29
8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 1/29 Project Management Through the BB Project Tracking System Black Belt Training Black Belt Training Ford Proprietary Copyright © 2005-2006, Ford Motor Company – All Rights Reserved Black Belt Training Ford Proprietary Copyright © 2005-2006, Ford Motor Company – All Rights Reserved Slide: 0 Project Management Through the Black Belt Project Tracking System

Bb Wk1 350 Project Mgmt Thru BB PTS

  • Upload
    sirdba

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 1/29

Project Management Through the BB ProjectTracking System 

Black Belt Training

Black Belt Training Ford Proprietary

Copyright © 2005-2006, Ford Motor Company – All Rights Reserved

Black Belt Training Ford Proprietary

Copyright © 2005-2006, Ford Motor Company – All Rights ReservedSlide: 0

Project Management Throughthe Black Belt Project

Tracking System

Page 2: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 2/29

Project Management Through the BB PTS 

Black Belt Training Slide: 1

Module Objectives

Upon completion of this module, Black Belts will be able to: Describe the 6-Sigma Project Tracking Process

 Access the Project Tracking System (PTS) from the 6-Sigma

website

Enter project information into the Project Tracking System

correctly

Manage a project from ‘New’ to ‘Approved’ status 

Page 3: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 3/29

Project Management Through the BB PTS 

Black Belt Training Slide: 2

Project Tracking: PTS Process Steps

Scope

of this

Module

Create Project

Enter customer satisfactionEnter team members

 Attach project charter and files

Financials Entered & Confirmed

Submit for OK to Start

Project Approvers Approve or Deny

Complete DMAIC or DCOV (DFSS)

Update Project Information

Enter Short-term Containment

Enter Key Actions / Replication

FA revises & confirms financials

Submit for OK to Close

Project Approvers Approve or Deny

Submit for OK to End 180 days after close

Project Approvers Approve or Deny

Project results are sustained and proven

Pending Approval 

New 

 Approved

Pending Close

Close

Pending SustainedEnd - Sustain

Enter Define for DMAIC or DCOV (DFSS)

Project Status

Page 4: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 4/29

Project Management Through the BB PTS 

Black Belt Training Slide: 3

PTS Overview

Page 5: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 5/29

Project Management Through the BB PTS 

Black Belt Training Slide: 4

CREATE PROJECT slide 1 of 6

Page 6: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 6/29

Project Management Through the BB PTS 

Black Belt Training Slide: 5

CREATE PROJECT slide 2 of 6

Page 7: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 7/29

Project Management Through the BB PTS 

Black Belt Training Slide: 6

See next slide for vehicle selection screen

CREATE PROJECT slide 3 of 6

Page 8: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 8/29

Project Management Through the BB PTS 

Black Belt Training Slide: 7

CREATE PROJECT slide 4 of 6

Page 9: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 9/29

Project Management Through the BB PTS 

Black Belt Training Slide: 8

slide 5 of 6CREATE PROJECT

Page 10: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 10/29

Project Management Through the BB PTS 

Black Belt Training Slide: 9

CREATE PROJECT slide 6 of 6

Page 11: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 11/29

Project Management Through the BB PTS 

Black Belt Training Slide: 10

ENTER CUSTOMER SATISFACTION slide 1 of 2

Note: The BB and MBB are responsible for the integrity of estimates entered into the PTS. Local procedures

must be followed to ensure any local reporting of delivery based on PTS data is accurate.

Page 12: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 12/29

Project Management Through the BB PTS 

Black Belt Training Slide: 11

ENTER CUSTOMER SATISFACTION slide 2 of 2

only for technical projects 

Required for OK to Start: Select Vehicle, CCC & Enter TGW, Click UPDATE

only if vehicle l ines are selected on the Project Inf ormation screen 

Note: The BB and MBB are responsible for the integrity of estimates entered into the PTS. Local procedures

must be followed to ensure any local reporting of delivery based on PTS data is accurate.

Page 13: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 13/29

Project Management Through the BB PTS 

Black Belt Training Slide: 12

ENTER TEAM MEMBERS

Page 14: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 14/29

Project Management Through the BB PTS 

Black Belt Training Slide: 13

ENTER DEFINE PHASE - DMAIC slide 1 of 2

While project is inthe NEW status,

only the Define

phase can be

updated.

Page 15: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 15/29

Project Management Through the BB PTS 

Black Belt Training Slide: 14

ENTER DEFINE PHASE - DFSS slide 2 of 2

DCOV checklistsare only available for 

Technical DFSS projects

Page 16: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 16/29

Project Management Through the BB PTS 

Black Belt Training Slide: 15

ATTACH PROJECT FILES & CHARTER  slide 1 of 2

Page 17: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 17/29

Project Management Through the BB PTS 

Black Belt Training Slide: 16

ATTACH PROJECT FILES & CHARTER  slide 2 of 2

Page 18: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 18/29

Project Management Through the BB PTS 

Black Belt Training Slide: 17

FINANCIALS ENTERED & CONFIRMED

The Financial Analyst is an optional role in the Project Tracking

System. Each organization independently defines the role of the

Financial Analyst relative to 6-Sigma projects. Consult with your 

MBB to understand local procedures.

