Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

Embed Size (px)

Citation preview

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    1/116

    S T AT E O F V E R M O N TP U B L IC S E R V IC E BO A R D

    Pe tit io n o f B eav er W o od E n er gy P ow na l, L L C )for a Ce rt ifi ca te of P u bl ic G ood , p u rsu an t to 30V .S .A . 2 48 , to in sta ll and o p e ra te a B io m assE n er gy Fa ci lit y an d an in teg ra ted w oo d p e lle t ) D o ck e t Noan uf ac tu rin g fac il ity lo ca te d n orth o f the o ld )G reen M ou n tai n R ac etra ck in P ow na l, V erm on t, )to b e k n ow n as t he P ow n al B io m ass P ro jec t )

    PR E -F IL E D TE S T IM O N Y O FM E D D lE P E R R Y

    ON B E H A L F O FB E A V E R W O O D E N E R G Y P O W N A L, L L C

    O cto b e r 25, 20 10

    T h e pu rp o se o f th e p re -f il e d te s t im o n y of Mr. P erry is to de m o n str at e th at th e proposedP o w n a l B io m ass P ro je ct w ill co m pl y w ith cer ta in p ro v is io ns o f 30 V S .A . 248 (b) (5).na m el y th ose p er ta in in g to h e a d w a te

    rs , w aste di sp osa l, f lo od w ay s, str eam s, sh or el in e s,w at e r sup p ly for th e P ro je ct , and b ur de n o n ex is tin g w a te r su pp li es .

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    2/116

    T A B L E O F C O N TE N T S

    1 . Int ro du ct io n .1

    2. S um m ary of F in d in gs 4

    3. C o nc lu si o n 12

    E X H IB IT S

    P et iti on er s Ex h ibi t MP-1 R esu m o f M ed dl e P erry

    P et itio n er s E x h ib it M P -2 G ro un d w a te r W ith dr aw al P erm it A pp lic at io n

    P e tit io n e rs E xh ib it M P- 3 U n d e rg ro un d In jecti on C on tro l P e rm it A pp li ca tio n

    P et iti o ne rs Ex hi bi t M P -4 F loo d Z o n e M aps

    P e tit ion e rs E x hi b it M P -5 H o o s ic R iv e r P rocess W ate r Intake: D e Minimis

    P e tit io n e rs E xh ib it M P -6 So u rce P ro tec ti o n Plan: P o ta b le W aterSupply Well

    Pe ti tio ne r s E x hi b it M P -7 T w o -Y e ar T rave l A naly sis : D o m es ti c W aste w ate r

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    3/116

    S T A T E O F V E R M O N TP U B L IC S E R V IC E B O A RD

    P eti tio n o f B eave r W oo d En erg y Po w na l, L L Cfor a C e rti fic at e o f P ub li c Good, p u rsu an t to 30

    V .S. A . 248 , to ins ta ll and o pe rate a B io m ass )E n er gy Fa ci lit y and an int eg ra ted w oo d p ell et ) D o cket Noa nu fa ct ur in g fac il it y lo cat ed n orth o f th e o ldG ree n M o u n ta in R ac et ra ck in Pow na l, V erm o n t, )to be k n o w n as the P ro jec t

    P RE -F IL E D T E S TI M O N Y O FM E D D lE P E R R Y

    O N B E H A L F O FB E A V E R W O O D E N E R G Y P O W N A L , L L C

    1 1. In tr od uc ti o n

    2 Q l. P le ase state your n am e , b u sin es s ad dr es s and em p loy m en t.

    3 A l. My n am e is A rn ed d ia(M e dd ie ) Jo hn P err y, and I am a se n io r h yd ro g eo lo g ist at4 V an asse H an ge n B ru st lin (V H B ). M y bu sin es s add re ss is 7056 U.S. R ou te 7,5 N orth F e rri sb ur g h , V erm o n t. M y full re su m is p ro vi de d as P e tit ion e rs Ex h ib i t6 M R -i .

    7 Q2. P lease de sc ri be yo ur e d u ca tio n a l b ac k gr o u nd and p ro fe ss io na l ex pe ri ence .

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    4/116

    P ow n al B iom ass P ro ject, PSB D o ck e t No.

    _ _ _ _ _

    P re fil ed T es ti m o n y o f M ed die P e rryO c to be r 25, 20 1 0

    Page 2 o f 12

    1 A2. M y ed u ca ti on a l b ac kg ro un d inc ludes a b ach e lo r of sc ie nc e d eg re e w hic h I

    2 re ce iv ed in 1995 fro m St. L aw ren ce U ni ve rs ity in C an to n, NY in the fields of

    3 env ir o n m en ta l sci ence an d b io log y . I hav e ta ken ad d iti on al cou rsew ork in

    4 h y dr o lo g y and h y d ro ge o lo g y at the U ni ve rs ity of V erm o n t at th e g radua te le ve l,

    5 as w el l as co n tinu in g e du ca ti on course s for hy d rog eo lo g ist s . I ha ve been

    6 em pl oy ed as a co n su lti n g hy dr og eo lo g ist in V er m o n t since 1996 and in th at

    7 cap ac ity I h av e m a nag ed d ozen s of h y d ro g eo lo gi c st ud ie s w h ic h have eva lu ate d

    8 safe y ie ld s o f u n d er g ro u nd w at e r sou rc es ; the effe ct s to aqu if er s a nd w a te r

    9 su p pl ie s caused by d ev e lo p m e n ts , w ate r su pp ly w el ls, an d co n ta m in a tion sources;

    10 lan d -ba se d d isp osa l o f w ast ew a ter and its im pac ts to g ro u nd w a te r and sur fa c e

    11 w a te r qua li ty ; and ha ve ev a lua te d e ff ects o f w ate r w ith d raw a ls to sur fa ce water

    12 hy d ro lo g y . I hav e b een cer tif ie d by the N atio na l G ro u n d w a te r A ssoc ia ti o n as a

    13 C er tif ied G ro u nd w a te r P ro fe ssi on al (C G W P ).

    14

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    5/116

    P ow nal B iom ass P ro jec t, PSB D o ck e t No.

    _ _ _ __

    P re fil ed T esti m o ny o f M ed d le P e rr yO c to b e r 25, 20 10

    P ag e 3 of 12

    1 M o re sp ec if ica ll y , p ro jects w h ic h I hav e m an ag ed inc lu de successfu l ex p lo ra ti on

    2 for aqu ifer s an d d ril lin g lo ca ti on s for h ig h y ie ld in g b ed ro ck and g ra ve l w el ls,

    3 de te rm in at io n s o f th e sa fe y ie ld of gra ve l and b ed roc k aquifers for pub li c sup p ly

    4 w el ls, d e li n eat ion s o f wells cap tu re zon es, re ch a rg e areas, and w ellh ead

    5 pr ote ct io n areas, ev al ua tio n s of the im pac ts o f h ig h yie ld in g wells on ex ist ing

    6 w ater sou rces , and s tud ie s of th e h y d ro lo g y o f su rf ac e w at er s as th ey rela te to

    7 fl o od in g , s to rm w ate r, an d w ater w ithd raw al s . My pro fess io na l e x perie nce

    8 enc o m p asse s d a ta co ll ec tio n and fie ld w ork as well as pro ject de si g n and

    9 pl ai m ing , d a ta an a ly sis and in te rp re tat ion , rep o rti ng , and exp er t tes tim o ny .

    10 Q3. W h at is the p ur po se o f you r t e s ti m o n y ?

    11 A3. T h e p ur po se o f my tes tim o ny is to d em o n stra te tha t the P o w na l B iom a ss P ro jec t

    12 (th e P ro jec t ) sat is fi es th e req u ire m en ts o f 30 V.S.A. 248(b )( 5) . Section

    13 24 8(bX 5) p ro v id es , in p er tin en t pa rt , th at a gen e ra ti o n or tra ns m iss io n fac il ity

    14 sh ou ld no t h ave an u nd u e adv e rs e ef fect on w at er p ur ity or the natural

    15 en v iro nm ent , w ith due co ns id er ati on h av in g b een g iven to the cr ite ri a sp ec ifi ed in

    16 10 V .S .A . 1 424 a(d ) (O ut s ta nd in g R eso u rc e W at e rs) and 6 086 (a )(1 ) th ro ug h

    17 (8) a nd (9 )(K ) (v ar io us A ct 250 c rite ria ). My te s tim ony sp ec ifi cally covers

    18 H ead w a te rs [ 6 08 6 (a) (1 )( A )J, W aste D isp os al [ 6 0 8 6 (a )(l )( B )], F loo dw ays [

    19 6 0 8 6( a )(1 )(D )J , S tream s [ 6 0 86 (a )( 1 )(E )J . S horeli ne s [ 60 86(a )(1 )(F )], Water

    20 S upp ly fo r the P ro jec t [ 6 08 6( a) (2 )], and B u rd en on E x istin g W ater Supplies [

    21 60 86(a )(3 )J .

    _ _ _ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    6/116

    P ow n al B io m ass Pr oj ect, P 5 8 D o ck e t No.P re file d T estim on y o f M edd ie Pe rry

    O cto be r 25, 2010P a ge 4 of 12

    1 M y co ll eagu e , A dam Crary, a p ro fe ss ion a l w e tl and sc ien ti s t, p ro v ides te s tim ony

    2 re lat ed to S tr eam s [ 6 08 6( a) (1) (E )1 , W etla nd s [ 60 8 6 (a )( 1 )(G )j , Rare and

    3 Ir rep la ce ab le N a tu ra l Areas [ 6 086 (a)(8 )J, and N ecessa ry W ild lif e H ab ita t and

    4 E n da ng er ed S peci es [ 60 8 6 (a)(8)(A)1.

    5

    6 Q4. H av e you test if ied p re v iou sl y be fo re th e B oar d?

    7 A4. Yes. P rev io u sly I hav e te s ti f ie d re g ar d in g an ap p li ca tio n for a C er tif ica te o f

    8 P u b lic G ood for B o lto n V al ley W ate r and Se w er. A dd it io na ll y , I h av e tes tif ie d in

    9 my capacity as a h yd ro g eo lo g is t fo r nu m ero u s A ct 2 50 hea ri ngs betw een 1997

    10 and 20 1 0 c on ce rn in g c rite ria reg ardi ng W aste D isp osa l [ 6 086(a)(1) (B )] .

    11 F lo o dw ays [ 6 0 86 (a )(1 )( D )], S tr eam s [ 60 86 (a )( 1 )( E )1 , W ate r S uppl y for the

    12 P ro je c t [ 6086( a) (2 )1 . arid B u rd en on Ex is tin g W ate r S upp lie s [ 608 6( a) (3 )].

    13

    14 2. S um m a ry of Findin2s

    15 Q5. B as ed up on y ou r eva lu ati on an d ana lys es , does th e P ro je c t com ply with S ec tio n

    16 248?

