WelcomeBanff Trail Area Improvements June 11, 2019: Open House

19-0

0376

931

During this session, you will:

ཚ Learn about this project

ཚ Meet the project team

ཚ Ask questions

ཚ Review our plans

ཚ Provide input where applicable

ཚ Find out what next steps we’ve got planned

Page 2: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

We are coordinating and consolidating multiple needs in the area and taking a holistic approach to all the work that needs to get done. This will help reduce multiple and consecutive disruptions to your neighbourhood. The combined work is now called: The Banff Trail Area Improvements Project

Timeline 16

Ave

nue

N.W

. Wid

enin

gBa

n� T

rail

Are

a Im

prov

emen

ts

WE ARE HERE

Fall 2019 Public Open House and online engagement.

Spring 2020 Start of construction.

Winter (Q1) 2020 Utility relocations (water, gas, electrical).

November 2018 Additional adjacent projects funded as part of The City’s four-year capital plan.

2014 Funding allocated in The City’s Investing in Mobility: Transportation Infrastructure Investment Plan (TIIP).

October 29, 2018 Public Open House and online engagement.

June 11, 2019 The Ban� Trail Area Improvements Public Open House and online engagement.

19-0

0376

931

Page 3: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Previous scopeOctober 2018 Open House

Ban� Trail Park

16 Ave NW

University Dr NW

22 Ave NW

23 Ave NW

23 Ave NW

20 Ave NWTy

e St N

W

21 Ave NW

20 Ave NW

19 Ave NW

18 Ave NW

22 St NW

22a St NW

23 St NW

17 Ave NW

20a St NW

21 St NW

21a St NW

22a St NW

24 St NW

24 St NW

22 St NW

Halifax Cres NW

Service Rd NW

Capitol Hill Cres NW

Ban� Trail NW

Ban� Trail NW

Victoria Cres NW

24 S

t NW

16 Ave NW

Crow

child

Tra

il N

W

Crowchild Trail N

W

19 St NW

19 St NW

20 St NW

TRANS CANADA HWY

McMahonStadium

BrantonSchool

Ban� Trail

11

1A

1A

N

Noise wall replacement(upgrade)

Pedestrian bridgereplacement under review

Pedestrian underpassimprovements

New local bus stops

New multi-usepathway

New streetlights

Roadwidening

New exit ramp

19-0

0376

931

Page 4: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

New scopeBanff Trail Area Improvements

Ban� Trail Park

16 Ave NW

24 Ave NW

University Dr NW

22 Ave NW

23 Ave NW

23 Ave NW

23 Ave NW

20 Ave NW

Tye S

t NW

21 Ave NW

20 Ave NW

19 Ave NW

18 Ave NW

22 St NW

22a St NW

23 St NW

24 St NW

17 Ave NW

20a St NW

21a St NW

22a St NW

24 St NW

24 St NW

24 St NW

22 St NW

Halifax Cres NW

Service Rd NW

Capitol Hill Cres NW

Ban� Trail NW

Ban� Trail NW

Victoria Cres NW

14 Ave NW14 Ave NW13 Ave NW

24 S

t NW

16 Ave NW16 Ave NW

Crow

child

Tra

il N

W

Crowchild Trail N

W

19 St NW

19 St NW

20 St NW

TRANS CANADA HWY

21 St NW

Ban� Trail NW

16 Ave NW Widening:- New eastbound lane - Noise wall replacement- New bicycle connection on 16 Ave NW (residential), south of the noise wall

- New streetlights- New local bus stops (both directions)

Pedestrian bridgeimprovements

Upgrade sidewalk to multi-use pathway

Pedestrian underpassimprovements

Pedestrian and bike improvements at intersection

e sidewalk (City & Developers)

