Balcones Canyonlands Conservation Plan
Infrastructure Working Group
Infrastructure Maintenance Training
Thursday, October 10, 2013
1
Balcones Canyonlands Conservation Plan Infrastructure Working Group Thursday, October 10, 2013 8:00 a.m. – 1:00 p.m.
J.J. Pickle Research Campus, Commons Bldg. Big Tex Auditorium 1.102
7:30 a.m. – 8:00 a.m.
8:00 a.m. -8:05 a.m.
8:05 a.m. – 8:35 a.m.
8:35 a.m. – 9:00 a.m. 9:00 a.m. – 9:30 a.m. 9:30 a.m. – 10:00 a.m.
10:00 a.m. – 10:25 a.m 10:25a.m. -11:00a.m. 11:00a.m.-11:30a.m. 11:30a.m.-12:00p.m. 12:00-12:30p.m.
Arrival and Sign-In Showing of the Texas Parks and Wildlife Golden-Cheeked Warbler Video
Welcome (Jennifer Leeper, LCRA)
Balcones Canyonlands Conservation Plan and Infrastructure 101 (Sherri Kuhl, City of Austin)
Mapping the Balcones Canyonlands Preserve (Kimberlee Harvey, City of Austin) Oak Wilt and Forest Stand Management (Eric Beckers, Texas A&M Forest Service) Infrastructure Considerations for the Endangered Species of the BCP (Bill Reiner, City of Austin)
Break/Travel Water Treatment Plant 4 Tunnel Video
Field Personnel Vista Tract Travis County
Project Managers/Supervisors JJ Pickle Center
Travel Preserve Orientation
Environmental Commissioning for the Jollyville Transmission Main: Ensuring Environmental Protection for the Really Big Tunnel (Thais Perkins & David Johns, City of Austin)
Tree Health And How to Prevent Oak Wilt And Reduce Wildfire Concerns (Eric Beckers, Texas A&M Forest Service; Luke Ball and John Chenoweth, City of Austin )
Guidance On Applying for a BCCP Infrastructure Permit (Kimberlee Harvey, City of Austin)
Golden-Cheeked Warbler Habitat and Monitoring Prg. (Jim O’Donnell and Cindy Sperry, City of Austin)
Lessons Learned: Successes and Challenges of BCCP Infrastructure (Wendy Connally, Travis County and Sherri Kuhl, City of Austin)
Karst Environments and Concerns (Todd Bayless and William Simper, Travis County)
Panel Discussion: Questions and Answers from Audience Reverse Panel Discussion: Questions and Answers to Audience
Wrap-up/Evaluation drop-off/Collect Certificates
2
1. Head north on Burnet Rd for .05 mi
2. Turn left onto W Braker Ln and travel for 1.5mi
3. Turn right onto Research Blvd and take the ramp onto US-183 N travel on the HWY for 5.9 miles
4. Take the exit toward US-183/Lakeline Mall Dr
5. At light, loop under the highway onto the access road of Research Blvd heading south.
6. Turn right onto Ranch Rd 620 N and travel 5 miles
7. Just after Concordia University turn right onto Wilson Parke Ave
8. Turn left onto Vista Parke. Vista Parke road is a wide road with space for parking along the side of the road. Please be careful parking and walking to the preserve.
JJ Pickle Research Center to Field Trip Site Directions
(Travis County BCP)
After the morning break field staff will drive to the field trip site. Supervisor/Project Managers will stay at JJ Pickle for presentations.
Please call 512-293-1551 if you get lost on your way to
the field trip location.
3
CITY OF AUSTIN, AUSTIN WATER UTILITY
Willy Conrad** o: 512-972-1661 [email protected] Mgr., Wildlands
Conservation Division
Kimberlee Harvey o: 512-972-1686 [email protected] Program
Coordinator
Sherri Kuhl o: 512-972-1664 [email protected] BCP Program Manager
CITY OF LAKEWAY / ALTA VISTA (SCHRAMM RANCH)
Chessie Blanchard o: 512-261-6098 [email protected] Deputy City Manager
CITY OF SUNSET VALLEY
Carolyn Meredith o: 512-891-9103 [email protected] Env. Services Manger
Katy Phillips o: 512-891-9103 [email protected], Public Works &
Environmental Services
6D RANCH
Tammy Gofortho: 512-263-8684
[email protected] Ranch Manager
LOWER COLORADO RIVER AUTHORITY (LCRA)
Jarrod Depew o:830-596-7213 [email protected] Natural Resource
Conservation Coord.
THE NATURE CONSERVANCY OF TEXAS
Brandon Crawford o: 512-263-8878 [email protected] Barton Creek Habitat
Preserve Steward
TRAVIS AUDUBON SOCIETY
Christopher Murray o: 512-263-2237 [email protected] Preserve Steward
TRAVIS COUNTY
Michael Wallace o: 512-854-7213 [email protected] Environmental Specialist
Wendy Connally o: 512-854-7214 [email protected] Manager Natural
Resources
Linda Laacko: 512-219-6190,
ext. [email protected]
Environmental Resources
Management Specialist
Senior
WILD BASIN PRESERVE
John Abbott o: 512-327-7622 [email protected] Director
Kendra Abbott o: 512-327-7622 [email protected] of Research and
Education
o = office phone ** BCCP Secretary List Revised 9/24/13
BALCONES CANYONLANDS PRESERVE
LAND MANAGER CONTACT INFORMATION
5
BCCP TERMS AND DEFINITIONS
Balcones Canyonlands Conservation Plan (BCCP) A Habitat Conservation Plan approved by the U. S. Fish and Wildlife Service (USFWS) for the western portion of Travis County on May 2, 1996.
