World Bank Loan Project
Tieline highway from Guyaozi to Qingtongxia on national
highway No.2ll
Environment Management Plan
Entrusting unit: Ningxia Communication Department
Prepared by: Environmental Protection Communications
Center of the MinistT) of
Scientific Research Communications
Institute of the Ministry of
June 2009
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
wb350881Typewritten TextE2259 v3
....
•
CONTENT
1 OVERVIEW......................................................................................................................................................1
1.1 BACKG ROUND OF THIS PROJECT .................................................................................................................... 1
1.2 PROJECT DESCRIPTION ................................................................................................................................. 1
1.3 EVALUATING STANDARDS .............................................................................................................................3
1. Acoustic environment ................................................................................................................................3
2. Surface Water Environment. ......................................................................................................................3
3. Ambient Air .............................................................................................................................................. .4
1.4 KEY ENVIRONMENTAL PROTECTION GOALS .................................................................................................4
2 ALLEVIATION MEASURES .........................................................................................................................7
3 ENVIRONMENT MANAGEMENT RESPONSIBILITIES ........................................................................8
3.1 MANAGEMENT INSTITUTIONS AND RESPONSIBILITIES ..................................................................................8
3.2 ENVIRONMENT SUPERVISION PLAN .............................................................................................................23
3.2.1 Determination of Environment Supervising Scheme of this Project.. ................................................ 23
3.2.2 Working Contents of Environment Supervision .................................................................................26
3.2.3 Management of Contractors ...............................................................................................................29
3.3 ENVIRONMENTAL MONITORING PLANS .......................................................................................................30
3.3.1 Environmental Monitoring Responsible Organizations, Monitoring Target.. ..................................... 30
3.3.2 Environmental monitoring plans ........................................................................................................30
3.3.3 Environmental Monitoring Report .....................................................................................................31
4 ENVIRONMENTAL PROTECTION TRAINING......................................................................................36
4.1 ENVIRONMENTAL PROTECTION TECHNIQUE AND SKILL TRAINING .............................................................36
4.2 TRAINING MODE AND TRAINING EXPENSES ................................................................................................37
5 LEGAL EFFECTS OF THE ENVIRONMENTAL PROTECTION ACTION PLAN .............................39
6 ENVIRONMENT MANAGEMENT STRUCTURE OF TEMPORARY PROJECT...............................40
6.1 MANAGEMENT STRUCTURE .................................................................................................................40
6.2 SITE SELECTION STANDARD ............................................................................................................... .40
6.3 SUGGESTIONS FOR THE DESIGN OF ACCESS ROADS .............................................................................41
7 INVESTMENT BUDGE OF ENVIRONMENTAL PROTECTION ..........................................................43
7.1 COMPILING PRINCIPLE AND BASIS .............................................................................................................. 43
7.2 INVESTMENT ESTIMATION OF ENVIRONMENTAL PROTECTION .................................................................. ..43
7.2.1 Investment Estimation of Environmental Protection Measures of this Project ..................................43
7.2.2 Calculation of the investment on special environmental protection .................................................. .45
1 Overview
1.1 Background of this Project
The planned highway from Guyaozi to Qingtongxia by passing Wuzhong is located a1 the central and northern parts of Ningxia. It is a fully-closed and fully-interchange expressway with four lanes and with the length of 75.675km. The starting point of this project is looted at the north of eastern Ningxia coal chern ical industry area, and it is connected 'vith Qing-Yin expressway. The ending point is located at the west of the new material ba~e at Qingtongxia, and it is connected with the planned expressway from Shizuishan to Zhongning. The construction period of this project is from July 2009 to October 2012. This highway will be completed and open to traffic in 2012, and the construction period is 4 years.
According to the regulations of "Law on Environmental Impact Assessment of the People's Republic of China" and "Clause 4.0 I Environment Evaluation in World Bank Busi less Policy", the planned project is class A project according to the potential environment and social impact scale, sensitivity of the engineering area, and the required comprehensive environmental evaluation report.
The "Environment Management Plan" (EMP) regulate the following items: project acti vity, potential influences, alleviation measures, implementing entity, monitoring enti!:, bu jget allocation, monitoring indexes, the setting of environment management and supervi iing system, as well as the ability bUildi'ng training plan.
This "Environment Management Plan" will be taken as part of the contract document and will be provided to contractors and supervising engineers. The alleviation measures specified in the "Environment Management Plan" will be integrated into the prdimi lary design and detailed design. These measures should be fully implemented by contradors according to the contract obligations.
According to "Law on Environmental Impact Assessment of the People's Republic of China", the environmental impact assessment should be based on the feasibility study report of the project. After approved, it should not be changed unless the engineering scope is changed greatly.
1.2 Project Description
Geographical location: Guyaozi-Qingtongxia highway(via Wuzhong City) lies in celtral north of Ningxia, extending from east to west by Lingwu City, Litong District of Wuzhong City and Qingtongxia City, and is located between east longitude 105°50'to ] 06°37', and north latitude 37°51'to 38°11'.
Length: 75.675km
..
Road grade: fully-closed and fully-interchange expressway with four lanes
Design speed: 100km/h
Width 0 roadbed: whole:26m; abruption:13m
Maximum longitudinal slope: 4%
Width of driveways: whole: 2 X 7.5m; abruption:7.5m;
Width of right paved shoulder: whole: 2 X 3.0m; abruption:3.0m;
Type of pavement surface: asphalt concrete
Designed automobile load grade: highway grade-l
Acceleration coefficient of seismic peak: 0.15, 0.15, 0.10, 0.20g
Designed flood frequency: 11300 for ultra large bridge, and 11100 for medium large bridge/small bridge and culvert and roadbed
Routes crossing type: flyover
Main engineering quantities of the whole line are listed in table 1.2-1.
Table 1.2-1 Table of main engineering quantities of recommended scheme
Guyaozi to Qingtongxia (expressway) Project Unit
LK3+600~LK79+275
Length of route km 75.675
Roadbed m 3 10233727 3Earthwork in each kilometer m 135409.75
Protection and drainage works
Special roadbed treatment
Special large bridge
large bridge
[bridgework Medium bridge
Small bridge
Culvert
m 3
km
mlset
m/set
mlset
mlset
/
164097.67
40.5389
1778.08/2
4472.265/20
448.3/7
23.02/1
164 ........... ..
Intersecting Connected cloverleaf junction
construction / 6
2
http:135409.75http:abruption:3.0mhttp:abruption:7.5m
Separate intercrossing / 22
Routeway
Overbridge
/
/
50
5 -
Management monitoring
center / I
Main line toll station / I [Traffic
project
'-----.
Ramp toll station
Maintenance work area
/
/
6
1
Service area / I I
.~......--
•Parking lot / I
House removing m2 65168
Occupied land hm2 513.08 -
Estimated amount 1O,000RMB 199782.0469
Average cost in each kilometer 1O,000RMB 2643.4589
1.3 Evaluating Standards
According to reply (annex 10) for the implementing standard of environmental impact assessment of this project by the Environmental Protection Bureau of Wuzhong City am the Environmental Protection Bureau of Yinchuan City, the implementing standard1 of environmental impact assessment of this project are:
1. Acoustic environment
The first class standard of "Quality Standard of Sound Environment" should be implemented for the evaluation of the current status of sound environment, while the second class stan jard should be implemented for schools and hospitals; the "Noise Limits for Construction mte" (GB 12523-90) should be implemented for the sound impact assessment during the construction period; the sound environment assessment during the operation period sh:)Uld be implemented according to decree No. [2003]94 "Notice on Problems relevant to Environmental Noise in Environmental Impact Assessment of Highway, Railway (including Light Rail), and other Construction Projects" issued by the Ministry of Environmental Protection; the class 4a standard of "Quality Standard of Sound Environment" should be implemented for regions within 35m of the red lines at both sides of the planned highrVay, and class 2 standard should be implemented to regions beyond that. The sensitive point 2 of schools and hospitals executes class-2 standard.
