Baudette, Minnesota/Rainy River, Ontario International
Bridge
Location
Location US and Canadian Customs
facilities are at each end of the bridge approach
Alignment on US side made challenging by US Customs equipment, City park, substation and archeological sites
Alignment on Canadian side expected to be less affected by Customs location, but archeological and other issues may still exist
This bridge provides access to Baudette, Minnesota and Rainy River, Ontario, a connection between the United States and Canada as well as a full-service, 24-hour Port of Entry
Originally built in 1959 by the Cities of Baudette, MN and Rainy River, ON
The bridge has a total length of 1,285 feet and accomodates a 2-lane roadway with a width of 24 feet and an open grate steel deck
Operated locally as a toll bridge until 1988, when ownership was taken over by the Minnesota Department of Transportation (MnDOT) and the Ministry of Transportation, Ontario (MTO)
History
The current project was initiated to address structural issues and the long-term need to continue providing a safe and reliable river crossing at this location
The bridge is classified as fracture critical (non redundant)
Project Purpose
Wooden Walkway
Open Steel Deck
Floor Beam Corrosion
Low Vertical Clearance
Bridge was found ineligible for inclusion on the Ontario Heritage Bridge List
MTO provided a position paper to the MnDOT stating MTO does not consider rehabilitation viable
Project Details
Bridge is eligible for the National Register of Historical Places in the United States
MnDOT is nearly complete with its rehabilitation study
Next steps will be to work through Section 106 of the National Historic Preservation Act and likely Section 4(f) of the Department of Transportation Act
Project Details
In the meantime, concurrent work has begun looking at replacement
Initial discussions were focused on developing project separately
This approach potentially solved some of the bureaucratic concerns, but it created others……
Project Details
Current approach is to have MnDOT lead (with close coordination with MTO) the environmental documentation, preliminary design, structure type study and early stakeholder coordination of the project
Work is underway to develop a cost-sharing agreement
Consultant will be required to either have offices in both the US and Canada, or at least partnering with approved firms on both sides of the border
Handling of detail design and construction will be decided in the future
Project Details
Presidential Permit not required◦ Congressional Authorized Bridge under International
Bridge Act of 1972◦ Existing owners of congressional authorized bridges
may replace, repair or expand their existing bridges without further State Department approval
Early consultant effort ongoing◦ Compile agency stakeholder list with contact
information◦ Compile list of permits/approvals needed◦ Anticipated duration for obtaining permits/approvals◦ Comparison of design standards/requirements between
MnDOT and MTO
Project Details
Potential Agency Stakeholders: MN SHPO MN DNR USACE FHWA US Customs US State Department US Coast Guard GSA Ontario Ministry of the Environment Department of Fisheries and Oceans Division of Water Quality Ontario Ministry of Natural Resources First Nations Transport Canada, Navigable Waters Canadian Border Service Agency
Project Details
A detailed critical path schedule has been developed
Schedule shows 300 days of float given a late summer 2013 consultant notice to proceed and letting date of November 2017
Project needs to be let no later than April 2018 to take advantage of Minnesota bonding dollars
Current schedule only includes MnDOT processes
Need to allow procurement time for detail design consultant
Project Timeline
Questions??