DESCRIPTION
OPERA Collaboration meeting. LNGS, May 20 th , 2003. BAM Activity at CERN. S. Buontempo, G. Decreuse, J. Dupraz, C. Schillinger. New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test measurements on pile Outlooks. - PowerPoint PPT Presentation
Citation preview
1
BAM Activity at CERN
New welding tools
Alternative folding brick: dimension measurements
Leakage test measurements in destructive mode
Pressure test measurements on pile
Outlooks
S. Buontempo, G. Decreuse, J. Dupraz, C. Schillinger
OPERA Collaboration meeting LNGS, May 20th , 2003
2
New welding tool from Sidec firmManual welding clamp with 2 heating sides and possibility to adjust: - welding heating time, - welding cooling timepressure depends from operator
Welding machine with 1 heatingside, with vacuum chamber and Possibility to adjust: - welding heating time, - welding cooling timepressure is fixed at 1 bar
3
Modified welding tool
We modified the manual welding clamp andnow we can control and adjust the pressure and start with external switch:• the closure of clamp (at set pressure),• the welding (heating of the clamp), • the vacuum (with slow ramping).
4
Modified welding tool
The possibility to adjust welding parameters has showed us that we have the best welding performance working at:
• 2 sec heating time• 6 sec cooling time• 5 bar pressure on the clamp
We have performed preliminary test measurements on envelopes done with different laminate films (Nagoya, Sidec FA30, Sidec 122TLS95), with T and without T points.
5
New welding toolWith the possibility to perform vacuum in a chamber we have checked the performance of welding inside vacuum environment.
The welding clamp here is heating on a single side and the opposite one is a silicon strip.
The pressure is 1 bar (not adjustable) and wehave found the best welding conditions at
1.2 sec heating time 2 sec cooling time
We are in contact with Sidec firm to applychanges on these welding conditions
6
Alternative folding packaging
We know that the weaker part of the ECC packaging with laminated film is the zone with overlapping of two welding lines (so called T point)
Some of the pre-selectedfirms have proposed anAlternative packagingwithout T point.
7
Alternative folding packaging
This kind of packaging can be done with several configurations having:
- different positions of the folded parts,
- and/or different positions of welding lines
8
Alternative folding packaging
After some brain storming we have chosen the following configuration to start measurements:
Folded parts on side and bottom
Welding lines on top and sides
9
Alternative folding packagingPreliminary measurements on the new brick shape:
Brick high
Brick length We made a tool to pull the
laminated film while welding in order to minimize the extra material on the corners
10
Alternative folding packagingMeasurements on 2 Al bricks wrapped with 0.2 mm PE film (nominal high 103.5mm):
Pos. brick n.1 n.2
1 -149 +1512 +64 +264 3 +426 + 5674 -158 +1525 +254 +5186 +528 +650
123456
We have seen that points2, 3, 5, 6, reduce with pressure (there is air gap therein the folded parts)VERY PRELIMINARY
11
Alternative folding packagingMeasurements on 2 Al bricks wrapped with 0.2 mm PE film (nominal high 125 mm):
Pos. brick n.1 n.2base
1 +158 +1512 +305 +053 3 +380 - 096top
4 +720 +3205 +1470 +15406 +440 +130
123
456
We could partially compensate this by skates and by PE, 0.2 mm thinner that carton paper
VERY PRELIMINARY
Points 4, 5, 6, reduce with pressure (air gap there in the folded parts)
12
Leakage measurements: set upStep 1: we make a brick with Al block or real pile, we packed with carton (or PE) and laminated film under vacuum, and then we make a hole
Step 2: we make vacuum again inside the brickusing the mass spectrometer pump
Step 3: we inject He around the brick and seethe amount measured by the mass spectrometer
13
Leakage measurements: materials and configurations
We have performed test measurements on different configurations:• envelopes (with T and without T)• Baseline bricks with carton or PE inside• Baseline no T bricks with carton or PE inside
We have used different materials:• Laminated films - Sidec FA30, Sidec122TLS95 (softer than FA30 with same low gas permeability), Nagoya film• Inside wrapping - Carton paper and PE