2. Surface Water Environment
Section LK37+ 1 00~LK79+275: Class III standard of "Environmental Quality Standards for
3
Surface Water" (OB3838-2002) should be implemented for the water quality of Yellow River and agricultural irrigation trench, and the first class standard of "Integrated Wastewater Discharge Standard" (OB8978-96) should be implemented for the discharge of corresponding wastewater; class V standard of "Environmental Quality Standards for Surface Water" (OB3838-2002) should be implemented for Kushui River (Shanshuigou) and Qingshuigou, and the second class standard of "Integrated Wastewater Discharge Standard" (OB8978-96) should be implemented for the discharge of corresponding wastewater.
Section LK3+600~LK37+100: Class III and [ standards of "Environmental Quality Standards for Surface Water" (OB3838-2002) and "Standards for Irrigation Water Quality" should be implemented for water environment quality standard. The first class standard of "Integrated Wastewater Discharge Standard" (OB8978-96) should be implemented for the discharge of wastewater.
3. Ambient Air
The second class standard of "Ambient Air Quality Standard" (GB3095-1996) should be implemented for the atmosphere. The second class standard of "Integrated Emission Standard of Air Pollutants" (OBI6297-1996) should be implemented for the emission of pollutants. The second class area II period standard of "Emission Standard of Air Pollutants for Coal-Burning Oil-Burning Oas-Fired Boiler" (OB13271-2001) should be implemented for parking lots and toll stations.
1.4 Key Environmental Protection Goals
Environmental protection goals along the highway are listed in table lA-I.
4
Table 1.4-1 Environmental protection goals along the planned highway
Environment sensitive factor
Protection objects Grade Address Relative position with
alignment Engineering type
Ecological environment
Baijitan Natural Reserve
Soil, vegetation, soil and water conservation fad lities, wild plants and biodiversity
National
I
East of Lingwu City
Wuzhong City and Lingwu City of Ningxia
LK17+500~LK29+500 crossing 2 larbge bridges
the experimental zone of 1 Small bridge 2 Separated Interchange
Baijitan Natural Reserve 2 Passages
Along the entire highway Roadbed, bridge, overpass, and service facilities
Woodland and along the line
basic farmland I
Wuzhong City and Lingwu City of Ningxia
Along the entire highway Roadbed, bridge, overpass, and service facilities
Acoustic environment
There are 46 sensitive places in the assessment scope, including 1 apartment for the elderly, 3 schools and 42 villages
Yellow River
Wuzhong City and Lingwu City ofNingxia
Wuzhong City
Residential buildings, schools, hospitals, etc. within 200m at both sides of the highway
-----------
large bridge span
Roadbed and bridge
Bridges
Aquatic Environment Yazidang Reservoir
Domestic, industrial water
Lingwu City
Reservoir is located at about 1400m away leftward from Guyaozi-Qingtongxia connecting line LKII highway.
Subgrade
Atmospheric environment f---------
Sensitive sites of society
Area along the highway
Resettling of building estate
real
Second class
Without official protective grade
Wuzhong City and Lingwu City of Ningxia
Along the entire corridor
Along the entire highway
Along the entire highway
Dust and vehicle tail gas during the construction period
5
Environment sensitive fador
Protection objects Grade Address Relative position with
alignment Engineering type
Maliantai borefield / Lingwu City
Start point is located out of the mine fields and the line has no crossover with the mine fieldsand
Subgrade
6
2 Alleviation Measures
According to the environmental impact assessment, a series of alleviation measures are established in this ~'Environment Management Plan", as shown in table 2-1,2-2 and 2-3.
Except the alleviation measures included in this "Environment Management Plan", the de5ign of construction of this project are also restricted by lots of domestic laws, regulations, technical manuals and operating regulations. These are all defaulted as the legal requirements of the project design and construction management. Main documents include:
"Environmental protection regulations for construction project"
Method on the administration of communications construction project environm(; ntal protection, No.5 command from the Ministry ofCommunications in 2003
"Notice of the State Council on Further Promoting National Green Channel Construction" (GF [2000) No. 31), the State Council
"Several suggestions on carrying out the strictest protection system of cultivated land dming the highway construction" (JGLF [2004) No. 164), the Ministry of Communications
"Notice on Conducting Traffic Engineering Environmental Supervision" (JHF [2(04) No. 314), the Ministry of Communications
"Classified Administration Catalog of Construction Project Environmental Protection" (the
Ministry of Environmental Protection, 2008.9)
"Standard of Environment and Sanitation of Construction Site" (JGJ146-2004)
"Design Code for the Reinforcing of Highway Bridges" (JTGTJ22-2008)
"Safety and Technical Code for the Construction of Highway" (JTJ076-95)
"Management Regulation of Construction Site"
"Safety Rule ofConstruction Project"
Detailed alleviation measures are given in the following annexes of this "Environment
Management Plan";
Attachment 1: Noise reducing
7
Attachment 2: Environment Impact Alleviation Measures for Bridge on Yellow River
Attachment 3: Alleviation Measures for Environment Sensitive Regions
Attachment 4: Wastewater Treatment System for Service Facilities
Attachment 5: Overview for Treatment Scheme of Soil Erosion and Water Loss
Attachment 6: Schedule of applicable standard
3 Environment Management Responsibilities
3.1 Management Institutions and Responsibilities
Environment management is the important guarantee for the control of negative effects of the project and for the creating of long term benefits. The environment management work should run through the entire design period, construction period and operation period. Many situations affecting the environment will be encountered during the management process.
8
Table 2-1 Implementation situations of environmental protection measures during the design stage
Implementation Responsible Evaluation index Environmental issues Measures for environmental protection
organization organization ~--------------~------------------------------------------------~----
compare local proposals in respect of environment, social economy and
engineering
Report the best proposal to local government and transportation d' . t't t
eSlgn inS 1 U e andlCommunication SatisfYing the'" I. line selection andidepartment 0 fN mgxJa provInce; . I
envlronmenta department of the requirements of relevantline type design General line type is smooth and suitable for local landform. evaluation unit autonomous region design codes
Longitudinal slope rate shall be increased as much as possible and no
excessive pursuit in high standard is allowed, which would lead to
destroy natural environment.
In line selection, high quality wood land and farm land shall be occupied
as little as possible while wasteland and scrubland shall be used as much
as possible.
Temporary occupied land prefers to be the subgrade and other
2 fi permanent auxiliary facility occupied land and no basic farm land is design institute andlCommunication SatisfYing the .meas.mes . or! allowed. environmental department of the requirements of relevant
eco 10 Ical rotectlon ..... .' . autonomous region design codes side slope with the protection of retaining wall so as to decrease occupy the land. At both sides of the bridge, greening or vertical greening design should be conducted according to the natural landscape.
g p Wlthm high quality farmland section, the subgrade shall adopt shrinkage evaluation umt
Local line design shall be further optimized so as to make the line away
from acoustic environment-sensitive site;
Noise reduction measures shall be considered during highway design
All sensitive sites ofand corresponding cost estimation shall be made; design institute andlCommunication II sound environn:ent 3.Traffic noise Environmental protection measures required by this report shall be environmental department of the involved in this project
designed at the same time; evaluation unit autonomous region should be protected According to the prediction, sound isolation 'Nindow, sound barrier'l" height-increased fence may be done depending on different sensitive I site, which will be included in design and bid document. I I
9
Optimize the design of medium bridge and culver; Sewage treatment equipments shall be established for 1 parking areas, I d' . .
