59
Basin-Scale Hydropower and Environmental Opportunity Assessments A framework for identifying and evaluating hydropower and environmental opportunities and linkages Simon Geerlofs, Jerry Tagestad, Kyle Larson, Kenneth Ham, Sara Niehus, Marshall Richmond Pacific Northwest National Laboratory Deschutes Basin Stakeholder Webinar 1/30/1 1 PNNL-21936

Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Basin-Scale Hydropower and Environmental Opportunity Assessments A framework for identifying and evaluating hydropower and environmental opportunities and linkages

Simon Geerlofs, Jerry Tagestad, Kyle Larson, Kenneth Ham, Sara Niehus, Marshall Richmond

Pacific Northwest National Laboratory Deschutes Basin Stakeholder Webinar 1/30/1

1 PNNL-21936

Page 2: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Acknowledgements

We’d like to acknowledge support for this project from the Department of Energy, Wind and Water Power Technology Office, as well as our partnership with the US Army Corps of Engineers and the Bureau of Reclamation, through the Sustainable Hydropower MOU. The help and support from Deschutes Basin stakeholders and our national steering committee. And the contributions of our technical team at PNNL and ORNL

2

Page 3: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Introduction

3

! Webinar Goals ! Basin Scale Opportunity

Assessment Overview ! Deschutes Pilot Assessment

Process

Page 4: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Webinar Goals

4

! Webinar housekeeping— o  Phone/computer on mute o  type questions in to chat box o  Webinar will be recorded o  presentations available o  If you’re having trouble with computer

audio, dial in: o  866-528-1882 code: 8189027

! Context (Simon Geerlofs) ! RiverWare Model—a flexible

planning tool (Sara Niehus) ! Interpretation of modeling results

(Kenneth Ham) ! Facilitated discussion

Page 5: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

5

! Can we increase hydropower and improve environmental conditions within a given river basin?

Page 6: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Hydropower MOU

6

MOU for Hydropower among DOE, DOI and DOA

•  Signed in March 2010, MOU highlights 7 key areas for interagency collaboration.

–  Assessments of energy generation potential and analysis of potential climate change impacts to energy generation at federal hydropower facilities

–  Exploring opportunities for collaboration across entire river basins to increase generation and improve environmental conditions

–  Green Hydropower Certification –  Federal Inland Hydropower Working Group –  Joint development and demonstration of advanced technologies –  Renewable Energy Integration and Energy Storage –  Facilitate permitting for federal and non-federal projects at federal

facilities

Page 7: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Summary of work in the Deschutes ! Spring, 2011—Site visit and meetings with environmental community,

irrigators, and PGE. ! Crooked and Upper Deschutes: Bowman, Wikiup, Juniper Ridge,

Ponderosa, PRB ! Late Summer, 2011—Bend stakeholder workshop

! 48 stakeholders ! Opportunity identification ! Research agenda

! October, 2011—Preliminary Assessment Report ! February, 2012—Seattle modeling workshop with Bureau, OWRD, and DRC ! July, 2012—Site visit II: Scenario scoping with “Logistics Committee” ! Feb1, 2013—Second stakeholder workshop—Preliminary Results ! Feb-July—RiverWare validation ! September presentation at Small Hydro Workshop in Bend ! Final Report under review—January, 2014 ! Webinar to share final results more broadly (today) ! Evaluation interviews in Spring ! Products available at basin.pnnl.gov

7

Page 8: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

8

Issues Opportunities Scenarios Evaluate

Page 9: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes Step 1

Identify environmental issues (2011) ! Water quality, instream habitat, fish passage, natural

storage, floodplain, protection status, etc.

