WelcomeBanff Trail Area Improvements June 11, 2019: Open House
19-0
0376
931
During this session, you will:
ཚ Learn about this project
ཚ Meet the project team
ཚ Ask questions
ཚ Review our plans
ཚ Provide input where applicable
ཚ Find out what next steps we’ve got planned
We are coordinating and consolidating multiple needs in the area and taking a holistic approach to all the work that needs to get done. This will help reduce multiple and consecutive disruptions to your neighbourhood. The combined work is now called: The Banff Trail Area Improvements Project
Timeline 16
Ave
nue
N.W
. Wid
enin
gBa
n� T
rail
Are
a Im
prov
emen
ts
WE ARE HERE
Fall 2019 Public Open House and online engagement.
Spring 2020 Start of construction.
Winter (Q1) 2020 Utility relocations (water, gas, electrical).
November 2018 Additional adjacent projects funded as part of The City’s four-year capital plan.
2014 Funding allocated in The City’s Investing in Mobility: Transportation Infrastructure Investment Plan (TIIP).
October 29, 2018 Public Open House and online engagement.
June 11, 2019 The Ban� Trail Area Improvements Public Open House and online engagement.
19-0
0376
931
Previous scopeOctober 2018 Open House
Ban� Trail Park
16 Ave NW
University Dr NW
22 Ave NW
23 Ave NW
23 Ave NW
20 Ave NWTy
e St N
W
21 Ave NW
20 Ave NW
19 Ave NW
18 Ave NW
22 St NW
22a St NW
23 St NW
17 Ave NW
20a St NW
21 St NW
21a St NW
22a St NW
24 St NW
24 St NW
22 St NW
Halifax Cres NW
Service Rd NW
Capitol Hill Cres NW
Ban� Trail NW
Ban� Trail NW
Victoria Cres NW
24 S
t NW
16 Ave NW
Crow
child
Tra
il N
W
Crowchild Trail N
W
19 St NW
19 St NW
20 St NW
TRANS CANADA HWY
McMahonStadium
BrantonSchool
Ban� Trail
11
1A
1A
N
Noise wall replacement(upgrade)
Pedestrian bridgereplacement under review
Pedestrian underpassimprovements
New local bus stops
New multi-usepathway
New streetlights
Roadwidening
New exit ramp
19-0
0376
931
New scopeBanff Trail Area Improvements
Ban� Trail Park
16 Ave NW
24 Ave NW
University Dr NW
22 Ave NW
23 Ave NW
23 Ave NW
23 Ave NW
20 Ave NW
Tye S
t NW
21 Ave NW
20 Ave NW
19 Ave NW
18 Ave NW
22 St NW
22a St NW
23 St NW
24 St NW
17 Ave NW
20a St NW
21a St NW
22a St NW
24 St NW
24 St NW
24 St NW
22 St NW
Halifax Cres NW
Service Rd NW
Capitol Hill Cres NW
Ban� Trail NW
Ban� Trail NW
Victoria Cres NW
14 Ave NW14 Ave NW13 Ave NW
24 S
t NW
16 Ave NW16 Ave NW
Crow
child
Tra
il N
W
Crowchild Trail N
W
19 St NW
19 St NW
20 St NW
TRANS CANADA HWY
21 St NW
Ban� Trail NW
16 Ave NW Widening:- New eastbound lane - Noise wall replacement- New bicycle connection on 16 Ave NW (residential), south of the noise wall
- New streetlights- New local bus stops (both directions)
Pedestrian bridgeimprovements
Upgrade sidewalk to multi-use pathway
Pedestrian underpassimprovements
Pedestrian and bike improvements at intersection
e sidewalk (City & Developers)
24 St NW
22 St NW
New northbound lane 23 Ave to 32 Ave NW
Intersection access changes:Closing southbound 24 St to 24 Ave NW
Crowchild Trail N
W
New road
Upgraded/modi�ed pathway
Add new multi-use pathway
24 Avenue NW Improvements:(Crowchild Trail to 14 St NW)- Pedestrian crossing improvements- Roadway resurfacing- New bicycle connection- Confederation Park pathway connection at 14 St NW
McMahonStadium
Foothills Athletic Park
BrantonSchool
11
N
New Crowchild Trail NW o�-ramp
Complete Street Improvements:- New bicycle connection- Pedestrian improvements
Remove service road, il e multi-use pathway and boulevard space
Ban� Trail
19-00325187
19-0
0376
931
19-00376931
Banff Trail Area Improvements16 Avenue NW: Lane Widening fromCrowchild Trail NW to 20A Street NW
16 Avenue N.W. Lane Widening from Crowchild Trail N.W. to 20A Street N.W.19 S
TR
EE
T N
W
Banff Trail Area ImprovementsWB 16th Avenue NW Off-ramp toNB Crowchild Trail NW
Westbound 16 Avenue N.W. O�-ramp to Northbound Crowchild Trail N.W.
19-0
0376
931
Banff Trail Area ImprovementsIntersection Improvements atCrowchild Trail NW and 24th Avenue NW
Intersection Improvements atCrowchild Trail N.W. and 24th Avenue N.W.
19-0
0376
931
Banff Trail Area ImprovementsIntersection Improvements atCrowchild Trail NW and 24th Avenue NW
Intersection Improvements at Crowchild Trail N.W. and 24th Avenue N.W.