Balcones Canyonlands Preserve (BCP) The system of nature preserves which protects eight local endangered species. The Preserve was created in connection with the BCCP and operates under a Regional 10(a) permit issued by the USFWS as authorized by the federal Endangered Species Act of 1973.
BCCP permit area The Regional 10(a) permit covers western Travis County, roughly the area west of the Mopac Rail line.
Drainage Basin A watershed; the area from which a stream, spring, or conduit derives its water. Edge effect Abiotic (temperature, light, noise, etc.) and biotic (edge predators, urban predators, humans, etc.) factors that occur adjacent to fragmentation edges and can result in impacts to the species of concern and/or their habitat.
Habitat The natural environment in which a plant or animal can live or grow. Examples of habitat include shrub, savannah, prairies, woodlands, karst and aquifer habitats.
Habitat fragmentation Fragmenting large blocks of habitat into smaller blocks of habitat through the processes associated with urbanization, i.e., roads, subdivisions, and utility corridors. Fragmentation of habitat reduces habitat quality for woodland songbirds. Hydrology or Hydrologic The study of water and its origin and movement of water in atmosphere, surface, and subsurface. Juniper-oak woodlands This particular habitat is characteristic of the Balcones Canyonlands. Large patches of mature juniper/oak woodland provides habitat for the golden-cheeked warbler.
Karst A terrain characterized by landforms and subsurface features, such as sinkholes and caves. Karst areas commonly have few surface streams; most water moves through cavernous openings underground.
Karst invertebrate Cave-dwelling animal that lacks a backbone. Natural or native nest predators Texas rat snake, Ringtail, and scrub jays are examples of nest predators associated with openings and corridors in closed canopy woodland.
6
BCCP TERMS AND DEFINITIONS Cont.
Neotropical migrant Birds which migrate twice a year between their breeding grounds in more northern areas and their wintering grounds in more southern areas.
Nest parasitism Brown-headed cowbirds lay their eggs in the nests of other bird species which usually results in a lowered productivity of the nesting species. Fragmentation increases the likelihood of this type of parasitism by opening corridors in the closed canopy woodlands.
Troglobite An animal that completes its lifecycle and spends its entire life in openings underground (such as caves). Trogloxene A cave-dwelling animal that leaves the cave on a regular basis to feed, such as bats, cave crickets, and daddy long-legs. Urban or edge nest predators Blue jays, crows, domestic and feral cats, raccoons, Eastern fox squirrel, opossum, and Red Imported Fire Ants are examples of predators common to corridors associated with the urban/wildland interface or edge.
7
8
8
and you are a BCP signatory(HCP, Managament Agreement, etc.)
Deduction from mitigation credits
Complete and submit a BCCP Infrastructure Project - Habitat
Assessment Application to BCCP Secretary, coordinate with BCP
landowner3, and refer to Section III of Appendix B Infrastructure Planning of the
BCCP
Infrastructure owner has a proposed maintenance or new
construction project in the BCCP Permit Area¹ - Start Process
Determine if your project is inside, outside, or adjacent to
the BCP Acquisition Area1
Complete and submit a BCCP Infrastructure Project Habitat Assessment Application, Pre-
Approved Maintenance Application, or a Vegetation Management Plan to BCCP
Secretary and coordinate with landowner of BCP property the project is adjacent to if
applicable
Contact Travis County to purchase BCCP
Participation Certificate
Alternative: Contact USFWS to begin Section 10(a) Permit
process
an
d y
ou
are
no
ta
BC
P S
ign
ato
ry
Complete and submit a BCCP Infrastructure Project Habitat Assessment Application, Pre-Approved Maintenance
Application, or a Vegetation Management Plan to BCCP Secretary and coordinate
with BCP landowner4
1 - See map "BCCP Permit Area and Preserve Lands in Travis County, Texas" in this booklet2 - Current BCCP Secretary: Willy Conrad, Division Manager, Wildland Conservation Division, Austin Water
Utility, City of Austin, Email: [email protected] Phone: 512-972-16613 - See BCP Land Manager Contact list in this booklet 4 - See document "Infrastructure Planning" in this booklet for more details5 - USFWS Austin Ecological Services Field Office, Phone:512-490-0057
Recommendation of conservation practices to infrastructure owner
Agreement of conservation
practices among inf rastructure owner, BCP landowner, and
BCCP Secretary
Contact USFWS Austin Ecological Services
Field Office5 for all projects, including maintenance and new construction
USFWS makes mitigation determination and recommendation of conservation
practices to infrastructure owner
Outside currently held BCP property boundaries, but anywhere within the
BCP acquisition area or outside approved corridors within BCP
properties
Within currently held BCP properties, in approved infrastructure corridors
In the BCP acquisition area or adjacent to its boundary
Adjacent to BCP property boundaries or boundaries of
BCP acquisition area
New construction
Maintenance
Project in the BCCPPermit Area, but outside the BCP
acquisition boundary.