· I &. . I' eSlgn Institute andlCommunication4. surface waterIservice areas, management supervIsion center, maintenance areas. I department of thelWater protection . Ted' ed fi h f' envlronmentapollution and 7 to II statIOns. reat water IS us or t e purposes 0 service I' 't autonomous region " '1' . d' eva uatlon umlaCI Ity greening an expressway greenIng.
Strengthen the design ofcrash carrier for river-crossing bridge.
5. Air pollution
During line selection phase, sensItive sites shall try to be avoided. During design phase, the locations of construction access and lime-soil d' . .
. , . h II b bl I d 'd eSlgn Institutemlxmg station s a e reasona y se ecte so as to try to avol. I dense-populated area. envllron.menta. .. . eva uatlon umt
Matenal transportation route shall be reasonably deSigned so as to be away from residence area as far as possible.
All sensitive sites of andlCommunication environment air
department of the involved in this project autonomous region should be protected
6. linkage isolation During feasibility design phase, the arrangement of culvert, passage andldesign institute division interchange shall be optimized so as to guarantee easy passage environmental for the resident at both sides of the line. evaluation unit
andlCommunication ISatisfying the department of the,requirements of relevant autonomous region Idesign codes
7. service facility
8. visional landscape
Coordinate the color of service facility with the landscape. Raise and fall of remote mountain shall be taken as the background during the design so as to make mountain, water and object as one body; design institute Parking area prefers to be located at hidden side and be surrounded by environmental local tall trees so as to hide parking area and visional pollution due to evaluation unit parking vehicle. Parking area ground prefers to be grid ground within which green grass grows.
Deep-dug side slope tries to use mild side slope so as to look like natural slope. Original natural landform shall be maintained as good as possible and plant cover tries to be recovered into natural wild plant cover. Artificial side slope shall try not to use concrete slope or mortar flagstone slope and shall be protected by both slope protection d' . t't t
' . d I 'h' h d I' I ' I eSlgn InS I U eengIneenng an p ant Wit riC root an ow reqUirement on geo oglca . t I d· . I h fl 'd I h b envlronmen a con Itlon, n case t at mortar agstone or concrete Sl e s ope as to e I t' 't
' . eva ua Ion umused, local Vine shall be planted at the bottom of tope of Side slope so as
to ease visional conflict to foot passenger.
In case that it is impossible to build mild side slope or only retaining
wall is feasible, local vine shall be planted at the bottom of retaining
wall,
andlCommunication IProtecting visional department Of. the landscape autonomous region
andlCommunication IProtecting visional department Of. thellandscape autonomous regIOn
10
During bridge design, the influence of bridge shape, deck line type and color on landscape environment shall be considered. Bridge guardrail design institute andlCommunication Satis1)ring the
9. Bridge near hill and valley shall not be in the color of great contrast with the environmental department of the requirements of relevantl environment and grass green may be used to match with natural evaluation unit autonomous region design codes mountain and make riding vision comfort.
Line type of the intersection shall be suitable for the terrain; Toll station shall be properly arranged and scientifically planned and its
dlshape, style and color shall be of local character. design institute and Communication Satis1)ring the10. Interchange
an Interchange area shall grows wood so as to hide it; environmental department of the requirements of relevantltoll station
Auxiliary facilities for the interchange (for example guardrail, indication evaluation unit autonomous region design codes board and sign line) shall be suitable for local situation and be safe and natural except to follow certain standards.
Emergent .telephone shal.1 be established in the bridge and strengthenedldes~gn institute andl Communication IPrevention of risks andII. risk accident crash barrIer shall be deSIgned for the bridge. envIronmental department of the accidents evaluation unit autonomous region
Nail down the distribution scope according to the investigated cultural relics, and try to avoid the ancient cultural relics. If unavoidable, these cultural relics should be exploited and excavated. By sticking to the working principle of "protection in priority and emergency treatment first", "in favor of economic construction and protection of cultural design institute andlCommunication All cultural relics
12. Cultural relics relics", cultural relics along the line should be protected, and research on environmental department of the involved in the project historical cultures of local place should be promoted. According to evaluation unit autonomous region should be protected. relevant regulations of "Cultural Relic Protection Law of the People's Republic ofChina", exploration and excavation should be conducted for cultural relics along the line before construction. The expenses should be listed in the project budget by the building unit.
Drainage ditch should be built at the surroundings of soil borrow field; Temporary drainage ditch should be set or soil retaining wall or toe protection should be constructed during the construction of roadbedld' . t' dlc .. ISatiS1)ring relevant . . eSlgn ms ltute an ommumcatlon. .
13.S0I1 eroslonlslope; . tid rt t f th deSIgn codes, passmg. I . envlronmen a epa men 0 e . I .protection Treatment measures like retaining wall, anchor spraymg concrete I at' 't It' Ithe techmca review 0 . ... "" .. . eva u Ion um au onomous region I., •
antt-slidmg pIle and slope cuttmg shoUlu oc:: la....c::n lor excavation I ISOlI croslOn protectIOn .
. sections with the development of landslide disaster;
ISmail slope should be adopted to excavation section with thel i
II
development of collapse hazards. Meanwhile, mortar laid stones should
be paved on the entire slope for protection.
Give priority to the existing village roads, tractor-ploughed roads for
expansion and upgrading of pavements,In case of no available existing
roads in surrounding areas, new construction pavements may be built,
which shall have the most immediate and shortest connection with the
village roads to reduce the length of the newly-built construction
pavements;
14. Construction Attention should be paid to the selection of construction camp during the design institute andlCommunication IProtecting of ecologicalcamp/construction design phase. They should be set in existing villages or on permanently environmental department of the environment access roads occupied land; evaluation unit autonomous region
Existing roads should be used as the construction access roads. Town or large residential area should be avoided while designing new construction access roads which can also be used as roads for transporting in local villages in the future; Septic tank should be constructed for each camp, and sedimentation tank should be set on the construction site.
All kinds of Design unit and Development unit compensation measures
15. Land requisitionlMake land requisition and resettlement scheme resettlement repot and governmental should satisfY theand resettlement preparation unit departments requirements of relevant
idesign codes
12
c
Table 2-2 Implementation situations of environmental protection measures during the construction stage
Implementation ResponsibleEnvironmental issues Measures for environmental protection Evaluation index
organization organization Before starting, propaganda signs should be set on the construction site and its surroundings for the protection of wide animals and natural vegetation. Propaganda and education for the protection of environment and biodiversity must be strengthened for contractors; After entering into the construction site, construction personnel should be educated with ecological protection. Problems relevant to construction field, construction camp and temporary access roads should be coordinated with local forestry management department in advance. Construction
1. Protection of ecological resources
camp should not be set in woodland. Damages to soil and
vegetation at the surrounding of the operating area should be
reduced to the minimum;
If cultivated land or woodland is used temporarily, the mellow
soil layer with the thickness of 30cm should be stripped off
and preserved. Reclamation should be conducted immediately IContractor
after the construction is completed;
Management during the construction phase should be
strengthened. Construction personnel are forbidden to hunt and
kill wild animals;
Blasting operation in the morning or night should be avoided;
Construction vehicles can not drive into farmland and
woodland while running on the temporary driveway;
All kinds of protective measures should be implemented at the
same time with the main project;
Temporary protective measures should be strengthened to
prevent water loss and soil erosion;
Communication IProtecting of department of the ecological autonomous region environment
Protective measures should be strengthened on soil borrow field and dreg discarding field to prevent water loss and soil
, Pff1'!lf"!:n- . IIThe pr~duction and living area and the construction roads I I I i
13
should be protected to avoid damaging the vegetation.
The construction time should be reasonably arranged and high noise construction should be avoided at night; Construction machines should be kept in good state; The builders should choose construction machines and
2. Control noise
of construction
transportation vehicles in accordance with related national standard, and better choose those equipments and techniques with low noise. Sound defense for construction personnel should be done; During the construction phase, sound at villages adjacent to the construction access roads should be monitored by the supervising engineer. The transportation route of materials should be changed if necessary according to the monitoring results. If unavoidable, temporary sound barrier should be equipped or certain economic compensation should be provided to local residents through making agreement with them.