    17 A 5 . Yes. T he p roj ec t co m pl ies w ith th e H ead w a te rs crite rio n [ 6 08 6 (a ) (1 )( A )J

    18 beca us e th e s it e is not in a hea dw a ter s lo ca tio n . It com pli e s with the \Vaste

    19 D isp o sa l c ri te rio n [ 6 0 8 6 (a )(1 )( B) ], w ith re spect to the di sp os al of process

    20 w astew a te r, b e ca u se an on -s ite soi l-b as ed w as tew ate r in fi ltr a tio n system has been

    21 desi g ne d th a t m eet s th e re qu ir e m en ts of the V erm o nt U n derg ro u nd Injection

    22 C ontr ol R u le (C h a p te r 13 of th e E nv ir o n m en tal P ro te c tio n Rules), and a permit

    _ _ _ __

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    7/116

    P o w n a l B io m ass Pr oj ec t, PSB D o ck et No.P re file d T estim o n y of M ed d ie P er ry

    O cto b e r 25, 2010P ag e 5 of 12

    1 ap p lic a tio n is p en d in g . W ith re sp ect to do m esti c sewage, it com plie s with DEC

    2 reg u la tio ns in c lud in g the m ai nt en an ce o f ad eq uat e sep ara ti o n d is ta nces to exi s ti ng

    3 w at e r supp lie s. E ngi n ee rs fro m B run o A ssoc ia te s and from B eav e r W o o d E nerg y

    4 P o w na l, L L C w ill te s ti fy reg ar d in g o th er w as te s fro m the P ro jec t. The P ro jec t

    5 m ee ts th e F lo o dw ay s c rit er ion [ 60 86 (a )( 1) (D )1 because the ab ov e -gr ad e

    6 de v e lo p m e nt is be in g p ro p osed for lo ca tio ns tha t are o u tsi de th e regu la tor y

    7 flo od w ay , an d ou ts id e th e F lu v ia l E ro sio n H aza rd (F E ll) area; and be ca us e the

    8 P ro je ct co nf o rm s to th e V erm on t A N K s T echn ic a l G u id ance for D eter m in ing

    9 Fl oo dw a y L im its P u rs u ant to Ac t 25 0 C rite rio n 1(D) (O c to b er 9, 2009). The

    10 P ro ject co m p li e s with th e S tream s cr ite ri o n 6 0 86 (a )( 1 )(E )j bec au se

    11 w ith d raw al s of w at e r fro m the 1-loosic R iv er will m ain ta in na tu ra l flo w co n di t io ns

    12 dow n st ream , the int ak e has be en de si gn ed to av o id fish im p in gem en t, and be ca us e

    13 the w ith d raw al is be in g p er m itt ed b y th e V erm o n t D EC as a de mi ni m is

    14 w ithd ra w a l du e to its ve ry sm all s iz e i n re lat ion to the R ive r at th e site. The

    15 P ro jec t co m pl ies w it h the S h o re li ne s c r ite rion [ 60 86(a )(1 )( F )J , b ec au se the

    16 de ve lo pm e nt is not on a sh o re lin e, an d the P ro je c t will re ta in the H oo sic River

    17 sho re li n e in na tu ra l c on di tio n. T he Pr oj ec t com plie s with the W a te r Supply for

    18 the P ro je c t cr ite ri o n [ 60 86 (a )(2 )J , be ca us e adequ at e qu an ti tie s and quality of

    19 w at er are av ai lab le fro m the R ive r and from an on -s ite well to m ee t process and

    20 p ot ab le w at er n eed s. Pe rm it a p p lic at io n s for a G rou nd w ate r W ith d raw a l Pe rm it

    21 and a N o n -T ra n s ie n t N o n -C o m m u n ity P ub li c W ate r S y stem Source and

    22 C on str uc ti on P e rm it are pe n d in g w ith the V e rm o n t DEC. F in a ll y , the Pr oj ec t

    _ _ _ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    8/116

    P ow n al B iom ass P ro je ct, PSB D ocke t No.P ref iled T esti m o ny of M edd ie P err y

    O cto be r 25, 2010Pa ge 6 o f 12

    1 co m p lies w it h the B u rd en on E xi sting W ate r S upp lie s c rite r io n [ 6086(a)(3)},

    2 b ec au se the w ithd ra w a l o f w a te r for th e P ro jec t will n o t adver sely affect any

    3 ex is tin g w at er sour ce . As n o te d , a p erm it ap p li catio n for a G ro u nd w a te r

    4 W it hd ra w a l P e rm it is pen d in g w ith the V erm o n t D E C.

    5 Q6 W h at w ork h av e you co ndu ct ed w ith re sp ec t to th e P ro je c t?

    6 A6 My s ta ff an d I h av e con du ct ed site in spec tio ns , res ea rc h, and te st in g reg ard in g th e

    7 h yd ro lo gy o f th e gr ou n dw at er and th e H o o sic R ive r. R eg a rd ing Fleadwaters [

    8 6 0 86 (a )( 1 )(A )J , we ha v e con du c ted a rec on n a is sa nc e of the site and the su rfa ce

    9 w ate rs , d e li ne at ed d ra inag e areas a nd ev a lu a te d flo w data. R eg ard in g W as te

    10 D isp os al [ 6 086(a) (1 )(B )1 , we ha ve te sted th e soi]s, g ro un dw a te r , an d ri ve r at the

    11 site an d w o rk ed w it h B ru no A sso c ia te s on th e d esign o f th e p roc es s w ater

    12 inf ilt ra tio n sy stem . C on c e rn in g F lo o dw a ys [ 6086(a )(1 )( D )1 , we h av e an aly ze d

    13 F E M A stud ie s, flo o d p la in m ap p in g , an d h yd rau lic m o de li n g at th e site. We h av e

    14 pe rf or m ed in d e p en de nt h yd ra ul ic m o de lin g o f the H o o s ic R iv er based on ac cura te

    15 sur ve ye d to p og ra ph y o f th e site and R ive r cross sec tio ns p repar ed by Bruno

    16 A ss oc ia te s and we h ave v erif ied th e d e lin ea ti o n o f the F E M A floo dp la in and

    17 f lo od w a te r el e v ati on s at th e site. W e also hav e p e rfo rm ed g eo m o rp h ic studies of

    18 the R iv e r and eva lu at e d the fl uv ia l e ros ion h aza rd zone. R eg ard in g Streams [*

    19 6 08 6( a) (1 )(E )] , we hav e p er fo rm ed sta ti s tic a l an a lys is o f lon g te rm flow da ta for

    20 th e H o o s ic R ive r, de te rm in ed w ate r w it h d raw a l ra te s th at are ac ce pt ab le in

    21 acco rd anc e w it h V er m o n t D E C po licy , and ca lc u la te d th e effects of the p rop o se d

    22 w ater w ithd ra w al to the h y d ra u li c c ha ra cte ri sti cs of th e H oo sic River. Concerning

    _ _ _ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    9/116

    P o w n a l B io m ass P ro jec t, PSB D ocke t No.P re f il ed T es tim o ny o f M eddi e P erry

    O ct o b er 25, 2010P ag e7 of 12

    1 S h ore lin es I 60 86 (a )(1 )(F )j, we ha ve p e rfo rm ed a re co n n a iss an ce of the site and

    2 re sea rc he d h is to r ic al im pacts to th e sh o re lin e at th e site. C o nce rni ng W ate r

    3 S up p ly for the P ro je ct [ 6 0 8 6 (a )(2 )] , we ha ve ev a lua te d w ell p um p ing test data,

    4 re sea rch ed the ge o log y o f th e site, te st ed g ro un dw a ter flow cha ra c te ris tics and

    5 w ate r qu alit y , in ves tig at ed p o ten tia l co nta m in an t so ur ces and dev e lo ped a sou rc e

    6 p ro te ct ion plan. F in all y , c o n ce rn in g B ur d en on E xis tin g W ater Supplies [

    7 60 86 (a )( 3) 1 , we have re v iew ed p e rm its, co ns tr u c tio n and te s ti n g reco rd s for are a

    8 w at e r su pp li e s , d e li n ea ted the P ro jec t w ell s a re a o f in flu en ce , a na ly ze d the

    9 lo ca ti o n an d flow of g rou n d w a ter , and dev eloped a co n cep tu a l model of

    10 gr ou n d w at er at th e site.

    11 Q7 Is the Pr oj ec t lo ca ted in a h ea dw ater and, if so, will it reduce the qua lit y of ground

    12 or su rf ac e w a te r?

    13 A7 T he Pr oj ec t s it e is no t lo ca ted w ith in a he ad w at e rs area as d e fi ned by 10 V.S.A.

    14 6 08 6 (a) (1 )(A ), b ec au se it is not locate d o n lands d ra in in g 20 sq uare miles or less

    15 [10 V .S .A . 6 0 8 6(a )(1 )( . ), C rite ri o n ii). T he w a te rsh ed of the H o os ic River,

    16 w hic h fl ow s im m ed iat el y ad jac en t to th e site, m ea su re s 210 squa re miles at this

    17 loca tio n. Fu rt he rm o re, th e Pr oje ct sit e is not lo ca te d w it h in lands cha rac ter ized by

    18 steep s lo p es, sh a llo w so ils , ab o ve 1.500 fee t in ele va ti on , in a w atersh ed of a

    19 pub li c w at e r sup pl y as de sig n ate d by A N R , or in an area supp ly ing sig n ific an t

    20 am oun ts o f re ch a rg e wa te r to aqu if e rs . To the co nt rary , th e P ro je ct site is flat,

    21 soils are deep , the land is at an el e v a tio n of app ro xi m a te ly 540 to 550 feet, and

    22 low am ou n ts o f re c h ar g e to aqu if e rs occu rs at the site due to low p erm eab il ity soil

    _ __ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    10/116

    P ow n al B io m ass P ro je ct , PSB Do ck e t No.P refi led Te st im on y o f M edd ie P erry

    O c to b er 25, 2010P ageR of 12

    1 m ate ri a ls . R e fe r to P etiti o ne rs E xh ib it M JP -2 , th e G rou n d w a ter W ith dr aw al

    2 P er m it A p plic a tion , w h ic h presen ts an ex te ns iv e stu dy o f th ese and o ther

    3 ch a rac te ri s ti c s o f the site.