BCCP Inf rastructure Coordinator makes a
mitigation determination. If
mitigation is required
Complete and submit a BCCP Infrastructure Project - Habitat
Assessment Application to BCCP Secretary2
9
INFRASTRUCTURE PLANNING GUIDELINES
Guidelines for the Operation and Maintenance of Facilities within the Balcones Canyonlands Preserve
(BCP)
The Coordinating Committee Secretary (CCS) shall be notified of any planned maintenance within
preserves by the various service providers or their contractors. Willy Conrad, City of Austin Wildland
Conservation Division Manager, serves as the CCS for the BCP. See the Land Manager Contact list at
the beginning of this booklet for contact information.
The notification shall contain a brief description of planned work and approximate dates the work will
be performed. Information needed to review infrastructure projects is provided in the BCCP
Infrastructure Project – Habitat Assessment Application (copy provided in this booklet, and on the City
of Austin’s website: www.balconescanyonlands.org. This application should be completed and
submitted to the City of Austin BCP for any new construction projects. For maintenance activities, a
Habitat Assessment Application, Pre-Approved Maintenance Application, or a Vegetation Management
Plan may be submitted.
In addition to working with the City of Austin BCP, service providers will need to coordinate with the
BCP landowner(s).
Pre-Approved Maintenance
Service providers shall work with the CCS to define and secure pre-approval for operation and
maintenance activities that may occur with a given corridor.
Where such maintenance activities are repetitive, mutually agreeable schedules shall be established.
Emergency Maintenance
Structural, facility, or equipment problems that threaten reliability or safety must be handled
immediately.
Equipment used during an emergency can vary widely and is dependent upon the circumstances
surrounding the emergency.
Work done under these circumstances may impact species of concern. Work during an emergency
should be done in such a manner as to minimize disruption and potential impacts to the species and their
habitats.
Efforts shall be made to contact the CCS for advice and guidance during emergency maintenance work.
Written notification describing the emergency maintenance work done shall be sent to the CCS within
five (5) working days after such work is completed. The infrastructure provider should also contact the
BCP landowner(s) during or immediately following the emergency to discuss what occurred.
10
INFRASTRUCTURE PLANNING GUIDELINES CONT.
Scheduled Maintenance
The CCS shall be notified in writing in advance of any maintenance activities not covered under “Pre-
Approved Maintenance” and “Emergency Maintenance.”
This type of scheduled work could consist of major facility replacement, repair and maintenance,
installation of cross and driveway culverts, grading and re-shaping of ditches, and clearing right-of-way.
Maintenance of Corridors
1. Access to all facilities shall be established, clearly identified on a map, and maintained.
The CCS shall work closely with the service providers to designate specific access routes to all
structures and facilities, consolidating access routes where possible and minimizing impact on the
species of concern.
The maximum width of these access routes shall be twenty feet (20’), except that they may be wider in
any curve to allow for clearance of truck booms.
Where possible, a closed canopy should be maintained over access routes to minimize fragmentation of
the habitat and potential impacts on species of concern.
2. Existing cleared areas near structure sites shall be used where possible to reduce clearing requirements.
Existing low-lying vegetation at structures shall be preserved to the maximum extent possible.
If needed, additional clearing at structure sites shall be limited.
Service providers shall work closely with the CCS whenever manipulation of vegetation is required to
ensure minimal impact on species of concern.
3. Clearing and trimming along the corridors shall be limited to the following:
Clearing/trimming from September 1 through February 28, outside of the breeding season of the
Golden-cheeked Warbler and Black-capped Vireo.
Minimum clearing for surveying purposes (typically a four foot [4’] line of sight).
Strategic mechanical removal or trimming of vegetation, limited only to vegetation that is detrimental to
the operation and maintenance of facilities. Requests to use chemicals may be approved by the CCS on
a case-by-case basis only.
11
INFRASTRUCTURE PLANNING GUIDELINES CONT.
Removal of fast growing native trees directly under electric transmission line conductors within the
corridor, and trimming of tree limbs to provide at least twenty feet (20’) of clearance from transmission
conductors. Stump-sprouting native trees should be cut back to allow the required clearance on the
edges of the corridor but to also allow re-sprouting to shrub form. Non-native trees – such as Chinese
Tallow and Chinaberry – should be removed when encountered.
Trimming of trees or limbs to provide at least six feet (6’) of clearance from electric distribution
conductors for span lengths up to two hundred feet (200’). If span lengths exceed two hundred feet
(200’), an additional one foot (1’) of clearance will be required for each one hundred fifty feet (150’)
length.
4. All trees and limbs cleared from the corridors shall be shredded, chopped, or hauled from the site.
Measures to prevent the spread of oak wilt must be followed at all times. This includes disinfecting
equipment and painting wounds on oak trees immediately after cutting.
With approval of the CCS, trees and limbs or shredded mulch may be left in piles outside the corridor
for use in remediation projects.
Special handling for oak trees exhibiting oak wilt will be necessary.
