GOVERNMENT OF ANDHRA PRADESH PANCHAYATRAJ ENGINEERING DEPARTMENT PROPOSAL ESTIMATE Name of the Work : Construction of high level bridge on the R/F Estimate Amount Rs.700.00 lakhs DISTRICT : WEST GODAVARI CIRCLE : ELURU DIVISION : ELURU SUB-DIVISION : ELURU MANDAL : PEDAVEGI

Balive Bridge Estimate

Embed Size (px)

DESCRIPTION

Model bridge estimate

Citation preview

CoverGOVERNMENT OF ANDHRA PRADESHPANCHAYATRAJ ENGINEERING DEPARTMENTPROPOSAL ESTIMATEName of the Work : Construction of high level bridge on the R/F EC Road to BaliveEstimate Amount Rs.700.00 lakhsDISTRICT:WEST GODAVARICIRCLE:ELURUDIVISION:ELURUSUB-DIVISION:ELURUMANDAL:PEDAVEGI

Sp.ReportSPECIFICATION REPORTName of the Work : Construction of high level bridge on the R/F EC Road to BaliveEstimate Amount Rs.700.00 lakhsAs per the instructions of the higher authorities and as per the request made by the Hon'ble MPEluru,the estimate is prepared for the work"Construction of high level bridge on the R/F EC Road to Balive",Est.Cost.Rs.700.00 lakhs.The proposed bridge connects both the West Godavari and Krishna Districts and it leads to afamous piligrim centre called BALIVE.It is proposed to construct a high level bridge with the following features:-1.Width of the carriage way is fixed as 7.50m2.Well foundations are proposed upto scour depth based on the calculations3.RCC abutments and piers along with bed blocks and backing walls are proposed4.Simply supported T-Beam type super structure is proposed.5.No aprons or cut-off walls are proposed.6.Back filling is proposed behind the abutments with filter media7.As per the guide lines of IWA,minimum clearence of 5m from FSL is proposed.Hence,the cost of the bridge proper and approaches is enhnaced.Further lump sum provisions are made in the estimate for the following items:-1)Provision for VAT @ 5.00%2)QC charges @ 0.5%3)Provision for insurance@ 0.5%The estimate is prepared as per the current SSR,i.e.2012-2013 rates and as perthe A.P Revised Standard data work will be carried out as per APDSS after getting administrative sanctionAsst.Executive EngineerDy.Executive EngineerPRI,EluruPRI,Eluru

AbstractGENERAL ABSTRACTName of the Work : Construction of high level bridge on the R/F EC Road to BaliveEst.Cost.Rs.700.00 lakhsS.NoDescription of item(Kms)Amountin Rs.12341Bridge Proper59700000.002Approaches6277747.003Provision for VAT @5%32988874Provision for Q.C.Charges @0.5%3298895Provision for insurance @0.5%3298896Provision for KM&HM stones63588Grand Total70000000.00Asst.Exe.EngineerDeputy Exe.EngineerPR,EluruPR,Eluru