Note: The BB, MBB and Finance Analyst (optional) are responsible for the integrity of estimates entered into the

PTS. Local procedures must be followed to ensure any local reporting of delivery based on PTS data is

accurate.

Page 19: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 19/29

Project Management Through the BB PTS 

Black Belt Training Slide: 18

REQUEST APPROVAL FOR OK TO START

Required before requesting an OK to Start: Project Scope, Project Goal, Project Location, Project Country, Project Champion

 Approver, Customer Sat Impact to Ford, Customer Sat Impact to Customer,

Customer Sat Category, CCC, TGW (zero is valid), Project Charter, FA confirmation

Note: Once approved, projects can be cancelled by clicking Submit for Cancel and selecting a reason to cancel.

The DD/MBB/DC and the PC clicks OK to Cancel.

P j M Th h h BB PTS

Page 20: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 20/29

Project Management Through the BB PTS 

Black Belt Training Slide: 19

PROJECT APPROVERS APPROVE OR DENY slide 1 of 2

screen seen by approvers:

Project is locked for updating until all

approvers approve or one denies.

If an approver denies, the project status isreset back to ‘New’ and the project needs

to be resubmitted again for approval.

P j t M t Th h th BB PTS

Page 21: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 21/29

Project Management Through the BB PTS 

Black Belt Training Slide: 20

PROJECT APPROVERS APPROVE OR DENY slide 2 of 2

P j t M t Th h th BB PTS

Page 22: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 22/29

Project Management Through the BB PTS 

Black Belt Training Slide: 21

COMPLETE DMAIC OR DCOV (DFSS)

Once the project is Approved, you can update the Measure, Analyze,

Control phases for DMAIC projects and the Characterize, Optimizeand Verification phases for DFSS projects

P j t M t Th h th BB PTS

Page 23: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 23/29

Project Management Through the BB PTS 

Black Belt Training Slide: 22

UPDATE PROJECT INFORMATION

Notes:

•Project Approvers can be changed on the ‘Update Project Information’ screen 

•Project Start Date can be revised only by the DD/DC/MBB within the Recording Black Belt’s organization 

P j t M t Th h th BB PTS

Page 24: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 24/29

Project Management Through the BB PTS 

Black Belt Training Slide: 23

ENTER SHORT-TERM CONTAINMENT

P j t M t Th h th BB PTS

Page 25: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 25/29

Project Management Through the BB PTS 

Black Belt Training Slide: 24

Managing a Project: Summary of Milestones and Roles

Defined in the PTS

Project Management Through the BB PTS

Page 26: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 26/29

Project Management Through the BB PTS 

Black Belt Training Slide: 25

Objectives Review

Black Belts should be able to: Describe the 6-Sigma Project Tracking Process

 Access the Project Tracking System (PTS) from the 6-Sigma

website

Enter project information into the Project Tracking Systemcorrectly

Manage a project from ‘New’ to ‘Approved’ status 

Project Management Through the BB PTS

Page 27: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 27/29

Project Management Through the BB PTS 

Black Belt Training Slide: 26

Questions to be answered

Appendix:

What are Hard/Soft Savings?

Project Management Through the BB PTS

Page 28: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 28/29

Project Management Through the BB PTS 

Black Belt Training Slide: 27

Hard vs. Soft Savings – (cont’d) 

Hard Savings – Measurable savings associated with improvements inValue of Lost Customer Satisfaction including:

Repairs, Rework, Scrap, Inspection, Material Cost, Warranty,etc.

Partial person labor savings – See next slides for clarificationon qualifying requirements.

Interest/Carry Cost effect of Cash Flow savings (i.e., inventory)

Mix Mgmt & Other  – Hard benefits of improved plant through-put

Hard savings are reductions from present operating levels resulting frommeasurable process improvements not a reduction in budget or plan.

Project Management Through the BB PTS

Page 29: Bb Wk1 350 Project Mgmt Thru BB PTS

8/22/2019 Bb Wk1 350 Project Mgmt Thru BB PTS

http://slidepdf.com/reader/full/bb-wk1-350-project-mgmt-thru-bb-pts 29/29

Project Management Through the BB PTS 

Bl k B lt T i i Slid 28

Hard vs. Soft Savings – (cont’d) 

Soft Savings –  Are less direct in nature and include:

Revenue associated with reductions in TGWs – Quality Investment

Decision Model

Projects that open plant floor space (as a side benefit) may allow for 

the location of future operations

Projects that reduce vehicle weight may enable other design actions

to delete expensive light weight materials

Cost avoidance, TGW avoidance, Recall avoidance

Other savings based upon indirect correlations or hypotheses (e.g., it

is likely vehicle re-purchase volume will increase if we enhance

owner notification letters to reduce perception of recalls)