5. Sedimentation control measures will be installed and maintained in accordance with the rules and
regulations of the City of Austin, LCRA, Travis County or Texas Department of Transportation,
whichever may apply.
6. All excavated materials requiring disposal shall be removed from the corridor to an approved dump or
fill area.
7. Any cleared areas shall be re-vegetated with native grasses, forbs, shrubs, and/or trees to re-stabilize
vegetative cover within the approved time period.
8. The CCS and the service providers may develop and agree to clearing guidelines on a site-by-site basis
that may modify and/or supplement the guidelines stated above.
12
Infrastructure Planning: Frequently Asked Questions and Answers
1. What is the Balcones Canyonlands Preserve (BCP)?
Answer: The BCP is a system of preserves that exists as a multi-agency conservation effort operating under a
regional “10(a)” permit issued under the Endangered Species Act by the U.S. Fish & Wildlife Service (USFWS). The
permit was issued jointly to the City of Austin and Travis County in 1996, though several other organizations
(including LCRA, The Nature Conservancy, Travis Audubon Society, and private developments) also own and
manage land dedicated to the BCP. Ultimately, the goal is to set aside 30,428 acres in western Travis County as
habitat for eight endangered species: the Golden-cheeked Warbler (GCWA), Black-capped Vireo (BCVI), and six
karst invertebrates. In addition, the preserves are designed to protect 27 species of concern, including 25 karst
invertebrates and two plants. Please see the following websites for more information about the BCP:
www.balconescanyonlands.org
2. What is the difference between the Balcones Canyonlands Conservation Plan (BCCP) and the BCP?
Answer: While the BCP is the more visible side of the regional effort to conserve endangered species and their
habitat, the BCCP is the habitat conservation plan that established the preserve system and how it would be funded
and organized. This plan serves as the basis for the federal permit. The BCCP was created to assist Travis County
landowners in complying with the requirements of the Endangered Species Act. The BCCP is a voluntary,
streamlined alternative to obtaining an “incidental take” or “10(a)” permit from the USFWS. The BCCP strikes a
balance between community demands for growth and economic development with federal law by protecting over
30,000 acres to offset habitat impacts within Travis County.
3. Who oversees the infrastructure program for the BCCP, and where do I find out information about what is required of
infrastructure service providers?
Answer: The City of Austin BCP manages the infrastructure program. The City of Austin BCP is part of the Wildland
Conservation Division of the Austin Water Utility. For more information on the infrastructure process, contact the
City of Austin’s BCP office (see Land Manager Contact list at the front of this booklet; flowchart and other
information in this booklet).
4. What is the difference between infrastructure permits and participation certificates?
Answer: The infrastructure program covers roadways, utilities, and other capital improvement projects throughout
the permit area and is managed by the City of Austin. Participation Certificates cover residential and commercial
developments and are issued by Travis County. Infrastructure service providers who are not signatories of the BCCP
may also purchase Participation Certificates as mitigation for infrastructure projects. Fees generated through the
Participation Certificate program are used to assist with BCP land acquisition.
5. Where is the BCCP permit area?
Answer: A map of the BCCP permit area is included in this booklet. It is limited to western Travis County and
generally includes areas west of the MoPac Rail Line, but not areas to the east of this line. It also does not include
the area within the Balcones Canyonlands National Wildlife Refuge.
6. What is “Appendix B”?
Answer: Appendix B is the infrastructure management plan appended to the BCCP that defines infrastructure
corridors within the BCP acquisition boundary and outlines the infrastructure process inside and outside of the BCP.
7. What are some examples of infrastructure?
Answer: Roads and electric, gas, telephone, cable, water, and wastewater lines.
8. Why is infrastructure planning so important to the BCP?
Answer: Infrastructure planning is critical to avoiding and minimizing further endangered species habitat loss and
fragmentation in the BCP. Fragmentation and edge effects reduce the quality of the habitat needed for successful
reproduction. Because the BCP has been designed to mitigate habitat loss outside of the preserves, protection of the
remaining habitat is essential.
13
Infrastructure Planning: Frequently Asked Questions and Answers
9. Have existing corridors outside the BCP but within the BCCP permit area been mitigated through the BCCP?
Answer: No. “Take” is only covered for activities within approved infrastructure corridors inside the BCP. For all
other infrastructure projects, a BCCP Infrastructure Project – Habitat Assessment Application should be completed
and submitted to the BCCP Coordinating Committee Secretary for a determination of whether mitigation is
necessary.
10. How do I determine whether mitigation is required for my project? How long will it take to obtain a determination
for my project? What will I receive from the City of Austin BCP?
Answer: First determine whether your project is within the BCCP permit area. If so, complete and submit a BCCP
Infrastructure Project Habitat Assessment Application to the City of Austin BCP, who will determine whether
mitigation is necessary. Typically the review process takes 7-30 days, depending on the completeness of the
application and City of Austin BCP staff workload. The City of Austin BCP will provide a letter stating whether
mitigation is needed, and if so, the acreage of the impacted area for each species (GCWA, BCVI, and/or karst
invertebrates). The letter will also provide general recommendations to minimize species impacts and, for areas
within the BCP, identify the BCP landowner(s). Examples of letters provided to non-signatories to the BCP and BCP
managing partners are included in this booklet.
