Batching Plan Foundation

Embed Size (px)

Citation preview

  • 8/17/2019 Batching Plan Foundation

    1/5

  • 8/17/2019 Batching Plan Foundation

    2/5

  • 8/17/2019 Batching Plan Foundation

    3/5

  • 8/17/2019 Batching Plan Foundation

    4/5

  • 8/17/2019 Batching Plan Foundation

    5/5

    Vol. = 10,4 M3 Vol. = 6,82 M3 Vol. = 1,132 M3 Vol. = 8,08 M3

    TA1 TA2 TB1 TB2 TL1 TS1 TS2 TA3 TB3 TL2 TS3 TS4 TC 1 x TC 1 y TC2 TC3 TS5 TC4 TC5 TS6 TL3 TS7

    b b

    a

    a

    b b

    a

    b b

    a

    a

    b

    a

    Volume Beton: 26,432 M3

    131,0775 Kg/M3

    Retaining Wall

    1200

    20

    8

    368

    20

    8

    116

    10

    8

    72,00

    D13

    1200

    44,16

    D13

    352

    207,64

    Ø10

    20

    30

    15

    80

    10 X 8 1 X 11

    179

    1 X 179

    12

    1 X 22

    6

    1 X 111 X 179

    116,80

    D13

    110

    18

    132,00 80,96 458,24

    20 20 10

    11 22 179

    1 X 22

    8

    1200 368 256

    10

    D13 D13 Ø10

    1200 352 110

    Tie Beam 25/30

    KODE KODE

    D13   1050,72 Kg

    Pile Cap Hopper

    Kg/M'

    Ulir

    32

    TOTAL KEPERLUAN

    PENGADAANTULANGAN

    D13   88 Batang/12M'

    1045,626 KgTotal Berat Perlu

    Tulangan  =

    JUMLAH PERLU

    PENGADAAN

    TULANGAN

    D16

    JUMLAH PERLU

    PENGADAAN

    TULANGAN

    Ø10   729,12 Kg

    TOTAL KEPERLUAN

    PENGADAAN

    TULANGAN

    Ø10

    JUMLAH PERLU

    PENGADAAN

    TULANGAN

    KODE

    Pile Cap Silo

    Ø10

    Total Berat Perlu

    TulanganØ10   1165,02 M

    D13   1050,88

    10

    98 Batang/12M'

    M

    Polos

    UlirD13

    140

    Batang/12M'

    8

    396

    20

    = Kg

    20 20

    M =

    16

    TA

    TBd

    176

    e

    TS

    67,20

    30

    1 X 16 1 X 30 4 X 12

    104,96

    JUMLAH TULANGAN

    TOTAL PANJANG

    KEPERLUAN TULANGAN

    (M')

    40

    40590

    Jarak antara (cm')

    D16 D16

    310

    8

    380

    Ø10 0,620 Kg/M'

    30

    110

    56,32107,52

    0,995

    D16 1,560 Kg/M'1683,926 Kg

    1684,8 Kg

    TOTAL KEPERLUAN

    PENGADAAN

    TULANGAN

    D16   90

    16

    1 X 30

    Total Berat Perlu

    TulanganD16   1079,44

    114,00

    656

    20

    30

    Tot. Panjang/btg (cm')

    722,3124

    BAR BENDING TIPE

    Diameter (mm')

    Panjang (cm')

    a

    b

    c

    D13

    1035

    Kait (cm')

    35

    D16

    TL

    TC

    33

    48

    D13 D13D16 Ø10

    115 40 15

    Ø10

    4 X 8

    8

    290 176

    8

    10 X 8

    110

    30 40 2020

    200110

    18

    8 88 8

    276

    10 1015

    1051 216146

    80

    129,86

    2 X 8

    16 40120 90

    10 X 12 10 X 9 1 X 151

    8

    168,16 86,40348,00 158,40

    151

    5 X 8

    86

    220,80

    D13

    Rasio Tulangan:

    129,60

    162

    15

    80

    10 X 8

    D16

    590

    33

    1 X 16

    118,80

    D16

    310

    35

    672

    D16 Ø10

    315 20

    60 20

    218,96 154,56

    8 8

    391 96

    SLOOF (120X20)cm RING BALK (30X40)cm KOLOM (30X30)cm

    56 161

    7 X 8 7 X23