! High-level scoping fed by stakeholder engagement and review of existing assessments

! Focus on reach-specific opportunities related to changes in hydrologic regime ! Upper and Middle Deschutes River ! Tumalo and Whychus creeks ! Lower Crooked River

9

Page 10: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes Step 2

Identify reach-specific opportunities to help address environmental issues (2012) An opportunity is a proposed change to the operation or management of the river system that is expected to provide some benefit

! Enhance flow (timing, magnitude, duration, conservation) ! Restoration (riparian health, bank stability, stream complexity)

! Key assessments ! Deschutes Subbasin Plan (NPCC 2004) ! Upper Deschutes Subbasin Assessment (UDWC 2003) ! DWA Instream Flow in the Deschutes Basin: Monitoring, Status,

and Restoration Needs (Golden & Aylward 2006)

10

Page 11: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes Step 3

Identify hydro opportunities (2011) ! Powering non powered dams

! BOR facilities, municipal facilities, opportunities related to irrigation reservoirs

! New small hydro in irrigation canals and conduits

! Flow shaping to maximize hydro value—Pelton-Round Butte

! Existing BOR, NUID, COID assessments and stakeholder interviews

11

Page 12: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes Step 4

Evaluate Hydropower Opportunities (2012-13): ORNL Technical and Economic Feasibility Assessment ! Hydropower Energy and Economic Assessment (HEEA) Tool

! Generate flow and power duration curves ! Determine turbine design flow, net head, and technology type ! Calculate monthly and annual power generation to determine design power

capacity ! Estimate project costs ! Perform benefits and economic evaluations

! 14 NPDs and 15 irrigation canal/conduit sites ! Four NPD sites feasible (Wickiup, Bowman, North Canal Diversion, Ochoco) ! Four canal sites feasible (Mile 45, Haystack canal, 58-11, 58-9) ! 19 MW capacity, 78 Gwh per year

! Power functions incorporated into PNNL RiverWare model

Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER DEVELOPMENT IN THE DESCHUTES RIVER BASIN. June 2013. ORNL Technical Report. http://info.ornl.gov/sites/publications/Files/Pub44168.pdf

12

Page 13: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

13

….A scenario is a set of opportunities that depend on a common resource

Page 14: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

A Scenario is a Set of Opportunities

14

Line a canal Install a Turbine

Implement Fish Passage

Alter Discharge Timing

Scenario A

Page 15: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes Scenario Scoping

! Increase minimum flow below Wickiup Dam during the non-irrigation season from 25 cfs (baseline) to 350 cfs in ~75 cfs increments

15

! Simulate water conservation measures by reducing baseline irrigation demand by 5 and 10 percent

Modify timing and amount of instream flow in upper Deschutes to benefit fish, water quality, and other ecological processes

Assess  Tension    and  Tradeoffs  

Analyze power benefits under modified flow scenarios

Assess risk to irrigation under modified flow scenarios

Page 16: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Model Implementation

16

! Combinations of scoping variables are implemented in a mass-balance river model to simulate different management scenarios

0%* 5% 10% 25* 25, 0% 25, 10% 25, 20% 100 100, 0% 100, 10% 100, 20% 175 175, 0% 175, 10% 175, 20% 250 250, 0% 250, 10% 250, 20% 350 350, 0% 350, 10% 350, 20%

Demand  Reduc+on  Levels  

Flow

 Cases  

Page 17: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

17

Page 18: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Application of RiverWare to Deschutes Basin Opportunity Assessment

Sara Niehus and Marshall Richmond Hydrology Group, Environmental Directorate Richland, WA

1

Page 19: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Our Modeling Collaborators

OWRD – Kyle Gorman, Jonathan La Marche, and Jeremy Griffin USBR – Jennifer Johnson CADWES – Edith Zagona and David Neumann

January 29, 2014 2

Page 20: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

What is a Model and Why are we using them?

Models are a replication of reality to explore complex, expensive, or dangerous alternatives to proposed scientific questions The best Models are the most accurate representations of reality RiverWare is a Model to visualize and explore many management options to aid in understanding entire basin impacts

3

Flight Simulator

Page 21: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes Case Study Outline

Background Modeling Strategy Model Inputs Infrastructure and Configuration Model Evaluation Model Outputs Model Outcomes

4

Page 22: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Background - WHY RIVERWARE?