    4 Q8 W ill th e P ro jec t m ee t any ap p lica b le h ealt h and D ep artm en t o f E nv ir on m en ta l

    5 C on se rv at io n re gu la tio n s re g ard in g the d ispo sal o f any g en era te d w aste?

    6 A8 Yes. M y te sti m on y is sp ec ifi ca lly d ir ec ted at the d isp o sa l o f pr oc es s w as te w a te r

    7 and d om esti c sew age ; o th er w itne ss es will desc rib e o th e r facets of waste

    8 m an ag em en t. T he in fil tra ti o n sys tem th at has been d es ig ned to re tu rn p ro ce ss

    9 w at e r to th e g ro u n d w a te r at th e site com p lie s w ith the V erm on t U nde rg ro un d

    10 In je ct ion C on tro l R u le and the V erm o nt G ro un d w a ter P ro te ctio n Rule and

    1 1 S tra te g y . T he su b su rfa ce inf ilt rat io n o f pr oc es s w ate r will m ain tai n p ot ab le water

    12 in th e gr ou nd w at er aqu ifer at the site, will no t affect any ex is ti n g underg roun d

    13 so u rc es of d rin ki ng w at er or any aq u ifer s w ith th e p o te n tial for use as drin ki ng

    14 w at e r sou rc es , and will m a in tai n e x ist in g w ate r q uali ty in the H o os ic River. The

    15 P ro jec t will no t in v o lv e the in je c ti on o f to x ic or ha rm fu l su bs ta nc es into

    16 g ro un d w ate r or w ells. A n U n d e rg ro un d In jec tio n C on tr o l (U IC ) pe rm it has be en

    17 ap p lied fo r an d a p er m it is e x p e c te d to be issued. R ef er to P e ti ti on ers E xhib it

    18 M JP- 3 for th e c o m p let e U IC a p p li c a tio n an d n ar rat iv e re por t. I have pe rf or me d a

    19 h yd ro ge ol og ic s tu dy o f th e p ro p o se d d om esti c s ew age leach fie ld , which has

    20 d et e rm ine d th a t it is loc at e d be yo n d a tw o- ye ar tra v el d is tan ce in g rou n dw ater

    21 fr om all d ri nk in g wa te r w ells, an d th us co m plie s w ith V erm on t D E C regulations

    22 for w as te d is p o sa l. S ee P e titi on er s E x hi b it MJP-7.

    _ _ _ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    11/116

    P ow na l B io m ass P ro jec t, PSB D ock et No.P re fil ed T es tim o ny o f Meddie P er r y

    O ct o b er 25, 201 0P ag e 9 of 12

    1 Q9 Is th e P ro je ct lo ca te d w ith in a flo odw ay , f lo o dw ay frin ge , or fl uv ia l ero si on

    2 h aza rd zo ne ? If so, does the P ro je ct co m pl y w ith the V erm on t A N R s T ech ni ca l

    3 G u id an ce fo r D et er m ini ng F lo o d w ay L im its Pu rs ua nt to A ct 250 C rit e rio n 1(D)

    4 (O c tob er 9, 200 9) ?

    5 A9 P o rt io n s o f the site are lo ca te d w ith in the flo odw ay , fl oo d w ay fr i ng e, and flu vi al

    6 e ro s ion h aza rd zone. H o w ev er, no a bo v e -g ra d e d ev el o pm en t is pro p osed w ithi n

    7 the f lo od w ay and flu vi a l e ro si on h aza rd zo n e . P eti tio ne r s E x h ib it M JP -4 depicts

    8 th e f lo o d h az ar d zones as th ey re lat e to the Pro je ct. E ng in eers from Bruno

    9 A ss oc ia te s w ill tes ti fy re g ard ing th e desig n of the P ro jec t co m ponen ts within the

    10 flo o d w ay fri n g e so th a t the y h av e been flo o d pro o fcd to co m pl y w ith F EM A and

    11 V e rm o nt g u ide li ne s . I h av e m et w ith the V erm on t A N R s fl o o dp la in coo rd ina to r

    12 and re vi ew e d th e f lo o d ha za rd zone bo u nd a ries a nd the d esign o f the P ro je ct , and

    13 exp ec t th a t th e D E C w ill con cu r th a t the P ro jec t co m plie s with the ANRs

    14 T ec hn ic al G ui da nc e for D eter m in ing F lo o dw ay L im its . T he P ro jec t will not

    15 re s tr ic t or di v e rt th e flow o f fl ood w a ter s, or en d an ge r th e hea lt h , safety and

    16 w elf a re of the p u b li c or o f ri p aria n ow ne rs d u rin g flo od ing ; and will not in cr ea se

    17 the pea k d is ch ar g e of the ri v e r or st ream w it h in or d o w ns tr eam from the area of

    18 d ev el op m en t; n o r w ill it en da ng er the he al th , sa fe ty , or w el fare o f th e public or

    19 rip a rian o w n ers d u ring flo o d in g . T he P ro jec t is lo c a ted w it h in Pownals Flood

    20 H az ar d O ve rl ay D istr ic t. T h e req ui re m en ts for de vel o p m en t in this district,

    21 d e fine d by th e flo o dp la in and fl o o dw a y reg u la ti o n s for th e N atio na l Flood

    22 In su ra n c e P ro gr am , are s im ilar to sta te s tan da rd s . The P ro ject will comply with

    _ _ _ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    12/116

    P ow n al B iom ass Pr oj ec t, PSB D ocke t No.P re file d T est im ony of M ed die P e rr y

    O c to be r 25, 2 010Pa ge 10 o f 12

    1 th e se re qu ir em en ts by adh erin g to th e flo o d p ro o fi n g requ ir em en ts , as d iscussed in

    2 te st im on y from B run o A ssoc ia te s .

    3 Q1O W ill the P ro jec t m a in ta in th e na tu ra l co n d it io n o f streams?

    4 A iD Yes. M y co ll eag u e A d am C rar y will te s tif y re ga rd in g the de li n ea tio n o f st re am s

    5 an d th eir bu ff ers , and th e P ro jects de si g n inso far as it does no t en cr oa ch on the

    6 s trea m buffe rs . My te sti m o n y pe rt a in s to the prop osed water w it hd raw a l from the

    7 H o os ic R ive r, w h ich will m ai n ta in n atu ral con di tio ns of d ep th an d ve lo ci ty o f

    8 flow do w ns tr eam . T he pro p o sed w it h d raw a l o f pr oc es s w ate r will be con duc te d

    9 at su ch a lo w rat e , rel at ive to th e na tur al d rou g h t flow in the H o osic River, th a t it

    10 will n o t ha ve a m ea su ra bl e im p ac t to the ri ve r. T he w ith d raw al is b e ing pe rm itte d

    11 in acco rd an ce w ith th e V e rm o nt A N R s de nijuirnis policy, w h ic h recogni zes th at

    12 ce rt a in w ith dr aw als are so sm a ll rel ati ve to the stre am tha t th ei r effe ct s will be

    13 n eg lig ib le . R ef e r to P e ti tio ne r s E x hi bi t M JP -5 .

    14 Q I l Is the Pr oj ec t locat ed on a sho re lin e?

    15 A ll No. T he P ro je c t pa rc el is no t on a sh o re lin e of a lake, pond, rese rv o ir or river, as

    16 d e fi ned in 10 V .S .A . 60 0 1(1 7 ). T he Pr oj ec t dev elopm en t will not take place

    17 alo n g th e sh o re line o f th e H oosic R iv e r, w h ich will b e m ain tai ned in a natural

    18 co n d it io n . H ist or ic si te act iv iti e s ha ve en cr oa ch ed up on the sho relin e , in cl ud in g

    19 the p av ing o f a la rg e p ar ki ng lo t fo r th e for m er G re en M ou nt ai n R ace Track, and

    20 th e cr e a tio n of a lev ee a lon g th e to p o f th e riv erban k . As part of the pr op os ed

    21 B eav e r W oo d P ro je ct , th es e m an ma d e fe at u re s w oul d be rem o v ed and the

    _ __ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    13/116

    P o w n a l B io m as s P ro je ct , PSB D ocke t No.P refil ed T esti m on y of M edd le P e rry

    O ct ober 25, 20 10P ag e 11 o f 12

    1 sh or e li ne w ou ld be res to red to a more na tu ra l co n d itio n th an it has b een sub jected

    2 to for th e pa st 50 ye ar s.

    3 Q12 Is suf fic ie nt w ater ava il ab le for the reaso n abl y fo re se ea bl e needs of the Pro jec t?

    4 A 12 Y es . My te s tim o ny p e rta in s to th e ava ila b il it y o f su ff ici en t wa te r in the

    5 gr ou nd w at er aqu if ers an d in the H oo si c R ive r for th e po tab le and pr oc es s w ater

    6 needs of th e P ro je ct . E ng in ee rs from B ru no A ssoc ia te s w ill d e sc ribe the design o f

    7 the p o tab le and p ro ce ss w ate r sys tem s. and the pe rm it tin g of the p ub li c Non-

    8 T ra ns ie nt N on -C o m m u n ity po tab le w at e r sy st em . P e ti tio n e rs E xh ib it M JP -2

    9 desc rib es in d e ta il the q ua n tit ies o f w ater n eed ed for p ro cess water, th e sta tis ti c a l

    10 ana ly sis of H o o sic R iv er s tre am fiow s, and th e fa ct th a t up to 1.458 gallons per

    11 m in u te (g pm ) m ay be w it hd ra wn fr om th e R ive r as a d e in ini m is w ithd ra w al

    12 w h er e as on ly 46 5 gp m w o u ld b e n ee d ed to meet pro cess w ate r demand on the

    13 p ea k usa ge da ys . T h is ex h ibi t also descr ib es the ava ila b il ity o f su ff ic ien t

    14 q ua nt iti e s o f gr ou nd w at er in th e ex is tin g on-site well tha t has been sub je c te d to

    15 h y d ro lo g ic te s tin g . In re la tio n to the 46 5 gprn pea k process w a te r needs, and the

    16 1.1 g p m of p o tab le n eeds, the w el l has a safe yield of a p pr o x im at el y 626 gpm and

    17 can pr ov id e su ff ici en t w a te r fo r th e for es ee ab le needs o f the P ro je ct . A sou rc e

    18 p ro te ct io n p la n has b een p rep ared fo r th e m a n age m en t of potentia1 co n tam inan t

    19 so u rces , in o rd e r to m a in ta in the ex c ell en t w ate r q u a li ty in the well. See

    20 P e tit ion e rs E x h ib it M JP -6 .

    21 Q13 W il l the P ro jec t cause an u n rea so n a b le bu rd en on an ex is ti ng w ater supply?

    _ __ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    14/116

    P o w n a l B iom as s P ro jec t, PSB D ocke t No.P re f il e d T estim o n y of M eddi e P e rry

    O c to be r 25, 2010Pa ge 12 o f 12

    1 A13 No. T he use o f w ate r fo r P ro je ct will not affect the g ro un d w a te r levels or th e

    2 a m o u nt or qu ality o f w at e r su p p ly ing any ex is tin g w ell or w ate r source. See

    3 Pe ti tio ne r s E xh ib it M JP -2 fo r a tho ro ug h d iscu ssio n of the po te nt ia l impacts to

    4 ex is tin g w ate r su pp li es .

