Ballona Creek EWMP Susie Santilena July 12, 2018 Ballona Creek Watershed Management Group City of Los Angeles County of Los Angeles Los Angeles Flood Control District City of Be ve rly Hills City of Culve r City City of Inglewood City of West Hollywood City of Santa Monica

Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Ba llona Cre e k EWMPSusie Santile naJuly 12, 2018

Ba llona Cre e k Wa te rshe d Ma na g e m e nt Grou pCity of Los Ange le sCounty of Los Ange le s Los Ange le s Flood Control Distric t City of Be ve rly Hills City of Culve r CityCity of Ing le wood City of We st Hollywood City of Santa Monica

Page 2: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

2

Pre se n t a t ion Ou t line● Watershed Background

● EWMP Implementation○ LID Progress

○ Green Streets

○ Project Highlights

○ Program Highlights

Page 3: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Wa te rshe d At t rib u t e s8 agencies

128 square m ile s

Highly urbanize d :

60% Re side ntia l

16% Com m e rcial

540 acre s of we tlands

7 applicab le TMDLs

3Watershed Background

Page 4: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Re g iona l Boa rdIssu e d

MS4 Pe rm itDe c 28, 2012

EWMP De ve lop m e nt

Ba llona Cre e kEWMP

Ap p rove dAp r 20 , 2016

Cu rre nt MS4 Pe rm it Exp ire d

De c 28, 2017

2012EWMP a nd CIMP Im p le m e nta t ion

ROWD su b m it t e d

June 27, 2017

Wa t e rshe d His tory

4

2017 2018

TSO for Dry We a the r Ba c t e ria

Issu e dMa y 14, 2015

2013 2014 2015 2016

Watershed Collaboration:

• Management group established in 2007

• Meets monthly

• Agencies collaborate on and cost -share watershed efforts

Watershed Background

Page 5: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

5EWMP Implementation

● LID ordinances adopted by all agencies

● Over 1750 LIDs constructe d 2012-2017

● Capacity: 15 ac-ft

Low Im p a c t De ve lop m e nt

Page 6: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Tra sh TMDL

6

● Over 16,000 catch basins re trofitte d

● Institutional m e asure s

● Im ple m e nting TMRP

o 3 Re ce iving Wate r Monitoring Site s

o 2 Tributary Monitoring Points

● Com pliance s ta tus: 100%

EWMP Implementation

Page 7: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Gre e n St re e t s

7

● Green Street Policies adopted by all agencies

● City of Los Angeles: Green Street Prioritization

● County of Los Angeles: Green Street Task Force

● Beverly Hills: Stormwater Compliance Master Plan

● Culver City: Median Project

● Inglewood: Greening red curbs

● West Hollywood: Complete Streets

● Santa Monica: Permeable Alley Surfaces EWMP Implementation

Page 8: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

PROJECT Highlights

8

• Regional Projects• Green Streets• TSO Projects

Page 9: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: Up to 33 cfs

● Drainage Area: 2,500 acres

● Estimated Cost: $1.7 M● Components:

○ Diversion for treatment and return

● Status: Completed ○ Evaluating Phase II feasibility

● Completion Date: 2006

9

We st s id e Wa te r Qua lit y Im p rove m e nt Pro je c t

Project Highlights

Santa Monica

Page 10: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

10

La d e ra Pa rk Re g iona l Storm w a te r Ca p tu re Pro je c t

● Capacity: 5.1 acre-ft

● Drainage Area: 110 acres

● Estimated Cost: $10 M ● Components:

○ Pretreatment system

○ Re-irrigation system

○ Recreation & aesthetic enhancements

○ Demonstration garden

○ Educational signage

● Status: Design

● Completion Date: Fall 2019

Project Highlights

County of Los Angeles

Page 11: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: 24 acre-ft

● Drainage Area: 578 acres● Estimated Cost: TBD

● Components:○ Capture & treat/divert to sewer

● Status: Feasibility Study● Completion Date: TBD

11

La Cie ne g a Pa rk Proje c t & Fra nk Fe nton Fie ld

Project Highlights

Beverly Hills

Page 12: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: 20 acre-ft● Drainage Area: 303 acres in Culver City

● Estimated Cost: $12-16M

● Components:○ Storage: 8 acre-ft

○ Treatment Volume: 11.66 acre -ft

○ Diversion to Harter Ave Drain

○ Diversion to Sepulveda Blvd Drain

● Status: Design

● Completion Date: Late 2020

12

Culve r Bou le va rd Pro je c t

Project Highlights

Culver City

Page 13: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: TBD

● Drainage Area: TBD

● Estimated Cost: $ 4 M

● Components:○ Infiltration BMPs

○ Transit and bicycle routes

○ Street lighting and furniture

○ Pedestrian safety/access

● Status: Planning/Concept

● Completion Date: Fall 2019

13

Me lrose Ave Com p le t e St re e t Pro je c t

Project Highlights

West Hollywood

Page 14: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: 9 acre-ft

● Drainage Area: 248 acres

● Estimated Cost: $9.8 M● Components:

