m span and capacityof 2,000 tons) delivered in Aug/12; (6) Integration work of the P-55;(7) Construction work of Estaleiro ERG 2, where it will be built 3 Setebrasil's Drillships (NS Cassino, NS Curumim and NS Salinas)

  • 7/26/2019 BACC Ship Finance_2

    9/17

    BrasFels Shipyard - RJ

    2

    3

    Overview of Estaleiro BrasFels in Ang ra dos Reis - RJ (31/08/12).(1) P-61 (CL:65%): HULL'S Construction of TOPSIDE's TLWP and integration (deckbox and built modules in Singapore).(2) So Pau lo Ci ty FPSO (CL: 65%): HULL's Conversion in China and integration of the 16 mod., Built in Brasfels (5 mod), Enaval (1 mod), Thailand (8 mod) and China (2 mod).(3) Paraty City FPSO (CL: 65%): HULL's Conversion in Singapore and integration of 15 modules built in the Brasfels (5), Nuclep (4), Enaval (2), and Singapore (4).

  • 7/26/2019 BACC Ship Finance_2

    10/17

    Mau Shipyard - RJ

    3

    1

    Overview of Estaleiro Mau, in Niteri - RJ (08/31/12).

    (1) Romulo A lmeida Produc ts Sh ip: Third Lot's Ship of 4 PROMEF 1's products ships (1st Phase), with delivery scheduled for Dec/12;(2) JosAlencar Products Sh ip: Fourth Batch's ship of 4 PROMEF 1s products ships (1st Phase), with delivery scheduled for Mar/13;(3) 1s t Panamax Vessel: Construction, in the Estaleiro Mau dry dock, 1st batch's Panamax Ship of 4 PROMEF 1 ships (1st Phase), with delivery scheduled for Jan/14.

  • 7/26/2019 BACC Ship Finance_2

    11/17

    At lnt ico Sul Shipyard - PE

    4

    5

    2

    3

    1

    Estaleiro Atntico Sul (Ipojuca-PE): Construct ion of t he Zumbi dos Palmares ship in dry dock and integration of P-62 on the shipyard dock (08/29/12).

    (1) P-62: Integration of the FPSO to the 15 modules, including 3 built in EAS, 7 in the UTC gantry and 5 in the Nuclep gantry(2) Zumbi dos Palmares SHIP of Suezmax type (2nd Lot's Ship of PROMEF 1) in dry dock; (3)Panel manufacturing workshops and pre-assembly of block,(4) Future area for construction of 7 Setebrasil's rigs ; (5) Future area of Estaleiro Promar, responsible for building the batch of 8 Promef Phase 2's gas tankers.

  • 7/26/2019 BACC Ship Finance_2

    12/17

    AgendaLeased FPSOs for Pre-salt

    LulaLula PilotPilotOnOn streamstream sincesince OctOct/2010/2010

    Baleia AzulBaleia AzulOnOn streamstream sincesince Set/2012Set/2012FPSO Cidade de AnchietaFPSO Cidade de Anchieta

    SapinhoSapinho PilotPilotOnOn streamstream sincesince Jan/2013Jan/2013

    a e e o au oa e e o au o

    11stst Oil in May/2013Oil in May/2013

    FPSOFPSO CidadeCidade dede ParatyParaty

  • 7/26/2019 BACC Ship Finance_2

    13/17

    PetrobrasVesselsCurrentandprojectedfleet

    2020StrategicPlanning

    FutureDemand(20132020)

    CriticalResources

    March/13

    Situation

    FutureSituation

    AccumulatedValues(1)

    By2017 By2020

    TankerVessels(DWTx1000t) 16,000 19,000 24,500 +198LargeSupply+198LargeSupply

    LargeSupplyBoats* 216 313 358

    ProductionUnits(SSandFPSO) 50 72 84

    DrillingRigs

    (SWD>2.000

    m) 41 44 54

    +36Production

    Units

    +36Production

    Units

    (1) Thefuturesituationof2020doesnotreflectthesumofthecurrentsituationwithfuture

    demand,astherearevesselswhosecontractsexpireby2020.Thisdemandmayberevised

    asnecessary.

    (2) FutureDemandincludeshireddemand,demandsinhiringphaseandyettobehired

    demand.