DataDATA SHEETIndex-codeS. NoDescriptionUnitQuantityRate Rs.Amount Rs.Remarks1234567FOUNDATION:-RBR-FNDN-11Excavation for StructuresEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTHNote : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H(B)Mechanical MeansiUpto 3 m depthUnit = cumTaking output = 240 cuma)LabourMateday-Mazdoor (Unskilled)day8.32b) MachineryHydraulic Excavator 1 cum bucket capacityhour6.00c&d) Overheads & Contractors ProfitCost for 240 cum = a+b+c+dRate per cum = (a+b+c+d)/240Note : 1. Cost of dewatering upto 5% of a+b may be added, where required, up to 10 per cent of labour cost. Assessment for dewatering shall be made as per site conditions.ii3 m to 6 m depthUnit = cum(A)Manual Meansa)LabourMate / Supervisorday-Mazdoor (Unskilled)day4.68b&c) Overheads & Contractors ProfitCost for 10 cum = a+b+cRate per cum = (a+b+c)/10Note : 1. Cost of dewatering may be added, when needed, up to 5 per cent of labour cost.2. Cost of shoring and shuttering, where needed, may be taken @ 10 per cent on cost of excavation for open foundation.BMechanical MeansUnit = cumTaking output = 210 cuma) LabourMateday-Mazdoor (Unskilled)day8.32b) MachineryHydraulic excavator 1.0 cum bucket capacityhour6.00c&d) Overheads & Contractors ProfitCost for 210 cum = a+b+c+dRate per cum = (a+b+c+d)/210Note : Cost of dewatering upto 5 per cent of (a+b) may be added, where required. Assessment for dewatering shall be made as per site conditions.RBR-FNDN-22Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTHISand fillingUnit = cuma)LabourMateday-Mazdoor (Unskilled)day0.31b) MaterialSandcum1.00c&d) Overheads & Contractors ProfitRate per cum = a+b+c+dRBR-FNDN-43Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.IP.C.C grade M 10(i)Nominal mix 1:3:6Unit = cum(a) MaterialCementt0.22Coarse sandcum0.4540 mm aggregatecum0.9Waterkl1.2(b) LabourMateday-Mason (1st Class)day0.1Mazdoor (Unskilled)day1.39(c) MachineryMechanical concrete mixer 0.4/0.28 cum capacity fitted with water measuring device and preferably also with load cell.hour0.40Water tanker 6 kl capacityhour0.13(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)4.00%e&f) Overheads & Contractors ProfitRate per cum = a+b+c+d+e+f4ER.C.C. grade M 25 (Design Mix) using 20 mm Graded Metal (MORD & MORTH 12.8 E) for wells steining,Kerb etc.Case 1 : Using Concrete MixerUnit = cum(a) MaterialCementt0.403Coarse sandcum0.4520 mm aggregatecum0.5410 mm aggregatecum0.36(b) LabourMateday-Mason (1st Class)day0.1Mazdoor (Unskilled)day1.39Bhistiday(c) MachineryConcrete mixer 0.4/0.28 cum capacityhr / cum0.4(d) Formwork @ 3.75% on (a+b+c)3.75%e&f) Overheads & Contractors ProfitRate per cum = a+b+c+d+e+fWELL FOUNDATIONRBR-FNDN-1111Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification 1204, 1900 MORTH.Unit = 1 MTTaking output = 1 MTa) MaterialStructural steel in plates, angles, etc including 5 per cent wastaget1.05Nuts & boltsKg20.00b) Labour(for cutting, bending, making holes, joining, welding and erecting in position)Mateday-Fitterday5.50Blacksmithday5.50Welderday5.50Mazdoor (Unskilled)day17.82Electrodes, cutting gas and other consumables @ 10 per cent of cost of (a) aboveHandling loading and unloading on (a)Hire charges of Welding machine on (a)c&d) Overheads & Contractors ProfitRate per MT (a+b+c+d)RBR-FNDN-1212Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification 1200, 1500 & 1700 MORTH.(ii)RCC M25 GradeSame as per 4.E except for formwork which shall be@ 20 per cent of the cost of concrete instead of 3.75 per cent.Case 1 : Using Concrete MixerPer Cum Basic Cost of Labour, Material & Machinery (a+b+c)cum1.00d) formwork @ 20 per cent of the cost of concrete20.00%Watere&f) Overheads & Contractors ProfitRate perm (a+b+c+d+e+f)(F)Well cap(ii)RCC Grade M25 (Design Mix)Case I : Using Concrete MixerUnit = cumTaking output = 15 cuma) MaterialCementt6.05Coarse sandcum6.7520 mm Aggregatecum8.1010 mm Aggregatecum5.40b) LabourMateday-Masonday1.50Mazdoor (Unskilled)day20.86c) MachineryConcrete mixer (cap. 0.40/0.28 cum)hour/cum6.00Generator 33 KVAhour6.00Form Work of a+b+c3.75%Centering ChargescumWaterd&e) Overheads & Contractors Profitcost of 15 cum = a+b+c+d+eRate per cum = (a+b+c+d+e)/15RBR-FNDN-1313Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level.Note : To arrive proportionate quantities keeping the cross sectional area & depth (22/7xd2xh) for lesser diametre wells than 6mUnit = Running Meter.Taking output = 1 mDiameter of well - 6 m.(A)Sandy Soil(i)Depth below bed level upto 3.0 MRate of sinking = 0.50 m per hour.a) LabourMateday-Sinker ( skilled )day1.00238.00238.00Sinking helper ( semi-skilled )day2.12238.00504.56b) MachineryHire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.hour2.002875.005750.00Consumables in sinking @10 per cent of (b)10.00%575.00c&d) Overheads & Contractors Profit1024.80Rate per metre = (a+b+c+d)8092.36(ii)Beyond 3m upto 10m depthRate of sinking = 0.33 m per hour.a) LabourMateday-Sinkerday1.25256.00320.00Sinking helper ( semi-skilled )day2.65238.00630.70b) MachineryHire & running charges of crane with grab bucket of 0.75 cum capacity and accessorieshour3.002875.008625.00Consumables in sinking @10 per cent of (b)10.00%862.50c&d) Overheads & Contractors Profit1513.54Rate per metre = (a+b+c+d)11951.74(iii)Beyond 10m upto 20ma. Add 5 per cent for every additional meter depth of sinking over the rate of sinking for the previous meterSUBSTRUCTURE:-5VIR.C.C. grade M 25 (Design Mix) for substructure items like abutments,piers etc.Unit = cum(i)Height upto 5mCase I : Using concrete Mixer(a) MaterialCementt0.403Coarse sandcum0.45020 mm aggregatecum0.54010 mm aggregatecum0.360(b) LabourMateday-Mason (1st Class)day0.10Mazdoor (Unskilled)day1.39(c) MachineryConcrete mixer 0.4/0.28 cum capacityhour0.40Generator 33 KVAhour0.40Vibratorhour(d) Formwork @ 10% on (a+b+c)10.00%e&f) Overheads & Contractors ProfitRate per cum = a+b+c+d+e+fCase II : With Batching Plant, Transit Mixer and Concrete PumpPer