1
2 1 4 3 5 7 8 9 6 10 11 DRAWING: SHEET 1 OF 31 S-01 GREENE COUNTY SOIL & WATER CONSERVATION DISTRICT BOX 907 GREENE COUNTY OFFICE BUILDING CAIRO, NY 12413 PHONE: (518) 622-3620 FAX: (518) 622-0344 PROJECT: BK2020 DATE: 04/22/2020 SCALE: AS SHOWN DRAWN BY: JRB/CJL DESIGN BY: JRB/CJL REVIEWED BY: DD NYCDEP REVIEWED BY: DuLac Engineering DONALD W. LAKE JR., P.E. 361 FUNK ROAD ERIEVILLE, NY 13061 BUSINESS: (315) 662-3744 HOME: (315) 662-7521 "People in balance with Nature" DONALD W. LAKE JR., P.E. LICENSE NO. 53844 PROJECT SPONSORS NEW YORK CITY DEPARTMENT OF ENVIRONMENTAL PROTECTION 71 SMITH AVENUE KINGSTON, NY 12601 TITLE SHEET BATAVIA KILL RESTORATION AT RED FALLS - PROJECT 1 NEW YORK STATE ROUTE 23 TOWN OF PRATTSVILLE GREENE COUNTY, NY FOR SCHOHARIE BASIN STREAM MANAGEMENT IMPLEMENTATION PROGRAM BATAVIA KILL RESTORATION AT RED FALLS - PROJECT 1 PRELIMINARY DESIGN (95%) APRIL 22, 2020 PROJECT SITE LOCATION SCALE: 1" = 2000' PROJECT SITE AERIAL SCALE: 1" = 500' NO: DATE 01 SHEET NO: SHEET TITLE REVISION HISTORY DRAWING INDEX 02 04 05 TITLE SHEET USGS QUADRANGLE: PRATTSVILLE, N.Y. ASHLAND , N.Y. 03 EXISTING CONDITIONS 06 07 08 09 STREAM CHANNEL PROFILE UPPER REACH SITE PLAN CROSS SECTION 35+40 - 38+00 CROSS SECTION 38+50 - 40+50 CROSS SECTION 41+00 - 49+50 10 11 13 14 15 16 12 17 CROSS SECTION 50+00 - 55+50 2016 AERIAL IMAGERY OBTAINED FROM THE NYS GIS CLEARINGHOUSE PROPERTY LINE BOUNDARIES ARE APPROXIMATE BASED ON GREENE COUNTY REAL PROPERTY TAX DATA FOR 2018 21 22 23 REVEGETATION PLAN 18 19 20 PROJECT SITE WETLAND MITIGATION PLAN MAINTENANCE AND PROTECTION OF TRAFFIC PLAN ACCESS ROAD PROFILE DEWATERING CHANNEL PLAN AND PROFILE EROSION AND SEDIMENT CONTROL PLAN PHASE I # TAX PARCEL OWNER NAME MAILING ADDRESS ADDRESS CITY STATE ZIP 1 75.03-3-28 DEANGELIS, DANILO PO BOX 502 GRAND GORGE NY 12434 2 75.03-3-25 SANENTZ, SHAHE NAVASART 36 WENTWORTH RD. BEDMINSTER NJ 17921 3 92.00-2-5 CITY OF NEW YORK 465 COLUMBUS AVE. VALHALLA NY 10595 4 75.00-2-5 CITY OF NEW YORK 466 COLUMBUS AVE. VALHALLA NY 10595 5 75.00-2-4 SUTTON, STANLEY G. 190 ROUTE 3 PRATTSVILLE NY 12468 6 75.00-2-3 CORSON, BRIAN 133 RICHE AVE STATEN ISLAND NY 10314 7 92.00-2-4 KANE, JOHN 13291 ROUTE 23 PRATTSVILLE NY 12468 8 92.00-4-11 KANE, JOHN 13292 ROUTE 23 PRATTSVILLE NY 12468 9 75.00-4-26 CORSON, ROBERT 133 RICHE AVE STATEN ISLAND NY 10314 10 75.00-4-68 NYSDOT 50 WOLF RD ALBANY NY 12232 11 75.00-4-20 LEBEC, MARCEL 327 4TH ST BROOKLYN NY 11215 UNAUTHORIZED ALTERATION TO A MAP BEARING LICENSED PROFESSIONAL ENGINEER'S SEAL IS IN VIOLATION OF SECTION 7209, SUB-DIVISION 2, OF THE NEW YORK STATE EDUCATION LAW 145. THE CERTIFICATION IS NOT AN EXPRESS OR IMPLIED WARRANTY OR GUARANTEE; IT IS PURELY A STATEMENT OF PROFESSIONAL OPINION BASED ON KNOWLEDGE, INFORMATION AND BELIEF, BASED ON EXISTING FIELD EVIDENCE AND DOCUMENTARY EVIDENCE AVAILABLE. CERTIFICATIONS ARE NOT TRANSFERABLE TO ADDITIONAL INSTITUTIONS OR SUBSEQUENT OWNERS. COPIES OF NOT HAVING THE EMBOSSED SEAL OF THE ENGINEER SHALL NOT BE VALID. ANY ALTERATION OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NY LICENSED AND REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW. UPPER REACH GRADING PLAN LOWER REACH GRADING PLAN STREAM CHANNEL PROFILE LOWER REACH EXISTING CONDITION TOPOGRAPHY TABLE OF 2018 TAX PARCEL DATA AND PROPERTY OWNERS IN THE VICINITY OF THE PROJECT. PROPERTIES WITHIN PROJECT EXTENTS INCLUDE PARCEL NUMBER 3, 4, 5 AND 7. 24 TREE REUSE PLAN PROJECT SITE CROSS SECTION 58+50 - 60+50 BIOENGINEERING DETAILS CHANNEL PROTECTION DETAILS CROSS SECTION 61+00 - 61+61 26 27 28 25 EROSION AND SEDIMENT CONTROL DETAILS 29 EROSION AND SEDIMENT CONTROL PLAN PHASE II EROSION AND SEDIMENT CONTROL PLAN PHASE III EROSION AND SEDIMENT CONTROL PLAN PHASE IV CROSS SECTION 56+00 - 58+00 EROSION AND SEDIMENT CONTROL DETAILS EROSION AND SEDIMENT CONTROL PLAN PHASE V EROSION AND SEDIMENT CONTROL PLAN PHASE VI 30 31