    5 3. In it ia l Pr oj ec t W o rk fo r 201 0 an d 20 11

    6 Q 14 W ith re spec t to th e c ri te r ia tha t you h ave te stif ied ab ou t, will th e initial phase o f

    7 w o rk prop o sed fo r 20 10 an d 2011 a ffec t the H eadw a te rs , W as te D is po sa l,

    8 F lo od w a ys. S tre am s, Sh o rel in es , W ate r S upp ly for th e P ro je ct , and B urd en on

    9 E x isti n g W a te r S up p lie s?

    10 A14 No, th e ini tia l p h ases of w o rk will not h av e any im p act to the se criteria. T he

    11 in it ia l ph ase , li ke th e en ti re P ro jec t, will not be in a h ead w a te rs no r on a shoreline.

    12 T he in it ia l pha se of w ork will no t in vo lv e the co n stru ct ion o f th e pr oc es s

    13 w as tew ate r le ac hf ie ld nor th e d o m est ic se w age Iea ch fi e ld , so th ere is not any

    14 act iv ity tha t in vo lv es cr ite rio n lB. T he initial w ork will no t be conducte d in a

    15 f lo o dw ay an d w il l no t in v o lv e w it h d ra w a l o f w a te r fr o m a str ea m . No w at er

    16 sup p ly will be n e e d ed fo r the in it ial ph ase o f w ork, which will inv o lve lay in g

    17 some p or tio ns of w at er li ne s b u t w ill no t co nn ec t an y w ater sources to any users

    18 of w ate r.

    19 4. Co u c lu si on

    20 Q6. Does thi s co nc lu de yo ur te st im on y?

    21 A6. Yes.

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    15/116

    S TA TE O F VE R M O NT

    P UB L IC SE RVI CE B O AR D

    P etit io n of B eav er W ood E ne rg y Po w na l, LL C )fo r a Ce rtific ate of P ub lic G ood , pu rsua n t to 30 )V .S .A . 24 8, to inst a ll and op e rate a Bi om ass )E ne rgy F acili ty a nd an int eg ra te d w o o d p elle t

    D k Nm an u fac turin g fa c ility lo ca te d n o rth of th e old )O C e 0.

    G re en Mo unta in R ace track in P o wn a l, V er m on t, )to be kn ow n as th e Po w na l B iom ass Pr o jec t )

    PR E FIL ED TE S TIM ON Y O FM E DD lE P ERR Y

    Ex h i bi t B W EP MP - 1

    R es um

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    16/116

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    17/116

    Wastewater Management Meddle (Ameddia) J. Co n duc te d n um e ro us hy dro g eol o gic eval uatio ns for land -bas e d w ast ew at e r Perry, CG W P

    dis p osa l syst e ms r a ngi n g fro m resi de nti a l-sc a le to ov er 300 ,000 gal lo ns pe r da ycap acity , in clud ing tes ting of soi l, g ro un d wa te r le vel an d flo w, per mea b ility , a n d CoctwLeo, p.2hy d rog e olo g ic ca pa ci ty.

    D es ign , p er mi tt ing , a nd in spec tion of w aste w ate r tre atm ent a n d dis posa ls yste ms in c lud ing colle c tion sy ste m s, sa n d fi lt ers, a n d m ou n d a nd in gro u nd

    leac h fie ld s. Stu died p ote n tial im p act s of lar ge was tew a ter disp o sa l sy s tem s (> 650 0 ga l/day )

    to la k es an d s trea m s, in vol v ing a n aly s is o f gro u nd w ate r an d su rfa c e w ate rche mis try, wa s tew a ter tre a tm e nt, s trea ni.flo ws, an d in s trea m bio logy .

    Environmenta l Inve stiga tion s Pe rform ed P h ase I En v iron men tal Si te A sse s sme n ts fo r sites inc ludi n g g as ol in e

    stati ons, a m a nuf a ctu re r o f p refa b ric a ted ho m es, ski are as, a n dtele c om m un ic ati o ns faci lities .

    In v est igate d g rou ndw ater c onta min ation , inc ludi n g p etro leum . PC B,pe rchio rate , and chl o rina ted solv ent co ntam inat ion in u nc o nso li da te d a n dbed rock en vi ron m en ts in V erm ont a n d N ew Ham psh ire. Man age dcon tam in ate d soil and gr ou nd w ate r.

    Man age d a lo ng- term ev alu a tio n of th e en viro n me n tal im p act s of st orag e oft reate d m inera l ta ili ng s, inc lu din g c h ara c teri z atio n o f ta i ling s and env iron m en talfa te o f co ntam ina n ts; e v alu a tio n of be droc k gro u ndw ate r hy drog eolo gy andge oche mis try, p o ten tial in tera c tio n wit h su rfa c e w ate r a nd dr in ki ng wa tersu p pli es .

    Surface Wa ter Inve stiga tion s D esi g ned stor m wa ter m a na g em e n t s yste ms and pe rfo rm e d hy drau lic a naly ses

    of run of f an d sto rm w at er flo w, P rojec ts h ave in c lud e d res iden tiald e vel o pm e nts , in du st ria l s ites , c om m er c ial p rop e rtie s , and edu c ati on alin sti tu tio ns .

    De linea ted floo dpla ins a nd r e vis e d F EM A fl o odp lain s b a sed on det ai Le d s tud iesof s ites in Be n nin g ton , Ve rm on t.

    A nal yzed st xe am fl ow , wa te r u se n eed s , a nd w it hd ra wa l for sn ow m a kin g atse ve ra l ski resort s in V erm ont and Ne w Y o rk . De s ign e d and pen nitte d ne w an du pg ra de d s no w ma k i ng s y stem s an d pe rform ed c omp lian ce mo n ito rin g fo rex istin g sy stem s.

    Edu cation 6.5. rnagna cum laude, Environmental Science & Biology, St.Lawrence University, Cantor. NY. 1995

    Feld Teotiniques f or S o il Evaluation, New England Center for

    Wastewater Training (1997)

    Ongoing Graduate and Continuing Education Coursework (1998-present)

    Pro lessi o nal OSHA 40-hour Hazardous Waste Operations and EmergencyR egis trati o ns Respo nse Course, Feb. 1997

    Certified Grou nd Water Professional (CGWP) #3106689

    Pro fessi onal Member, National Groundwater AssociationAffiliations

    1 /FIB

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    18/116

    ST AT E O F V E R M ON T

    PU BL IC S ER V IC E BOA RD

    Pet it ion o f B eave r W ood En ergy P ow n al, L LCfor a Cer tific a te o f Pu b lic G oo d, p urs u ant to 30V .S.A . 248, to in st al l an d op erat e a B iom assE n erg y Fa cilit y a nd an int eg ra ted wo o d pel let

    D o ck et N om anu factu ring fa c ility loc at ed n o rth of the oldGr een Mo unta in R a cetr ack in P ow n al , V er mo n t, )to be k now n as the P o wn al Bio m as s P roje ct

    PR E FI L ED T EST IMO NY O FMED DlE P ER R Y

    E x hib it B W E P - M P- 2

    G r o u n d w a t e r W it hd ra w a l P e rm i t A p pl ic ati on

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    19/116

    C

    I n a s s e i -I an g e n B ru s h /n, In c.T rans port ation j L and D eve lopm ent Env ironm ent al S e rvic es

    Oc tobe r 22, 201 0

    Ref: 5 740 703

    M r. De n nis Ne a lonH ydr ogeo log ist Wa ter Res o urc e s S ecti o nW ate r S up pl y Div isionV erm o nt Dep artm ent o f E n vir on m en ta l C o ns erv a tio n10 3 Sou th M ain St reet, Th e O ld Pa n try Buil dingW a te rb ur y, Ve rm o nt 056 71 -0 40 3

    Re ; B ea ve r Wo o d E n erg y P o wn a l, LL CGrou ndw ater W ith d raw al Pe rm it A ppl ic ati on

    D ear D en ni s:

    Enc losed ple as e fin d a Grou ndw ater W ithd raw a l Per m it A pp lic a tio n fo r the p ro p os ed u se of th e ex istin gg ra ve l-p a ck ed we ll as a so urce of pro c ess wa ter fo r th e p lann ed Be av er W o od bio mas s en ergy facili ty inPo wna l. A n arra t ive rep o rt is at ta che d p r esen ting all the in fo rm at io n spe cifie d on the a ppli c atio n form . Ache ck fo r t he $1, 50 0 a p plic a tio n fe e als o is atta c hed .

    T h is su bm it tal has bee n p repa red in ac c ord a nc e w ith 10 V SA , ch . 48 , s ub c ha pte r 6 as a m en de d b y A ct 199.B ec au se the a dm in ist ra tiv e rule s for gro u nd w ate r w ith d raw al per mitt ing a re cu rre n tly in draft fo rm , thi spe r mi t a pp lic at io n has b ee n dev elop ed in a ccor d anc e w ith the st atu te , a n d the d raft a dm ini str at ive rul e sh ave bee n fo ll ow e d as a gu id an ce in inst an ce s w he re the sta tu tor y lan gu ag e is no t speci fic.

    Ple ase do not h esit a te to con tact m e w ith an y qu es tio ns or c o mm ent s you may ha v e.

    S inc erely ,

    V A NA S SE HA NGE N B RU STL IN, IN C .

    Sen ior . d ro g eo log is t

    M JP / cpcEn clos ure

    cc: K are n Bu rrin g ton , P ow na l T o wn Cle rkPo wna l S elec tboa rdPow nal C on se rv ati on C orn .rnis sionBe n nin g ton C oun ty Re g ion a l C o mm issi o nT om E m er o, B ea ver W ood E n erg y Po w na l , L LCBi ll B o usq u et, B ea ve r W oo d E ner g y P o wn a l, LLCH ans Hue s sv, K en lan , Sc hw ieb er t & Fac ey P.C.

    1 05 6 US Ro u te 7\ \Vt d a\ pro jects \5 ?4 07 03 S W E P o wn al Per m iln n g\re port s\GW _w itbd r awa t_ap plica tion \cov er utie , do t Po st Of f ice B ox 12 0

    N o rth F erris b urg h, V T 054 7 3802 .425 .778 8 F A X 8 02 .4 25 .7 79 9

    m m .v hb c orn

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    20/116

    rE N V I R O N M E N TA L CO NS E RV A TI O N A P P L I C A T IO N

    W ate r S up pl y DivisionGR O U N DW AT E R W IT H DR A W A L P ERM IT

    AP P LIC AT I ON

    Th i s ap p lic a tion in iti at es the Wa ter S u ppl y Divisions re view and pe rm it tin g p roce ss fo r sour ce d evelo pme ntof a G rou nd w at er S ou rce to se rve a Pr o pos e d or Existing In dus trial/ Com mer cial facility wi th dr aw in g g reat erth a n 5 7 ,60 0 gp d . Drinking w at er sup p ly so ur ce s are requ ired to obta in a sepa rate p er m it.