    +28DrillingRigs+28DrillingRigs

    Significantequipmentdemandmapping:

    Historicall im orted e ui ment with otential to attract orei n su liers

    Source:Transpetro;PNG201317;Petrobras(E&PSERV/USCONTandABLO/TM)

    Equipmentproducednationallybutwithpotentialbottlenecksinproductioncapacity

    *AHTS,ORSV,PSV

  • 7/26/2019 BACC Ship Finance_2

    14/17

    DrillingRigsFleetincreaseby2020

    +14

    Drillin ri sconsidered orthe

    PetrobrasDrillingRigsStartupTimeline

    Equipmentdemandnot

    yetaddressedforthe28drillingrigstobedelivery

    equipmentdemandanalysis

    Exampleofequipmentwith

    potentialfornationaldevelopment

    28DerrickStructure

    +7

    +8

    28Travelingequipment

    28ChokeandKillManifold

    28setsofRisers

    28BOP(parcial)

    +4

    +4

    +5

    se s e r ca ys em

    168MainDieselGenerators(parcial)

    28Emergencygenerators

    84DeckCranes

    168Azimut Thrusters

    +1

    2,716Pumps

    840HVACSystem

    28Accomodation

    Source:Petrobras;Sinaval *Beingnegotiated.EstimatewillbeconfirmedatthecontractsigningBrazilAbroad

    ConstructionSite

  • 7/26/2019 BACC Ship Finance_2

    15/17

    TankerVesselsFleetincreaseby2020

    PetrobrasFleetGrowthProgramwith

    BrazilianVessels

    PROMEFIand

    IIPROMEF

    Iand

    II EBN

    Iand

    IIEBN

    Iand

    II

    49Vesselsby2020 39Vesselsby2017

    4 deliveredVesselsand21Vesselsinadvancedstageof

    12Products

    8LPG

    3Bunkers

    14Suezmax

    8Aframax

    4Panamax

    26Products

    6Bunker

    7LPG

    2 Vessels in advanced sta e o constructionconstruction

    24Vesselsinhiringphaseorinitial

    constructionphase

    24Vesselsinhiringphaseorinitial

    constructionphase

    37Vesselsinhiringphaseorinitial

    constructionphase

    37Vesselsinhiringphaseorinitial

    constructionphase

    Exampleofequipmentwithpotentialfornationaldevelopment

    Equipmentdemand

    not

    yet

    addressed

    for

    61

    Vessels

    (by

    2020)

    Source:Transpetro;Petrobras(ABLO/TM)

    acuum ewage ys ems

    53InertGasGenerationUnit

    72LifeBoats+Davit

    1.830AccomodationCabines

  • 7/26/2019 BACC Ship Finance_2

    16/17

    LargeSupplyVesselsFleetincreaseby2020

    AHTSAHTS

    CurrentPetrobrasFleet Quantity FutureDemand

    +

    198

    Large

    Supply

    Vessels

    by2020OSRVOSRV

    MaintenenceTOs+DMAs+NewProductionUnits

    Instalation+FPSO`sandNTsOperation

    MaintenenceTOs+DMAs+NewProductionUnits

    Instalation+FPSO`sandNTsOperation

    36

    (almostthesamequantityasthecurrent

    fleet 216)

    Oi RecoveryOi Recovery

    PSVGeneralCargo+Oil +Bulk+Cement

    PSVGeneralCargo+Oil +Bulk+Cement 125

    Exampleofequipmentwithpotentialfornational

    development

    TSTugs+OilRecovery

    TSTugs+OilRecovery

    21

    SOSStandby+HandlingSpy(messenger)SOSStandby+HandlingSpy(messenger)

    SVSV

    30

    4

    198Offshore

    and

    Provision

    Cranes

    198VacuumSewageSystems

    396RescueBoats

    Source:E&PSERV/USCONT

    UT/PEmergencyCargo/Passenger

    UT/PEmergencyCargo/Passenger 38

    , anua pera e a ves

    44,550tonofPiping

    4,800ton

    of

    Fitting

  • 7/26/2019 BACC Ship Finance_2

    17/17

    Information:

    Investor Relations

    +55 21 3224-1510

    [email protected]

    .

    www.petrobras.com.br/ir

    17