BATAVIA KILL RESTORATION AT RED FALLS - PROJECT 1 Falls Project Permit Documents/Red Fall… · batavia kill restoration at red falls - project 1 new york state route 23 town of prattsville

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BATAVIA KILL RESTORATION AT RED FALLS - PROJECT 1 Falls Project Permit Documents/Red Fall… · batavia kill restoration at red falls - project 1 new york state route 23 town of prattsville

2

1

4

3

5

7

8

9

6

10

11

DRAWING:

SHEET 1 OF 31

S-01

GREENE COUNTY

SOIL & WATER

CONSERVATION DISTRICT

BOX 907 GREENE COUNTY OFFICE

BUILDING

CAIRO, NY 12413

PHONE: (518) 622-3620

FAX: (518) 622-0344

PROJECT: BK2020

DATE: 04/22/2020

SCALE: AS SHOWN

DRAWN BY: JRB/CJL

DESIGN BY: JRB/CJL

REVIEWED BY: DD NYCDEP

REVIEWED BY:

DuLac Engineering

DONALD W. LAKE JR., P.E.

361 FUNK ROAD

ERIEVILLE, NY 13061

BUSINESS: (315) 662-3744

HOME: (315) 662-7521

"People in balance with Nature"

DONALD W. LAKE JR., P.E.

LICENSE NO. 53844

PROJECT SPONSORS

NEW YORK CITY DEPARTMENT

OF ENVIRONMENTAL PROTECTION

71 SMITH AVENUE

KINGSTON, NY 12601

TITLE SHEET

BATAVIA KILL

RESTORATION AT RED

FALLS - PROJECT 1

NEW YORK STATE ROUTE 23

TOWN OF PRATTSVILLE

GREENE COUNTY, NY

FOR

SCHOHARIE BASIN STREAM

MANAGEMENT IMPLEMENTATION

PROGRAM

BATAVIA KILL RESTORATION

AT RED FALLS - PROJECT 1

PRELIMINARY DESIGN (95%)

APRIL 22, 2020

PROJECT SITE LOCATION SCALE: 1" = 2000' PROJECT SITE AERIAL SCALE: 1" = 500'

NO: DATE

01

SHEET

NO:

SHEET TITLE

REVISION HISTORY

DRAWING INDEX

02

04

05

TITLE SHEET

USGS QUADRANGLE: PRATTSVILLE, N.Y.

ASHLAND , N.Y.