    A sit e visit will be sche d ule d following re ceip t of a com ple te ap p lica tion . Following co nstr uctio n of thesou rc e th e a pplic ant shall su b mit a so urc e tes ti ng pr op os al (o n a form pro v ide d by the S ecre tary) an d th eap plic a nt a nd/o r ap p lic an t s c o nsu lt an t shall att end a p u blic m eet ing to a ddr e ss public con cern s. Fo llowingth e pub lic m ee ti ng and a f ter re ce iv ing s tate appr oval for the sourc e te slin g pro po sa l, the ap plic a nt sha llco nd uc t so urc e te st ing an d ad dres s un du e ad ve rs e imp act con cern s . T h e a p plic ant shall su bmi t a so urceev alua tion re po rt th a t a ddr e sses th e se conce rns. O nce th e ap p lica n t sa tisfi e s all admin istra tive an dtec h nic a l req ui re m en ts the st a te will is su e a Grou ndw ater W it hd ra w al Permit.

    I Th is line for WSD use only: WSD p ro jec t ID # As soci a ted WSH) # I C ode I D a te IFor s ta ff us e W SD c od e s: C = com p lete d N R = no t required IR = info, requ ired TBD to be de te rm in ed

    L1. To wn: Po w na l2. Facility_name:_Beaver_Wood_Enerciv_Pown al._LLC3. A p pli cant nam e: T om E m er o

    Mailing ad d res s: 23 0 W est S tre e tR utl an d, VT 05 7 01

    D ay ti me _ ph on e: _( 50 8) _3 21 -1 1 81 e-m ail:_ tome mer oa mpil .com[4 . So u rce o wne r (if di ff ere nt fro m a pp li can t) : Pr oc re ss Partners LTD.. at tn: R ich ard Hem: Mailing a ddr e ss: 132 Lar c hm o nt Av e

    L arc hmo n t, N Y 10 53 8Da y tim e_ph one :_91 4 -90 7 -60 30 e-m ail:_ rthd esign @v erizo n.ne t

    5. Hy d rog eolo g ist : M ed die Pe rry , CGWPMailing_address:_7056_US_Route_7._P0_Box_120

    North Fer r isbu rQh , VT 05 4 73D ay tim e_ ph o ne: _ (80 2)_4 25-7 7 88 _ext _645 4 e- ma il:_m ner ry @ v hb. com

    rEst im at e d daily w ithdr awa l:

    6. D es crib e th e pu rpo se of the gro u ndw ater wi thdr awal _(att ach) : att a che d7. Time fr ame : F Pea k am ou n t: I M ea n am o u nt

    Est im at e d ye ar ly w ithd rawa l:

    E stim a ted m on thly with draw al: I 63 0:00 0 q allo n s pe r day

    8. R eq u este d w ithd raw al rat e: 4 6 5.2 g al lo ns per m inut e

    6 9,9 Q _q a llon s per day 1 0 3,0 8 0 ga ll ons p e r y

    279 .500 ga ll on s pe r d a y

    103 .080

    103

    gal lo ns per day

    g al lo ns pe r d ay

    9. D esc ribe th e al terna te m e ans con side red for sati sf yin g th e sta ted p u rp os e of the w a terw it hd ra wa l (att ac h) : a ttach ed

    10. De scri be how the with draw al is pla nne d in a fas hion tha t pro v id es for e ffi ci en t use ofth e_ w ate r_(a tt ach ) :_a tt ach ed

    1 0/19 /201 0- 1/4

    r11. S o urc e of the p rop o sed wit h dra w al (che ck a ppl ic ab le typ e ): D sedr o ck drilled WellF Ds p rin g O D ug well X U nco nso lidat ed drilled well D oth e r (de scrib e):

    12. pr ovid e det a iled p lans of th e pro p ose d so urc e co nstr u ctio n (at ta ch ): a ttach ed 13. a) Ide nt ify pr o pos ed a nd ex ist in g wi thdra wal loc a tion (s) on a USGS m ao attac hed

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    21/116

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    22/116

    N ote : A ttac h m e nt s a re v o lu m in o u s an d a re n o t inc lu de d in th ise x h ib it, b u t ca n be p ro v id e d u p on re qu es t.

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    23/116

    ST A T E O F V E R M O N T

    P U B L IC S E R V IC E B O A R D

    Pe ti tio n o f B eav e r W oo d En erg y Po w na l, LL Cfor a C er tif ica te of P ub lic G oo d, pursuan t to 30V .S .A . 248 , to in sta ll an d o pe ra te a B iom assE ne rg y F ac il ity an d a n in teg ra ted w o od p e lle t

    D k Nm a n uf ac tur in g fa ci lit y l ocated n ort h o f th e ol d )oc e O

    G reen M o u n ta in Ra ce tr a ck in Pow na l, V er m o n t,to b e k n ow n as the P o w n a l B iom ass P ro je c t

    P RE F IL ED T E ST IM O N Y O FM E D D lE P E RR Y

    E x h i b i t B W E P M P -- 3

    U n d e rg ro u n d In je c ti on C o n tro l Pe rm it A p p li ca ti o n

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    24/116

    V a iz c se fl an ge n B rus ll n z I n cTra n spo r tatio n En v iron men tal L and D ev el op m ent Se rv ice s

    O ctob e r 22, 2010

    Mr. Jeff F eh rsE ng in ee rW a ste w ate r M an ag em e nt D ivis io nD ep ar tm en t o f En vi ro nm en tal C ons erva tion10 3 S out h M ai n S t . S ew ing Bu ildin gW ater b ury , Ve rmon t 05671-0405

    Re: Beaver W ood E nerg y P o wn a l, LLCU nd e rgr o und Inje c tion C on trol P erm it Ap p lic at ion

    De ar Jeff:

    Enclosed plea se fin d an U nd er gr ou nd Inje ctio n C on tr ol (UIC) p er mi t app li cat io n for thepro p ose d inf iltra tion sy s tem for the m anag eme n t of pr o ces s w ate r from the pr o pos edBeaver W oo d En ergy bio mas s facility in Po wna l.

    The en cl os ed UIC Per mit Ap p lica tion NJar ra tiv e R ep o rt p rovi des all the in fo rm atio nreq uire d by th e UI C Rule, th e pe rmit ap pl ic ati on form, and the S ched u le D for apr o pos ed C lass V inj ectio n well. The a ppli c atio n fee of $ 5,741.92 is also en c lose d .

    Please con ta ct m e if you h ave any q ues tion s or requ ire an y a ddit ional in fo rm atio n.

    Sincerely,VA NA HA NG EN BRUSTUN, INC.

    M ed di q1 e rr yS en i o r Hy d rog eolo g ist

    cc: Tom E mer o , B eav e r W oo d En e rgy Po w na l, L.L CBill B ou sq ue t, B ea v er W o od E ne rgy P o wn a l, LLCH an s H ues sy, K enla n , S ch w ieb ert & Facey P.C.

    \\Vtd a ta\p roje c ta\5 7407 .OO Bea ver W au d Po w nal \r ep or [s\ U IC \U Ic _ Ap p _co v erL e tte r. doc

    Page 1 o f2

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    25/116

    ST ATE OF V E RM O N TA G E N CY OF EN V IR O NM EN T AL C O N SE R V AT IO N

    D E P AR T M E NT OF W A T ER R E SO U RC E SAND E N V IR O NM EN T A L E N GI N EE R IN G

    WA T ER P O LL U T IO N C ON T RO L P E RM IT R EG U L A TI ON S , CH A P T ER 13UN D ER GR O UN D IN JE C TI O N C O N TR O L, S U BC H A PT E R UIC

    FORM W R- U IC -I

    APP LIC A TI O N FO R A P E RM IT TO D ISC H A R GE W A ST E S IN TO AN IN JE C TI O N W EL L

    All inf or ma tion to ty pe d or n eatly p rint ed and legible .See ins tru ct io ns on foll o win g pages.

    1. A ppl ican t/Ow ner Be aver W o od E n erg y Pownal, L L C _ Le g al En tity L im it ed Liability C ow .

    2. M aili ng A d dr es s 230 W est Street, R ut l and , VT 05701

    3 . Op erat or Mr. Bill B o usg u et Te le ph on e 603 46 5 -29 5 7

    4. N am e o f Ac tivit y o f F acili ty for w hi ch A p pli catio n is submitted. B ea v er Wood EnergyPo w nal B iom ass P lan t

    5. D escr ip tio n o f A ct ivi ty or F aci lit y S u bsu rfac e d is po sa l of p ro ce ss wa st ew a ter from cool ingto we r b lo w do w n, p ro ce ss drai n s (oil w ater sep ar ato r eff lu en t) , and d em in era lizat io n

    S IC C o de s 491 1

    & Na tu re of W as tes: Sa n ita ry i Oil or Gas Re late d Fluids CommercialD rain ag e H ea t Pump R etu rn F low O the r (D esc rib e)7. Cla ssifi catio n o f Inj ec tio n Well I II III

    8. De sc ri pti on of L oc ati o n o f In jec ti on Well (A tta ch map per in st ru ct ion s)2 .500 feet n ort h of for m er G re en M o u nt ain Ra c e Tr a ck G ra nd st and in P ow n a l, VT

    9. Status of Di scha rge s e d E x isti n g (Pe rm it N o ._ )

    10 . The ap pl ic ant h er eb y appl ie s for a di sc ha rg e p erm it to dis ch ar ge wastes in to an injectionwell from the ab ov e na m ed act ivi ty o r facili ty as de scrib ed in this app lica ti on, its attachedsched u le( s) , and spec if ica ti on s.

    IL A p pli catio n is for i n a t P e r m L t P erm it Ren ewa l I f this is for a pe rmi t renew al.is original appl ic ati o n still v al id in all re sp ec ts? Yes No I fnot , attach new schedules(s),plans. and sp eci fi cat io ns .

    P 2 f 2

    _ __ _ ___ _ __ _ ___ _ ___ ___ _ _

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    26/116

    Page 2 o f 2

    12 . List below by p er m t number or other ident ification all State or Federal permits orconstruction ap prov als received or appl ied for under any of the following programs for thisfacility:

    (I) Ha zard ou s Waste Manageme nt program under RCRA. NQIIc

    (ii) UIC p rog ram under SDWA. None

    (iii) NP DES pr ogra m under CWA . Construction General Permi t 3-9020, StormwaterPermit 3-9015

    (iv ) Prevention o f Si gnifi cant Deterioration (PSD) program under the Clean Air Act.None

    (v) Non atta in me n t program under the Clean Air Act. No ne

    (vi) Na t iona l Emission Standards for Hazardous Pollutants (NESHAPS) preconstructionapproval u

    nder the Clean Air A c t None(vii) Ocean dumping permits under the Marine Protection Research and Sanctuaries Act.None

    (viii) Dredg e or fill permits under section 404 o f CWA. None

    (ix) Other relevant environmental permits, including State permits. Vermont Section248 (Public Se rvic e Board): Vermont W ate r/Wa stew ater Permit. Vermont GroundwaterWithdrawal Permit

    13 .

