3
wastewater pond wastewater pond Ajana Kalbarri Road approx. 2 km Binnu Road West approx. 7 km 50 0 m b o re 150 m industry 500 m was t e w a te rpo nd AJANA ROAD FIRST FIFTH STREET THIRD SECOND ST WARRIBANNO CHIMNEY FOURTH STREET ROAD ROAD STREET STREET STREET FIRST WARRIBANNO CHIMNEY 28 29 23 22 20 1 21 3 15 16 9 4 6 5 2 17 7 8 19 24 10 18 11 13 14 12 27 Barrel Well Layout Plan 1 - Living Area 0 50 100 150 Metres Perth Broome Karratha Geraldton Port Hedland Kalgoorlie Kununurra Newman S Esperance NT SA MID WEST location map Barrel Well Draft Version 2 N This layout plan does not constitute development approval. It is the responsibility of the developer to ensure that all relevant consents, approvals, licences and clearances are in place prior to commencing physical works on the site. Organisations responsible for such matters may include land owner, local government, incorporated community council, native title representative body, Department of Environment Regulation, Aboriginal Cultural Materials Committee, Environmental Protection Authority, Department of Commerce and the Department of Water. MGA Zone 50, GDA 94 Top left : 263655, 6904825 Bottom right : 265030, 6904100 Settlement layout lots are not derived from calculated dimensions. Cadastral data supplied by the Western Australian Land Information Authority (Licence LI 782-2015-1). Extraction date of cadastre 30/11/2015. Features derived from as-constructed survey data provided by Sinclair Knight Merz. Last completed survey date 15/11/2005, updated 1/05/2008 December 2011 aerial image provided by Landgate. Map document: Barrel Well LP1 DV2 - Living Area.mxd Layout plan prepared by Department of Planning. © Western Australian Planning Commission Community Traditional Owners WAPC Local Government Layout Plan 1 endorsement - - - - WAPC - Amendment 1 endorsement WAPC 23 April 2013 RATIFIED DRAFT Land Use community industrial open space public utility recreation residential road reserve rural waterway Land Administration cadastre settlement layout lot (SL-lot) recommended settlement zone SL-lot number 62 settlement zone Exclusion Boundary industry wastewater drinking water source wellhead protection zone

Barrel Well Layout Plan 1 Draft Version 2 map-set · Barrel Well Layout Plan 1 Draft Version 2 map-set Author: Department of Planning Subject: Barrel Well Layout Plan 1 Draft Version

Embed Size (px)

Citation preview

Page 1: Barrel Well Layout Plan 1 Draft Version 2 map-set · Barrel Well Layout Plan 1 Draft Version 2 map-set Author: Department of Planning Subject: Barrel Well Layout Plan 1 Draft Version

wastewaterpond

wastewaterpond

Ajana

Kalbar

ri Road

approx

. 2 km

Binnu

Road

West

appro

x. 7 k

m

500 m bore

150 m industry

500 m wastewater pond

AJANA

ROAD

FIRST

FIFTH

STREET

THIRD

SECOND

ST

WARR

IBAN

NO C

HIMN

EY

FOURTH

STREET

ROAD

ROAD

STREET

STREET

STRE

ET

FIRST

WARR

IBANN

O CH

IMNE

Y

28

29

23

22

20

1 21

315

16

94

6

5

2

17

7

8

19

24

10

18

11

13 14

12

27

Barrel Well Layout Plan 1 - Living Area

0 50 100 150Metres

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAlice

Sp rin gs

Esperance

NT

SA

MID WEST

location map

Barrel Well

Draft Version 2

N

This layout plan does not constitute development approval.It is the responsibility of the developer to ensure that all relevantconsents, approvals, licences and clearances are in place prior tocommencing physical works on the site. Organisations responsible forsuch matters may include land owner, local government, incorporatedcommunity council, native title representative body, Department ofEnvironment Regulation, Aboriginal Cultural Materials Committee,Environmental Protection Authority, Department of Commerce and theDepartment of Water.

MGA Zone 50, GDA 94Top left : 263655, 6904825Bottom right : 265030, 6904100

Settlement layout lots are not derived from calculated dimensions.

Cadastral data supplied by the Western Australian Land InformationAuthority (Licence LI 782-2015-1).Extraction date of cadastre 30/11/2015.Features derived from as-constructed survey data providedby Sinclair Knight Merz.Last completed survey date 15/11/2005, updated 1/05/2008December 2011 aerial image provided by Landgate.Map document: Barrel Well LP1 DV2 - Living Area.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

Community

Traditional OwnersWAPC

Local Government

Layout Plan 1 endorsement--

--

WAPC -Amendment 1 endorsement

WAPC 23 April 2013RATIFIED DRAFT

Land Usecommunityindustrialopen spacepublic utilityrecreation

residentialroad reserveruralwaterway

Land Administrationcadastre

settlement layoutlot (SL-lot)

recommendedsettlement zone

SL-lot number62settlement zone

Exclusion Boundary

industrywastewater

drinking water sourcewellhead protection zone

Page 2: Barrel Well Layout Plan 1 Draft Version 2 map-set · Barrel Well Layout Plan 1 Draft Version 2 map-set Author: Department of Planning Subject: Barrel Well Layout Plan 1 Draft Version

500m bore

500 m wastewater pond

26

24

27

25

ROAD

AJANA

FIFTH

WARR

IBANN

O CH

IMNE

Y

ROAD

ROAD

STREET

WARR

IBAN

NO C

HIMN

EY

FIRST

STREET

Barrel Well Layout Plan 1 - Context

0 100 200 300Metres

location map

NT

SA

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAlice

Sp rin gs

Esperance

NT

SA

MID WEST

Barrel Well

Draft Version 2

N

This layout plan does not constitute development approval.It is the responsibility of the developer to ensure that allrelevant consents, approvals, licences and clearances are inplace prior to commencing physical works on the site.Organisations responsible for such matters may include landowner, local government, incorporated community council,native title representative body, Department of EnvironmentRegulation, Aboriginal Cultural Materials Committee,Environmental Protection Authority, Department of Commerce,and the Department of Water.

WesternAustralianPlanningCommission

MGA Zone 50, GDA 94Top left : 262885, 6906110Bottom right : 265358, 6903055

Settlement layout not derived from calculated dimensions.

Cadastral data supplied by the Western AustralianLand Information Authority (Licence LI 782-2015-1).Extraction date of cadastre 30/11/2015December 2011 aerial image provided by LandgateMap document : Barrel Well LP1 DV2 - Context.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

Community

Traditional OwnersWAPC

-Local Government

Layout Plan 1 endorsement-

--

WAPC -Amendment 1 endorsement

WAPC 23 April 2013RATIFIED DRAFT

Land Administration

67

recommendedsettlement zone

cadastre

settlement layoutlot (SL-lot)SL-lot numbersettlement zone

Land Usecommunityindustrialopen spacepublic utilityrecreationresidentialroad reserveruralwaterway

Exclusion Boundarydrinking water sourcewellhead protection zoneindustrywastewater

Page 3: Barrel Well Layout Plan 1 Draft Version 2 map-set · Barrel Well Layout Plan 1 Draft Version 2 map-set Author: Department of Planning Subject: Barrel Well Layout Plan 1 Draft Version

WARR

IBANN

O C

HIMNE

Y

ROAD

WARR

IBANN

O C

HIMNE

Y

ROAD

Lot 4659Freehold

Lot 4656Freehold Lot 4661

Freehold

Lot 4656Freehold

Lot 10134Freehold

Lot 11991Crown reserve 1475

Aboriginal Lands Trust

Lot 11991Crown reserve 1475

Aboriginal Lands Trust

Barrel Well Layout Plan 1 - Land Ownership

location map

NT

SA

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAlice

Sp rin gs

Esperance

NT

SA

MID WEST

Barrel Well

Draft Version 2

0 100 200 300Metres

N

This layout plan does not constitute development approval.It is the responsibility of the developer to ensure that allrelevant consents, approvals, licences and clearances are inplace prior to commencing physical works on the site.Organisations responsible for such matters may include landowner, local government, incorporated community council,native title representative body, Department of EnvironmentRegulation, Aboriginal Cultural Materials Committee,Environmental Protection Authority, Department of Commerce,and the Department of Water.

WesternAustralianPlanningCommission

MGA Zone 50, GDA 94Top left : 262785, 6906230Bottom right : 265450, 6902930

Settlement layout not derived from calculated dimensions.

Cadastral data supplied by the Western AustralianLand Information Authority (Licence LI 782-2015-1).Extraction date of cadastre 30/11/2015Map document : Barrel Well LP1 DV2 - Land Ownership.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

Community

Traditional OwnersWAPC

-Local Government

Layout Plan 1 endorsement-

--

WAPC -Amendment 1 endorsement

WAPC 23 April 2013RATIFIED DRAFT

Land Administration

recommendedsettlement zone

cadastre

settlement layout lotsettlement zone

Land Ownershipcrown reserve

freehold

other

unallocated crown land