All test measurements have been performed with 5 min measurement time on mass spectrometer
14
Leakage measurements: results
Sidec 122TLS 95 Envelopes (no T) with 0.2 mm PE film inside
2.20E-10
4.90E-10
7.70E-10
2.50E-10
4.90E-10
9.20E-10
2.70E-10
2.70E-10
4.10E-10
4.30E-104.30E-104.90E-10
3.00E-10
2.70E-10
4.30E-10
5.60E-10
4.30E-10
5.20E-10
0.00E+00
1.00E-10
2.00E-10
3.00E-10
4.00E-10
5.00E-10
6.00E-10
7.00E-10
8.00E-10
9.00E-10
1.00E-09
1 2 3 4 5 6 7 8 9
This shows that we have a good control of welding procedure and thatlaminated film is high quality
15
Leakage measurements: resultsAL bricks done in baseline mode (with T) with Sidec laminated film 122TLS 95 and carton paper
Sidec TLS95 + white carton
3.40E-10
5.20E-10
6.50E-10
4.50E-10
4.10E-10
4.80E-10
6.30E-10
3.90E-10
4.00E-104.40E-10
2.90E-10
8.90E-10
9.80E-10
5.80E-10
5.10E-10
5.30E-10
4.40E-105.10E-10
5.60E-10
7.20E-10
0.00E+00
2.00E-10
4.00E-10
6.00E-10
8.00E-10
1.00E-09
1.20E-09
1 2 3 4 5 6 7 8 9 10
Bricks
16
Leakage measurements: resultsAL bricks done in baseline mode (with T) with Sidec laminated film FA30 and carton paper
Sidec FA30 + black carton
3.10E-09
1.20E-09
4.70E-103.00E-10
1.90E-103.10E-102.70E-10 3.10E-10
9.80E-10
1.90E-10
5.20E-10 5.20E-10
3.50E-104.30E-10
3.60E-10
1.00E-09
3.60E-10
5.90E-10
0.00E+00
5.00E-10
1.00E-09
1.50E-09
2.00E-09
2.50E-09
3.00E-09
3.50E-09
1 2 3 4 5 6 7 8 9
Bricks
FA30 is also good in terms of permeability but it is mechanicallyharder than 122TLS95 giving worst brick shapes
17
Leakage measurements: resultsEnvelopes done with Nagoya film and carton
leakage rate in envelopes
0.00E+00
1.00E-10
2.00E-10
3.00E-10
4.00E-10
5.00E-10
6.00E-10
7.00E-10
8.00E-10
9.00E-10
1 2 3 4 5 6 7 8 9 10
envelope
lea
ka
ge
ra
te (
mb
ar.
l/se
c)
envelopes with T
0.00E+00
2.00E-10
4.00E-10
6.00E-10
8.00E-10
1.00E-09
1.20E-09
1.40E-09
1.60E-09
1 2 3 4 5 6 7 8 9 10
envelope
lea
ka
ge
ra
te (
mb
ar.
l/se
c)
No T with T
No Leakage
18
Leakage measurements: resultsAL bricks done in baseline mode (with T) with Nagoya film and carton
Nagoya + black carton
3.20E-102.50E-102.30E-102.40E-10
3.40E-103.40E-103.10E-10
7.20E-09
2.20E-08
1.00E-08
8.00E-07
3.40E-08
1.00E-08 1.10E-08
1.00E-10
1.00E-09
1.00E-08
1.00E-07
1.00E-06
1 2 3 4 5 6 7
Bricks
Important leakage in T point (confirming preliminary data reported in Strasbourg meeting)
19
Leakage measurements: resultsAl bricks done in baseline mode (with T) with Nagoya film (starting from envelopes done by GRT firm) and carton
GRT enveloppe (film Nagoya)
6.40E-10
8.30E-10
3.80E-104.50E-10
5.40E-10
8.20E-10
4.10E-10
6.60E-106.20E-10
1.20E-09
0.00E+00
2.00E-10
4.00E-10
6.00E-10
8.00E-10
1.00E-09
1.20E-09
1.40E-09
1 2 3 4 5
Bricks
Much lower leakage (on envelopes 2 of 3 welding lines are done in industrial mode with larger welding line and with a rolling device)
20
Leakage measurements on a real pile brick
Pile bricks done in envelope mode (no T) with Sidec film 122TLS 95 and PE (replacing carton)
leakage rate vs time
0.00E+00
5.00E-10
1.00E-09
1.50E-09
2.00E-09
2.50E-09
3.00E-09
3.50E-09
4.00E-09
4.50E-09
0 50 100 150
time (min)
Le
ak
ag
e r
ate
(m
ba
r.l/s
)In first 30 minthe mass spectrometer measures a leak
After 135 min we find no leakage even with He injection.So the brick did not leak, but there was residual air inside
No He injected
21
Leakage measurements: conclusionsEnvelopes: we do not find big difference in between T and no T modefor all tested laminated films. In empty envelopes there is not the mechanical stress on T point like in bricks
Al Bricks: - with all Sidec films we find low leakage 5 x 10-10 (new 122TLS95 is much better in terms of mechanical flexibility)- with Nagoya film we find large leakage 1 x 10-8 in T point- using Nagoya film envelopes done by GRT firm we find low leakage ~7 x 10-10
Pile brick:Preliminary measurement (lack of material !) show that the pile traps air inside which demands for 30 min to be purged out.Further study is needed on pressed piles
22
Pressure test measurements on pile
Some of the pre-selected firms have raised the problem of residual air inside the pile. They propose to purge it applying pressure.
