Upload
nayak4u
View
257
Download
0
Embed Size (px)
Citation preview
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 1/13
Generated by Jive on 2016-05-23+02:00
1
SRM Confirmation process and issueresolution
This document explains how confirmations are transferred to ECC ( both material confirmations andservice entry sheets) and gives some useful tips for supporting issues encountered.
Confirmations for Material items
Once the confirmation is created in SRM, an IDoc is created in SRM and an entry is made in
BBP_DOCUMENT_TAB table.
IDoc in SRM
BBP_DOCUMENT_TAB entry
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 2/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
2
GUID field contains GUID of confirmation
OBJKEY - IDoc number
CORE KEY - first 10 digits refers to PO number and last 10 digits refer to confirmation number
When the IDoc reaches ECC, system generates a new IDoc in ECC. To figure out the IDoc number generated
in ECC, follow below steps
- go to BD87 and enter the IDoc number and execute.
- select node under MBGMCR and click on Trace IDocs.
- This will give IDoc number in ECC
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 3/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
3
- Go to ECC and open the IDoc in WE02. The status of the IDoc should be 53 (Application document posted)
Meanwhile the CLEAN_REQREQ_UP program (if scheduled as batch job) reads the entry in
BBP_DOCUMENT_TAB and calls FM B46A_GOODSMVT_UPDATECHECK (Note that this process is
independent of whether the confirmation is posted in backend or not). In this FM there is a call to ECC using
RFC FM BBP_46A_DOCUMENT_UPDATECHECK, where the corresponding IDOC in ECC is read and GR
number generated in the backend is determined and exported in table parameter RELATED_OBJECTS.
Entry with ELEMENT value INBOUND_OBJECT contains GR number generated in ECC in column OBJKEY
Entry with ELEMENT value OUTIDOC contains IDoc number generated in SRM in column OBJKEY
Entry with ELEMENT value INIDOC contains IDoc number generated in ECC in column OBJKEY
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 4/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
4
The GR number from ECC is taken and updated in BBP_PDBEH table using FM
BBP_PD_CONF_SET_BE_REF and BBP_PD_CONF_SAVE
After CLEAN_REQREQ_UP runs successfully, entry in BBP_DOCUMENT_TAB is deleted and 'Related
document' tab in PO item is updated with backend number.
How it looks in ECC
How to find the IDoc in SRM for a given material confirmation
- Go to WE09
- Enter date range in 'created on' field- Enter details as shown below
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 5/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
5
How to find the corresponding GR number in ECC
- In SE37 execute FM B46A_GOODSMVT_UPDATECHECK
- In IS_DOCUMENT_TAB, enter IDoc number in field OBJKEY
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 6/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
6
- In table CONTROL_RECORD enter below two entries with logical system of ECC
RELATED_OBJECTS Table will have details of ECC GR number and IDoc
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 7/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
7
How to create an entry in BBP_DOCUMENT_TAB for a given material confirmation
In some cases where the status or the backend document number is not updated in related documents, we
might need to create an entry in BBP_DOCUMENT_TAB table manually.
- Go to SE37 and run FM BBP_UPDATE_LINK
- Pass 'IM' in import parameter doc_type-Enter below values in IMLINK table
OBJKEY is PO number and GUID is confirmation GUID.
- Execute the FM
Return delivery in SRM
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 8/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
8
How it looks in ECC (A new material document with movement type 102 is posted)
Cancellation in SRM
How it look in ECC
IDoc Transfer process for Return delivery and cancellation is exactly as it is for confirmations.
Note: In Return delivery we can choose how much quantity we want to return but in case of cancellation we
have to cancel the entire quantity of confirmation.
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 9/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
9
Confirmations for Service / Limit items
For service/Limit items, when confirmation is created in SRM, a new document called service entry
sheet is created. The transfer process for service entry sheets, does not involve any IDocs and no
BBP_DOCUMENT_TAB entries are created. Everything happens in FM META_ENTRYSHEET_CREATE,
including entry sheet creation and updating of backend document number in table BBP_PDBEH. In ECC, every
accepted entry sheet will have a corresponding material document posted. This is the reason why we see two
entries in 'Related documents' tab of PO item (one for entry sheet with backend number and another with just
backend number, but no SRM number)If we cancel the entry sheet in SRM then a new material document with
movement type 102 is created in backend.
Confirmations for limit PO
How it looks in ECC
The relation between entry sheet and SRM confirmation is stored in field 'Communication number' in tab
'Origin' of Entry sheet (Table ESSR field USER1, we can use this table to find corresponding entry sheet for a
given SRM confirmation)
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 10/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
10
Material document
Reference document field contains corresponding entry sheet number.
After cancellation of entry sheet from SRM, we have a reversal document created in SRM and it refers to same
original ECC entry sheet. We also have a cancellation document with only backend number (this is the material
document with movement type 102 in ECC)
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 11/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
11
How it looks in ECC. Please note a new material document with movement type 102 is created in ECC
Status of entry sheet in ECC is deleted
Everything is same for service POs
After creating confirmation in SRM
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 12/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
12
How it looks in ECC
After cancelling entry sheet in SRM
How it looks in ECC
Important notes:
When analyzing issues related to confirmations
- Check whether the confirmation is posted in ECC or not as described above
- If posted and the backend number is not updated in SRM or status is not posted in backend, for material
confirmations update the BBP_DOCUMENT_TAB as described above
- If posted and the backend number is not updated in SRM, for service entry sheet, we have to update the
BBP_PDBEH table directly with entry sheet number
8/16/2019 Bbp Document Tab
http://slidepdf.com/reader/full/bbp-document-tab 13/13
SRM Confirmation process and issue resolution
Generated by Jive on 2016-05-23+02:00
- If the confirmation is NOT posted in ECC and status is Error in transmission or approved, try to transfer the
confirmation from BBP_PD
Press enter after entering TRANSFER in command field and execute.