Contractor Communication department of the autonomous region
Complying with requirements of relevant regulations
3. Surface water pollution control
1 Prevention measures ofwastewater during the construction
Leakage prevention during the transportation process of road
materials should be clearly specified in the contract. Piling
place should not be set at the bank of water body to avoid the
pollution ofwater body by the flushing of rainwater;
The piling place for building materials such as pitch, paints
and chemicals should be in shelter to reduce the pollution
caused by flushing by rainwater.
It's forbidden to set up stock grounds, waste stacking grounds
or construction sites within 200m away from the riverside.
During the construction of bridges which cross rivers, the
Communication IDischarging after Contractor department of the reaching to the
autonomous region standard
construction wastewater can not be drained directly into the river. 2. Control measures of oiled wastewater The control of oiled wastewater is disposed by control during the construction and cleaning production plan. Solid oil adsorption material should be used to transfer waste oil into solid materials, which should be collected, sealed, and
14
(
transported to refuse site for centralized treatment; Rectangular sedimentation tank should be constructed in construction field and mechanical maintenance field. The tank should be buried by soil after the construction is completed. 3. Contro 1 measures 0 f sewage The repast and washing of construction personnel should be managed in a concentrated and unified way; Septic tank should be set at the nearby of the construction camp to collect feces and washing sewage of catering. 4. Protective engineering measures for the construction of bridges Oil leakage by bridge constructing machines is forbidden; chemical products should not be spilled into the water body; During the construction process, machines should be properly maintained and cured to prevent the leakage ofoil.
4. Control ofair pollution
The pavements of piling field and soil borrow field should be kept wet to reduce the fugitive dust caused by the passing automobiles and wind; Construction unit should equip certain number of sprinkler cars to sprinkle water on non-paved temporary roads, construction access roads and material piling fields, especially in dry and windy days. Water should be sprinkled twice a day (once time in the morning and one time in the afternoon) to reduce the pollution of fugitive dust; Contractor
Communication department of the autonomous region
IRedu~e the dust pollutIOn
Piling field which has the potential of spilling powder materials should be placed at the leeward direction of the sensitive point. Wind protection and covering measures should be taken to prevent fugitive dust; Wind protection and covering measures should be taken for transportation of cement, sand, lime, and other bulk materials, especially in dry and windy weathers to prevent fugitive dust.
15
Before the construction of highway, contractors and
construction personnel should be educated to protect cultural
relics. The knowledge of cultural relics of construction
Cultural relics Communicationpersonnel should be enhanced, especially their judgment accidentallydepartment of theability of cultural relics. Once cultural relics are found out5. Cultural relics Contractor discovered during the autonomous region during construction, the excavation should be stopped construction should be
immediately. Relevant situations should be reported to local protected.
cultural relic department. Excavation should not be
continued before the appraisal by competent department and
before taken necessary protective measures.
Management should be strengthened. Trees beyond the confiscated felling area. The felling of trees should be reduced in the confiscated felling area; Prohibit establishment of construction camp and site, or temporary land occupation such as borrowing pit and spoil ground etc. within the nature reserve. Prohibit construction personnel from digging medicinal herbs
such as licorice etc. or hunting wild protected animals.
Protective The width of the construction access roads should be strictlyMeasures for controlled. Existing roads should be fully utilized.Vegetation and Construction access roads should be reduced to reduce the Animals damages to surface vegetation;
6. Baijitan Communication Protect the ecological Stripe the surface soil (20 cm thick) on the sub grade before Natural Contractor environment in thedepartment of theconstruction and cover the surface soil on the side slopes after Reserve autonomous region natural reserve construction.
The construction time should be properly selected to avoid the
high peak period of wild animal activities. Morning, dusk
and evening are the peak period for wild animals to move
about, breed and seek foods, and high-noise operation such as
or shall be avoided in the aforesaid periods.
Strengthen vehicle monitoring, and control passage of the
Protective vehicles with noise or exhaust exceeding relevant standards to
Measures for protect the environment inside the nature reserve.
Environment Arrange construction personnel to learn relevant state and
Quality local laws, rules and regulations on the nature reserve, and
carry 0llt universal n£lclbIicitynand education on rekvan=t-L,________---I.________-'--________.....I
16
,
I(
environmental protection laws, rules and relevant knowledge on environmental protection to improve the awareness of environmental protection. It is strictly forbidden to poach or
desert at random etc .. Supervise the construction behaviors and implementation of
environmental protection measures and water-soil retaining measures during construction in the reserve, ; Supervise establishment of construction pavements and vehicle transport as well as pollution caused during transport
Environment of construction materials; Supervision and Supervise construction behaviors involving temporary land Management occupation and scope of construction; It is strictly forbidden to
fetch earth, desert earth or dig sand in the reserve at random. Supervise implementation of protective measures of the side slopes of the subgrade and measures for improving side ditches; Vegetation shall be adopted to protect the side slopes if possible. The transportation time and route should be properly arranged to avoid causing traffic jam to existing roads; Vehicles should drive slowly during night and ringing is forbidden; Public service facilities along the line should not be damaged
7. Reducing the disturbance to the public
by the highway construction; A piece of billboard should be set at each entrance of every, Contractor construction contract section. The hotline number of
Communication department of the autonomous region
Guarantee the safety of traffic
contractor, construction supervlsmg unit and local environmental protection agency and the name of the contact person should be written on the billboard. In this way, people can contact with relevant department if they are affected by the noise, air pollution, traffic and other adverse influences brought by the construction.
--r:: - -------
8. Pollution control in construction camp and site
Septic tank should be set in the construction camp,
I~hould be cleaned regularly; C All kinds of wastewater should not be discharged directly into I ontractor inatural water bodies; i
Communication department of the :11!tnnomOH(! region
Guarantee the constructionienvironmental hygiene
17
Solid wastes in the construction camp should be collected regularly and sent to specified municipal solid waste disposal station for treatment; The construction camp should be far away from rivers and other natural water bodies. The repast and washing of construction personnel should be managed in a concentrated and unified way, such as concentrated repast and washing to reduce the amount of sewage. The washing process is limited to certain water consumption by hot water or other ways to substitute wash so that the content of wash in the wastewater will be reduced. Stone chips or crushed stones should be paved on eXIsting roads if they are used as construction access roads. New access
9. Management construction access roads
fl roads should be compacted and paved with crushed stones to o avoid fugitive dust.
After the construction is completed, these access roads should
Communication department ofthe autonomous region
Reasonable use of construction access roads
be recovered to their original states. If required by local place, they can be used as transporting roads for villages. Before construction, contractors and relevant personnel from the construction supervision unit should be trained with the Provincial
10. Management contractors
fl knowledge of environmental protection; o Environmental protection measures and other environmental
protection documents should be incorporated in the bidding
communication department, environmental
Communication department of the autonomous region
Proper environment management
and tendering documents to make environmental protection to evaluation group be the duty ofcontractors.
18
4
Table 2-3 Implementation situations of environmental protection measures during the operation stage
Environmental issues
Measures for environmental protection Implementation
organization Responsible Evaluation organization index
I. Transportation accidents of dangerous articles
Leading team for the transportation of dangerous articles and leakage accident of dangerous articles should be established; the "three-certificate" system should be implemented to vehicles
Managementwhich transport dangerous articles; vehicles which transport dangerous articles should be marked; department and
Public security, transportation and fire fighting department should specify routes and parking public security
places for vehicles which transport dangerous articles; bureau
Emergency treatment team for leakage accident ofdangerous articles should be established.