11. What is the infrastructure process for non-signatories to the BCP (private utilities)? For BCP managing partners?
Answer: Both begin the process by submitting a BCCP Infrastructure Project Habitat Assessment Application to the
City of Austin BCP. Once the City of Austin BCP has made a mitigation determination, non-BCP signatories may
purchase Participation Certificates or work with USFWS to address mitigation needs. BCP managing partners do
not have to pay fees but instead deduct credits from their mitigation land banks. For new construction within
approved infrastructure corridors, BCP managing partners must show as part of the application that their new
construction projects have been mitigated (mitigation bank).
12. How are mitigation bank activities accounted for? How much is left?
Answer: The City of Austin BCP tracks the mitigation deductions for each BCP managing partner through the
infrastructure process and reports the credits and deductions each year in an annual report to USFWS. .
13. For BCP managing partners, are mitigation credits required for maintenance work or just new projects? For example,
would LCRA use credits for their preserves to mitigate for clearing for maintenance of infrastructure or just for new
construction projects?
Answer: Typically, no additional mitigation is required for routine maintenance within approved corridors in the
preserves. However, if an approved infrastructure corridor hasn’t been cleared and habitat has grown back,
mitigation will need to be re-assessed.
14
Infrastructure Planning: Frequently Asked Questions and Answers
14. What constitutes emergency maintenance? How are emergencies within the BCP handled?
Answer: Emergencies include threats to public health and safety, including structural, facility, or equipment
problems that threaten reliability or safety. In the event of an emergency, act immediately to address the needs. To
minimize impacts to the species and their habitats, efforts should be made to contact the BCCP Coordinating
Committee Secretary (Willy Conrad, 512-972-1661) for advice and guidance during emergency maintenance work.
Within 5 days of completing the work, provide written notification describing the emergency maintenance work to the
Coordinating Committee Secretary. The infrastructure provider should also contact the BCP landowner(s) during or
immediately following the emergency to discuss what occurred.
15. What is “pre-approved maintenance”?
Answer: Where the infrastructure provider has worked with the City of Austin BCP and the BCP landowner(s) to
define and secure pre-approval for routine operation and maintenance activities within an approved corridor (within
the BCP). Where such maintenance activities are repetitive, mutually agreeable schedules can be established. The
benefit of having “pre-approved” maintenance is negating the need for repeated project reviews.
16. What is “scheduled maintenance”?
Answer: Where the infrastructure provider notifies the City of Austin BCP and the BCP landowner(s) in advance of
any maintenance activities not covered under “pre-approved maintenance” or emergency maintenance. This type of
scheduled work could consist of major facility replacement, repair and maintenance, installation of cross and
driveway culverts, grading and re-shaping of ditches, and clearing of right-of-way. Notification is in the form of a
written plan or application, which must be approved by the City of Austin BCP and BCP landowner(s) for each
maintenance project.
17. What measures can be implemented during maintenance or construction to protect the GCWA and BCVI?
Answer: This will be discussed during the application process with City of Austin BCP staff. For corridors within the
preserves, infrastructure service providers will also need to work with the BCP landowner. Recommendations
typically include maintaining closed canopy woodlands to minimize fragmentation; consolidating access routes;
leaving native shrubs and grasses; minimal and strategic pruning; removal of non-native trees; measures to prevent
the spread of oak wilt; measures to control erosion and sedimentation; revegetation with appropriate native plants;
prohibiting the use of herbicides and pesticides; and avoiding the critical nesting season (March 1 – August 31).
18. What are the dates to avoid when working within the BCP (unless in an emergency)?
Answer: March 1 – August 31 (GCWA and BCVI nesting season).
19. What design/construction-related activities (i.e. survey, geotech investigation, etc) can be performed on BCP
properties during GCWA/BCVI breeding season?
Answer: Very little, so planning ahead is critical. Emergencies are understood to be special situations. Activities
that could have been conducted outside of the GCWA/BCVI breeding season but were delayed due to poor planning
are not considered to be emergencies.
20. Why is implementing measures to prevent oak wilt so important?
Answer: Oaks provide critical nesting and feeding sites for both the GCWA and BCVI. The loss of trees due to oak
wilt can be extensive and devastating, and there is no cure. Trenching in an effort to contain infected areas is
expensive and not fully effective in preventing further spread. Thus, the only way to avoid the further spread or
introduction of oak wilt is to ensure preventative measures are implemented.
21. What measures can be implemented during maintenance or construction to protect karst species?
Answer: This will be discussed during the application process with City of Austin BCP staff. For approved corridors
within the BCP, infrastructure service providers will also need to work with the BCP landowner(s). Protective
measures may include ceasing work (such as drilling holes) if a void is encountered and contacting USFWS and BCP
staff; avoiding driving/crossing sensitive areas; erosion and sediment control; maintaining surface vegetation;
minimizing soil disturbance; and prohibiting the use of chemicals, including herbicides and pesticides.
15
Infrastructure Planning: Frequently Asked Questions and Answers
22. Some erosion controls such as silt fences may be more destructive and less appropriate than more recent alternatives
such as mulch berms. Could these alternatives be used instead of standard temporary controls?