    Application fee enclosed $5,741.92.

    Date of A pp l icati on October 25. 201014. Signature o f Authorized Re p rese n tati v e (See INSTR UCTIONS)

    CERTIFICATIONI c e r ti u nde r pen a lty o f law that I have per so na ll y exa min ed and am fam ilia r with theinformation submitted in this document and all att ach m ents and tha t, based on my inqu iry o fthose individuals im me diate ly re sp o nsibl e for obtaining the information, I believe that theinformation is true, accur ate, and complete. I am aware that the re are significant penalties forsubm itting false inlbr mati on , including the possibility o f fine and imprisonment.

    Icertify that to the best o f my knowledge nothing in this application will cause or allow theendangernient o f any underground source o f drinking water .

    I ?urther c er ti that the Secretary or an authorized repr esen tativ e is hereby authorized to enter,inspect, sample, monitor and have access to and copy records at reasonable limes at the facilityidentified above. -.

    Tom Emero Managing M e m be r . .. ./ --TYPE OR PRINT NA ME TITLE SIGNATURE

    F 5 7 437 P e ,,, W o P, .rj ,tU K fo ,m V R JK . L4

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    27/116

    N o te : A tta ch m en ts a re v o lu m in o u s an d a re n o t in clu d e d in thi se x h ib i t, bu t c an b e p ro vi de d u po n re q u e st.

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    28/116

    ST A TE OF VE R M O N T

    P U B LI C S E RV ICE BO A RD

    Peti tion o f B ea ve r Wo o d E ner gy Po w na l, L LC )fo r a C ert ifica te of P ublic G ood , pur suan t to 30V .SA . 24 8, to in sta ll a nd o pera te a B iom assE n erg y F acilit y and an in te gra te d w oo d pe ll et

    D oc k et Nom anuf actu r ing fa cili ty lo cated nor th of the o ldG re en M oun tain R ace tr ack in P o wn a l, V er m on t, )to b e kno w n as th e P ow n al Bi o ma ss P roj ec t )

    PR EF ILED TE S TIM ON Y O FM E D Dl E P E RR Y

    E x h ib i t BW EP -M P - 4

    Fl o od Zo ne M aps

    I

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    29/116

    F

    /

    ?

    -_I

    I-,

    -

    \

    %

    \

    -

    I

    /

    -

    /

    /

    I

    \

    IF,f

    I

    tp 1

    A

    I

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    30/116

    !:.

    1

    %

    I

    I

    ryt.1 . /

    P

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    31/116

    S TAT E O F VE R M O NT

    P U BL IC S E RV IC E BO AR D

    P etit ion of Be aver W ood E ner g y P ow n al, LLC )fo r a Cer ti fica te of Pu b lic G oo d , p u rsu ant to 30V .S.A . 248, to in sta ll and ope ra te a B iom assE ne rg y F acil it y an d an int egra ted w oo d p ell et

    Do cket Nom anuf actur ing fa cilit y loca ted nor th of the old )Gr e en Mo u nta in Rac e tra ck in P own a l, V er m on t, )to be know n as the Po w nal B iom as s P roj ect

    PRE FIL E D TE S TIM ON Y OFM E D Dl E PE RRY

    Ex h i bi t B W E P - M P - 5

    H oo s ic R i v e r P r oce s s W at e r In ta k e : D e M ini m is

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    32/116

    V u n a ss e 1-hangen B ru s tl in , Jn c .Env iron m en tal Tr a nsp o rta ti on La n d D e ve lo pm e nt S ervi c es

    O ctob e r 22, 2010

    Mr. B rian F itzge raldSt ream fiow Pr otec tion Co or d ina to rV erm o nt Ag enc y of N a tur al R es ou rc esW ate r Q uali ty Div isio n103 S o uth M ai n St.W a terb ury , VT 05671-0408

    Re: B eav er W oo d E n erg y P ow n al, LL CP ropo sed H o osi c R iv er Intak e

    P o wn a l, VT

    D ea r B ri an :

    A pro cess w a ter inta ke tha t con sists of a scre ened inle t bel ow the wa ter surf ac e isp rop o sed as a co m po n en t of the p ro po se d B ea v er W o od E n erg y Pow nal LLC b io ma ssener g y gen e rat in g p lan t in Po w na l V erm o nt. Th e w a ter in tak e st ru ct ur e w oul d heco ns tru c ted o n the Ho o sic R iver wh ic h run s al o ng th e S o ut he rn V erm ont E nerg y P arkre ne w ab le e ne rg y de ve lo pm e nt, wh e re the pro je ct has b ee n prop osed . T h e p ur po se ofthe pr op os e d w it hdr a wal is to en ab le Bea ver W o od to ob tain ad equ a te q u ant ities of

    w a ter for g e ne ra tin g s tea m to tu rn the el ect ri c g ener a tin g tur b ine s , a nd fo r coo ling .P ro ce ss w a ter ne eds wi ll va ry b ase d o n th e am bie nt te mp e rat ur e, hu m id ity , an d o th erfa ct ors , ra ng in g from 129 to 465 g allo n s per min u te (g pm ), and a v era g ing 322 gp man n ual ly. T he des ign of th e st ructu re ha s b een ba sed on the pr ima ry go als of pr ov id in ga p ract ical m ean s of w ithd raw ing w ate r , min imiz ing th e am o un t of di s turb anc e to theri ve r, and ca us ing no s igni f ican t effe cts to fis h p o pu la tio ns o r aq u ati c ha b itat .

    T he pr o po se d pea k wit h dra w al rate wo u ld b e eq ual to a p pro x im a tely 1.6 perc ent of thesite sp ecif ic 7Q 10 stre amfl ow in th e H o os ic Riv er, an d th eref o re me e ts the re qui reme n tsof th e A ge nc y P ro ce d ure for De te rm in in g A cc e pta b le Mi n imu m S trea m fio ws(7/1 4/19 93) fo r a de minimis w ithd ra w al .

    This le tter pr op os e s th e de rninzmis wi th dra w al an d pre sents info rmat ion to d etai l th ew ater n eed s , o ptio ns for alt er na tiv e sou rc es of sup ply, and hyd rolo gic analy s is of th eHo os ic R iv e r . Ad di tio n all y, we ha ve bee n in d isc u ssio n wi th Ma rtha Ab air of the USArm y C or ps of Eng inee rs (U SA CE) , a n d wi ll be a p ply in g fo r a W at er Qu a lityC erti fi cat io n fo r the pr oje c t u nder S ect io n 404 of th e C le an W ate r Act.

    70 5 6 U S R o ute 7Po st O ffic e Box 12 0

    N ort h F erris burg h, VT 05 47380 2 . 425 7 788 FAX 80 242 5 7 7 99

    w . vhb com

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    33/116

    Mr. B ria n F itzg eral dRE: Be a ve r Wo od En er gy P ow n al, LLC, P rop o sed H o osi c Rive r I n tak eO cto b er 22, 2010Pa g e 2

    I. H oos ic Ri v er Ch a rac teriz a tio n

    A. W a te rsh e dAt th e pro ject site, th e H o os ic R iver ha s a re lativ ely la rge w a ter sh ed ar ea of 211 squ arem iles. See pag e 1 of A tt ac hm e nt I for a map of the w a ter sh ed show ing the loc ati on ofthe pro ject s ite an d the tw o USG S ga uges tha t a re sit ua ted u pst re am of the p roj ec t site.R is in g in th e B erksh ire M o un ta ins o f w est er n M ass a chu setts , th e Ho o sic fl ow sn orth war d thr o ug h V erm o nt a nd New Yo rk en rout e to the H ud son River.

    B. S trea mfl o ws

    S ta tis tic al st rear n flow s wer e d et erm ine d by a na lyz in g USGS g auge da ta fro m the H oos icw at ers h ed in acc orda nce w ith s tan da rd hy drol ogic pro ced u res.

    1. 7Q10 Streamfiow w as de te rm in ed in a c cor d anc e wit h USGS proc edu res (HCR iggs , 1972, Te chn iques O f Wa te r Re so u rce s Inv estig ation s Of Th e USGS,C ha pt er BI: L ow -Fl ow In vest igati ons ) b ased on the USG S H oo sic R ive r ne arW il li am s tow n , MA g auge . The da ta w ere ad jus ted for the d iffer ence s inw ate rs he d are a be tw e en th e USGS stat ion and the pr oje c t site. See p age s 2 and 3of A ttac h me n t 1. A 7Q10 fl o w o f 65 cfs, eq ua l to 0.31 c sm , w as de te rm ined at thepr o jec t si te ba s ed on 70 yea rs of flo w r ec ord s.

    2. de minirnis flow: For me eting th e req u ire m en ts of the Ve rmo n t De p art m en t ofE nv iro n me n tal C on se rv ati on (DEC), a de minim is flo w of 5 p erce nt of the sitespeci fic 7Q10 flo w was de term ined . W ater may be w ithd raw n a t a ny tim e fromthe Ho os ic R iv er in ac cord ance w ith th e Age ncy Pro cedu re for D eter min ingAcc epta ble Mi ni mu m S trea m flo ws (7 /1 4/ 19 93 ) at a de minimis rat e o f 1,458g a llon s pe r min u te. See p ages 2 an d 3 of A ttac h me n t 1. In c on tr ast , the pro p ose dw ate r d e man d for th e pr o jec t on p eak d ays is on ly 465 gp m , or only 32 per ce nt ofth e all owa b le de m ini m is w ith dr aw a l rate.

    3. Aq uatic Base Flow (ABE) w as d ete rm in e d in acc orda nce with the pro cedu res of

    the US F ish an d W ild lif e Serv ice s In terim R eg io na l P olic y for N ew E ngla ndS tr eam s Flo w Re com m en d ati o ns (the USEWS flow polic y), as fur the rd esc ribe d in the Q u es tio ns and An swe rs o n th e New E n gla n d F low P olic yd oc u me n t (Q #13 , Ma y 11, 1999, V erno n La ng, US F&WS). See p ag es 4 throu gh 8of At ta ch m en t 1. A n ABF of 89 cfs, eq ual to 0.70 csm , wa s d e ter m ine d at thepr o jec t s ite b a sed o n 70 ye a rs of flo w rec o rds . Th e sit e sp ecifi c ABE is h igh e r th a nth e de faul t New En gl an d ABE of 0.50 c sm, in d ica ting that th e Hoo sic w ate rshedh as a re lati v ely h igh rate of ba se flow .