Communication Prevention
department of of risks and
the autonomous accidents
region
2. Noise and air pollution
Speed limit and ring forbidden signs should be set; Corresponding measures should be taken for places which noise exceeds the standard.
HighwayAccording to the environmental protection requirements of the area, coal-burning boilers should managementnot be used as the heating measures in service facilities along the line. Electricity can be used for departmentthe heating in toll stations. Heating by electricity or more advanced environmental protection heating mode can be adopted to parking lot and service area with large heating area.
Protecting Communication the quality department of of sound the autonomous environmen region t and air
quality
3.Drainage systems
The drainage system should be cleaned regularly. The discharged water from service facilities Management should be comprehensively utilized. department
Communication department of the autonomous region
4. Planning
The building unit should cooperate with local planning department to strengthen the planning Local control of land at both sides of the highway. government
Local government Coordinatio
Specific plans should be made for environmental protection of industrial parks along the line of Local this project according to relevant planning. government
Local n with government relevant
Specific plans should be made for environmental protection of mining area along the line of this Local project according to relevant planning. government
Local planning
government
5. Monitoring Environment monitoring should be conducted regularly. Environment monitoring unit
I
Communication Supervising department of the the autonomous environmen region Ital quality
19
•
Therefore, specialized management institution with good business foundation and management ability should be established. Necessary management personnel for environmental protection should be employed. The established comprehensive and professional environmental protection systems should be integrated. The institution should be responsible for organizing, implementing, supervising and managing the environmental protection works of this project.
The organization organ for the environmental protection works of this project can be divided into three parts in functional division, which are implementing institution of
environmental protection measures, supervising institution and management institution. The structure of the supervising institution and management institution is shown in Fig. 3.1-1.
§ ~~
tl \: o '"0 0 u
'"0 . t c 0..
(';S
.~ til
..
The composition of all structures and corresponding responsibilities are listed in from tab Ie 3.1-1 to table 3.1-3.
Table 3.1-1 Major responsibilities of implementation division
Composition Major responsibilities
Stage of Organization Environmental protection measures stated in environmental affe( tion Design of Design report shall be integrated in construction drawing design.
•• Bidding document includes the content concerning environml.:ntal protection and civilized construction; various proposed prote,;tion measures shall be included in corresponding terms.
Contractor • The contractor shall include environmental protection measure ir the
TransportationConstruction bidding document. Each contractor shall appoint at least one sp,!cial Department ofphase environmental protection employee who shall strictly irnplelnent
Ningxia • environmental protection measures and work specified in bidjingProvince document.
• Check and remedy the actions adverse to environmental protectk n in cooperation with environmental protection engineer
"Transportation
Operation Department of Be responsible for usage and maintenance of environmental proteltion phase Ningxia equipment in order to ensure proper running.
Province
Conduct environmental monitoring plan during constructi;m period andMonitoring site
operation period.
Table 3.1-2 Major responsibilities of management division
Composition Major responsibilities
• to coordinate and manage environmental protection
work.
• Implement various environmental protection guideline, policies and
laws enforced by PR China and Ministry of Transportation; prepare
management methods and detailed rules for environmental protection inCorresponding transportation industry. environmental protection
section under Transportation • Be responsible to review construction and design proposal for
Department ofNingxia environmental protection measures.
Province • Strictly implement three same-time system for environmental protection
measure and main body construction, ensure environmental protection
investment put in place and monitor the implementation of various
environmental protection measures.
• Inspect the usage and maintenance of environmental protection facility.
Construction I Project • Prepare implementation plan and management methods for phase'--_____--'-c_o_n_s_tr_u_c_t_io_n I environmental protection during construction period according tom
21
"
headquarter environmental protection measures and advices stated in environmental
• evaluation report and involve it into bid document and contract • agreement.
• Appoint one environmental protection engineer for each bid section who
is responsible to environmental management and monitor, supervise the
implementation of environmental protection measure stated in bidding
document and inspect and remedy the actions adverse to environment
during construction period.
• Conduct promotion, education and training on environmental protection
so as to improve environmental protection consciousness and civilized
construction quality for construction staff;
• Be responsible to treat emergent pollution accident during the
construction and report to competent department and relevant departments
in time;
• Organize monitoring plan during construction period;
• After construction completion, organize comprehensive inspection on
the implementation of environmental protection measures and
environmental recovery of construction sites and push construction unit to
timely withdraw temporary occupied site and remove temporary facilities.
• Be responsible for environmental protection during operation period,
prepare environmental protection plan based on environmental protection
measures and advices stated in environmental evaluation report and
appoint one special employee who is responsible for environmental Project management for this project;
Operation operation • Organize monitoring plan during operation period;
phase management • Organize to prepare and conduct emergency response plan for pollution
unit accident and timely treat pollution accident and dispute;
• Organize to develop environmental protection promotion, education and
training and improve environmental protection consciousness and quality
of the employees.
Table3.1-3 Major responsibilities of environment management & supervision division
Name of
institution
Environmental
Protection
Administration
ofthe
Autonomous
Region
Responsibilities
• Review and approval environment evaluation report;
• Organize completion acceptance for environmental protection engineering for this
project.
22
l'
• Participate in completion acceptance for environmental protection engineering; Environmental
• Specify environmental laws and standards which shall be followed for this project; protection
bureau of • Participate in reviewing environmental influence report;
Yinchuan City • Supervise construction units to implement environmental action plan and foll)w
Environmental relevant environmental laws and standards;
protection • Coordinate each division to properly conduct environmental protection work; bureau
. of I • Be responsible to inspect and monitor the construction, operation and completion of Wuzhong City
environmental protection facilities within administrative governing area.
3.2 Environment supervision plan
The construction supervising engineer can assume the office of the supervising personnel of construction environmental protection. Through training and studying, the construction supervising engineer can be qualified as environment supervisor.
Responsibilities of environment supervisor are identifying problems through daily~ fie,ld
observation, consulting and deal ing with environment problems of the project together wi [h
the environmental protection department of the project office, comprehensively control alld
~ alleviate the environmental impacts by the planned highway, guaranteeing tile
implementation of the "three simultaneous" system, the environmental impact report alld
relevant environmental protection measures.
3.2.1 Determination of Environment Supervising Scheme of this Project
Environment supervIsIOn includes the supervISIon of environmental quality and t:le supervision of environmental works. Before implementing environment supervision, t le supervising unit should prepare the supervision scheme for this project according to environmental protection codes and standards relevant to this project, engineering design drawings, design explanation and other design documents, engineering constructil)fl contract, bidding document and tendering document, engineering environment supervishg contract and bidding document, etc. The supervising scheme should mainly include tile following contents:
[J Environment Supervising Scope, Stage and Term
Environment supervising scope: area of the project and area affected by this project
Working scope: construction field, living camp, construction roads, auxiliary facilities, a ld areas with environmental pollution and ecological damaged caused by construction in t le above scopes.
Working stage: environment supervision in construction preparation stage, constructbn stage, and project maintenance stage.
23
"
Supervision service tenn: starting from the construction preparation stage of this project to the construction maintenance stage of this project. The duration of service of the maintenance stage is one year since the completion date. The environment supervision of this project is divided into construction preparation stage, construction stage, hand over and defects liability stage.
[J Working Goals
Working goals of environment supervision: according to relevant laws, regulations, policies established and issued by China and relevant competent departments, regulations of the World Bank, nonnative documents, technical standards, approved design documents and bid document, as well as legally signed supervision and construction contract. According to the scope and contents of environment supervising service, fulfill the environment supervision duties, independently, fairly, scientifically and effectively service this project, implement comprehensive environment supervision, and guarantee this project reaching to the environmental protection requirements in design, construction and operation. Supervision should be conducted according to the requirements of measures in the management plan proposed in the report.