Answer: This should be discussed during the application process with the City of Austin’s BCP and the BCP
landowner(s). Typically, sedimentation control measures are installed and maintained in accordance with the rules
and regulations of the City of Austin, LCRA, Travis County or Texas Department of Transportation, whichever may
apply.
23. Should all brush be removed or shredded and mulched on site? If so, how thick can the mulch be?
Answer: This will be site-specific and should be discussed with City of Austin BCP staff and the BCP landowner(s).
Appendix B states that brush should be hauled off site. Brush piles are not allowed because they pose a fire hazard
and provide habitat for avian nest predators. However, strategic placement of tree limbs on slopes may be beneficial
to help control erosion; special handling for oak trees exhibiting oak wilt will be necessary. Chipping and shredding
brush may also be recommended to provide mulch around plants and over bare soil. Typically, mulch should be
spread uniformly about an inch thick over bare ground.
24. Are there BCP management activities we should be aware of?
Answer: Yes. The BCP conducts deer hunting during the fall and winter on several tracts within the BCP each year.
The hunts typically begin November 1 (the meat is donated to the Hunters for the Hungry program, a statewide effort
to receive donated meat and distribute it to food banks around the state. The BCP is the largest contributor in Texas
to this program). Always call ahead to check if this land management activity is occurring on the property where an
infrastructure crew needs access.
25. Why is the BCP acquisition goal only 30,428 acres? Why not try for more if possible?
Answer: The BCCP established a minimum of 30,428 acres which was arrived at through a combination of political
and biological discussions. The requirement of the federal permit is the minimum of what is needed, not the amount
that was originally recommended. In the 1980s and 1990s, the Biological Advisory Team assembled to contribute to
the habitat conservation planning effort initially proposed 120,000 – 150,000 acres, which represents one of every
four acres west of MoPac. The USFWS stepped up to assist with protection by establishing the Balcones
Canyonlands National Wildlife Refuge northwest of Austin with the goal of protecting 46,000 acres.
26. Does BCCP take donations to purchase more acres for the preserve?
Answer: Certainly! Acquisition is still continuing, and any efforts to assist the BCP managing partners would be
most welcome. Travis County is currently taking the lead in completing the BCP acquisitions and is trying to
leverage things like conservation easements and federal grants to acquire remaining acreage. Anyone with a new
idea about funding or an interest in donating funds is welcome to call Travis County BCP staff (see Land Manager
Contact list at the front of this booklet).
27. Is there any chance the populations of GCWA and BCVI could stabilize and reproduce to the point they would be
taken off the Endangered Species list?
Answer: Regardless of the status of the GCWA and BCVI, the BCCP requires that their habitat within the BCP be
protected in perpetuity. When reviewing the status of these species, the USFWS would take the success and
effectiveness of the BCP into consideration.
16
17
18
19
Golden-Cheeked Warbler and Black-Capped Vireo
golden-cheeked warbler black-capped vireo
Appearance 4-5 inches long. Males have yellow feathers on "cheeks", with a black stripe through the eye, a black throat, and cap on the head with a white belly. The female resembles the male, but with less striking colors.
4.5 inches long. Mature males have olive green on back, white on belly, and a yellow-green on their flank above their leg. Species name comes from the black color on the top & sides of head. The female coloring is duller than the male with a grey head in place of black.
Habitat Oak-juniper woodland (closed-canopy stands of mature Ashe juniper mixed with species of oak such as live oak, Spanish oak, and shin oak)
Low scrub, often on poor/eroded soils. In central Texas, this type of habitat is often a result of regrowth after the occurrence of clearing, overgrazing, or fire.
Diet Caterpillars, spiders, beetles, & other insects
Adult insects, insect larvae, & spiders
Threats Habitat loss & fragmentation due to urbanization, brown-headed cowbirds & edge predators such as domestic and feral cats, rat snakes, squirrels, and jays.
Brood parasitism by brown-headed cowbirds, loss of habitat and fragmentation from clearing, over browsing by deer/domestic animals, fire suppression, natural succession (changing preferred habitat into woodland), & edge predators such as domestic and feral cats, rat snakes, squirrels, and jays.
Nesting behavior/ materials
Nest is open cup woven of strips of juniper bark & insect silk, lined with grass, hair or down and placed in small tree. Mature juniper trees (over 20 years old) are vital because they have shredding bark that is used as nest building material.
Nest placement in trees/shrubs only a few feet from the ground. Open hanging cup made of leaves, grasses, plants, and animal silk, lined with grass.
Migration Spends winters in Central America and southern Mexico and returns to Central Texas in March.
Spends winters on the western coast of Mexico and March/April to August/September in Texas
Breeding range
Central Texas only, in spring & summer Central and southwest Texas. May still breed in small parts of OK and Mexico. Breeding season is April to August.
Incubation/ nesting
Lay three to five eggs (one per day on consecutive days), incubation for 11-12 days, fledging around 9 days after hatching.
Four eggs are usually laid. Incubation is 14 to 17 days, and young fledge 9 to 11 days after hatching. Usually nests more than once a year in a new nest each time.
Behavior Forages by gleaning from foliage & branches and sometimes hangs to glean from undersides of leaves.
