19
Baku International Sea Port Baku International Sea Port By Taleh Ziyadov OSCE-UNECE Inter-regional Workshop on Developing Euro-Asian Transport Links 7-8 December 2010 Turkmenbashy , Turkmenistan

Baku International Sea Port TalehZiyadov

  • Upload
    others

  • View
    6

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Baku International Sea Port TalehZiyadov

Baku International Sea PortBaku International Sea PortBy Taleh Ziyadov

OSCE-UNECE Inter-regional Workshop on Developing Euro-Asian Transport Linksp g p

7-8 December 2010Turkmenbashy , Turkmenistan

Page 2: Baku International Sea Port TalehZiyadov

Outline• Transportation & Infrastructure in Azerbaijan• Baku International Sea Port Trade Turnover Over Years• Baku International Sea Port Trade Turnover Over Years• Services & Terminals at Baku Port• Port’s Current Location• New Baku International Sea Port at Alyat

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Page 3: Baku International Sea Port TalehZiyadov

Transportation & Infrastructure Transportation & Infrastructure Sector in Azerbaijan

• According to the World Bank, in 2005-2009, the Azerbaijani Government invested $9 billion in infrastructure projects of which Government invested $9 billion in infrastructure projects of which $4.5 billion was for road construction and rehabilitation.

• Additional $13 billion will be invested in the medium term for the • Additional $13 billion will be invested in the medium term for the modernization and construction of roads, railways and other physical infrastructure, including ports (2010-2015)

• An estimated $3.8 billion is being jointly invested with international organizations on the construction of new regional roads in the East-West and North-South direction

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

West and North South direction

Page 4: Baku International Sea Port TalehZiyadov

Transportation & Infrastructure Transportation & Infrastructure Sector in Azerbaijan

Transportation of goods has more than

In 2000 80 million tons

In 2009 190 million tons

doubled since 2000.

I 80 million tons 190 million tons

TOTAL 80

0.032

190

In 2009, 47.4 milliontons of cargo

hi d

Sea

Air

8.8

0.037

94 2

13.2

0.032

2009

2000

was shipped via TRACECA, of which 13.2 million tons

Railway

Highway

15.9

40.4

62 1

20.3

94.2 2000million tons were transit

shipments.

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

0 20 40 60 80 100 120 140 160 180 200

Pipeline 15.262.1

Page 5: Baku International Sea Port TalehZiyadov

Baku International Sea PortBaku International Sea PortTrade Turnover 1970-2010

2440525000

30000

Baku Port Trade Turnover (1970-2010)

15000

20000

25000

6900 5131

5000

10000

0

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Baku Port Trade Turnoverin 1,000 tons 

Page 6: Baku International Sea Port TalehZiyadov

Baku International Sea PortBaku International Sea PortTrade Turnover 2009-2010

250482

85

2009

59116

2010 (9 months)

4,568

Import

Export

Transit

232

3,262

Import

Export

Transit

Local

in 1,000 tons 

Local

in 1,000 tons 

Total: 5,385,000 tons

Total: 4,101,000 tons

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

84 % is transit goods 79 % is transit goods

Page 7: Baku International Sea Port TalehZiyadov

Baku International Sea Port Baku International Sea Port Services & Terminals

ServicesServices• Dry cargo and liquid bulk handling• General and project cargo handling• Container handling (stuffing/stripping)• Warehousing and storageWarehousing and storage

Terminals• Main Cargo Terminal• Dubendi Oil TerminalCapacity of Baku Port: Dubendi Oil Terminal• Ferry Terminal• Passenger Terminal

Trade

Capacity of Baku Port: 18 million tons

•8 million tons (Oil Terminal) TradeThe major trading partners are Ports of Aktau, Turkmenbashi, and Anzali & Amirabad

•8 million tons (Ferry Terminal)•2 million tons (Cargo Terminal)•10,000 TEU (Container Terminal)

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Page 8: Baku International Sea Port TalehZiyadov

Baku International Sea Port Baku International Sea Port Terminals

Main Cargo Terminal

• Handles up to 2 million tons of general and dry cargo• Has 6 berths of total length of 866 m

Main Cargo Terminal

Trade turnover at the Cargo Terminal 2009 & 2010 g

• 1 of the 6 berths is a Ro/Ro quay with quayside depth of 7 meters• Berths are equipped with:

• 16 portal cranes with lifting capacity of 1.5-10

Local

Total

3

290

7

610

tons • 100 rolltrayiers and portal haulers of SI-SU

type

• Can handle 3 vessels up to 150 wagons and 100 trucks simultaneously

Export

Transit

24

23

3

41

76

2010

2009

• Total area of warehouses: 24,000 m2 (open) and 10,000 m2 (sheltered)

Source: Baku Sea Port

0 200 400 600 800

Import 240487

in 1,000 tons

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Imports: 80 % of imports are from Iran, 15 % from Aktau & Turkmenbashy, and 5 % from Europe

Page 9: Baku International Sea Port TalehZiyadov

Baku International Sea Port Baku International Sea Port Terminals

Ferry Terminal

• Important terminal in Euro-Asian trade via Caspian Sea

Ferry Terminal

Trade turnover at the Ferry Terminal 2009 & 2010

• Annual capacity is 8 million tons• Transshipments are done by 9 CASPAR ferries, of which 2 recently purchased vessels can handle 52 wagons and up to 100 cars

Total 2296

1680

1975

Source: Baku Sea Port

Export

Transit

370

1792

191

1680

2010

2009• The majority of transit is from East toWest and it primarily consists of oil and oil

0 500 1000 1500 2000 2500

Import 134104 related products from Kazakhstan and

Turkmenistan.