Cum Basic Cost of Labour, Material & Machinery (a+b+c) of Chapter 11.4 (E) Case II excluding of Formworkcum1d) formworkAdd on cost of material, labour and machinery (a+b+c) for Formwork10.00%e&f) Overheads & Contractors ProfitRate perm (a+b+c+d+e+f)RBR-SBST-66Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded.Unit = t(a) MaterialHYSD bars including 5 per cent overlaps and wastaget1.050Binding wirekg6.000(b) Labour for cutting, bending, shifting to site, tying, and placing in positionMateday-Blacksmithday2.000Mazdoor (Unskilled)day6.840c&d) Overheads & Contractors ProfitRate per t = a+b+c+dRBR-SBST-97Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.Unit = NosTaking output = 30 Nos(a) MaterialAC pipe 100 mm dia including wastage @ 5 per cent. Average length of weep hole is taken as one metre for the purpose of estimatingm31.500MS clampsNos.30.000Collar for AC pipe (average taking 10% of above pipe rate)10.00%Cement mortar 1:3 (For rate refer to item 11.5 I)cum0.050(b) LabourMateday-Mason 1st Classday0.500Mazdoor (Unskilled)day0.280c&d) Overheads & Contractors ProfitCost for 30 Nos = (a+b+c+d)Rate per No = (a+b+c+d)/30Note in MORTH : 1. In case of stone masonry, the size of the weep hole shall be 150 mm x 80 mm or circular with 150 mm diameter.2. For structure in stone masonry, the weep holes shall be deemed to be included in the item of stone masonry work and shall not be paid separately.RBR-SBST-108Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTHUnit = cumTaking output = 10 cumIGranular material(a) MaterialGranular materialcum12.000(b) LabourMateday-Mazdoor (Unskilled)day7.280(c) MachineryPlate compactor / power rammerhour2.500Water Tankerhour0.050d&e) Overheads & Contractors ProfitCost for 10 cum of granular backfill = a+b+c+d+eRate per cum = (a+b+c+d+e)/10IISandy materialUnit = cumTaking output = 10 cum(a) MaterialSandcum12.000(b) LabourMateday-Mazdoor (Unskilled)day7.280(c) MachineryPlate compactor/power rammerhour2.500Water Tankerhour0.060d&e) Overheads & Contractors ProfitCost for 10 cum of granular backfill = a+b+c+d+eRate per cum = (a+b+c+d+e)/10RBR-SBST-119Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTHUnit = cumTaking output = 10 cum(a) MaterialFilter media as per specificationcum12.000(b) LabourMateday-Mazdoor (Unskilled)day7.320Mazdoor (Skilled)day1.000c) MachineryWater Tanker of 6 KL capacityhour0.060d&e) Overheads & Contractors ProfitCost for 10 cum of granular backfill = a+b+c+d+eRate per cum = (a+b+c+d+e)/10Note : Suitable Grade of Filter media shall be proposed as per Specification in said IRC.SUPER STRUCTURE :-RBR-SPST-110Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTHNote : 1. Water for CC works : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions2. Coarse aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view.I (A)R.C.C grade M 25 (MORD)(i)For nominal mix 1:1.5:3 (Using Concrete Mixture)Height upto 5m to 10mUnit = cum(a) MaterialCementt0.44Coarse sandcum0.4520 mm aggregatecum0.5410 mm aggregatecum0.36(b) LabourMateday-Mason (1st Class)day0.10Mazdoor (Unskilled)day1.39c) MachineryConcrete mixer 0.4/0.28 cum capacityhr / cum0.40e&f) Overheads & Contractors ProfitRate per cum = a+b+c+d+e+fIIFor T-beam & slab(iii)Height above 5m to 10mBasic Cost of Labour, Material & Machinery (a+b+c) for cumcum1.00d) Formwork and staging of (a+b+c)25.00%e&f) Overheads & Contractors ProfitRate per cum = (a+b+c+d+e+f)RBR-SPST-211(i)Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.Unit = t(a) MaterialHYSD bars including 5 per cent for laps and wastaget1.05Binding wirekg8.00(b) Labour for cutting, bending, tying and placing in positionMateday-Blacksmith/ Rod Binderday3.00Mazdoor (Unskilled)day8.44c&d) Overheads & Contractors ProfitRate per t = a+b+c+dRBR-SPST-512(i)Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTHUnit = cum(a) MaterialCementt0.407Sandcum0.4520 mm aggregatecum0.5410 mm aggregatecum0.36HYSD bar reinforcement including binding wire (Rate as per item 13.2) except OH & CPt0.075(b) LabourMateday-Mason (1st Class)day0.10Mazdoor (Unskilled)day1.39Mazdoor (Unskilled) for cleaning deck slab concrete surfaceday0.15c) MachineryConcrete mixer 0.4/0.28 cum capacityhour0.40Generator 33 KVA.hour0.40(d) Formwork @ 3% of cost of concrete3.00%e&f) Overheads & Contractors ProfitRate per cum = a+b+c+d+e+fRBR-SPST-1113Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705 MORTHUnit = 1 No(a) MaterialCorrosion resistant structural steel grating including 5 per cent wastagekg4.00G I pipe 100 mm diam6.00GI bolt 10 mm Diaeach6.00Galvanised MS flat clampeach2.00(b) LabourFor fabricationMateday-Blacksmith, Welder etc. (Skilled)day0.02Mazdoor (Unskilled)day0.04For fixing in positionMateday-Mason (1st Class)day0.01Mazdoor (Unskilled)day0.21Add @ 5 per cent of cost of material and labour (a+b) for electrodes, gas cutting, sealant, anti-corrosive bituminous paint, mild steel grating etc.5.00%c&d) Overheads & Contractors ProfitRate per m = a+b+c+dNote in MORTH : 1. In case of viaducts in urban areas, the drainage spouts should be connected with suitably located pipelines to discharge the surface run-off to drains provided at ground level.2. In case of bridges, sufficient length of G.I Pipe shall be provided to ensure that there is no splashing of water from the drainage spout on the structure.RBR-SPST-1314iReinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTHUnit = cum(a) MaterialReinforced cement concrete M 25 gradeRate as per Item 11 (i)cum1.00HYSD reinforcementRate per item 2t0.05Rate per cum = (a)15(II) (A)Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per drawing and technical specifications MORDUnit = Running mTaking output = 7.5 m(a) Material20 mm thick compressible fiber board 250 mm deepsqm1.875Area = 7.5 x 0.25 = 1.875 sqm(b) LabourFor carrying, placing and fixingMateday-Mazdoor (Unskilled)day0.11Mazdoor (Skilled)day0.1c&d) Overheads & Contractors ProfitCost for 7.5 m = a+b+c+dRate per m = (a+b+c+d)/7.5