[J Supervise the soil erosion and water loss caused by the main project and temporary projects. Check if the contents of all soil and water conservation facilities are reaching to the requirements of the design regulation, and if the soil borrowing and abandoning are conducted according to the procedure and in specified places. Supervise the random abandon of spoil and stone in emphasis to avoid damaging the landscape. Temporary sedimentation tank should be built during the construction. The grounding-breaking points and other places which are vulnerable to soil erosion and water loss should be protected with straw mat or plastic film before heavy rain. Rivers, ditches and drainage systems should not be blocked, and the working conditions should be good.
[] Environment superVISIOn for the treatment measures of production wastewater and domestic sewage: supervise the sources, discharge amount and water quality indexes of production wastewater and domestic sewage, check and monitor if reaching to the approved discharge requirements.
D Environment superVISIon of air pollution control measures: air pollution in the construction area is mainly caused by the exhaust gas and dust generated during the construction and production processes. Pollution sources should be discharged after reaching to the standard. The construction area and its influencing areas should reach to specified environment quality standard.
C Environment supervision of noise control measures: to prevent the damages of noise, the pollution sources which will generate strong noise or vibration should be prevented according to the design requirements.
24
"
Environment supervision of solid waste disposal measures: disposal of solid wasUs
includes the disposal of production and domestic wastes and production waste slag. Tile site of the project should be kept clean and tidy.
[]Environment supervision for ecological measures of wild lives: avoid the influences :>f
soil erosion and water loss, and manage the construction according to the requiremerts specified for the protection of vegetation.
Environment supervision of human health measures: guarantee the safety and reliability of potable water, prevent the infection of disease, and provide necessary welfare and sanitary conditions, and measures in other aspects.
OEnvironment monitoring and supervision: supervise the implementation of environment monitoring works according to the monitoring contents in this report.
Construction and installation supervision of environmental protection fadliti,::s: supervise the construction of sewage treatment, sound barriers, environment greening, ald other engineering facilities of this project.
[J Working System
Including working record system, personnel trammg system, reporting system. let er sending and receiving system, environment regular meeting system: one environmen:al protection supervising meeting should be held in each quarter. During the envir
,
The working plan of environment supervision and implementation details of works should be complied by the supervising engineer, and they should be submitted to the owner for approvaL
[J Quality Control
Principle of Quality Monitoring
Conduct full process and Omni directional checking, supervising and management for the construction. Pay attention to the beforehand control, timely predict and prevent all kinds of unfavorable factors which may influence the environment, and nip them in the bud; strict the control in process, eliminate all kinds of hidden dangers which may influence the environment; improve the control afterwards, guarantee the engineering items submitted by contractors complying with the design drawings and technical codes, as well as satisfying all kinds ofenvironmental protection requirements ofthe contract.
Main Methods and Measures of Quality Control
A perfect quality monitoring system with the chief supervisor as the main should be established for the environment supervision. Omni directional supervision and checking should be conducted to the construction methods and construction processes of contractors.
Organization and Coordination, Information Collection, Transmission and Management
Coordination and management works of environment supervision is mainly realized in the form of meeting.
According to the requirements of the owner and by referencing the regulations of the World Bank, relevant national and local departments, the information collection, filing and management should be arranged, classified, tabulated and filed according to the characteristics of this project. Thematic meeting should be regularly held to check and urge contractors to timely arrange the contract documents and technical archives. The engineering information and archive classification should be clear and complete. The technical archives and drawing data should be synchronous with the entities.
3.2.2 Working Contents of Environment Supervision
oEnvironment Supervision in Propbase of Construction
Verification of pollution prevention scheme: according to the process design of specific item, verify the discharge link of "three~waste" in the construction processes, if the treatment technology adopted in the discharge of main pollutants and design is advanced and if the control measures are feasible. Final disposal methods and places of pollutants should be planned according to relevant regulations and treatment requirements in the
26
prophase of the project. The plan should be declared to the competent department }f environmental protection first and implemented later.
The supervision tasks in this phase mainly include compiling environmental supervision regulations, examining environmental protection clauses in construction contrad, contractors' environmental management plans in construction period and environmenlal measures in construction's organization and design, verity temporary constructior's occupying location and its preparatory work, and check whether construction materia s' stacking accords environmental requirements.
o Environment Supervision during the Construction Period
Supervise and check if the soil and water conservation measures are implement\~d according to the environmental protection countermeasures, the implementing sitllatio 1S and effects.
Supervise and check if the noise pollution of all kinds of mechanical equipments in l1e construction process are controlled according to the regulation.
Supervise and check if the domestic sewage and domestic wastes from the constructi')fl site are properly treated and disposed.
Supervise and check the daily collection, classified storage and treatment works of domestic wastes.
Production wastewater should be discharges after reaching to the standard.
Supervise and check if the roads of the construction site are smooth, if the drainage system is in good state, and if the construction site has accumulated water.
[] Train the construction personnel with the knowledge of environmental protection, cultivate the consciousness of environment protection and pollution control.
Monitor, check and test the discharge of pollutants generated during the construction period.
Investigate and deal with environment pollution accidents and disputes during 1he construction period.
o Environmental supervision of handover and defect liability period
The work of this phase mainly include summarization of the relevant information on environmental protection acceptance in project completion, environmental engineering construction etc, and supervision on the restoration and maintenance of temporary sites
27
•
such as earth pits, pre-cast plant and construction camps etc in defect liability phase.
[J Supervising the compilation of completion document.
Organizing primary checking.
Helping the owner to organize the completion acceptance.
-. Compiling summary report ofenvironment supervision of this project.
Arranging environment supervision completion data.
o Field supervision
During the construction period of subdivisional work, the environment supervIsmg engineer will conduct Omni directional inspection to the construction of environmental protection and links with potential pollution. The engineer should monitor and check the whole process and all links of the pollution working procedures. The main working contents include:
Coordinate the environment supervising works of construction on the site, patrol the construction site in emphasis, master the pollution dynamics on the site, urge contractors and supervisors to implement the environment supervising details, timely find out and deal with serious environmental pollution problems, especially the tie line LK17+500~LK29+500 from Guyaozi to Qingtongxia which crosses the experimental zone of Baij itan Natural Reserve.
o The supervising engineers should conduct whole process side-station supervision for the construction process of all project parts, site supervision, and checking of construction records made by contractors.
Supervising engineers should guide supervisors, demonstrate how to monitor and check, and tell the points for attention. Supervisors should record the environmental protection status of this project.
The contents of site checking and monitoring include: whether the construction is conducted according to the environmental protection clauses and if changed without permission; if the construction process satisfies the environmental protection requirements through the mode of monitoring; if the construction operation is complied with the environmental protection codes and if it is conducted according to the design requirements of environmental protection; if all kinds of environmental protection measures which are used to guarantee the environmental protection requirements are implemented.
Supervisors should record the site monitoring and checking situations in every day and
28
,
report to the environment supervising engineer who should supervise and check the works of supervisors, and timely find out problems of the treatment.
3.2.3 Management of Contractors
During the construction process, contractors should station in the construction site and he responsible for the effectively control and reduce the influences to the environment. Most of the environmental protection measures should be implemented by contractors. guarantee the implementation of environmental protection measures and "Environment Management Plan" by contractors, the following measures should be taken:
During the process of prequalification and while reviewing the qualifications of contractors, environment management should be included in the identification clauses. Under dIe same conditions, bidders who have passed the authentication of IS09000 and ISO 14000 will be chosen in priority.
In each construction stage, at least one full time personnel should be assigned tor tlle implementation of environment supervision, environment monitoring and specilic environmental protection measures.
During the preparation of bidding document, the owner of this project should integrate all kinds of environmental protection measures (put forward through approved "Environment Impact Report" and "Environment Management Plan" of this project) into relevant clauses to help bidders to understand the detailed situations of environmental protecticn. Corresponding project estimate should be established in the bidding document. Therefne, implementing environmental protection measures will become the obligations arId responsibilities of the bid winner.
