Beamline Readiness Review - HutchBeamline 12.3.2
Microdiffraction
March 28, 2006
Floor Plan, Sector 12 25L760C
Sector 12 superbend beamlines 12.2.2, 12.3.1 & 12.3.2
Hutch Assembly Details
Hutch construction drawing from vendor
Wall panel construction
2mm sheet lead
1” thick - 4# mineral wool insulation
14 gauge steel
Prior to assembly, interior materials have combined thickness of 52.8mm
After assembly, the interior components havebeen compressed to 47.6mm from 52.8mm
Wall panel construction
Wall panel connection detail
Typical Wall Panel with Pb sheet installed
Panel with second layer of insulation installed
Front wall prior to second layer of insulation
Window
2nd front wall panel with opening for 12.3.2 beampipe
Typical wall corner with Pb bent along vertical edge
Different corner with 2nd layer of insulation
H- channel with Pb captured
Pb
Pb visible in all of these H-channel units
bottomside
Pb
Framed opening detail – labyrinths, beampipe opening
Labyrinth Pb detail prior to insulation
Pb in track prior to steel cap
Labyrinth detail
Labyrinths after Pb shielding applied
Labyrinth with detail of how Pb is doubled over
Overview of back wall construction
1” overlap from Backwall to flashing
Roof to back wall connection detail
Back wall Pb overlap detail
Fastening tabs to secure to structural brace
Pb overlap
Back wall right side
Back wall detail
Lead laminatedto steel
Steel
Back wall detail 2
Lead overlap for next panel
Roof – Wall panel connection