LeadLEAD STATEMENTName of the Work : Construction of high level bridge on the R/F EC Road to BaliveEstimate Amount Rs.334.00 lakhsSl. No.Description of MaterialUnitName of the QuarryLead in KMConveyance chargesInitial CostBlasting chargesMachine crushing chargesLoading chargesUnloading chargesTotal Amount1234567891011121Coarse Sand for Mortor1.00 CumRajahmundry16.00152.00220.000.000.0034.3010.90417.202Coarse Sand for filling1.00 CumRajahmundry16.00152.0070.000.000.0034.3010.90267.203HBG 10mm nominal size---SS51.00 CumI.Pangidi92.00718.80560.0070.00140.0068.3010.901568.004HBG 20mm nominal size---SS51.00 CumI.Pangidi92.00718.80844.0070.00211.0068.3010.901923.005HBG 40mm nominal size---SS51.00 CumI.Pangidi92.00718.80500.0070.000.0068.3010.901368.006Gravel1.00 CumMeerjapuram8.0083.2050.500.000.0034.3010.90178.907Bricks1000 Nos.Local8.00110.603100.000.000.00134.10134.103478.808Steel1.00 MT34500.000.000.0034500.009Cement1.00 MT4600.000.000.004600.0010Bitumen 80/100 grade(Bulk)1.00 MTVisakhapatnam385.001155.0034708.920.000.000.000.0035863.9211Emulsion SS-I grade1.00 MTVisakhapatnam385.001347.5023050.400.000.000.000.0024397.9012Emulsion RS-I grade1.00 MTVisakhapatnam385.001347.5023644.660.000.000.000.0024992.1614HBG 2.36 to 5mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80260.0070.0065.0068.3010.901193.0015HBG 5 to 7mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80430.0070.00107.5068.3010.901405.501405.50Seal coat16HBG 9.5 to 11mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80560.0070.00140.0068.3010.901568.0017HBG 12 to 14mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80690.0070.00172.5068.3010.901730.501676.3875OGPC18HBG 19 to 22mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80950.0070.00237.5068.3010.902055.5019HBG 25 to 27mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80830.0070.000.0068.3010.901698.0020HBG 40 to 45mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80500.0070.000.0068.3010.901368.001481.3333333333Gr-II21HBG 50 to 55mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80390.0070.000.0068.3010.901258.001598.8333333333Gr-III22HBG 60 to 63mm size---(IRC&MORTH)1.00 CumI.Pangidi92.00718.80360.0070.000.0068.3010.901228.001.Certified that the above leads are correct to the best of my knowledgeDeputy Executive Engineer,Assistant Executive Engineer,PRI Sub-Division, EluruPRI, Eluru

Sections

Sections23.3423.2420.2118.9418.9419.0919.3918.9418.9418.7919.3418.0318.9418.9418.6918.9419.1918.7418.9418.9418.9418.9421.3121.5423.5923.69

Cross section at Proposed site

Levels23.4422.7720.3119.3419.1819.1919.0319.3119.2719.1819.119.119.3419.2319.2719.2319.2919.1419.0419.0419.3219.2320.5221.6423.6923.79

Cross section at 400m U/S of the Proposed site

Hydraulic Design23.2423.1420.1118.8418.8418.9918.8918.8418.8418.6918.3218.2318.418.418.3818.5618.5918.6418.8418.5418.8418.5820.7921.4423.4923.59

Cross section at 400m D/S of the Proposed site

Approaches-500-500-500-500-500-5005.54-480-480-480-480-480-4805.45-460-460-460-460-460-4605.39-440-440-440-440-440-4405.36-420-420-420-420-420-4205.33-400-400-400-400-400-4005.24-380-380-380-380-380-3805.14-360-360-360-360-360-3605.12-340-340-340-340-340-3405.1-320-320-320-320-320-3205-300-300-300-300-300-3004.9-280-280-280-280-280-2804.88-260-260-260-260-260-2604.86-240-240-240-240-240-2404.76-220-220-220-220-220-2204.65-200-200-200-200-200-2004.64-183-183-183-183-183-1834.58-160-160-160-160-160-1604.55-140-140-140-140-140-1404.46-120-120-120-120-120-1204.36-100-100-100-100-100-1004.34-80-80-80-80-80-804.32-60-60-60-60-60-604.22-40-40-40-40-40-404.16-20-20-20-20-20-204.060000004.042020202020203.984040404040403.966060606060603.858080808080803.81001001001001001003.741201201201201201203.71401401401401401403.621601601601601601603.581801801801801801803.52002002002002002003.412202202202202202203.382402402402402402403.352602602602602602603.262802802802802802803.163003003003003003003.143203203203203203203.123403403403403403403.023603603603603603602.963803803803803803802.884004004004004004002.844204204204204204202.84404404404404404402.724604604604604604602.664804804804804804802.65005005005005005002.54

L/S from 500m U/S of the Proposed site to 500m D/S

High level bridgeLongitudinal section of channel from 500m U/S of the bridge site to 500m D/SChainageBSISFSHIRLRemarksReduced level-5001.8770.2868.41TBM5.54-50062.87-4801.6870.2868.39HM Stone top5.45-48062.94-4601.6570.2868.375.39-46062.98-4401.6270.2868.355.36-44062.99-4201.670.2868.335.33-42063-4001.5670.2868.315.24-40063.07-3801.5670.2868.295.14-38063.15-3601.6870.2868.275.12-36063.15-3401.9870.2868.255.1-34063.15-3202.2470.2868.235-32063.23-3002.670.2868.214.9-30063.31-2803.3170.2868.194.88-28063.31-2603.023.8170.2868.174.86-26063.31-2403.6471.1968.154.76-24063.39-2203.8571.1968.134.65-22063.48-2003.9871.1968.114.64-20063.47-1833.9571.1968.094.58-18063.51-1603.9571.1968.074.55-16063.52-1403.8371.1968.054.46-14063.59-1203.9371.1968.034.36-12063.67-1003.6671.1968.014.34-10063.67-803.371.1967.994.32-8063.67-603.0671.1967.974.22-6063.75-402.4871.1967.954.16-4063.79-201.7871.1967.934.06-2063.8701.671.1967.914.04063.87201.4571.1967.893.982063.91401.3571.1967.873.964063.91601.2971.1967.853.856064801.2571.1967.833.88064.031001.1871.1967.813.7410064.071201.1871.1967.793.712064.091401.1571.1967.773.6214064.1516067.753.5816064.1718067.733.518064.2320067.713.4120064.322067.693.3822064.3124067.673.3524064.3226067.653.2626064.3928067.633.1628064.4730067.613.1430064.4732067.593.1232064.4734067.573.0234064.5536067.552.9636064.5938067.532.8838064.6540067.512.8440064.6742067.492.842064.6944067.472.7244064.7546067.452.6646064.7948067.432.648064.8350067.412.5450064.87