Gleans from leaves, twigs, & branches. Sometimes hangs upside down or hovers while feeding.
Endangered Listing Date
1990 1987
20
21
22
23
24
25
26
27
28
29
30
31
Balcones Canyonlands Conservation Plan Infrastructure Project - Habitat Assessment Application
Application No. __________________ 1. Applicant Information:
Applicant Name: ____________________________________________________________________
Company or Agency: ________________________________________________________________
Mailing Address: ____________________________________________________________________
City: _________________________ State: ____________ Zip Code: ________________
Contact Name: ___________________________ Contact Title: ______________________________
Daytime Phone # (____) ____-______ Fax # (____) ____-______
Email address: ___________________________________________________________
2. Landowner:________________________________________________________________________
Contact Name and Department/Division: _________________________________________________
Mailing Address: ____________________________________________________________________
City: _________________________ State: ____________ Zip Code: ________________
3. Project Name: ______________________________________________________________________
Applicant’s Project Number (if applicable): _______________________________________________
Street Address or Location Description: __________________________________________________
Project Manager: ____________________________________________________________________
Phone (___)____-______ Email address: _____________________________________
4. Brief Project Description: ____________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
5. Description of Vegetation Disturbance: _________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
__________________________________________________________________________________
32
Application No. _______________
6. Dimensions of Disturbed Areas (length, width, total square feet): ___________________________
__________________________________________________________________________________
__________________________________________________________________________________
7. Total acreage of disturbed area: __________________________
8. Attach to this application:
1. Regional map showing location of project
2. Site plan maps
3. Access route map, including length and width of route and type of equipment to be used with locations
marked (new construction projects only)
4. Map delineating disturbed areas (show source of #6 and #7)
5. Copies of any City of Austin environmental permits, if applicable
6. On-site, single point project contact (include phone and email address)
9. Has the U.S. Fish and Wildlife Service (USFWS) determined mitigation requirements or potential take of listed
species for this project or a portion thereof?*YES____ or NO____
*If YES, attach a copy of the calculations and any related correspondence from USFWS.
ADDITIONAL COMMENTS:
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
I realize that failure to supply complete information with this application may delay processing. I understand that a copy
of this application may be provided to the Austin office of the U.S. Fish and Wildlife Service, and that habitat
assessments are valid for six (6) months after completion. I certify that all statements on this application are true and
correct to the best of my knowledge.
___________________________________________________ ______________________
SIGNATURE of Person Responsible for Submitting Application DATE Signed
___________________________________________________ ______________________
PRINTED NAME of Person Signing Company or Agency
Call or fax directly to: Kimberlee Harvey 512/972-1686 or Fax 972-1665
Submit applications to: BCP Program - Infrastructure
Wildland Conservation Division, Reicher Ranch
Austin Water Utility
3621 South FM 620 Rd.
Austin, Texas 78738
Attn: William Conrad
City of Austin Wildland Conservation Division Manager
33
Sample: BCCP Partner Infrastructure Mitigation Letter
Michael Wallace
Transportation and Natural Resources
411 West 13th
Street Austin, Texas 78767
Re: Improvements to Crosswind Dr. and Tradewind Dr. (BCCP Application # Travis County 09-006)
Dear Mr. Wallace:
Thank you for your application on behalf of Travis County regarding the proposed improvements to 1.5 miles
of Crosswind Drive and Tradewind Drive, from the intersection with Beek Road to the second intersection
(North) of Tradewind Road. The proposed project will consist of repaving and spot drainage improvements. All
proposed work will be done within the existing ROW.
The project site lies outside of the preserve acquisition boundary for the Balcones Canyonlands Preserve. Based
upon a review of the project plans submitted with the application, this project is eligible to participate in the
regional Balcones Canyonlands Section 10 (a) permit. Participation under the BCCP permit will cover
incidental take of endangered species habitat, particularly golden-cheeked warbler habitat that the project might
impact.
Based on current BCCP habitat zone maps and the calculations provided with the application, .12 acres of Zone
2 golden-cheeked warbler habitat would be cleared of vegetation. No sensitive karst features would be affected
by this project.
Because this is a Travis County infrastructure project, mitigation needs are provided from the mitigation bank
balance maintained by Travis County. The vegetation removal would occur in Zone 2 golden-cheeked warbler
habitat. For the clearing of .12 acres of Zone 2 habitat, the mitigation assessed for BCCP partners is ½ acre of
Zone 1 mitigation for every 1 acre of Zone 2 take. All mitigation acreages for infrastructure projects are
rounded up to the next 0.1-acre increment under calculation procedures approved by the Balcones Canyonlands
Coordinating Committee. Therefore, a deduction of .1 acres of Zone 1 warbler habitat mitigation will be made
to the Travis County current balance for the proposed project due to the calculations approved by the Balcones
Canyonlands Coordinating Committee.
As stated in your application, clearing activities will occur within areas designated as Zone 2. When
participating under the BCCP permit, there are important requirements that relate to site clearing and
subsequent construction activity that must be observed. Clearing of woody vegetation should be completed
during the months from September through February. After March 1, such work must cease since golden-
cheeked warblers will have returned to the area to nest. During the period from March through August,
vegetation removal can be done only after a bird-monitoring program using USFWS protocols demonstrates
that no nesting birds are located within 300 feet of the project bounds. Construction may proceed beyond the
deadline once the natural vegetation has been removed in accordance with USFWS protocol.