03

EXISTING CONDITIONS

06

07

08

09

STREAM CHANNEL PROFILE UPPER REACH

SITE PLAN

CROSS SECTION 35+40 - 38+00

CROSS SECTION 38+50 - 40+50

CROSS SECTION 41+00 - 49+50

10

11

13

14

15

16

12

17

CROSS SECTION 50+00 - 55+50

2016 AERIAL IMAGERY OBTAINED FROM THE NYS GIS CLEARINGHOUSE

PROPERTY LINE BOUNDARIES ARE APPROXIMATE BASED ON GREENE COUNTY REAL PROPERTY TAX DATA FOR 2018

21

22

23

REVEGETATION PLAN

18

19

20

PROJECT SITE

WETLAND MITIGATION PLAN

MAINTENANCE AND PROTECTION OF TRAFFIC PLAN

ACCESS ROAD PROFILE

DEWATERING CHANNEL PLAN AND PROFILE

EROSION AND SEDIMENT CONTROL PLAN PHASE I

# TAX PARCEL OWNER NAMEMAILING ADDRESS

ADDRESS CITY STATE ZIP

1 75.03-3-28 DEANGELIS, DANILO PO BOX 502 GRAND GORGE NY 12434

2 75.03-3-25 SANENTZ, SHAHE NAVASART 36 WENTWORTH RD. BEDMINSTER NJ 17921

3 92.00-2-5 CITY OF NEW YORK 465 COLUMBUS AVE. VALHALLA NY 10595

4 75.00-2-5 CITY OF NEW YORK 466 COLUMBUS AVE. VALHALLA NY 10595

5 75.00-2-4 SUTTON, STANLEY G. 190 ROUTE 3 PRATTSVILLE NY 12468

6 75.00-2-3 CORSON, BRIAN 133 RICHE AVE STATEN ISLAND NY 10314

7 92.00-2-4 KANE, JOHN 13291 ROUTE 23 PRATTSVILLE NY 12468

8 92.00-4-11 KANE, JOHN 13292 ROUTE 23 PRATTSVILLE NY 12468

9 75.00-4-26 CORSON, ROBERT 133 RICHE AVE STATEN ISLAND NY 10314

10 75.00-4-68 NYSDOT 50 WOLF RD ALBANY NY 12232

11 75.00-4-20 LEBEC, MARCEL 327 4TH ST BROOKLYN NY 11215

UNAUTHORIZED ALTERATION TO A MAP BEARING LICENSED PROFESSIONAL ENGINEER'S SEAL IS IN VIOLATION OF SECTION 7209,

SUB-DIVISION 2, OF THE NEW YORK STATE EDUCATION LAW 145. THE CERTIFICATION IS NOT AN EXPRESS OR IMPLIED WARRANTY OR

GUARANTEE; IT IS PURELY A STATEMENT OF PROFESSIONAL OPINION BASED ON KNOWLEDGE, INFORMATION AND BELIEF, BASED ON

EXISTING FIELD EVIDENCE AND DOCUMENTARY EVIDENCE AVAILABLE. CERTIFICATIONS ARE NOT TRANSFERABLE TO ADDITIONAL

INSTITUTIONS OR SUBSEQUENT OWNERS. COPIES OF NOT HAVING THE EMBOSSED SEAL OF THE ENGINEER SHALL NOT BE VALID.

ANY ALTERATION OR REVISIONS OF THESE PLANS, UNLESS DONE BY OR UNDER THE DIRECTION OF THE NY LICENSED AND

REGISTERED ENGINEER THAT PREPARED THEM, IS A VIOLATION OF THE NYS EDUCATION LAW.

UPPER REACH GRADING PLAN

LOWER REACH GRADING PLAN

STREAM CHANNEL PROFILE LOWER REACH

EXISTING CONDITION TOPOGRAPHY

TABLE OF 2018 TAX PARCEL DATA AND PROPERTY OWNERS IN THE VICINITY OF THE PROJECT. PROPERTIES WITHIN PROJECT EXTENTS

INCLUDE PARCEL NUMBER 3, 4, 5 AND 7.

24

TREE REUSE PLAN

PROJECT SITE

CROSS SECTION 58+50 - 60+50

BIOENGINEERING DETAILS

CHANNEL PROTECTION DETAILS

CROSS SECTION 61+00 - 61+61

26

27

28

25

EROSION AND SEDIMENT CONTROL DETAILS

29

EROSION AND SEDIMENT CONTROL PLAN PHASE II

EROSION AND SEDIMENT CONTROL PLAN PHASE III

EROSION AND SEDIMENT CONTROL PLAN PHASE IV

CROSS SECTION 56+00 - 58+00

EROSION AND SEDIMENT CONTROL DETAILS

EROSION AND SEDIMENT CONTROL PLAN PHASE V

EROSION AND SEDIMENT CONTROL PLAN PHASE VI

30

31