Hydraulic designHydraulic Particulars:-1.Maximum Flood Level22.24m2.Ordinary Flood level20.04m3.Lowest Bed level18.03m4.Average bed slope0.005005.Rugosity Coefficient0.0306.Bottom of deck proposed23.34m7.Road Crest level24.690m8.Width of carriage way7.50m9.Catchment area0.55SqKm10.Dickens constant13.0011.Ryve's constant6.80Soil Particulars obtained from SPT tests:-0.00 to 4.70mYellowish clay4.7 to 5.0mClay mixed with sand5.00 to 6.0mCoarse sandDischarge Calculations:-1)Area Velocity method:-a)At the proposed bridge site:-Maximum Flood level22.24mSlope0.0050Rugosity Coefficient0.030S.NoChainageR.LDepth ofAverageDistanceAreaWettedflowdepth of(m)(Sqm)perimeter(m)flow(m)(m)1023.3400.000.000.000.000.002523.2400.000.005.000.000.0031020.2102.031.025.005.075.2441518.9403.302.675.0013.335.4552018.9403.303.305.0016.505.7062519.0903.153.235.0016.135.2373019.3902.853.005.0015.005.4583518.9403.303.085.0015.385.0794018.9403.303.305.0016.505.00104518.7903.453.385.0016.885.02115019.3402.903.185.0015.885.21125518.0304.213.565.0017.785.04136018.943.303.765.0018.785.34146518.943.303.305.0016.505.12157018.693.553.435.0017.135.01167518.943.303.435.0017.135.02178019.193.053.185.0015.885.03188518.743.503.285.0016.385.07199018.943.303.405.0017.005.03209518.943.303.305.0016.505.002110018.943.303.305.0016.505.002210518.943.303.305.0016.505.002311021.310.932.125.0010.586.452411521.540.700.825.004.085.032512023.590.000.355.001.755.9726128.823.690.000.008.800.000.00333.10120.48Hydraulic RadiusR=Total area/Wetted perimeter =2.76Velocity V =1/nX(R2/3XS1/2)4.64m/secDischarge Q =AXV1545.58Cumecsb)At 400m downstream of proposed bridge site(As per IRC SP-13):-Maximum Flood level22.14mSlope0.0050Rugosity Coefficient0.030S.NoChainageR.LDepth ofAverageDistanceAreaWettedflowdepth of(m)(Sqm)perimeter(m)flow(m)(m)1023.2400.000.000.000.000.002523.1400.000.005.000.000.0031020.1102.031.025.005.075.2441518.8403.302.675.0013.335.4552018.8403.303.305.0016.505.7062518.9903.153.235.0016.135.2373018.8903.253.205.0016.005.4583518.8403.303.285.0016.385.0794018.8403.303.305.0016.505.00104518.6903.453.385.0016.885.02115018.3203.823.645.0018.185.21125518.2303.913.875.0019.335.04136018.4003.743.835.0019.135.34146518.4003.743.745.0018.705.12157018.3803.763.755.0018.755.01167518.5603.583.675.0018.355.02178018.5903.553.575.0017.835.03188518.6403.503.535.0017.635.07199018.8403.303.405.0017.005.03209518.5403.603.455.0017.255.002110018.8403.303.455.0017.255.002210518.5803.563.435.0017.155.002311020.7901.352.465.0012.286.452411521.4400.701.035.005.125.032512023.4900.000.355.001.755.972612723.5900.000.007.000.000.00352.45120.48Hydraulic RadiusR=Total area/Wetted perimeter =2.93Velocity V =1/nX(R2/3XS1/2)4.83m/secDischarge Q =AXV1702.33Cumecsc)At 400m Upstream of proposed bridge site(As per IRC SP-13):-Maximum Flood level22.34mSlope0.0050Rugosity Coefficient0.030S.NoChainageR.LDepth ofAverageDistanceAreaWettedflowdepth of(m)(Sqm)perimeter(m)flow(m)(m)1023.4400.000.000.000.000.002522.7700.000.005.000.000.0031020.3102.031.025.005.085.2441519.3403.002.525.0012.585.4552019.1803.163.085.0015.405.7062519.1903.153.165.0015.785.2373019.0303.313.235.0016.155.4583519.3103.033.175.0015.855.0794019.2703.073.055.0015.255.00104519.1803.163.125.0015.585.02115019.1003.243.205.0016.005.21125519.1003.243.245.0016.205.04136019.3403.003.125.0015.605.34146519.2303.113.065.0015.285.12157019.2703.073.095.0015.455.01167519.2303.113.095.0015.455.02178019.2903.053.085.0015.405.03188519.1403.203.135.0015.635.07199019.0403.303.255.0016.255.03209519.0403.303.305.0016.505.002110019.3203.023.165.0015.805.002210519.2303.113.075.0015.335.002311020.5201.822.475.0012.336.452411521.6400.701.265.006.305.032512023.6900.000.355.001.755.972612723.7900.000.007.000.000.00320.90120.48Hydraulic RadiusR=Total area/Wetted perimeter =2.66Velocity V =1/nX(R2/3XS1/2)4.53m/secDischarge Q =AXV1453.68Cumecs2)Catchment area method:-a)Dicken's formula:-Q = CM3/4=8.30Cumecsb)Ryve's formula:-Q = CM2/3=4.56CumecsAs the catchment area is not given,the discharge can not be calculated.However in view ofvery small discharges,the discharge arrived from area-velocity method can be adopted with sufficientaccuracy.For safety purpose,it was increased by 20% percent.Maximum Discharge =1854.70CumecsMaximum Velocity =5.57m/secVentway Calculations(H.F.L Condition):-Assuming afflux =x =0.15mWidth of channel at H.F.L =110.06mClear span =10.99mDepth of flow =di =4.21mHead due to velocity of approach =(Vmax2/2g)X[di/(di+x)]21.473mCombined head due to Velocity of approach andhi =1.623maffluxVelocity through vents Vv =0.90X(2ghi)1/2 =5.08m/secLinear water way requiredLWW = Qd/(VvXdi) =86.74mNo.of vents required =LWW /LC=7.8926296633As per the width of the river =8.8118494796at H.F.LNo.of vents to be provided9NosNo.of piers =8NosAfflux Calculations(H.F.L Condition):-Un obstructed area of cross section =A =333.10SqmTotal vented area provided =No.of ventsXClear spanX(BDL-LBL) =525.21SqmWhich is greater than the Un obstructed area of cross sectionUsing Orifice formula for calculation of dischargeQ = Co X (2g)1/2 X L X Dd X [h+(1+e)u2/2g]1/2In the present case,Linear water way =L =98.91mUn obstructed width = W =110.06mL/W =0.8986916228Corresponding to this value the coefficient Co =0.89Corresponding to this value the coefficient e =0.6Hence448.61 = 0.89X4.43X69X3.7X[h+1.6u2/2g]1/20.1986318123=h + 0.0815u2At just upstream of the bridgeQ = W X (Dd + h) X u448.61 = 80X[3.70+h]uu = 5.607/(3.70+h)Substituting0.1986=h + 0.0815[5.607/(3.70+h)]2Solving h = 1.4 cm,hence,it can be neglectedScour Depth Calculations:-Discharge for design of foundations =1.30XMax.Discharge =2466.75CumecsLacey's Silt factor for medium silt = 1.76Xm1/2 =0.85Discharge per metre width of foundations = q =24.939Normal scour depth D = 1.34(q2/f)1/3 =11.81mMaximum scour depth Dm = 1.3XD =15.35mDepth of foundation = Dm + Max.of 1.2m or 1/3 Dm =16.55mBottom level of foundation =5.69mDepth of foundation below low bed level =12.34mSafe Bearing capacity of the soil(As per the soil testing report enclosed):-a) At 2.00m depth below LBL:-12.2t/sqmb) At 4.00m depth below LBL:-14.2t/sqmRaft foundation is proposed at a depth of 1.40m below LBL.No cut-off walls or aprons are required as perscour depth calculationsDesign of cut-off walls:-Though,it is sufficient to take the D/S side cut-off upto 1.27 times the normal scour depth as percaluse 703.2.3.2 of IRC 78-1983 considering that the reach is straight.1.27XNormal scour depth from HFL =15.00mDepth of bottom of Cut-off wall from HFL =15.00mBottom level of cut-off wall =7.24Depth of bottom of D/S side Cut-off wall from LBL10.79mDepth of bottom of U/S side Cut-off wall from LBL3.20mDesign of LAUNCHING APRONS:-Size of stones as per clause 5.3.7.2 of IRC 89-1985Diametre (d) = (Vmax/4.893)2 =1.29mSay0.30mWeight of each stone considering the specific gravity of stone as 2.65Weight of stone = 4/3x x(d/2)3 x 2.65 x 1000 =37.48KgSay40KgWeight of each stone shall not be less than 40 Kg.Dimensions of apron as per clause 5.3.5.2 of IRC 89-1985( T ) = 0.06 x (Qdf)1/3 =0.81Thickness of apron at inner edge(near raft) = 1.5 x T =1.215mSay0.90mThickness of apron at outer edge = 2.25 x T =1.823mSay1.30mHence provide a thickness of 0.60m at near end and 0.9m at the outer endWidth of Launching Apron on U/S Side:-The launching aprons are designed to reach a level of 1.50 times the normal scour depth1.5 x D =17.715mBottom level of apron after launching = HFL-1.5 X D =4.53mDepth below top of the raft =11.51mThe apron should launch in a slope of 1V : 2H as per clause 5.3.7.6 of IRC 89Hence the width of launching apron at U/S =23.02mSay8.0mWidth of Launching Apron on D/S Side:-The launching aprons are designed to reach a level of 2.00 times the normal scour depth2.0 x D =23.620mBottom level of apron after launching = HFL-2 X D =-1.38mDepth below top of the raft =18.41mThe apron should launch in a slope of 1V : 2H as per clause 5.3.7.6 of IRC 89Hence the width of launching apron at D/S =36.82mSay16.0mSection of Raft,Cut-off walls&Launching apronsU/SD/S8.0m16.0m1.3m0.9m3.2m4.4mAssistant Exe.EngineerDeputy Exe.EngineerExecutive EngineerPR,IchapuramPR,IchapuramPR,TekkaliSuperintending EngineerPR,SrikakulamAsst.Executive EngineerDy.Executive EngineerPRI,EluruPRI,Eluru