24 St NW

22 St NW

New northbound lane 23 Ave to 32 Ave NW

Intersection access changes:Closing southbound 24 St to 24 Ave NW

Crowchild Trail N

W

New road

Upgraded/modi�ed pathway

Add new multi-use pathway

24 Avenue NW Improvements:(Crowchild Trail to 14 St NW)- Pedestrian crossing improvements- Roadway resurfacing- New bicycle connection- Confederation Park pathway connection at 14 St NW

McMahonStadium

Foothills Athletic Park

BrantonSchool

11

N

New Crowchild Trail NW o�-ramp

Complete Street Improvements:- New bicycle connection- Pedestrian improvements

Remove service road, il e multi-use pathway and boulevard space

Ban� Trail

19-00325187

19-0

0376

931

Page 5: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

19-00376931

Banff Trail Area Improvements16 Avenue NW: Lane Widening fromCrowchild Trail NW to 20A Street NW

16 Avenue N.W. Lane Widening from Crowchild Trail N.W. to 20A Street N.W.19 S

TR

EE

T N

W

Page 6: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Banff Trail Area ImprovementsWB 16th Avenue NW Off-ramp toNB Crowchild Trail NW

Westbound 16 Avenue N.W. O�-ramp to Northbound Crowchild Trail N.W.

19-0

0376

931

Page 7: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Banff Trail Area ImprovementsIntersection Improvements atCrowchild Trail NW and 24th Avenue NW

Intersection Improvements atCrowchild Trail N.W. and 24th Avenue N.W.

19-0

0376

931

Page 8: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Banff Trail Area ImprovementsIntersection Improvements atCrowchild Trail NW and 24th Avenue NW

Intersection Improvements at Crowchild Trail N.W. and 24th Avenue N.W.

19-0

0376

931

Page 9: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

19-00376931

8

attached

24 Avenue N.W. between Crowchild Trail and 14th Street N.W.

14 S

TREE

T N

W

15 S

TREE

T N

W

16 S

TREE

T N

W

17 S

TREE

T N

W

18 S

TREE

T N

W

19 S

TREE

T N

W

20 S

TREE

T N

W

22 STREET NW

22A STREET NW

23 STREET NW

CAPITOL HILL CRESCENT NW

24 S

TREE

T N

W

23 S

TREE

T N

W

22 S

TREE

T N

W

23 AVENUE NW

24 AVENUE NW 24 AVENUE NW

21 AVENUE NW

25 AVENUE NW

EXSHAW ROAD NW

MORLEY TRAIL NWCROW

CHILD TRAIL NW

Page 10: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

When thinking about travelling along 24 Avenue N.W. (via walking, cycling, driving, and parking)…Please answer the following questions by placing a post-it note on the map with your feedback

How do you currently use 24 Ave N.W.?

What are future opportunities for 24 Ave N.W?

What are the current issues with 24 Ave N.W.?

Use yellow post-it note Use blue post-it note

Use red post-it note

19-0

0376

931

Page 11: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Ban� Trail N.W. cross-section

The options:

Figure 1: Existing Banff Trail Cross Section:Available ROW varies approx. 15.8m at south end adjacent 16 Ave to approx. 15.5m near BanffTrail LRT Station.

Figure 2: Banff Trail with Desired Full Amenities on Both Sides:Per Banff Trail ARP recommended fixtures, however requires 21.6m of road right-of-way to accommodate which isin excess of available.

Figure 3: Banff Trail Upgrade - Option 1, west side only, maintain east curband sidewalk This proposed option is approximately 15.6m wide

Figure 4: Banff Trail Upgrade - Option 2, dedicated bike lanes each way, maintain east curb and sidewalkThis proposed option is approximately 15.7m wide

Existing Banff Trail cross-section:

Option 1:

ཚ Remove northbound lane and sidewalk on the east side

ཚ Raised bicycle path on east and west sides

ཚ Sidewalk and street scape improvements on west side

The work we are doing along the Banff Trail N.W. corridor is in alignment with the Banff Trail Area Redevelopment Plan.