    7 0 56 US Ro u te 7P os t O ffi c e Box 1 20

    No rt h F erh sbur gh, VT 0 547 380 2 .42 5 .77 8 8 F A X 802 4 25 7 199

    v. w w. vh b co rn

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    34/116

    Mr . Br ian F itzge raldRE: B eave r Wo o d E ne rg y Po w nal , LLC, Pr o pos ed H oosi c R ive r In takeO cto ber 22, 2010Pa ge 3

    H. P roc ess W ate r N eed s

    T h e b io ma ss en e rgy g ene ratin g p la nt req uire s b etwe en 129 an d 465 g pm of p ro ce ssw ater to g ener a te ste a m n ec es sa ry to turn th e e lec tr ic g ene ratin g tu rbin e s and to cool thepl a nt. Po table w ate r fo r empl oyee s is not inc lude d in th is ra n ge, co mp risesa pp ro xi ma te ly 1 .1 g pm , an d w o uld be pr ovid ed separ a tely fr om a dri lled w ell o n-si te.

    T he p ro ce ss w a te r ne eds wi ll va ry bas e d o n the am bie n t w et bulb te m pe ra tur es an dre lati v e hu m id ity , wh ich ref le ct the n atu ral v aria tion s in te m pe ra tur e, mois ture con te nt ,an d ba ro me tric p re ss ure of th e air. Pa ge s 1 and 2 of At tach m en t 2 ta bul a te and gra p hth e w at er dem and s as a fu nctio n of the w e t b ulb tem p era tu re s an d rela tive h um idit y.Pa ge 3 o f A tt ach m en t 2 su m m ar ize s th e re lativ e qu a nti ti es of s trea mflo w, av e rag e an dmax imum p lan t de m an d , a n d retu rn w at er flow. T he pe ak de m an d w ith d raw a lrep re se nts o n ly ab ou t 1 p er ce nt of th e AB F f low , an d th e a imu al av erag e d e ma n drep re sen ts on ly a b out 0. 8 pe rcen t of AB E

    Not e th a t ab o ut 15 pe rc en t of th e p roc e ss w at er w oul d be re tu rne d indir ectly to th e rive rv ia the pro p ose d pr o ces s w ate r inf ilt rat io n fiel d , w hic h is be in g pe rm it te d u n der th eVerm on t Un derg roun d Inj ect io n C o ntro l R ule (1982). G ro un d wa te r fr om the in fi ltra tionfield w oul d flow tow ards the H o osi c Riv er.

    II I. Alt e rna tives A na lysis

    Pote ntial alt er na tiv es to a ri v er int a ke in ctu d e g rou n dw a ter w el ls and stor age la g oo ns ,o r so m e com b ina tion th er eof .

    Use of sto rage lago o ns ha s be en de te rm in ed to be u nfe asibl e , be c aus e th e w ater use d f orthe pl an t m ust be c le an and fr ee of alg ae, sedi m en t, a nd sus pe nd ed ma tter w her easwa te r p ond e d in st orag e ten ds to de v elo p h igh le vels of the se su bst a nce s .

    A p ort io n of the n orth ern en d of the ex istin g m an m ad e po nd on sit e w o uld ne ed to be

    fi lled in o rde r to c ons tr uc t th e bi o ma ss facili ty at a lo ca tio n that is ou tsid e th e regula toryflo o dw a y limi t. T he resu lting pon d wou ld m e asu re appr o xim a tel y 6.6 ac r e s, an d w ithan ave rage wa ter d e pth of 5.5 feet , c ou ld store ap p rox ima te ly 1 2 mil lion gal lo ns (Mgal).Refer to th e P roc ess W ater So u rce s M ap on p age 4 of A tta chm e nt 2 for th e lo c ati on of thep ond and ot her si te feat u res .

    As dis cuss ed in t he M ass Bala nce R e sult s sectio n bel o w, sto rage in the m a nm a de pon dw as e va lua te d in th e c onte x t of w ithdr a wa l from the Ho o sic Riv er o ccu rring o n ly w he ns trea mflo ws w ere abov e ABE, as p ot en tia ll y m ay be req u ire d in acc o rda n ce w ith USFWSfl o w po licy tha t the US A C E wo u ld ev al ua te dur in g th e p ro ce ss of p e rmi tt ing the pr o ject

    7 05 6 U S R ou te 7

    Po st O ff ic e B ox 1 20N ort h Fe rr isb u rgh , V T 0 547 3

    80 24 25 7 78 8 F AX 8 0 2.4 2 5 77 9 9w w* v h beo rn

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    35/116

    C

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    36/116

    CM r . Bria n F itzg eraldRE : Be av er W o od E ne rgy P ow n al, LL C, Pr o pos ed H oo si c R ive r In ta keO ctob er 22, 2010Pa ge 5

    co mbi natio ns of d iff e ren t s tora g e v olu m es, w ell y ie ld s, an d st reax nflo w lim itati o ns.

    B. M ass Bala nce A na ly sis R esult sPa g e 1 of A tta ch m en t 4 p res en ts a su mm ary of the r es ul ts. Res u lts fro m in d ivid uals cen a rio s fo llow and inc lude a de taile d ta bula tion o f the res ults, an d h ydr o gra p hsd ep ic tin g the str eamf iow , riv e r w ithd raw a l, well p rod u cti on , sto ra ge , p lant usa g e, andde m an d .

    1. Scenario ISc enar io 1 co n sis ts of a rive r int ake, no w ith d raw a l w hen stream flow s are less tha n ABF,n o w el l, an d no s to ra ge. O n ave rage , 78 perc ent of the a nnu a l w ater n e eds w ou ld bemet. Plan t d e man d w o uld be fully m et in on ly 3 perc ent of all ye ars. T he re fo re thi ssc e nar io w o uld not me e t th e w a ter nee d s of the p roje c t and is th us n ot fea s ib le. Seep ages 2 thr o ugh 6 o f At ta ch m en t 4.

    2. Scenario 2S ce n ari o 2 is re pre sent a tive o f the S ta te of Ve rm o nt s de minimis flo w po licy , and con sist sof a rive r in tak e , w ithd raw a l a t all na tu ral stre a mfl ows bas ed on the prov isio n s of PartC.6. of th e USF WS F low P o licy , an d no stora g e. P lant dem and w o ul d be fully m et in ally ears an d the wit hdra wal w ou ld not a ffe ct aq u atic h abit a t o r b iota. T her e for e thisscen a rio is fea sible . See p a ges 7 thr o ugh 11 of At tach m en t 4.

    3. Scenario 3S c ena rio 3 cons ists of a riv e r in take , n o w it hd ra wa l w hen s trea m fio ws are Less th an ABF,n o w e ll, and the 12 M ga l o f stor a ge t h at w o uld be ava ilab le in the e xis ti ng on -site manm a de pon d . On avera ge, 93 p er cen t of th e an n ua l w a te r ne eds wo ul d be met. Pla ntde m an d w ou ld be fully m et in on ly 33 p e rce nt of a l l y ea rs. The refo re thi s s cena riow o ul d not me e t the w at er ne e ds o f th e p ro je ct an d is th u s no t f e asib le. See pa g es 12thro ugh 16 of A tt ac hm e nt 4.

    4. Scenario 4

    Sc enar io 4 con sists of a riv e r int ake, no wi th dr aw al w hen str eamf iows are less th an ABF,no w ell, an d th e am o un t of sto rage th at w o ul d be n ee de d to ena b le d em a nd to be m et atall times . Pl ant dem and w ould be ful ly m et in all y ear s . H ow ever, th e requ isite 83.4Mg al of sto rage co u ld n ot be c ons truct e d at the si te, as di scus sed a bov e, an d is no tfeasib le. See pag es 1? th ro u gh 21 o f A tta c hm e nt 4.

    5. Scenario 5S ce n ari o 5 c on si sts of a r ive r intak e, n o w it hd ra w al w h en str eamf iow s a re less than ABF,use of th e on -s ite w e ll at u p to 500 gp m w hen H o osi c R ive r fl ows ar e less th an ABF, an dno s tora g e. T h is s cena r io p refe renti alk reli es on the ri ve r, an d us es th e well as a wat er

    70 56 U S R o ute 7P ost O f fice B ox 1 2 0

    N ort h F err is bu rg h, V T 05 47380 2 .42 5 77 8 8 Fk X 8 02 .4 25 77 g 9

    vrnw . vhb corn

    a

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    37/116

    M r. B rian F itzg eral dRE : B eav er Wo od E n er gy Po w na l, LLC , Pr opo sed Ho o sic Riv er I nta k eOct o ber 22, 20 10P ag e 6

    sou rce on ly w he n stre amfi o ws ar e b elow ABF, or w hen o n ly a p ort io n of de m an d can beme t w ith th e R iver in take d ue to the need to m a in tai n do w ns tre am flo w s at or a boveAB F . P la nt de m an d wo u ld be ful ly m et in all yea rs. T her e for e , t his sce n ari o is feasib le.

    W ell wa te r w oul d co mpr ise 22 p erc en t of p lan t usag e o n a vera g e. Th u s, the a vera ge rat eof gr o und wate r w ith d raw al wo uld be 37.6 M gal per ye ar , eq ua l to 103 ,080 g pd or 72g a llon s per mi n ute , an d a Gro u ndw ate r W it hd ra w al Pe rm it fro m th e V erm o nt D EC ,W at e r S u ppl y Div ision w o ul d be need ed. In som e y ears , the w ell w o uld no t ne ed to beu se d at all. In a p eak w el l u sag e ye ar, th e w ell w ou ld nee d to pr ov id e 58 perc ent of thew ate r u sed in a ye a r by the bio m as s p la nt, e qu a l to 102 M g al p er y ear, 27 9,500 gpd , or194 g pm . A t a p eak mo n thl y ra te , th e we ll wo u ld be ca lle d u p on to p rod u ce 630,0 00g pd, eq ual to 438 gp m . Se e p age s 22 thro u gh 26 of A ttac hme n t 4.

    6. Sc enario 6To ev a lua te o ptio ns for usin g a we ll w itho u t excee ding th e 57 ,600 gpd th resh o ld forne edin g a g roun dwa ter wit h dra w al pe rmit , S ce na rio 6 con sists of a rive r in tak e, nowit hdra wal w hen s tre a mfl o ws ar e le ss than AB F , use o f the we ll fo r up to 39 g pm , andno sto rage . On av erag e, 81 pe rc en t of th e an nu al w at e r n eed s w o uld be m et. Pl a ntde m and w oul d be fu lly m e t in onl y 3 p er ce nt of all y e ars . T he re fo re this sce n ari o wo uldnot m eet th e w at er n ee d s of the pr o jec t an d is th u s no t fe as i b le. See pag es 27 thro u gh31 of A tt ach m en t 4.