Current capabilities: MODSIM Deschutes model was completed in 2013

Monthly hydrologic inflow and groundwater returns Capabilities RiverWare offers

Modeling transparency Daily time scale

Environmental assessment Hydropower

Water accounting Groundwater application Flexible coding for operations Data-centered design for model update ease Wide use and recognition

Entire Colorado River and Rio Grand Basins Truckee River Basin

5

Page 23: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Modeling Evaluation Strategy

Monthly inflow

MONTHLY regulated outflow, storage level, water supply

MONTHLY regulated outflow, storage level, water supply Evaluation

Historical demand

Groundwater

RiverWare MODSIM

Presenter
Presentation Notes
Common flow, common ground water, equivalent plumbing, different logic for determining operations i.e. water rights versus demand (?) PLEASE EDIT
Page 24: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Modeling Scenario Strategy

Historical demand

Groundwater

RiverWare

DAILY regulated outflow, storage level, water supply

Daily inflow

Presenter
Presentation Notes
Common flow, common ground water, equivalent plumbing, different logic for determining operations i.e. water rights versus demand (?) PLEASE EDIT
Page 25: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

RiverWare inputs from external data or models

January 29, 2014 8

Inflow from MODSIM

Historic Water Diversion

Groundwater Losses and Returns

Page 26: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Model Infrastructure

Existing hydropower capacity: Opal Springs, Siphon, Juniper Ridge, and Ponderosa

Proposed hydropower capacity:

Crane Prairie, Wickiup, Crescent Lake, Bowman, Ochoco, Monroe Drop, Mile 45, Mile 51, and NC-2 Falls

Diversion/Water Users:

31 diversions from Arnold, Central Oregon, North Unit, Ochoco, Three Sister, Swalley, Lone Pine and Tumalo irrigation district 72 Aggregated water rights accounts

60 in stream flow 12 Project Storage

Pumping Stations:

Ochoco Relift and Barnes Butte

9

Page 27: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Reservoir Storage Evaluation

January 29, 2014 10

BIAS MAE

Page 28: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Storage Evaluation– Crescent Reservoir Storage 1985 to 1990

11

RiverWare MODSIM Observed

Crescent Storage

Page 29: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Reservoir Outflow Evaluation

January 29, 2014 12

BIAS MAE

Page 30: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Reservoir Outflow Evaluation – Crescent Reservoir

13

RiverWare MODSIM Observed

Crescent Outflow

Page 31: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

NUID simulated irrigation diversion – which water was used?

14

Page 32: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

RiverWare Modeling Evaluation Summary

What works well in RiverWare? Most reservoir outflows and storage are preforming similar to MODSIM Water Diversion: Project vs. Instream Allocable flow Hydropower estimation

What can be Improved? Ochoco Inflow inputs Groundwater return inputs at and below DEBO gage Fine tuning of reservoir operations

15

Page 33: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Model Outputs

Reservoir Storage and Outflow

Stream Discharge Water Diversion

RiverWare Simulated vs. Historically Observed What water is used: Storage vs. Instream

Hydropower

Potential Megawatt Generation

16

Page 34: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

RiverWare Output of Potential Hydropower

17

Hydropower Site Avereage (MW) Max (MW)Average energy generation

per year (MWh)Crane 0.11 0.40 955Wickiup 3.89 6.71 34,124Crescent 0.08 0.42 707Ochoco 0.19 2.15 1,646Prineville 0.56 5.08 4,898Monroe Drop (NUID) 0.27 0.45 2,329Mile 45 (NUID) 0.87 1.47 7,608Mile 51 (NIUD) 0.63 1.07 5,542NC2 Falls (COID) 0.99 3.62 8,658

Riverware Calculated Generation with 1980 - to 2000 hydrologic history

Page 35: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Simulated Potential Hydropower

18

Hydropower Site Avereage (MW) Max (MW)Average energy generation

per year (MWh)Crane 0.11 0.40 955Wickiup 3.89 6.71 34,124Crescent 0.08 0.42 707Ochoco 0.19 2.15 1,646Prineville 0.56 5.08 4,898Monroe Drop (NUID) 0.27 0.45 2,329Mile 45 (NUID) 0.87 1.47 7,608Mile 51 (NIUD) 0.63 1.07 5,542NC2 Falls (COID) 0.99 3.62 8,658

