Ericssonwide Internal INSTALLATION INSTR. 1 ( 14 ) / XSNHSSG 26/1531-LZA 701 0001 Uen EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A Prepared (also subject responsible if other) No. Approved Checked Date Rev Reference Connecting BBS 2216 to RBS 2216 RBS Site Solution Copyright © Ericsson AB 2006 – All Rights Reserved Disclaimer No part of this document may be reproduced in any form without the written permission of the copyright owner. The contents of this document are subject to revision without notice due to continued progress in methodology, design and manufacturing. Ericsson shall have no liability for any error or damage of any kind resulting from the use of this document. Contents Page 1 Introduction ....................................................................... 2 1.1 Documentation .................................................................... 2 1.2 Tools ................................................................................ 2 2 Preparations ...................................................................... 2 3 Connecting the Battery Power Cable ........................................ 5 4 Connecting the Communication Link Cable ................................ 8 5 Connecting the External Alarm Cable ....................................... 11 6 Connecting the Transmission Cables (Optional) .......................... 13 7 Concluding Routines ........................................................... 14 7.1 Powering up the RBS ............................................................. 14 A4 XSEIF R4

BBS 2216 - Installation Instruction

Embed Size (px)

DESCRIPTION

BBS 2216 - Installation Instruction

Citation preview

  • Ericssonwide InternalINSTALLATION INSTR. 1 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    Connecting BBS 2216 to RBS 2216

    RBS Site Solution

    Copyright

    Ericsson AB 2006 All Rights Reserved

    Disclaimer

    No part of this document may be reproduced in any form without the writtenpermission of the copyright owner.

    The contents of this document are subject to revision without notice due tocontinued progress in methodology, design and manufacturing. Ericsson shallhave no liability for any error or damage of any kind resulting from the useof this document.

    Contents Page

    1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21.1 Documentation .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21.2 Tools .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

    2 Preparations .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

    3 Connecting the Battery Power Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

    4 Connecting the Communication Link Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

    5 Connecting the External Alarm Cable .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

    6 Connecting the Transmission Cables (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . 137 Concluding Routines .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147.1 Powering up the RBS ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

    A4 XSEIF R4

  • Ericssonwide InternalINSTALLATION INSTR. 2 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    1 Introduction

    This document describes how to connect Battery Backup System (BBS) 2216to the RBS 2216.

    1.1 Documentation

    Ensure that the following documents have been read and understood:

    Personal Health and Safety Information, 124 46-2885

    System Safety Information, 124 46-2886

    RBS Installation Instructions, 2/1531-LZA 701 0001

    BBS 2216 Installation Instructions, 190 08-EN/LZT 751 0056

    DF-OVP Installation Instructions, 190 08-EN/LZT 0040

    1.2 Tools

    Table 1 Tools Required

    Product Description Product NumberTool set Maintenance tool set LTT 601 137/1Tool set 0.54 Nm torque set, which

    includes 8 mm open-endedhead for SMA connectors

    LTT 601 145/1

    2 Preparations

    This section describes what to do before starting to connect the power cableand the communication link cable.

    To unlock and open the door, do the following:

    1. Use the key to unlock the handles on both sides of the RBS.

    2. Turn the left-hand handle clockwise while turning the right-hand handleanti-clockwise.

    3. Lift and detach the cabinet cover, as shown in the figure below.

  • Ericssonwide InternalINSTALLATION INSTR. 3 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    1234P015907A

    Figure 1 Cabinet Cover Detachment

    4. Connect the Electrostatic Discharge (ESD) wrist strap to the earthgrounding point of the RBS.

  • Ericssonwide InternalINSTALLATION INSTR. 4 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    P015911B

    Earth grounding point

    3M

    Figure 2 ESD Wrist Strap Connection Points

    5. Switch off all Internal Distribution Module (IDM) circuit breakers.6. Unlock and detach the BBS cover in the same way as the RBS cover

    was detached.

    7.

  • Ericssonwide InternalINSTALLATION INSTR. 5 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    Connect the ESD wrist strap to theearth grounding point of the BBS.

    P016665A

    Earth grounding point

    3M

    8. Switch off the main switch of the BBS.

    9. Switch off the power to the RBS.

    3 Connecting the Battery Power Cable

    This section describes how to connect Battery Power Cable from the BatteryFuse Unit (BFU) in the BBS to the IDM in the RBS.Note: Before connecting the power cable, make sure that both the BBS

    and RBS are earth grounded. For instructions on handling the earthgrounding connection, see documents RBS Installation Instructionsand BBS 2216 Installation Instructions.

    Caution!

    Improper handling of batteries can result in the batteries short-circuiting, whichcan result in serious injury due to high energy levels. Exercise the necessarycare when working with batteries.

    Note: Make sure that both the AC power and the battery switches are in theOFF position before working with the battery connection.

    To route the battery power cable, do the following:

    1. Route the cable as shown in the figures below and fasten it in place withcable ties.

  • Ericssonwide InternalINSTALLATION INSTR. 6 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    P016560A

    RBS 2216

    BBS 2216

    Power cable

    BFU

    IDM PSU

    Figure 3 Power Cable Routing

  • Ericssonwide InternalINSTALLATION INSTR. 7 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    P016561A

    Power cable

    RBS 2216BBS 2216

    BFU

    IDM PSU

    Figure 4 Power Cable Routing

    2.