○ Storm drain diversion○ Bioswales along 3 mile

stretch of median○ Treatment and reuse

○ Phase 1: 4 ac-ft / yr ($3.0 million)

○ Phase 2: 5 ac-ft / yr ($6.8 million)

● Status: Design

● Completion Date: Fall 2019

14

Burton Wa y Me d ia n Gre e n St re e t Pro je c t

Project Highlights

Beverly Hills

Page 15: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: 1 acre-ft

● Drainage Area: 13 acres

● Estimated Cost: $500 k● Components:

○ Infiltration

○ Treatment

○ Flood Control

○ 3200 ft of green street

● Status: Construction

● Completion Date: Fall 2018

15

Sa nta Monic a Bou le va rd Gre e n St re e t s Pro je c t

Project Highlights

Beverly Hills

Page 16: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

16

Monte ith Pa rk & Vie w Pa rk Gre e n Alle y Storm w a te r Ca p tu re Pro je c t

Project Highlights

● Capacity: 9.3 acre-ft

● Drainage Area: 228 acres

● Estimated Cost: $3.7 M● Components:

○ Pretreatment system

○ Recreation & aesthetic enhancements○ Green alley with drought tolerant

landscaping○ 16 infiltration wells

○ Educational signage

● Status: Planning/Concept

● Completion Date: Fall 2021

County of Los Angeles

Page 17: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: 7,700 cf● Drainage Area: TBD

● Estimated Cost: $9 M● Components:

○ Bioretention

● Status: Design

● Completion Date: 2019

17

La Bre a Gre e n St re e t Pro je c t

Project Highlights

Inglewood

Page 18: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: 300 acre -ft /year

● Drainage Area: 2,400 acres

● Estimated Cost: $5.4 M● Components:

○ Storm drain diversion

○ 2 parallel vegetated swales (1,400 ft )

○ Native vegetation

○ Restoration of riparian habitat

○ Educational signage

● Status: Design

● Completion Date: Fall 2020

18

We stw ood Ne ig hb orhood Gre e nw a y Pro je c t

Project Highlights

Los Angeles

Page 19: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: 0.23 acre-ft

● Drainage Area: 209 acres

● Estimated Cost: $600 K● Components:

○ 35 rain gardens

○ Replenishes groundwater through

infiltration

○ Beautification in DAC

○ Community education on LID

● Status: Completed

● Completion Date: 2017

19

Unive rs it y Pa rk Ne ig hb orhood Ra in Ga rd e ns Pro je c t

Project Highlights

Los Angeles

Page 20: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

● Capacity: TBD

● Drainage Area: 39 acres

● Estimated Cost: $3.7 M● Components:

○ Median biofilter

○ Green alley

○ Green street standard plans

○ Beautification in DAC

● Status: Design● Completion Date:

○ Phase I- June 2019

○ Phase II- February 2021

20

Ve rm ont Ave . Storm w a te r Ca p tu re & Gre e n St re e t Pro je c t

Project Highlights

Los Angeles

Page 21: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Ba c te ria TSO

21

3 Regional Projects:● LFTF-1 on Ballona Main Stem○ ≤ 6 MGD for ozone treatment

○ ≤ 23 MGD diversion to HWRP

● LFTF-2 on Sepulveda Channel○ ≤ 1.3 MGD for ozone treatment

● Mesmer LFD on Centinela Creek○ ≤ 1.0 MGD conveyed to HWRP

Design started May 2018.

EIR certified June 2018.

Estimated Cost: $31.3 M

Project Highlights

Page 22: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

PROGRAM Highlights

22

• CIMP Implementation• Measure CW

Page 23: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Wa te rshe d Monitoring

23

● 5 new monitoring sites as a result of the CIMP:

○ 3 Stormwater Outfalls

○ 2 Non-Stormwater Outfalls

● 1 Shoreline Station

● 2 NSWO screenings of 2 sig. outfalls

Program Highlights

MonitoringType Frequency

Wet Weather Events 3x / year

Dry Weather Events 2x / year

Bacteria TMDL Weekly

Metals TMDL Monthly

Estuary Bed Sediment Annually

Mussel Tissue Annually

Fish Tissue Annually

Plastic Pellets Monitoring 2x / year

Page 24: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Me a su re CW Cu lve r City

24

● The Clean Water, Clean Beach Parcel Tax passed in Culver City (November 2016)

● Set annual parcel tax for:○ Single family residential $99

○ Multi -family dwelling unit $69 ○ $1,096 per acre for

non-residential

● A dedicated funding for Culver City’s Water Quality Programs

● Measure V: Santa Monica

Program Highlights

Page 25: Ballona Creek EWMP...City of Inglewood City of West Hollywood City of Santa Monica 2 Presentation Outline Watershed Background EWMP Implementation LID Progress Green Streets Project

Tha nk YouAny [email protected]