Riverware Calculated Generation with 1980 - to 2000 hydrologic history

Page 36: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes stakeholder driven scenario case

Wickiup Minimum Outflow (cfs) 25 100 175 250 350

Water supply reduction for NUID (%)

0 5 10

19

Page 37: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Wickiup Power Production with Various minimum flows – 0% Water Reduction

20

Page 38: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes RiverWare Outcomes

Water supply reductions throughout the basin affect: Instream flows Water users Reservoir Storage/Outflow

Site specific power potential

Operation minimum out of Wickiup outflows affect:

Hydropower generation capacity at Wickiup and downstream hydropower location Available in stream and project water for many diversions

21

Page 39: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

What benefits to the basin does this RiverWare model provide

Investigate proposed planning: How will environmental, water use, operations and hydropower potential all be impacted Run many potential case to find out when can all interests be met

How will climate change effect our basin and what stress will we encounter?

22

Page 40: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Thank you!

Questions?

23

Page 41: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

January 30, 2014 1

Scenario Based Modeling Results for the Deschutes River Basin

KENNETH D. HAM, PH.D.

Page 42: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Common Tools Create Shared Understanding of Costs and Benefits

Deschutes Basin ModSim and RiverWare models benefited from collaborative input from multiple groups Those models can be operated based on a range of scenarios proposed by stakeholders Model output used to evaluate value-based metrics for all stakeholders What benefits are possible at what cost

January 30, 2014 2

Page 43: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

3

Issues Opportunities Scenarios Evaluate

Page 44: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Definitions

Opportunity: a proposed change to the operation or management of the river system that is expected to provide some benefit Scenario: a set of opportunities that combine to provide a mix of benefits. Scoping: an incremental evaluation of an opportunity that reveals how the mix of benefits changes across a range of management action Value-Based Metric: a representation of an aspect of the river system that is valued by a stakeholder

January 30, 2014 4

Page 45: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

A Variety of Metrics Were Defined Around Deschutes Basin Stakeholder Values

Category Value-Based Metric Description Target Level

Applicable Scenario

Hydropower

Percent of potential energy generated during water year

200% of baseline

Deschutes & Crooked

Percent of water year where inflow to Lake Billy Chinook is 4400-4600 cfs

NA Deschutes & Crooked

Environmental

Percent of storage season (Oct 15 – Apr 15) that flow below Wickiup Dam ≥ 300 cfs

95% Deschutes

Percent of summer (Jun 1 – Aug 31) that Deschutes River below Bend ≥ 250 cfs

65% Deschutes

Irrigation Percent of NUID annual diversion request that was received

95% Deschutes & Crooked

Recreation Percent of water year that Prineville Reservoir storage ≥ 92,000 ac ft

NA Crooked

January 30, 2014 5

Page 46: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Simulation Output Reveals How Scenarios Impact Values

January 30, 2014 6

Page 47: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Visualization Tool Dashboard Displays Value-Based Metrics

Visualize modeling results to help interpret how values change and facilitate discussion

7

Page 48: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

The Upper Deschutes Scenario Includes Hydropower, Environmental, and Water Use

January 30, 2014 8

Wickiup

NUID Diversion Flow Below Bend

Page 49: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Winter Flow Below Wickiup Dam Drops Below 300cfs in Below-Average Water Years

January 30, 2014 9

0

20

40

60

80

100

1981 1983 1985 1987 1989 1991 1993 1995 1997 1999

Perc

enta

ge o

f Day

s Flo

w B

elow

Wic

kiup

>30

0cfs

Hydrologic Year

25 cfs 100 cfs 175 cfs 250 cfs 350 cfs

Page 50: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Value-Based Metrics Can be Summarized Across The 20-year Simulation Period

January 30, 2014 10

0

2

4

6

8

10

12

14

16

18

20

22

0 50 100 150 200 250 300 350 400

Num

ber

of Y

ears

Cri

teri

a M

et

Minimum Flow Below Wickiup (cfs)

≥ 300 cfs at Wickiup for ≥ 95% of storage season

Page 51: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Comparing Metrics Reveals Trade-offs

January 30, 2014 11

0

2

4

6

8

10

12

14

16

18

20

22

0 50 100 150 200 250 300 350 400

Num

ber

of Y

ears

Cri

teri

a M

et

Minimum Flow Below Wickiup (cfs)

NUID receives ≥ 95% of request

≥ 250 cfs below Bend for ≥ 65% of summer

≥ 300 cfs at Wickiup for ≥ 95% of storage season

Energy ≥ 200% of baseline

Page 52: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Greater Winter In-stream Flow can Decrease Summer In-stream Flow

January 30, 2014 12

0

10

20

30

40

50

60

70

80

90

100Pe

rcen

t of D

ays C

riter

ia M

et

Water Year

Sum of WICO metric value - 175

Sum of WICO metric value - 250

Sum of DEBO metric value - 175

Sum of DEBO metric value - 250

Page 53: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

In a Low Water Year, Higher Winter Flow Reduces Availability in Late Summer

January 30, 2014 13

0

200

400

600

800

1000

1200

1400

1600

1800

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Cub

ic fe

et p

er se

cond

Month

Avg. flow below Bend - (min flow = 175 cfs) Avg. flow below Bend - (min flow = 250 cfs)

Avg. NUID diversion - (min flow = 175 cfs) Avg. NUID diversion - (min flow = 250 cfs)

Avg. discharge at Wickiup Dam - (min flow = 175 cfs) Avg. discharge at Wickiup Dam - (min flow = 250 cfs)

Page 54: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Demand Reduction Increased the Number of Years When Metrics Met Criteria

January 30, 2014 14

0

2

4

6

8

10

12

14

16

18

20

22

0 5 10

Num

ber

of Y

ears

Cri

teri

a M

et

Demand Reduction (%)

NUID receives ≥ 95% of request

≥ 250 cfs below Bend for ≥ 65% of summer

≥ 300 cfs at Wickiup for ≥ 95% of storage season

Energy ≥ 200% of baseline

Page 55: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

These Explorations Provide Useful Information on How the System Responds

Tension between water use and instream flow Metrics changed rapidly between 175cfs and 250cfs

Water use reduction helped meet criteria in moderately low water years

Improvements fell short of criteria in lowest years Tradeoffs rarely involved hydropower generation

Generation driven by water use and instream flow

January 30, 2014 15

Page 56: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

These Tools Can Be Used to Support Discussion Among Stakeholders

Compare a range of potential management alternatives See how achieving an objective interacts with other objectives Identify critical areas for detailed analysis

January 30, 2014 16

Gary Halvorson, Oregon State Archives

Page 57: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Thank You

Questions?

January 30, 2014 17

Page 58: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Deschutes RiverWare Model Future

Model will be housed with the staff at the Bureau of Reclamation Pacific Northwest Region and PNNL

Points of Contact for Model:

PN BOR: Dawn Weidmeier [email protected] PN BOR: Jennifer Johnson [email protected]

PNNL: Simon Geerlofs [email protected] PNNL: Sara Niehus [email protected]

18

Page 59: Basin-Scale Hydropower and Environmental Opportunity … · 2020. 6. 23. · Zhang et al. TECHNICAL AND ECONOMIC FEASIBILITY ASSESSMENT OF SMALL HYDROPOWER ... CADWES – Edith Zagona

Next Steps: Beyond the Deschutes

Rapid high-level assessment approach—(90 day process, rather than multiple years)

Associate hydropower opportunities with environmental issues through a rules-based approach Identify site-specific hydro/environmental interactions Look beyond site specific interactions to system-scale

Rapid assessments underway in the Roanoke, Connecticut, and Bighorn basins FY 14: Package tools and methodologies

Provide assistance for basin stakeholders wanting to use tools 19