    Connect the power cable connectorto the RBS connector on the BFUin the BBS.

    P016562A

    Power cable

    BFU

    RBS

    BBS

    3.

  • Ericssonwide InternalINSTALLATION INSTR. 8 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    Connect the terminals of the powercable to the battery connection onthe IDM in the RBS. See documentRBS installation instructions.

    P016563A

    IDM

    PSU 3 PSzxczaU 4PSU 2PSU 1

    DRU 130A

    DRU 230A

    DRU 330A

    DRU 430A

    DRU 530A

    DRU 630A

    DXU 3A

    FAN 10ATMA-CM1 3ATMA-CM2 3ALIGHTING 0.5ACLU 11A

    Operational

    BatteryConnection+24 V DC250A

    +24V 0V +24V 0V +24V 0V +24V 0V

    RBS

    4 Connecting the Communication Link Cable

    This section describes how to connect the communication link cable betweenthe BBS and the RBS.

    To route the communication link cable, do the following:

    1. Route the cable and as shown in the figures below and fasten it in placewith cable ties.

  • Ericssonwide InternalINSTALLATION INSTR. 9 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    P016938A

    RBS 2216

    BBS 2216

    Communication link cable

    BFU

    IDM PSU

    Figure 5 Communication Link Cable Routing

  • Ericssonwide InternalINSTALLATION INSTR. 10 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    P016939A

    Communication link cable

    RBS 2216BBS 2216

    BFU

    IDM PSU

    Figure 6 Communication Link Cable Routing

    2.

    Connect one end of the cableto the Power Supply Unit (PSU)connector on the BFU in the BBS.

    P016564A

    Communication link cable

    BBS

    BFU

    RBS

    PSU

    3.

  • Ericssonwide InternalINSTALLATION INSTR. 11 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    Connect the other end of the cableto the A1 connector on the firstPSU from the left in the RBS.

    P016565A

    RBS PSUA1 connector

    Communication link cable

    5 Connecting the External Alarm Cable

    This section describes how to connect the external alarm cable between theBBS and RBS.

    To route the external alarm cable, do the following:

    1. Route the cable as shown in the figures below and fasten it in place withcable ties.

  • Ericssonwide InternalINSTALLATION INSTR. 12 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    P016951A

    RBS 2216

    BBS 2216

    BFU

    PSUDXU

    External alarms connector

    Ext. alarm connector

    DF-OVP

    Figure 7 External Alarm Cable Routing

  • Ericssonwide InternalINSTALLATION INSTR. 13 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    P016952A

    RBS 2216BBS 2216

    BFU

    DXU

    DF-OVP

    Ext. alarm connector

    External alarms connector

    Figure 8 External Alarm Cable Routing

    2. Strip the insulation from the cable and insert the wires into External Alarmsconnector.

    Note: Write down the designation of the wires in the external alarm cable.

    3. Connect the external alarm cable to the Distribution Frame withOvervoltage Protection (DF-OVP), and then connect the DF-OVP to theDistribution Switch Unit (DXU) in the RBS. See the DF-OVP InstallationInstructions.

    6 Connecting the Transmission Cables (Optional)This section describes how to connect the transmission cables.

    To connect the transmission cables, do the following:

    1.

  • Ericssonwide InternalINSTALLATION INSTR. 14 ( 14 )

    / XSNHSSG 26/1531-LZA 701 0001 Uen

    EAB/ PJR/TP ( Louise Cederlund) 2006-10-18 A

    Prepared (also subject responsible if other) No.

    Approved Checked Date Rev Reference

    Route the transmission cables on the right-hand side of the BBS and theRBS as shown in the figure below and fasten them in place with cableties.

    P015836B

    2. Connecting the transmission cable from the transmission equipment to thetransmission ports on the DXU in the RBS. If the BBS and RBS are in adifferent Electromagnetic Compatibility (EMC) environment, DF-OVP isrecommended to be connected between the BBS and the RBS. For detailson how to connect DF-OVP, See DF-OVP Installation Instructions.

    7 Concluding Routines

    7.1 Powering up the RBS

    1. Disconnect the ESD wrist strap.

    2. Switch on the power switch outside the cabinet.

    3. Switch on the IDM circuit breakers for the units installed in the cabinet.

    4. Switch on the RBS switch on the BFU in the BBS.

    5. Put back and lock the Cover of BBS.

    6. Put back and lock the Cover of RBS cover.

    tocConnecting BBS 2216 to RBS 22161 Introduction1.1 Documentation1.2 Tools

    2 PreparationsFigure 1 Cabinet Cover DetachmentFigure 2 ESD Wrist Strap Connection Points

    3 Connecting the Battery Power CableFigure 3 Power Cable RoutingFigure 4 Power Cable Routing

    4 Connecting the Communication Link CableFigure 5 Communication Link Cable RoutingFigure 6 Communication Link Cable Routing

    5 Connecting the External Alarm CableFigure 7 External Alarm Cable RoutingFigure 8 External Alarm Cable Routing

    6 Connecting the Transmission Cables (Optional)7 Concluding Routines7.1 Powering up the RBS

    tablesTable 1 Tools Required