19-0
0376
931
19-00376931
8
attached
24 Avenue N.W. between Crowchild Trail and 14th Street N.W.
14 S
TREE
T N
W
15 S
TREE
T N
W
16 S
TREE
T N
W
17 S
TREE
T N
W
18 S
TREE
T N
W
19 S
TREE
T N
W
20 S
TREE
T N
W
22 STREET NW
22A STREET NW
23 STREET NW
CAPITOL HILL CRESCENT NW
24 S
TREE
T N
W
23 S
TREE
T N
W
22 S
TREE
T N
W
23 AVENUE NW
24 AVENUE NW 24 AVENUE NW
21 AVENUE NW
25 AVENUE NW
EXSHAW ROAD NW
MORLEY TRAIL NWCROW
CHILD TRAIL NW
When thinking about travelling along 24 Avenue N.W. (via walking, cycling, driving, and parking)…Please answer the following questions by placing a post-it note on the map with your feedback
How do you currently use 24 Ave N.W.?
What are future opportunities for 24 Ave N.W?
What are the current issues with 24 Ave N.W.?
Use yellow post-it note Use blue post-it note
Use red post-it note
19-0
0376
931
Ban� Trail N.W. cross-section
The options:
Figure 1: Existing Banff Trail Cross Section:Available ROW varies approx. 15.8m at south end adjacent 16 Ave to approx. 15.5m near BanffTrail LRT Station.
Figure 2: Banff Trail with Desired Full Amenities on Both Sides:Per Banff Trail ARP recommended fixtures, however requires 21.6m of road right-of-way to accommodate which isin excess of available.
Figure 3: Banff Trail Upgrade - Option 1, west side only, maintain east curband sidewalk This proposed option is approximately 15.6m wide
Figure 4: Banff Trail Upgrade - Option 2, dedicated bike lanes each way, maintain east curb and sidewalkThis proposed option is approximately 15.7m wide
Existing Banff Trail cross-section:
Option 1:
ཚ Remove northbound lane and sidewalk on the east side
ཚ Raised bicycle path on east and west sides
ཚ Sidewalk and street scape improvements on west side
The work we are doing along the Banff Trail N.W. corridor is in alignment with the Banff Trail Area Redevelopment Plan.
19-0
0376
931
Figure 1: Existing Banff Trail Cross Section:Available ROW varies approx. 15.8m at south end adjacent 16 Ave to approx. 15.5m near BanffTrail LRT Station.
Figure 2: Banff Trail with Desired Full Amenities on Both Sides:Per Banff Trail ARP recommended fixtures, however requires 21.6m of road right-of-way to accommodate which isin excess of available.
Figure 3: Banff Trail Upgrade - Option 1, west side only, maintain east curband sidewalk This proposed option is approximately 15.6m wide
Figure 4: Banff Trail Upgrade - Option 2, dedicated bike lanes each way, maintain east curb and sidewalkThis proposed option is approximately 15.7m wide
Existing Banff Trail cross-section:
Option 2:
Ban� Trail N.W. cross-section: The options (cont.)
ཚ Remove northbound lane and sidewalk on the east side
ཚ Cycle track on west side
ཚ Sidewalk and street scape improvements on west side
19-0
0376
931
Figure 1: Existing Banff Trail Cross Section:Available ROW varies approx. 15.8m at south end adjacent 16 Ave to approx. 15.5m near BanffTrail LRT Station.
Figure 2: Banff Trail with Desired Full Amenities on Both Sides:Per Banff Trail ARP recommended fixtures, however requires 21.6m of road right-of-way to accommodate which isin excess of available.
Figure 3: Banff Trail Upgrade - Option 1, west side only, maintain east curband sidewalk This proposed option is approximately 15.6m wide
Figure 4: Banff Trail Upgrade - Option 2, dedicated bike lanes each way, maintain east curb and sidewalkThis proposed option is approximately 15.7m wide
Existing Banff Trail cross-section:
Option 3:
ཚ Remove northbound lane and sidewalk on the east side
ཚ Cycle track on east side
ཚ Sidewalk and street scape improvements on west side
Ban� Trail N.W. cross-section: The options (cont.)
19-0
0376
931
Do you have any additional feedback in regards to the Ban� Trail area as a whole?Please fill out a post-it note and leave it on this board.
19-0
0376
931
Last year’s engagementWhat we heardFrom our community engagement last fall, the following themes emerged:
ཚ Desire for sidewalks throughout the Motel Village area to be widened
ཚ Increase mobility and accessibility
ཚ Desire for increased lighting in the Crowchild Trail underpass
ཚ No desire for permeability in the noise wall on the south side of 16 Avenue N.W.
Please Note: A copy of the full What We Heard Report is available online at: www.calgary.ca/Ban�TrailAreaImprovements
19-0
0376
931
Last year’s engagementWhat we did (cont.)Below are the themes that were identi�ed as factors in our engagement, and the con�rmed scope based on this feedback:
Theme Confirmed ScopeIncrease mobility and accessibility
Build a new ramp connecting to the existing pedestrian bridge near Ban� Trail. The pedestrian bridge is not to be replaced.Extend active modes and public realm improvements along Ban� Trail N.W. from 16 Avenue N.W. to 23 Avenue N.W.
A desire for increased lighting in the underpass
Enhance pedestrian underpass at Crowchild Trail & 16 Avenue N.W. including lighting and new pathway.
A desire for sidewalks throughout the Motel Village area to be widened
Improvements to the public realm on the north side of 16 Avenue N.W., adding sidewalks on 24 Street N.W., and improving the public realm on Ban� Trail N.W.
No desire for permeability in the noise wall on the south side of 16 Avenue N.W.
Replacement of the noise wall insulating Briar Hill Community.No new openings in noise wall are being added.
19-0
0376
931
1. Visit calgary.ca/BanffTrailAreaImprovements to learn more about the project and to provide feedback online from June 11-25.
2. We’ll be back in the fall to touch base with you.
Next steps
19-0