19-0

0376

931

Page 12: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Figure 1: Existing Banff Trail Cross Section:Available ROW varies approx. 15.8m at south end adjacent 16 Ave to approx. 15.5m near BanffTrail LRT Station.

Figure 2: Banff Trail with Desired Full Amenities on Both Sides:Per Banff Trail ARP recommended fixtures, however requires 21.6m of road right-of-way to accommodate which isin excess of available.

Figure 3: Banff Trail Upgrade - Option 1, west side only, maintain east curband sidewalk This proposed option is approximately 15.6m wide

Figure 4: Banff Trail Upgrade - Option 2, dedicated bike lanes each way, maintain east curb and sidewalkThis proposed option is approximately 15.7m wide

Existing Banff Trail cross-section:

Option 2:

Ban� Trail N.W. cross-section: The options (cont.)

ཚ Remove northbound lane and sidewalk on the east side

ཚ Cycle track on west side

ཚ Sidewalk and street scape improvements on west side

19-0

0376

931

Page 13: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Figure 1: Existing Banff Trail Cross Section:Available ROW varies approx. 15.8m at south end adjacent 16 Ave to approx. 15.5m near BanffTrail LRT Station.

Figure 2: Banff Trail with Desired Full Amenities on Both Sides:Per Banff Trail ARP recommended fixtures, however requires 21.6m of road right-of-way to accommodate which isin excess of available.

Figure 3: Banff Trail Upgrade - Option 1, west side only, maintain east curband sidewalk This proposed option is approximately 15.6m wide

Figure 4: Banff Trail Upgrade - Option 2, dedicated bike lanes each way, maintain east curb and sidewalkThis proposed option is approximately 15.7m wide

Existing Banff Trail cross-section:

Option 3:

ཚ Remove northbound lane and sidewalk on the east side

ཚ Cycle track on east side

ཚ Sidewalk and street scape improvements on west side

Ban� Trail N.W. cross-section: The options (cont.)

19-0

0376

931

Page 14: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Do you have any additional feedback in regards to the Ban� Trail area as a whole?Please fill out a post-it note and leave it on this board.

19-0

0376

931

Page 15: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Last year’s engagementWhat we heardFrom our community engagement last fall, the following themes emerged:

ཚ Desire for sidewalks throughout the Motel Village area to be widened

ཚ Increase mobility and accessibility

ཚ Desire for increased lighting in the Crowchild Trail underpass

ཚ No desire for permeability in the noise wall on the south side of 16 Avenue N.W.

Please Note: A copy of the full What We Heard Report is available online at: www.calgary.ca/Ban�TrailAreaImprovements

19-0

0376

931

Page 16: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

Last year’s engagementWhat we did (cont.)Below are the themes that were identi�ed as factors in our engagement, and the con�rmed scope based on this feedback:

Theme Confirmed ScopeIncrease mobility and accessibility

Build a new ramp connecting to the existing pedestrian bridge near Ban� Trail. The pedestrian bridge is not to be replaced.Extend active modes and public realm improvements along Ban� Trail N.W. from 16 Avenue N.W. to 23 Avenue N.W.

A desire for increased lighting in the underpass

Enhance pedestrian underpass at Crowchild Trail & 16 Avenue N.W. including lighting and new pathway.

A desire for sidewalks throughout the Motel Village area to be widened

Improvements to the public realm on the north side of 16 Avenue N.W., adding sidewalks on 24 Street N.W., and improving the public realm on Ban� Trail N.W.

No desire for permeability in the noise wall on the south side of 16 Avenue N.W.

Replacement of the noise wall insulating Briar Hill Community.No new openings in noise wall are being added.

19-0

0376

931

Page 17: Banff Trail Area Improvements - Open House presentation ... · Existing Banff Trail cross-section: Option 1: ཚ Remove northbound lane and sidewalk on the east side ཚ Raised bicycle

1. Visit calgary.ca/BanffTrailAreaImprovements to learn more about the project and to provide feedback online from June 11-25.

2. We’ll be back in the fall to touch base with you.

Next steps