• The bulk of exports go to Port of

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

in 1,000 tons  Turkmenbashy and a smaller portion goesto Port of Aktau.

Page 10: Baku International Sea Port TalehZiyadov

Baku International Sea Port Baku International Sea Port Terminals

Dubendi Oil Terminal

• The largest oil terminal on the AbsheronPeninsula

Dubendi Oil Terminal

Trade turnover at the Oil Terminal 2009 & 2010

• Handles oil from Kazakhstan and Turkmenistan• Has 2 piers for handling 4 tankers with capacity of 5 000-13 000 tons DWCC

Local

Total

49

2545

9

1515

capacity of 5,000-13,000 tons DWCC simultaneously• There is a Vessel Traffic Service

Export

Transit

0

2496

0

1506

2010

2009

Source: Baku Sea Port

0 1000 2000 3000

Import 00

in 1,000 tons 

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Page 11: Baku International Sea Port TalehZiyadov

Baku International Sea Port Baku International Sea Port Terminals

3000

Trade at Baku Port by Terminals2009 and 2010 (9 months)

2,296

2,545

19752000

2500

610

1515

1000

15002009

2010

290

610

0

500

Cargo Terminal Ferry Terminal Oil TerminalCa go e a e y e a O e a

in 1,000 tons 

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Page 12: Baku International Sea Port TalehZiyadov

Baku International Sea Port Baku International Sea Port Terminals

12000

Trade at Baku Port by Terminals 2009-2010 (9 months) Combined

10,131

8000

10000

5,171

4,060

2000

4000

6000

51%40%

900

0Cargo Terminal Ferry Terminal Oil Terminal TOTAL

9%

Trade Turnover 2009-2010in 1,000 tons 

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Page 13: Baku International Sea Port TalehZiyadov

Port’s Current LocationPort s Current Location

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Page 14: Baku International Sea Port TalehZiyadov

New Baku International Sea Port at AlyatNew Baku International Sea Port at Alyat

The current Baku International Sea Portill b d t l ti bwill be moved to a new location by 2014

near the town of Alyat, 65 km south ofBaku.

The new site is located at the crossroadsof two major transportation corridors,the East-West and the North-South – anarea where Azerbaijan’s main railwaysj yand highways networks meet.Current Baku

International Sea Port

New Location at Alyat

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Page 15: Baku International Sea Port TalehZiyadov

CASPIANSEA

ALYAT

AKHALKALAKIISTANBUL

BOYUK KESIK

ALYATKARS

Page 16: Baku International Sea Port TalehZiyadov

Baku International Sea Port at AlyatBaku International Sea Port at AlyatPhased Development

The New Baku International Sea Port at Alyat will be builtThe New Baku International Sea Port at Alyat will be builtover an area of 400 ha in three phases. One fourth of theport (100 ha) will be allocated to a state-of-the-artinternational logistics center.

Phase 1 (by 2014)10 million tons of cargo and 40 thousand TEUs

Phase 217 million tons of cargo and 150 thousand TEUs

hPhase 321-25 million tons of cargo and 1 million TEUs

The cost of the first phase of construction will amount

On November 3, 2010, President Aliyev laid the foundation stone for the New Baku International Port at

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

pto about 760 million USD.

Baku International Port at Alyat.

Page 17: Baku International Sea Port TalehZiyadov

Baku International Sea Port at AlyatBaku International Sea Port at AlyatPhased Development

Ph U d C t tiPhase 1 – Under Construction

Phase 1 Key Features:

- Wide Basin- 4 General Cargo Berths- 1 RoRo Berth- Small Craft Berth/Pontoon- 2 Ferry Berths- Road and Railway Access- Rail Shunting Yard

Presentation to Prime MinisterRepublic of Azerbaijan

- Logistics Centre- Border Control /Customs

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy

Republic of Azerbaijan

July 2010

Page 18: Baku International Sea Port TalehZiyadov

Baku International Sea Port at AlyatBaku International Sea Port at AlyatPhase 1

Phase 1 Key Features (cont.):

- 2 way access channel- 7.6m water depth (current Caspian Sea level)- 160m wide; 200m on bend

k l- 7 km long- Large turning basin- No breakwater needed- Gil Island

Taleh Ziyadov 7‐8 December, 2010Turkmenbashy