If you have any further questions regarding this assessment or encounter any problems, please feel free to call
me at (512) 972-1662.
Sincerely,
William A. Conrad
BCCP Secretary
Sample: Non-partner Infrastructure Mitigation Letter
34
Re: Slaughter Lane to Highway 290 (S. Mo-Pac Expressway)
BCCP Application # xxxxx
Dear Mr. Doe:
Thank you for your application on behalf of the Utility Service for the Slaughter to Highway 290 (S Mo-Pac Expressway)
Pipeline Construction. The proposed project encompasses the construction of a gas line to improve gas distribution
service to areas located in western Travis County, Texas. The pipeline will be installed in a new right-of –way (ROW)
within the existing MoPac (ROW) from Slaughter Lane to Highway 290.
The project site lies outside of the preserve acquisition boundary for the Balcones Canyonlands Preserve (BCP). Based
upon a review of the project plans submitted with the application, this project is eligible to participate in the regional
Balcones Canyonlands Section 10(a) permit. Participation under the BCCP permit will cover incidental take of
endangered species habitat, particularly golden-cheeked warbler, black-capped vireo, and karst invertebrate habitats that
the proposed project might impact.
As described in the Habitat Assessment Application for this project, the construction footprint will be 18,480 linear feet x
30 feet wide = 554,400 sq ft, totaling approximately 12.73 acres. All trenching, ditching, and boring associated with the
proposed project will occur within the MoPac ROW. The proposed pipeline cuts across portions of Zone 2, unconfirmed
warbler habitat, and Zone 3, not known to be warbler habitat. However, since all work will be done within the existing
MoPac ROW and since all woody vegetation has been cleared from this area, it is anticipated that no warbler habitat will
be impacted. Therefore, no fees will be assessed. The proposed pipeline will cut across 15,000 linear feet of karst zones 1
and 2. No designated BCCP caves will be affected by the proposed action. However, three protected BCCP caves
(District Park, Whirlpool, and Get Down Cave) are in the immediate vicinity of the proposed pipeline and the Project
Manager and Construction Manager will need to be aware of the sensitivity of trenching through karst limestone.
The mitigation requirements for the pipeline project impacting habitat are 10.4 acres of Karst Zone habitat (15,000 linear
feet X 30 feet wide = 450,000 sq ft =10.33 acres). All mitigation acreages for infrastructure project are rounded to the
next 0.1 acre increment under the calculation procedures approved by the Balcones Canyonlands Coordinating
Committee. The fee for karst mitigation is $750/acre. At current Balcones Canyonlands Conservation Plan (BCCP)
participation rates, coverage for this project would amount to $7,800, payable to the BCCP. These mitigation fees are
used to purchase additional habitat lands within the Balcones Canyonlands Preserve for the long-term protection of the
listed endangered species and other species of concern.
I am passing this habitat assessment along to Travis County for preparation of a participation certificate. Travis County
will provide the necessary participation agreements for your signature and issue the certificate upon receipt of the
participation fee. Your contact for this phase of the application process is Michael Wallace, Travis County Transportation
and Natural Resources, at 512-854-7215.
Following the above requirement, this letter constitutes your authorization to proceed through participation in the regional
Section 10(a) permit. No clearing of vegetation in or within 300 feet of occupied warbler or vireo habitat is allowed nor is
it authorized under this letter of habitat assessment during the birds’ breeding/nesting season (March 1 – September 30).
Additionally, participation by subsurface excavation projects near karst habitats, such as this project, should note that
when construction activity uncovers new caves or significant karst features, such work must cease and the local USFWS
Ecological Services office notified to check the cave for endangered species. Internal City assistance during such
discoveries may also be obtained from the Watershed Protection and Development Review Department (974-2781 or 974-
1916) or this office. It should be noted that the applicant has agreed to follow the City of Austin’s specifications for void
mitigation during trenching operation.
If you have any further questions regarding this assessment or encounter any problems, please feel free to call me at (512)
972-1660.
Sincerely,
William A. Conrad
35
36
37
Danger
Zone**
Maximum
Vegetation
Height**
Maintenance
Frequency
(years)
Date Last
Maintained
** Height above ground surface
All vegetation maintenance plans must be linked to a GIS Shape file that is either in the BCCP infrastructure system or is submitted with the
application. See the BCCP Infrastructure Guidelines for details on formats and required information.
****Manual or mechanical (if mechanical give detailed description of equipment and methodology.
*Expand the table on this form as needed to include all segments. Segments will be defined between each tower or valve.
BCCP PREAPPROVED INFRASTRUCTURE PLAN APPLICATION
VEGETATION MAINTENANCE
Describe maintenance methodology****
Type (electric, water, wastewater, other):
Description (Voltage, pipe size, other):
Trees to Remove***
***List by species and number
GIS Reference information:
Segment*
Infrastructure Corridor:
Infrastructure Owner:
Landowner/managing entity:
Infrastructure Description
Length: Width: