24
BASF’s Roadmap To ISO 50001 Certified Energy Management System Singapore, 9/10/2018

BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

BASF’s Roadmap To

ISO 50001 Certified

Energy Management

System

Singapore, 9/10/2018

Page 2: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Sustainability

14.11.20182

We create chemistry for a

sustainable future

• Sourcing and producing responsibly

• Acting as a fair and reliable partner

• Connecting creative minds to find the best solutions for market needs

Energy Verbund

Combined heat and

power

Energy Management,

Energy Efficiency and

ISO 50001

Renewable energies

Sustainable energy supply

for production sites

Energy is one of the main cost drivers of production. Therefore an

efficient energy generation and use of energy in the production is

very essential for BASF.

Page 3: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

2020 Goal

Increase energy efficiency

Baseline 2002

BASF operations incl. Oil & Gas

+35%

Specific Energy Efficiency IncreaseSpecific Energy Efficiency Increase Implement EnMS

2020 Goal

Coverage of our primary

energy demand through

certified energy management

systems at all relevant sites

BASF operations incl. Oil & Gas

90%

Energy Goals – At BASF Group Level

14.11.20183

2020 Goal

Reduction of greenhouse gas

emissions per metric ton of

sales product

Baseline 2002

BASF operations incl. Oil & Gas

-40%

Page 4: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Energy Goals – Asia Pacific Rollout Plan

14.11.20184

No Legal Entity / Site / Location Country ISO 14001 ISO 9001 ISO 50001 EnMS Rep. country

1 BASF Company Ltd. / BK / Yeosu Korea Yes Yes Yes Jae Goo Kang

2 BASF Company Ltd./ BK / Ulsan (Chemicals) Korea Yes Yes Yes Jae Goo Kang

3 BASF Company Ltd./ BK / Gunsan Korea Yes Yes Yes Jae Goo Kang

4 BASF Company Ltd./ BK / Ulsan Pigment Korea Yes Yes Yes Jae Goo Kang

5 BASF Company Ltd./ BK / Ansan Korea Yes Yes Yes Jae Goo Kang

6 BASF Company Ltd. / BK / Yesan Korea Yes Yes Yes Jae Goo Kang

7 BASF Polyurethanes (China) Co. Ltd. / SBPC / Caojing China Yes Yes Yes Hans Liu

8 BASF Chemicals Co., Ltd./ BACH / Caojing China Yes Yes Yes Hans Liu

9 BASF Auxiliary Chemicals Co., Ltd./ BACC / PuDong China Yes Yes 2017 Hans Liu

10 BASF Specialty Chemicals (Nanjing) Co. Ltd./ BSNJ / Nanjing China No Yes Yes Hans Liu

11 BASF Polyurethanes (Chongqing) Co. Ltd. /BPCC / Chongqing China Yes Yes 2018 Hans Liu

12 BASF Catalysts (Shanghai) Co. Ltd. / BCSC / Jinqao China Yes Yes 2017 Hans Liu

13 BASF Polyurethane Specialties Ltd./ BAPS / PuDong China Yes Yes 2017 Hans Liu

14 BASF Care Chemicals (Shanghai) Co. Ltd./ BCCS / Jinshan China Yes Yes 2017 Hans Liu

15 BASF India Ltd. / BIL / Dahej India Yes Yes 2018 Bino Pariyaram

16 BASF India Ltd. / BIL/ Ankleshwar / Diamond Dye Chem India Yes Yes 2019 Bino Pariyaram

17 BASF India Ltd. / BIL / Mangalore India Yes Yes 2017 Bino Pariyaram

18 BASF India Ltd./ BIL / Thane India Yes Yes 2019 Bino Pariyaram

19 BASF (Thai) Ltd. / BTL / Rayong Thailand No Yes 2018 Manatchai Petmuang

20 BASF (Thai) Ltd./ BTL / Bangpakong Thailand Yes Yes 2018 Manatchai Petmuang

21 BASF Petronas Chemicals Sdn. Bhd. / BPC / Kuantan Malaysia Yes Yes 2020 Jason Ong

22 Toray-BASF PBT Resin Sdn. Bhd./ TBPR / Kuantan Malaysia No Yes 2018 Mohd Borhan bin Saleh

23 BASF South East Asia Pte. Ldt./ BSEA / Jurong Island Singapore No Yes 2017 HueyLing Siah

Page 5: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Energy Goals – Responsible Care Management System

14.11.20185

RC-Code 0 Organization

RC-Code 1 Product Stewardship

RC-Code 2 Transport and Distribution Safety

RC-Code 3 Occupational Safety

RC-Code 4 Occupational Health

RC-Code 5 Process Safety

RC-Code 6 Environmental Protection

RC-Code 7 Emergency Response

RC-Code 8 Communication

RC-Code 9 Security

RC-Code 10 Energy

Responsible Care® is a voluntary initiative of the chemical industry to

continuously improve in the areas of environmental protection, health

and safety.

Responsible Care® is part of BASF’s company policy and is covered by

10 topics, which are expressed in the 10 RC-codes.

EnergyWe are committed to energy efficiency

and global climate protection. Providing

our production sites with a reliable

supply of energy is a prerequisite for

optimized and economical production.

We increase energy efficiency along

the value chain and utilize, for

example, modern technologies for

generating steam and electricity,

energy-efficient production processes,

and comprehensive energy management

Page 6: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

The Roadmap

14.11.20186

Global Energy Target mandated by BASF board

Responsible Care® requirement under RC-Code 10: Energy

Local legal requirement to implement structured EnMS for existing facilities

under Enhanced ECA

Goal: Implement ISO 50001 EnMS

?

Challenge #1

■ First time setting up an EnMS

– what are the requirements

and how can it be done?

Page 7: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Resources – Publications, Training, Consultancy

14.11.20187

Publications

ISO

50001:2011

Family of

Standards

BASF Group

Directive

Energy

BASF Global

Guidance

Document on

ISO 50001

implementation

BASF

Handbook: Best

Practices in

Energy

Efficiency

BASF EnMS

Handbook

Existing ISO

9001 Quality

Management

System

Procedures of existing management systems can be applied to ISO

50001 EnMS where requirements overlap

Page 8: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Resources – Publications, Training, Consultancy

14.11.20188

Training

External Training Courses

E.g.

■ IRCA Certified ISO 50001 Energy

Management System – Lead Auditor

Training

ISO 50001 EnMS consultant

■ Develop documented

EnMS

■ Provide internal auditor

training

Consultancy

Annual Regional Energy Workshop

■ 2-3 Nov, 2017 at BASF Shanghai Pudong,

China

■ 27-29 Sep, 2016 at BASF Kuala Lumpur,

Malaysia

Page 9: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

The Roadmap

14.11.20189

Global Energy Target mandated by BASF board

Responsible Care® requirement under RC-Code 10: Energy

Local legal requirement to implement structured EnMS for existing facilities

under Enhanced ECA

Goal: Implement ISO 50001 EnMS

?

Challenge #2

■ How to ensure commitment

from top management to

support EnMS?

Page 10: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Commitment

14.11.201810

Co

mm

itm

en

t

■ Defining, establishing,

implementing and maintaining

an Energy Policy

Written Commitment

■ Forming an energy management

team

■ Appointing the management

representative

Personnel Commitment

■ Allocating budget for

consultancy, training,

measuring instruments and EE

measures

Financial Resource Commitment

Page 11: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Schedule

14.11.201811

Nov

17

Dec

17

Jan

18

Mar

18

02 – 03 Nov Internal Auditor

Training

17 Nov – 01

Dec

Internal Audit

20 Nov Stage 1 Audit

29 Nov Management

Review

04 – 05 Dec Stage 2 Audit

End Jan Certification by BSI

Mar RC audit 2018

(ISO 50001

certification is a

requirement)

May

17

Jun

17

Aug

17

21 – 25 Aug External Lead

Auditor Training

09 Jun ISO 50001

EnMS

Awareness

Training

08 May Kickoff meeting

with consultant

■ Establish EnMS Policy & Procedures

■ Energy review – identify energy sources, energy

consumers and SEUs

■ Establish Energy Baseline

■ Identify EnPIs

■ Set Energy Objectives and Targets

■ Identify and implement EE measures

Page 12: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Anti-oxidant Plant In Jurong Island

14.11.201812

️Electricity

Natural

GasSteam

Raw Materials

Product Portfolio

■ Irgafos® 168 Process stabilizers

■ Irganox® 1010 Anti-oxidants

■ Metilox

■ Irganox® L135 /

1135

■ Free Flow (FF)

■ B-Blend

Page 13: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Energy Planning –

Identify Energy Sources, Energy Use & SEUs

14.11.201813

■ All energy-consuming equipment

are identified from master

equipment list or SAP system.

■ Energy-consuming equipment

consume steam, electricity or

natural gas which are purchased

or imported across the battery limit

into the site.

■ Significant energy use – Energy

use accounting for substantial

energy consumption and/or

considerable potential energy

performance improvement.

Significance criteria are

determined by the organization.

Significance

criterion:

energy consumption

> 15% of total energy

source in site

349 energy-

consuming

equipment

36 energy

use5 SEUs

Page 14: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Energy Planning –

Energy Performance Indicator (EnPI)

14.11.201814

1 x

site level

3 x

plant level

5 x

SEU level

■ Energy Performance Indicator

(EnPI) – quantitative value or

measure of energy performance, as

defined by the organization.

■ EnPIs could be expressed as

► A simple metric

► Ratio

► A more complex model

■ EnPIs are monitored and reported

monthly and compared against the

Energy Baseline (EnB) or Energy

Target

Page 15: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Linear Regression equation for EnB:

No. SEUEnPI

DescriptionEnPI Type β1 x1 β0 x0

- SiteMWh-Energy /

kt-Production

Statistical

model1,149.366

Total site

production (kt)1,504.385 1

- Metilox PlantMWh-Energy /

kt-Metilox

Statistical

model534.201

Metilox

production (kt)309.283 1

- IF168 PlantMWh-Energy /

kt-IF168

Statistical

model1,091.814

IF168

production (kt)220.518 1

- IX1010/L135 PlantMWh-Energy /

kt-IX1010/L135

Statistical

model1,129.240

IX1010/L135

production (kt)455.241 1

1 K240 Distillation ColumnMWh-Steam /

kt-MeOH

Statistical

model652.809

MeOH

production (kt)18.906 1

2 IX1010/L135 Process HeatingMWh-Steam /

kt-IX/L135

Statistical

model426.823

IX1010/L135

production (kt)160.205 1

3 Hot Oil Heater

MWh-Natural

Gas / MWh-

Hot Oil

Ratio of

measured

value

1.883Hot oil thermal

output (MWh)0.000 1

4 Glycol Chillers

kW-Electricity

/ RT-Cold

Glycol

Ratio of

measured

value

3.666

Glycol chiller

cooling output

(RTh)

0.000 1

5 Utility Pumps

MWh-

Electricty / kt-

Production

Ratio of

measured

value

86.989Total site

production (kt)0.000 1

EnPI EnB

Lin

ear

Reg

ressio

n

y = mx + c

Ref. ISO 50006

Energy Planning – Energy Baseline (EnB)

14.11.201815

2016 E

nerg

y P

erf

orm

an

ce D

ata

Mo

nit

or

En

PI

ag

ain

st

En

Bo

r Targ

et

Fixed energy cost

independent on

production

Variable energy

cost dependant on

production

Target is achieved if EnPI is below red line

Page 16: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Energy Goals –

At BASF Jurong Island Site Level

14.11.201816

■ To achieve 5% reduction in

variable energy component of site

SEC as compared to Y2016

baseline

► Maintain SEC to <10% poor

performance deviation from

EnB or target

Energy Goals for Y2018

Page 17: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

The Roadmap

14.11.201817

Global Energy Target mandated by BASF board

Responsible Care® requirement under RC-Code 10: Energy

Local legal requirement to implement structured EnMS for existing facilities

under Enhanced ECA

Goal: Implement ISO 50001 EnMS

?

Challenge #3

■ How to carry out

measurement where there is

no instrument?

Page 18: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Monitoring & Measurement

14.11.201818

Fie

ld M

easu

rem

en

t

■ Data from custody transfer

meters and supplier

invoices is taken in

monitoring of energy

consumption.

■ Meters are installed at the

site, plant and equipment

level.

■ Instrument calibration plan

is established and records

of calibration are kept.

■ Portable meters are used

to take measurements as

and when required.

■ Hot tapping was carried

out to install thermowell to

take temperature

measurement

DCS

■ Utilities consumption is

monitored real-time in the

DCS.

PI Database

■ Historical energy

consumption data is stored

in OSIsoft PI database

which can then be

extracted to Excel

22X091F52

7.18

t/hr

22X091F60

7.74

t/hr

22X091P50

17.95

barg

22X091P51

17.90

barg

S18 (BASF METER) STEAM SUPPLY FROM SUT S18 (SUT METER) STEAM 18 BARG

1/9/2018 12:00:00 AM1/8/2018 12:00:00 AM 31.00 days

Plot-0

0

2

4

6

8

10

12

14

16

18

20

0

20

0

20

0

20

EnPI Reporting

■ Energy consumption is reported

monthly and tracked against

production throughput.

■ Where measured data is

unavailable or meter is faulty,

energy consumption at the SEU or

equipment level is estimated using

energy balance.

■ EnPIs are derived based on

measured or estimated data and

reported monthly.

Page 19: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Action Plans & Energy Efficiency Measures

14.11.201819

OPEX measures

■ Process optimization and improvement

are continually studied and implemented

in BASF Jurong Island to increase

productivity and energy efficiency.

■ Example of a low investment EE measure

is the bypassing of heating step in the

Irganox® crystallization process, which

yielded an annual energy reduction of

287,621 kWh in steam consumption.

CAPEX projects

■ In 2015, old water chiller (COP ~3.6) was replaced with new unit (COP

~4.4) which comes with 3 cooling circuits, economizers and PHE.

■ In 2018, old glycol chiller (COP ~1.5) which supplies cold glycol at -

18°C will be replaced with a more energy efficient unit (COP >2.2),

which incorporates VSD and economizer in its design.

■ Expected annual energy savings of 1.55 GWh or ~$200 k could be

expected.

■ EE measures are identified and tracked

in monthly EnPI reports and via OpEx

database.

■ Best practices from OpEx plan are

shared.

OP

EX

da

tab

as

e

Page 20: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Action Plans & Energy Efficiency Measures

14.11.201820

Response to deviations in energy performance

SEC of Glycol Chillers SEC of Water ChillersLow flow due to plugged strainer

SEC normalized after

strainer de-plugging

SEC improved after

strainer de-plugging

■ Deviation in energy performance of glycol chillers was found when

VSD output of glycol pump became 100%. Normal output should have

been ~80%.

■ Pump suction strainer was found plugged and SEC could be

normalized after strainer de-plugging

■ Deviation in energy performance of water chillers was found when flow

meter reading measures only ~80 m3/h chilled water flow. Design

chilled water is 117 m3/h.

■ Chiller inlet strainer was found plugged and SEC could be greatly

improved after strainer de-plugging.

Page 21: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Post reward per implemented

measure

Post reward based on

criteria set and extent of

savings

Reward = Feasibility x

Originality x Value Creation

Employee Suggestion Scheme (ESS)

14.11.201821

About Employee Suggestion Scheme (ESS)

The Employee Suggestion Scheme is designed to drive the culture of innovation and continuous improvement in MY-SG Business Area. Employees are encouraged to participate by proposing innovative and valuable ideas. The process is simple and outstanding suggestions will be rewarded.

Scope

BMS, BSEA (excluding Suntec, BASF Learning Campus & Chemetall), and BASF See Sen ESS covers ideas that:

Improve environment Identify and eliminate hazards Increase safety awareness and quality control Achieve significant cost savings; efficiency in operation procedures Improve relationships among sales and/or with customers Improve personal accountability in safety Or any other improvement deemed meaningful and necessary but not defined in current standard procedures

ESS excludes: Suggestions which fall within the employee‘s job scope Suggestions, such as;

● Implementation of general safety related corrective measures ● Revert to previous practices that have been implemented at earlier time at the same site ● BU driven initiatives

Rewards Initial Reward: Given to proposals which pass the pre-evaluation Proposed amount: USD 50 per suggestion (aligned with internal recognition award) Post Reward: Given to proposals with contributions to the company based on the proposed criteria. Amount of reward depends on the extent of savings, but capped at Euros $5,000 or 0.75 of monthly base salary whichever is lower.

What You Need To Do?

Submit your ideas via the Employee Suggestion Scheme site!

ONE Business Growth Plan

Idea Management Scheme Employee Suggestion Scheme

Old system in place before 1st

August 2018

New system rolled out after

1st August 2018

Usually initiated by plant

operations or maintenance

All are encouraged to initiate

suggestions

Long process of idea

evaluation by Idea

Management Team

Idea evaluation by Duty

Manager within 1 month

No initial reward Initial reward per suggestion

Page 22: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Employee Suggestion Scheme (ESS)

14.11.201822

Achieves ISO 50001 requirement Clause 4.5.3 Communication

Meets the target of continuous improvement by being open to new ideas

Employee involvement and open channel for feedback at all levels

Employee recognition by awarding certificate and a non-cash token from Corporate Affairs

Best practices sharing with all employees through quarterly report and annual ESS campaign

Improve environment

(reduce waste or pollutant emission)

Identify and eliminate hazards

Improve product or service

quality

Achieve significant cost

savings; efficiency in operation

procedures

Improve communication

efficiency

Increase awareness and

improve personal

accountability in safety

📧 EE idea

submitted here

ESS covers...

Page 23: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and

Energy Management

14.11.201823

Energy Policy

Energy Performance

Indicator

Energy Baseline

Energy Targets

Action PlansDesign

Operational Control

Procurement

Monitoring & measurement

In general, energy management is each and every kind of action that aims at optimizing energy use.

As an energy-intensive company, we are committed to energy efficiency and global climate protection.

Active energy management is the consequence of our commitment.

Energy

Management

Page 24: BASF’s Roadmap To · 2018. 11. 21. · Energy Goals –Responsible Care Management System 5 14.11.2018 RC-Code 0 Organization RC-Code 1 Product Stewardship RC-Code 2 Transport and