BB5 and commissioning DAQ
E. Pasqualucci
BB5 DAQ
• Design of the system
• DAQ status
• Debug status
• Online analysis
• People training
BB5 DAQ design and status
Trig & Busy reset
Data readout
Trig
CSM(s)RCD
Eth
GOLA
RCD
RPCRX
TTCvi
TTCvi
I/O
Conf & Control
Data readout
Trig & Busy reset
Trig & Busy reset
Latched Trig
Trig
Busy resetTrig
Data
REB
Eth
Debug status
• No dedicated time during chamber test
• Jeff to debug GOLA SW this week– In case is needed, system available next
week
Online analysis
• Based on H8 software– GNAM and PMP
• Available
– Plug-in to be modified• ASA DAQ debug is finished
People training
• Training site– On-surface commissioning site
• Site installation• DAQ installation• Detector software• Local people training during the week of 14/3
• BB5 DAQ is being documented!– Half document is ready– First version completed in 1 week
Commissioning sites
• On-surface site– Simplified copy of BB5– Prerequisites:
• HW availability and readiness– Ludovico is checking
• BB5 GOLA SW working– Jeff debugging
– Start of installation March 14
Commissioning sites (2)
• Commissioning in the pit– Prerequisites:
• Infrastructure ready– Need to be checked with Giuseppe Mornacchi (E.P.)
• MROD availability– Check with Nikhef
• MROD VME readout– Already working– Debugging upgraded DAQ @ Nikhef
– Mid April ?