Before the start of construction, contractors should be trained with relevant environmen:al protection knowledge. In all sections, at least one senior management personnel and one environmental protection professional should attend the training organized by senior environmental protection experts and local management department. This kind of training should be conducted in 2-3 days before the signing of contract. The contents of training
include:
Relevant national and local laws, regulations, and discharge standards;
Technical manual ofenvironmental protection;
"Environment Impact Report" and "Environment Management Plan" ofthis project;
Specific requirements ofthe monitoring points and monitoring methods;
Specific requirements of monitoring report and monitoring information feedback;
29
.,
Suitable alleviation measures;
Emergency measures for emergency situations and leakage ofdangerous materials;
Settlement of disputes and complaints of the masses during the construction period;
Environmental protection responsibilities of contractors;
Construction supervising unit fulfill their environment supervising liabilities through assigning environment supervising engineer. Environment supervising requirements should be included in the bidding document, and finally in the contract signed by supervising engineer. At least two (one of them has to be a senior management personnel) of the bid winning construction supervising engineers should attend the above training.
3.3 Environmental monitoring plans
3.3.1 Environmental Monitoring Responsible Organizations, Monitoring Target
Environmental monitoring is planned to be entrusted by the owner to the monitoring organizations with monitoring certificate and certain experiences to handle with.
Environmental monitoring is an important integral part in environment management plan both in road construction and operation period. The targets of environmental monitoring are:
[I] To verify the conclusion on the potential environmental impact of projects to be constructed in Environmental Impact Statement;
[2] Confirm actual impact level;
[3] Verify the effectiveness and adequacy of environmental protection measures;
[4] Confirm and evaluate expected negative impact's level;
[5] To offer accordance for the environmental protection measures superadded to solve the negative impact beyond the environmental impact evaluation conclusion.
3.3.2 Environmental monitoring plans
Project headquarter is responsible for the project environmental monitoring plan's organization and implementation and environmental monitoring department shall make sampling, and reserve and analyze sample with the methods stipulated in the regulations and standards promulgated by environmental protection authorities. The accountability units of the environment monitoring plan of this project are communication bureaus of Wuzhong City and Yinchuan City who should entrust for the implementation.
30
The monitoring key point is atmosphere, noise, water and ecology environment, carry (n fixed point and course monitoring, timing and untiming random inspection. The monitorir g plans are shown as Table 3.3-1 and Table 3.3-2.
Contractors and construction supervIsIon organizations shall submit environmentll monitoring report to project office every half a year. Additionally, when unexpeckd environmental pollution accidents happen, they shall report the situations immediately.o the project office so as to adopt proper pollution control measures including hiriLg professional monitoring organization to monitor etc.
3.3.3 Environmental Monitoring Report
Monitoring report system is shown as Graph 4.3~1. Every time monitoring is finished, the monitoring organizations shall submit monitoring report and report it throufh administrative levels. Road construction organization shall submit environmennJ monitoring report to the Environmental Protection Bureau of Ningxia Hui Autonomolls Region every season of the construction period and every half a year of the operation 11 period. These reports are the accordance for Ministry of Environmental Protection aid Environmental Protection Office of Ministry of Transportation to assess different sections' achievements on environmental protection and necessary environmental protecti(ln measures when environmental impact is worse than expected.
31
Table 3.3-1 Environment monitoring plan dnring the constrnction period
Monitoring Elements
Monitoring point (cross section)
Monitor content Monitoring frequency Implementing
institution Source of financing
Note
Water quality
Yellow River Grand Bridge (Yellow River) downstream lOOOm set
monitoring section
SS,COD,BODs,ammonia nitrogen and petroleum chemicals
Once in normal, dry and flood seasons in every year,
continuously sampling for 2 days and once in each day
Monitoring unit and supervising
unit
Special environmental
protection
Air Group 4, Wujiahu Village
TSP Once in every 6 months, and continuously sampling for 12h
Monitoring unit and supervising
unit
Special environmental
protectionApartment for the aged
asphalt mixing station TSP, asphalt smoke
Noise Group 4, Wujiahu Village
equivalent[continuous A] sound level Once in every quarter, and once in daytime and once in nighttime
Monitoring unit and supervising
unit
Special environmental
protectionApartment for the aged
Flood forecasting
Collecting hydrological information of upstream incoming water and precipitation during the construction period, and compile
the flood forecasting scheme during the construction period.
Real time monitoring
Contractor, development
unit, supervising unit
Including in contractor quotation
and special environmental
protection.
water loss and soil erosion
Set 2 measuring points at the slope of the roadbed
and both sides Set 2 measuring points at the borrow pit and bridge
and culvert foundation facilities
Set 1 measuring point at the temporary soil
stacking field, prefabricating field,
mixing field and construction access roads
Topographic and land feature changes of the constructed areas.
Once in the construction phase and once when the construction
completes.
Monitoring unit and supervising
unit
Special water conservation
vegetation area and quantity destroyed by the construction
Once in the construction phase and once when the construction
completes.
Earth filling and cutting Twice in the construction phase and once when the construction
completes.
Wind and water erosion volumes in different areas
Monitor wind erosion once every 15 days in spring and autumn, ~Monitor once more when it's
5m1s Monitor water erosion once
32
..
every 15 days in rainy season, monitor once more when the
daily precipitation is 25mm or rainfall intensity reaches
5mmliOmin and IOmml30min. I--
Vegetation area and quantity destroyed by the construction
Once in the construction phase and once when the construction
completes.
33
Table 3.3-2 Environment monitoring plan during the operation period
Monitoring Elements
Monitoring point (cross section) Monitor content Monitoring frequency Implementing
institution Source of financing
Note
Water quality
Yellow River Grand Bridge (Yellow River) downstream IOOOm set monitoring section
SS,COD,BODs,ammonia nitrogen and petroleum chemicals
Once in every two years, continuously sampling for two days, and one time in each day
Monitoring unit
Special environmental protection
Ningdong main line toll station
Tianshuihe ramp toll station Baijitan service area
Lingwu ramp toll station, management department and maintenance work area
Yangmahu ramp toll station
Jinji ramp toll station
Jinji parking lot
Qingtongxia town toll ..............
statIon and maintenance work area
Acoustic environment
Group 4, Wujiahu Village
equivalent[ continuous A] sound level
TSP, N02
Four time in each feature year (once in each quarter), two days in each time, two times in each day, one in the daytime and the other in the nighttime.
------_...
Once in each year, continuously sampling for 12h, and monitoring 3 days during the sampling period
Monitoring unit
Special environmental protectionApartment for the aged
Monitoring unit
Special environmental protection
Ambient Air
Group 4, Wujiahu Village
Apartment for the aged
Soil erosion protection
Set 2 monitoring spots in side slope, two sides of roadbed, earth pits area and bridge and culvert foundation, 1 monitoring spot in pre-cast yard,
survival rate, conservation rate, growth situation and degree of coverage of forest and grass measures in various regions
Once every spring and once every autumn
Builders Special water conservation
34
mixing yard, and construction roads Stability, maintenance status and operation situations of the protective engineering in different regions.
Once eve')' 'pdng ",d every autumn
onoe
Dreg-blocking and soil conservation effects of different prevention and controlling measures'implementation
Once every spring and every autumn, monitor more in stormy weather
once
once I
35
The Environmental Protection Bureau of Ningxia Hui Autonomous Region
i Regional and Municipal
~Environmental Protection Entrusting Unit
I- Department ofTransportation of Ningxia Hui
Autonomous Region
Bureau
i Environment monitoring
institution
Graph 3.3-1 Schematic Diagram for Monitoring Report Procedures on Roads to be
Constructed
4 Environmental Protection Training
Before the construction, contractors, supervising engineers, and all environment management personnel in the environmental protection department of the project office should be trained with environmental protection knowledge for at least once. Main environmental protection management personnel and environment supervising engineers should accept on-the-job training. The training and studying time should be 1 to 3 months.