Name of the Work : Construction of high level bridge on the R/F EC Road to BaliveName of the sub work : Bridge ApproachesS.NoDescription of ItemQuantityRateperAmount1234561Earthwork in excavation for removal of unsuitable material levelling,compaction through mechanical means, cost of hire charges for plant and machinary, labour charges as per drawing and technical specification including setting out, removal of stumps and other deleterious matter , dressing sides of bottom, etc., complete including seignoarge charges for finished item of work as per mort&h specification 304(4 th Revision) Excluding Bailing out water charges and as per approved reinforced soil wall drawing.2708.00048.00cum129984cum2Vibrated cement concrete M 15 Grade Concrete using max. size of 40mm hard broken graded granite metal (SS-5)and 20mm and 10mm size HBG crushed stone aggregate (SS-5) including cost,seignorage and conveyance of cement and all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (4th Revision)for levelling pad as per approved reinforced soil wall drawing.83.003987.00cum330921cum3Construction of Reinforced Soil Wall (designed for 100 years life) which includes designs, detailed drawings, procurement of all the required material for concrete (M35 grade) for panels/blocks for facia , required reinforcement, all necessary accessories, geotextile material for wrapping the reinforced soil layers and drain pipe, all required machinary, labour, form work, supervision, quality checks, coordinating wall construction with soil filling behind walls ( as per reinforced soil wall approved design and drawing ), defect liability period, all leads , lifts and temporary form work if necessary complete for finished item of work for different ranges of heights (2.0m increments) in accordance with MORTH specification 1500,1600,1700 ,2200 & 3100 for materials, construction and quality (excluding foundation block/pad & ground improvement,fill material/ compaction etc..) in the Height range.(The designs shall be got finally approved by the department prior to execution of the reinforced soil wall which is mandatory.Performance guarantee for 10 years shall also be furnished along with designs).HeightSurface areaRate/Sqm0-2.0m18.003043.00547742.0-4.0m275.373043.008379514.0-6.0m543.753381.0018384196.0-8.0m333.753883.0012959514Providing and laying well graded drainage fill by 450mm thick composed of 22-19mm, 11.2-9.5mm, 7-5mm and down grade of well graded aggregates as per drawing and techinical specification and including cost,seignorage and conveyence of all the materials to site and all labour charges, drain pipes wrapped with geotextile, hire charges of plant and machinary for laying filter media, including technical supervision as directed by Engineer-in-charge for finished item of work for drainage layers behind the facia as per approved reinforced soil wall drawing.535.251795.00cum960774cum5Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm hard broken graded granite crushed metal (SS-5) including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P and all water leads ets.,complete as per apporoved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (4th revision ) and as directed by the Engineer-in-Charge for coping beam on top of concrete pannels/facia Blocks as per approved drawing of reinforced soil wall.16.504542.00cum74943cum6Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm hard broken graded granite crushed metal (SS-5) including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P and all water leads etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (4th revision ) and as directed by the Engineer-in-Charge for friction slab as per approved drawing of reinforced soil wall..0.0004887.00cum0cum6Provision of an Reinforced cement concrete crash barrier/ R.C.C Wall type railing at the edges of the road, approaches to bridge structures and medians, constructed with M-25 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to Drg No.R&B/D&P/ROBs/RCC PPT/18/2010, Dtd: 29-09-2010 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified excluding cost of steel Reinforcement, its fabrication charges and premoulded filler for finished item ( as per approved drawing ).0.00545.00RM06Providing and fixing 'W' metal beam crash barrier comprising 3mm thick corrugated sheet metal beam rail,70cm above road/ground level fixed on ISMC series channel series channel vertical post,150 x 75 x 5 mm spaxced 2m centre to centre.1.80m heigh,1.10m below ground level,all steel partsand fitments to be galvanised by hot dip process,all fittings to confirm to IS 1367 and IS:1364,metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm ,330mm long including fixing new post in excavated or driven by approved materials and equipment and the holes shall be backfilled as per clause 810.4.3 MORTH specification including cost and conveyance of all materials,equipment,machinery and labour with all leadss and lfts,loading and unloading charges etc,complete necessary for successful completion of the work as per MORTH clause no:810 and circular nos(1) RW / NH /33022 /1 94 - DO:III dt.24th June 1994 (ii) RW/NH/33044/2/88/Do: II S & P dt.9th MAy 2000.(As percirrcular memo no: 2/DCE(R) /EE(RS & PMS)/DEE1/AEE! dated 11-07-2005.)7Vibrated Reinforced Cement concrete M20 Grade with a cube strength of minimum of 200 kgs/sqm at 28 days works tests using HBG machine crushed graded metal (SS5) including cost, Seigniorage and conveyance of all materials to site and labour charges for Centering, Machine mixing conveyance of materials to site, hire and operational charges of all T&P water charges etc, complete ( but excluding cost of steel and its fabrication ) as per MoRT&H Specification no 1500, 1700, 2200 for For Kerbs over Retaining wall0.0014087.00cum8Construction of precast VRCC Railing of M20 grade using HBG crushed stone aggregate of size not exceeding 12 mm and fine aggregate conforming to table 1000-2 true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical posts not to exceed 2000mm, leaving adequate space between vertical posts for expansion including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges as per approved drawings and technical specifications for finished item of work as per MoRT&H Specification 2703, 1500, 1600, 1700(4th Revision) as per S.D Drg 2020.000.00cum397.001600.00635200RmRm7Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 1985 for friction slab, crash barrier [in non-viaduct, (REwall) portion] etc.2.0059415.00MT118830MTSub-Total=62777479Provision for VAT 4% on6277747010Unforceen and rounding off06277747TOTAL =6,277,747

SUB-ESTIMATEName of the Work : Construction of high level bridge on the R/F EC Road to BaliveName of the sub work : Bridge ProperEstimate Amount Rs.597.00 lakhsS.NoDescription of itemNosMeasurementsQuantityRatePerAmountLengthBredthDepth1Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTHReturn walls1X43.001.806.00129.60Cum129.60Cum110.601.00Cum143342Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.M10 Grade for bed concreteReturn walls1X43.001.800.153.24Cum3452.001.00Cum11184Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTHApproach slab1X23.007.450.313.41Cum5213.001.00Cum699063Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification 1204, 1900 MORTH.Piers1X83.14*5.150.05427.012MTAbutments1X23.14*6.650.05422.264MT9.276MT67000.001.000MT6214924Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing and Technical Specification 1200, 1500 & 1700 MORTH.for well kerbPiers1X810.681Cum85.449CumAbutments1X213.958Cum27.917Cum113.366Cum6235.001Cum7068365Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing and Technical Specification 1200, 1500 & 1700 MORTH.for well steiningPiers1X83.14*4.40.6011.8782.538CumAbutments1X23.14*5.750.7511.8319.574Cum1102.112Cum6458.001Cum71174386Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing and Technical Specification 1200, 1500 & 1700 MORTH.for top pluggingPiers1X83.14*(3.8*3.8)/41.00.545.342CumAbutments1X23.14*(5.0*5.0)/41.00.519.625Cum64.967Cum6345.001Cum4122137Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level.PiersUpto 3m below GL1X81.01.03.00m24.00m8092.361.00m194217From 3 to 10m below GL1X81.01.07.00m56.00m11951.741.00m669297From 10 to 20m below GL1X81.01.01.00m8.00m12549.331.00m1003951X81.01.01.00m8.00m13176.791.00m1054141X81.01.01.00m8.00m13835.631.00m1106851X81.01.01.00m8.00m14527.411.00m1162191X81.01.01.00m8.00m15253.791.00m1220301X81.01.01.00m8.00m16016.471.00m128132AbutmentsUpto 3m below GL1X21.01.03.00m6.00m8092.361.00m48554From 3 to 10m below GL1X21.01.07.00m14.00m11951.741.00m167324From 10 to 20m below GL1X21.01.01.00m2.00m12549.331.00m250991X21.01.01.00m2.00m13176.791.00m263541X21.01.01.00m2.00m13835.631.00m276711X21.01.01.00m2.00m14527.411.00m290551X21.01.01.00m2.00m15253.791.00m305081X21.01.01.00m2.00m16016.471.00m320331X21.01.01.00m2.00m16817.301.00m336351X21.01.01.00m2.00m17658.161.00m353161X21.01.01.00m2.00m18541.071.00m370821X21.01.01.00m2.00m19468.131.00m389368Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing and Technical Specification 1200, 1500 & 1700 MORTH.for bottom pluggingPiers1X83.14*(3.8*3.8)/41.00.6054.410Cum5.15-0.20=4.95,(4.95+3.80)/2 = 4.3741X83.14*(4.37*4.37)/41.01.15138.170CumFor Concave portion 2/3(dXd)h1X82/3(4.95*4.95)1.00.38550.337CumAbutments1X23.14*(5.0*5.0)/41.00.6023.550Cum6.65-0.20=6.45,(6.45+5.0)/2 = 5.7251X23.14*(5.73*5.73)/41.01.41572.813CumFor Concave portion 2/3(dXd)h1X22/3(6.45*6.45)1.00.48526.916Cum366.196Cum5678.001Cum20792619Sand filling in between top and bottom pluggings including cost and conveyance of all materials and all labour charges etc.completePiers1X53.14*(3.8*3.8)/41.011.3640.450CumAbutments1X23.14*(5.0*5.0)/41.011.3443.525Cum1083.975Cum1180.001Cum127909110Plain/Reinforced Cement Concrete M25 Design mix, in Well Foundation complete as per Drawing and Technical Specification 1200, 1500 & 1700 MORTH.for WELL CAPPiers1X83.14*(5.0*5.0)/41.01.2188.400CumAbutments1X23.14*(8.5*8.5)/41.01.2136.119Cum324.519Cum6890.001Cum223593611Supplying, fitting, and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.230999Kg67000.001000Kg1547696612R.C.C. grade M 25 (Design Mix) for substructure items like abutments,piers bed blocks,return walls etc.Piers1X83.14*(2.5*2.5)/41.08.395329.504CumAbutments1X28.452.09.295149.231CumHammer head bed blocks(Rectangular)1X86.002.50.672.000CumHammer head bed blocks(Trapezoidal)1X8(6.0+2.5)/22.50.651.000CumReturn walls1X430.510.89165.346CumBacking wall:1X28.450.31.8969.613CumAbutment caps1X28.452.20.310.901CumBearing pedastals1X300.830.420.151.569CumPier pedastals1X82.52.50.525.000Cum667.081Cum6540.001Cum436271013Supplying, fitting, and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.100062Kg67000.001000Kg670416414Supplying and fixing of fully moulded type Neoprene Rubber Bearing of 500X320X84mm size including the cost and conveyance of bearings and labour charges for fixing the same in position confirming to specifications stipulated in specification for bridges and road works of MORTH drawings.Abutments1X663.0022.006.1050727.60ccPiers1X2463.0022.006.10202910.40cc253638.00cc2.801.00cc71018615Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH for M25 grade concrete for deck slabDeck slab1X941.301.01.0371.700CumKerbs1X4119.030.221.0104.746Cum476.446Cum7890.001Cum375916216Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTHOver Deck slab1X912.477.500.07563.129CumOver approach1X23.007.500.0753.375Cum66.504Cum6890.001Cum45821517Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTHApproach Slab1X23.007.450.30013.410Cum7910.001Cum10607318Reinforced Cement Concrete M 25 grade hand rails including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTHOver Deck slab1X1212.471.01.0149.64mOver approach1X43.001.01.012.00m161.64m1230.001.00m19881719Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded.95289Kg67000.001000Kg638438220Rough stone packing for revetment with concrete grouting using CC(1:4:8) using 300mm size Rough stone including cost and conveyance of all materials and all labour charges etc.completeQuadrants1X43.14*(6.59*6.59)1.01.414*0.357.846Cum670.001Cum3875721Providing gravel backing 150mm thick under revetment including cost,sienorage and conveyance of all materials to site including all labour charges etc.complete1X43.14*(6.59*6.59)1.01.414*0.1528.923Cum450.001Cum1301522Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH1X23.156.2510.880428.400Cum670.001Cum28702823Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTHLength=7.45-0.6+2(3.75-0.3) = 13.75m1X213.750.6010.880179.520Cum1070.001Cum19208624Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705 MORTH1X361.01.01.036Nos2500.001Nos9000025Providing and fixing 20 mm thick compressible fiber board in expansion joint complete as per drawing and technical specifications MORD1X101.01.01.010Nos4500.001Nos4500026Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.Abutments1X960.951.01.091.20mReturn walls1X840.501.01.042.00m133.20m230.001.00m3063627Provision for Caution Boards.----------------------------- LS --------------------------------------------------------1000028Provision for VAT@5%--------------LS--------------------277464229Provision for engaging technical person--------------LS--------------------110985730Provision for insurance--------------LS--------------------27746431Provision for unforeseen items----------------------------- LS --------------------------------------------------------45193TOTAL59700000Asst.Executive EngineerDy.Executive EngineerPRI,EluruPRI,Eluru