We have started some test measurements with hydraulic pump withpressure range up to 700 kg/cm2
23
Pressure test measurements on pileIn order to evaluate the pile squeezing we performed a differential measurement with respect to the deformation of the table of the machine,raising up to 100 kg/cm2
pressure pile table differencekg/cm 2̂ mm mm mm
10 -1,37 -0,9 -0,4725 -1,5 -1 -0,550 -1,7 -1,12 -0,5875 -1,87 -1,22 -0,65
100 -2,09 -1,33 -0,760 -0,42 0 -0,42
25 -1,48 -1 -0,4850 -1,7 -1,14 -0,5675 -1,88 -1,25 -0,63
100 -2,06 -1,34 -0,720 -0,45 0 -0,45
100 -2,06 -1,34 -0,72here we apply the adhesive tape
70 -1,8 -1,22 -0,580 -0,43 0 -0,43
pile squeezing
-2.5
-2
-1.5
-1
-0.5
0
0 5 10 15 20
pressure (kg/cm2)
dis
pla
ce
me
nt
(mm
)
pile
table
difference permanent reduction, lost since the beginning,
confirmed even after wrapping with adhesive tape
24
Pressure test measurements on pilePerforming the test we learned the following information
Applying pressure ~ 100 kg/cm2 the pile (or parts of it) get sticky. This may depend from the:
• vacuum sucking effect of removing air,• residual lamination oil,• painted lead,• stickiness of emulsion films
This could help the BAM procedure but wehave to evaluate if it is dangerous for emulsion sheets.
We need to repeat these tests with final lead and emulsion sheets
25
Pressure test measurements on pileWith pile under pressure (70 kg/cm2) with - 0.58 mm squeezing effect we wrapped it with adhesive tape (as proposed by some firms):
3M R425 XT-8015 (0.13 mm Al with siliconglue, certified zero degassing)
This could replace carton or PE in baseline option or could be a hermetic and light tight packaging on top of which we can apply mechanical pressure (alternative solution)
…moreover
26
Pressure test measurements on pileAfter wrapping the pile goes back to - 0.43 mm squeezing and
it becomes “solid” !
This could also simplify a lot all the pile manipulationduring the BAM procedure before packaging
We need to repeat these tests with final lead and emulsion sheets
27
BAM Activity at CERN: Conclusions and OutlookNew welding devices have been received and modified.
More experience has been done on welding procedure and leakage rate measurements.
A new laminated film 122TLS95 from Sidec has been testes: positive results in terms of leakage. Sidec firm is producing a customized 122TLS95 film with addition of PE photo black inside and aluminized PE outside. Delivery expected in mid june.
We have started studies on Brick packaging with no T point.Preliminary measurements on dimension show an increasing of brickHigh and length. More precise evaluation is needed for more statisticand possible sources of compensation (skate shape, PE replacing carton etc etc)
Preliminary study of pile compression have started.
28
Additional measurements needed on:• on brick size, (baseline T and no T, with new laminated film and alternative packaging)• on pile bricks in destructive mode (Pb and emulsion urgently needed)• using final laminated film solution (custom for OPERA from Sidec)• performing He injection in the brick • on leakage rate in non destructive mode
Alternative packaging film tests: mechanical performance, ECC dimension uniformity, performance of wrapping with adhesive tape,pressure measurements on pile
Welding: test on new tools, modifications on vacuum chamber machine to apply same conditions on modified manual clamp
BAM firm selection: test measurements on packaging material compatibility with emulsion films and follow up of BAM proposed designs
BAM Activity at CERN: Conclusions and Outlook