4.1 Environmental Protection Technique and Skill Training
o On-the-job Training of Environment Management Personnel
The purposes of on-the-job training of environment management personnel are strengthening the environment management during the construction period and operation period, guaranteeing the quality of environment monitoring and the effectiveness of environment management, and thus improving the quality of the entire project. Through post training, the environment management personnel can distinguish main environmental problems during the construction stage. They can also better understand the problems and deficiencies existed in environment management. They can report to the environmental protection department of this project in time, and necessary preventive measures can be taken as soon as possible. During the construction period, the project construction office of the highway tieline from Guyaozi to Qingtongxia on line No.G211 (for project department in brief) should invite experts of environmental protection or environment management personnel with similar management experience to explain the potential environment problems and solutions.
o Training of the Person Liable to Construction and Construction Personnel of all Works
36
Before the construction of this project, the person liable to construction and construe tion personnel who will undertake the construction of this project should be trained .vith systematic specialized knowledge of environment. In this way, damages to the enVlronnent caused by operation errors during the construction process of this project will be avoijed. The purpose for training the contract liable person is nailing down the responsibilities of environmental protection which should be undertaken by the construction unit. The purpose of training the constructing personnel is strengthening the correct operating modi: of construction works during the construction period to avoid unnecessary damages to the environment. The training of project liable person and constructing personnel should be undertaken by the director of the environmental protection department of this project. The main purposes of this training are explaining the possible environment losses which may be caused during the construction process, explaining the environmental protection measures which should be taken for this project, and the treatment methods of environment problem. Through training, the liable person of this project can understand the obligation; of environmental protection which he should be undertaken, and the possible consequence s of damaging the environment. Constructing personnel can directly understand the prote( tion degree and protection method of environment sensitive points. According to the al;tual situation of this project, the training period of constructing personnel is one week.
During the project operation period, the project company should regularly held trainir g of environmental protection knowledge for its staff. In this way, all staff can realize the pos ,ible environment problems of their own posts and necessary measures can be taken. Each staff should have the concept of environmental protection.
4.2 Training mode and Training Expenses
Please refer to table4.2-1 for the training plan of environmental protection qualificatk n in detail.
Table 4.2-1 Training plan of environmental protection qualification
Training Training and
Training object Training content Organizer Location RemarksNo. number learning time
Workers of the
project
The eXJense department and Knowledge about should be
Yinchuanproject environmental Project 10 person I month paid b;' theI
Cityenvironmental protection and department projectprotection management. departll' ent. department of
this project
Workers of the . The expense project
Visit similar domestic YinchuanProject Half aprojects, and learn their should be6 person 2 Citydepartment monthmature environmental paid b:J the
Iproject department and
Iprojectmanagement
37
environmental experience. department. protection department of this project
3
Workers of the project department and project environmental protection department of this project
Comprehensively study knowledge about environmental protection and management, understand the contents of environment impact report of this project.
Project department
4 person 1 month Wuzhong City
The expense should be paid by the project department.
5
Main field directors of the supervising unit and environment supervising
Knowledge about environmental supervision and contents of environment impact report of this project, as well as contents of
Project department and supervising
Determined according to the number of contract
Half a month
Wuzhong City
The expense should be paid by the supervising
personnel of this project
environmental protection design documents relevant to this project.
unit sections unit.
6
Main technical directors and construction directors of contractors
Knowledge about environmental protection and management.
Project department and contractor
Determined according to the number of contract sections
Half a month
Wuzhong City
The expense should be paid by! contractors.
7 Constructors
Knowledge about environmental protection of this project.
Project department and contractor
All constructing personnel
1 week Wuzhong City
The expense should be paid by contractors.
Total -
Training mode include:
Lectures given by experts or lectures given by leaders of the competent department of environmental protection, and the budget of training is 20,000 Yuan RMB;
Visiting the environmental protection site of similar projects: visiting the domestic developed or finished representative project site of highway construction, and studying the matured environment management method and technique through site practice following demonstration. The budget of training is 30,000 Yuan RMB.
n Unconventional short term training (1 to 3 months) in domestic colleges, universities and scientific research institutes, and the budget of training is 50,000 Yuan RMB.
Adopting the mode of lectures given by experts or lectures given by leaders of the competent department of environmental protection, train the main directors and project environment supervising personnel on the site of the bid winning supervising unit for one month. The budget of training is 20,000 Yuan RMB.
38
Adopting the mode of lectures given by experts or lectures given by leaders of the competent department of environmental protection, train the technical directors and construction directors of contractors for one month. The budget of training is 55,000 "'uan RMB
Adopting the mode of lectures given by experts or lectures given by leaders oj the competent department of environmental protection, train personnel for one week. The budget of training is 40,000 Yuan RMB
The total budge for the training of the above items is 215,000 Yuan RMB.
5 Legal Effects of the Environmental Protection Action Plan
The environmental protection action plan refers to the action manual for the implementir g of environmental protection measures by the construction unit of this project. It is also the 11asis for the acceptance of implementation situations of environmental protection measures b;' the competent department of environment. Therefore, the environmental protection action plan should have the same legal effect with the contract, bidding document, and other documer ts.
While the development unit of this project is bidding for construction units to the sc,ciet),. the environmental protection action plan should be provided to the bid responding units as Ol:le of the basic data. The bid responding units should bring corresponding contents of the environmental protection action plan into the tendering document. They should also brin!~ the expenses of all kinds environmental protection measures into the budge of construction fund.
While reviewing the bidding document, the development unit of this project should takl: the commitment of fulfilling the environmental protection action plan as one of the revie'lVing bases. While signing the contract of this project, the implementing of the environm.mtal protection action plan should be taken as one of the service contents. The environm~ntal protection action plan should be nailed down as one of the bases for the acceptance of project quality. The environment losses caused by not implementing the environmental protedion action plan should be undertaken by the construction unit. The director of the environm~ntal protection department of the project department should deeply understand the significam:e of the environmental protection action plan, and explain it to the construction unit.
The supervising unit of this project should take the environmental protection action pl
schedule specified in the environmental protection action plan.
6 Environment Management Structure of Temporary Project
Due to the restrictions of feasibility study stage, only the borrow pits are primarily selected. More detailed site optimization will be conducted in the following preliminary design and detailed design stages.
In addition, the access roads can only be reasonably determined while contractors beginning the construction preparations on the site. Some borrow pits will be adjusted according to the actual situation, that is to say, new borrow pits will be selected during the construction stage.
6.1 Management Structure
According to general construction management routines, contractors will use the borrow pits recommended in the environmental assessment and project design document. If necessary, new borrow pits and access roads can be adjusted or determined according to actual situation and according to the negotiation with local government and communities. In any case, the following procedures should be complied with:
Before the construction of this project, contractors will make plans and design schemes for temporary projects (including access roads and borrow pits), including substantial environmental protection measures and reclamation scheme.
These schemes will be submitted to the environment supervising engineer and/or the project owner for verification and approval.
During the construction period, the environment supervising engineer and the project owner will supervise the environmental performances of contractors on these sites.
6.2 Site Selection Standard
To optimize the borrow pits during the design stage and select new site/access roads during the construction stage, the following principles should be complied with:
Earth Pits
Fetch earth collectively to reduce the number ofearth pits and select slopes or barren land for fetching earth to occupy less arable land and woodland; It is forbidden to occupy basic farmlands, basic grasslands and ecological protective woods.
D Earth pits shall be located in concealed areas, far away from river channel, to reduce soil erosion and negative impact on water quality of the river channel;
40
lJ The earth pits shall be of each assess to a