    7. Sc enario 7To furt he r eva lu ate o pti o ns fo r us in g a w ell w ith o ut ex c eed ing th e 57,69 0 gp d th resh o ldfor n e ed in g a gr ound wat e r w ithdr awa l pe rmit, Sc e na rio 7 co nsist s of a r iver inta k e, now ith d raw al wh e n s trea m flo w s are less than ABF, use of th e wel l for up to 39 gp m , an dthe 12 Mg al of stor a ge in the exis ting m anm a de pon d o n si te. On ave ra ge , 95 perc ent ofthe an nu al w a ter need s w o ul d be m et. P lant de m an d w o ul d be fully me t in o n ly 40p er ce nt of all y ea rs. T here fore this sc en a rio w ou ld no t m eet the wat e r need s of thepro ject and is th us n ot feas ib le. See p age s 32 th ro ug h 36 of At tachm ent 4.

    8. Scen ario 8To fur the r eva luat e o p tion s fo r u sin g a w ell with out e x cee d ing the 57,6 00 g pd thr esho ldfo r n eed ing a gro und w ate r w ithd rawa l perm it, scen a rio 8 co n sis ts of a r ive r in take , now it hdr a wa l wh e n s tre a mf low s are le ss tha n AE F, us e of the wel l for up to 39 g pm , andth e am o un t of s torag e th at wo u ld be nee d ed to enab le de m an d to be m e t at all times .Plan t d em and wo u ld b e ful ly met in all y ea rs . Ho w ev e r, the requ isite 73 M g al of sto ragecould no t he co n str uc te d at the s ite, as d isc u sse d ab ov e, an d is no t fea sibl e . See pa g es 37th rou g h 41 of At tac h me n t 4.

    7 05 6 U S R o ut e 7P o st O ffic e B ox 1 2 0

    No rt h Fe rrisb urg h , VT 05 47 38 0 2.4 2 5.7 7 88 F A X 80 2. 42 57 79 9

    Ww w yh b.co m

    a

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    38/116

    Mr. B rian Fit zger a ldRE: B eave r W o od En er gy Pow nal , LLC, Pro p ose d Ho o sic River Inta k eO c to be r 22, 2010Pa g e 7

    9. Sum maryThe two feas ib le sc enar io s are #2 and #5. Scenario #2, in c lud ing w ithd rawa l a t n o mo rethan 465 g pm at an y nat u ral stre a mf iow in acc o rda nce wit h th e d e mimmis, p ro vi sio ns ofthe Ver m on t St re am fl ow Policy, and wi th no ad v ers e im pa ct to the b io ta or ha bita t in theHo o sic Riv er in acc ord an ce w it h Pa rt C.6. of th e USFWS Flow Policy, wo uld m eet theb io ma ss pla n ts w ater n eed s at all ti mes . Scenario #5, w hi ch relies up on th e ons ite wellw he n stre amf lows are bel ow ABF, also wo uld m ee t the b ioma ss pla n ts wa ter n eeds atall ti m es b ut w o ul d requ ire u p to 58 p erce n t of th e p lant s w ate r su ppl y to co m e fromthe we ll, w hich is less su itab le for the pl ant th an th e river w at er .

    IV . Intak e D es ig n

    The int ake h as been de sig n ed to m inim ize ph ysi ca l dis turb ance to the ri ve r cha nn el an dto av oid any e ntr ai nm e nt of aq ua ti c org anis m s. See d esig n infor m ati on in At tach m en t 5.

    The inta ke is p ro p ose d to he hydr auli c ally jack ed into a de ep pool in the riv er b o tto mfrom a tem pora ry p it o n the p roj ect site. The jack in g tech n iqu e will av oi d d ig gin g intoth e riv e rba n k so that th e onl y p hy si ca l distu rban ce will be the pr otru sion of the int ak epi pe its el f fr om the riv erbe d. A sm all (8- inch d ia me te r) pip e is p rop o sed .

    A sc ree n ed in take s tru ct ur e wit h inte rnal baffles and a 0.45-inc h scree n o p en in g wille nsur e that en tranc e ve loci ties are less than 0.3 f t/ sec ov er its en ti re ex t ent , pre v ent in gany ris k of ent rain m en t. Ty p ical requ irem e nts are for a m a xim um of 0.5 ft/s e c ent ra nc eve loci ty to av o id ent ra inm ent . The inta k e str uctur e is 16 inches in di am et er , 1 8 incheslong , and wo u ld be p lace d in a d e ep po o w ith ov e r 5 feet of de p th to ens u re ad equ a tew ater d e pth at all times of year.

    V. Su mma ry

    A proc ess w a ter in take alo ng the Ho o sic Riv er is prop osed as a com pon e nt of the

    p rop os ed B eav e r W ood Ene rgy Pow nal L L C b iom ass ener gy g ener a ting pla n t inP own al. T h e pu rp os e o f the p ro po se d w it hd ra wa l is to ena ble B ea ve r W ood too b tain ade q uate q u an ti ties of w a ter for ge ne ra tin g stea m to tu rn th e ele c tricg e ner a tin g t urb in es , and fo r c ool ing. W a ter nee d s w il l ran g e from 129 to 465g p m d epe n din g on we a the r co nd iti o ns, a nd w ill ave rage 322 g p m ann u ally .

    Th e s ite-s p eci f ic 7Q 10 flo w in the H oo si c Riv e r ha s be e n d e ter m ine d , a n d th epr o pos ed p ea k wi th dr aw al rat e w oul d b e equ al to ap prox ima tely 1.6 p e rce n t ofthe 7 Q 10 s trea m fio w at the s it e, and the refo re m e ets the requ irem ents o f the

    705 6 U S Rou te 7P ost Off ic e B o x 120

    N or th F er ri sbu rgh, V T 054 7 3802. 4 25. 7788 FA X 802 .425 .779 9

    s . v hb .c om

    Il l

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    39/116

    Il l,Mr. Br ian F itzg eral dRE: Beaver W oo d En e rgy P o wn al, LLC, Pro pos e d 1-loosic River Intak eOc to be r 22, 2010Page 8

    Ag ency P roc e dur e fo r De term ining A cce ptab le M ini m um St ream flow s( 7/ 14 / 1993) fo r a de minirnis w ith d raw al.

    T he d es ig n of the int ak e s t ruct ure h a s been b a sed o n the prim ary g oa ls ofp rovid ing a p rac tical m ea ns of wi th dra w in g w ater , mi n im iz ing the amo unt ofd istur banc e to the ri v er, a nd c au si ng no si gn if ica nt ef fects to fish po pula tion s o ra qu ati c h a bita t . T he p roj ec t w il l be ap plyi n g for a W at er Q ua li ty Ce rtifi c atio nfr om t h e US A rm y Co rps of E ngin eers u n der Se ction 404 of th e Cle a n W ater Act.

    Please feel w elc o me to call me if y ou h av e an y qu es tio ns .

    Sincerely,

    VANASSE H A N GE N B RU S TU N, INC.

    M ed die J. Perry, CGWPS enio r Hy drog eolo gist

    MJP!cpcAtta chm ents

    cc: To m F m ero , Beaver W oo d En e rg y P o wn a l, LLCBill B ou sq u et, Be a v er W ood Energy P ow n al, LLCHa n s H ues sy, K en lan , S ch w ieb ert & Facey PC .

    \Vt d a, \ p roje cta\ S ?9 7O 8 Wo od P o wn al \d oc s\I et ter 5\ DEC w it hd ra wa ) \6tz g era ld _l bc

    70 5 6 U S Ro ute 7P ost O ffic e B ox 120

    No r th F erris b urg h, V T 05 4 738 024 257 7 88 FAX 8 02 4 25 77 99

    f tv ;v vh b. co rn

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    40/116

    N o te : A tta ch m en ts a re v o lu m in o u s a n d ar e n o t in c lud e d in th ise x h ib it , b ut c a n b e p ro v ide d up on r eq u e s t .

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    41/116

    S TA T E O F V E R M O N T

    P U B L IC S E R V IC E B O A R D

    P eti tio n of Be av e r W oo d E ne rg y P ow nal , LL Cfo r a C ert ifi ca te o f P ub lic G o od , p u rsuan t to 30V .S. A . 24 8, to in st a ll an d o p e rat e a B io m assE n e rg y F ac il ity an d a n in te g rat ed w oo d p el le t

    D oc ke t Noan ufac tu rin g fac ili ty located no rth of the o ldG reen M o u n ta in R ac etr ac k in P o w n a , V erm on t,to be k n o w n as th e P o w na l B io n ia ss P ro je c t

    P R E F IL E D T E S T IM ON Y O FM ED D lE P E R R Y

    E x h ib it B W E P M P -- 6

    S o u rc e P ro tec tio n P lan : P o ta b le W a te r S u p p ly W e l l

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    42/116

    G r ave l W ell: S ou rc e Pr o tec t ion Plan

    B E A V E R W O O D E N E R G Y

    P O W N A L , L L CW S ID # 2 5 8 5

    P o w n a l, V e rm o nt

    Prep ared for Bea v er W o od Ener gy P o wn al , L IC.2 30 W es t S tre e tRu tl an d, V erm ont 05 70 1

    P repa red b y V ana sse H an ge n Br u stli n , In c.7 05 6 U S R out e 7Po st O ffice Bo x 1 20

    No rth F erri sbur g h, V T 0 5 47 3

    O ctob er 8 ,20 1 0

    t 2 ina ss e Han gen B ru stl in , In c

    B E A V ER W OO D EN ER G Y P O W N AL , L LC .W S ID # 25 8 5

    SOU RC E PR OT E CT ION PL A N : G ra ve l We ll

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    43/116

    j o f C o nt e n t

    1.0 In tr od uc tio n 1

    2.0 W ellhe ad Pro tecti o n A re a 2

    3.0 Pot entia l S our ces of C on tam ina ti on 3

    4,0 M a na ge m en t P lan 6

    5.0 C ont inge ncy Pla n 8

    R efer ence s 132

    B E A V ER WO OD EN ER G Y POW NA L, L L C.W SI D # 2 58 5SO U R CE PRO TE C TI O N P L AN : Gr av el W e ll 1

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    44/116

    I

    1.0 I nt r o d u ct i o n

    Th is So u rce Pr otec tion P la n (SPP) has be en pr ep ar ed by Van asse H an g en Br ustli n, Inc.

    (VH B) fo r B eav er W oo d En e rgy Pow nal , LLC.s (Beaver W o od ) P ublic N on -T ra ns ie nt, N o n-C om m un ity (NTN C) wa te r sys tem , WSTD #2585. The w ate r sys tem is loca ted in th e T ow n

    of Pow nal, V erm o nt, T he NT N C wat e r sys te m is com pos ed of an e xis ti ng gr av el w e ll th at

    wa s dri ll ed in 1962 as p art of the o rigi nal c onst ructi on of the G re e n M ount ain Race T ra ck

    (GMRT) w hic h is lo cat ed al o ng U S R o ute 7 an d the Ho osic Riv e r (see Site Pl an and Pr o per ty

    P arce l Ma p o n pa g e 2 of the A ppe ndix ). Th e w ell is loca ted on la nd ow ned by Pr og re ss

    P art n ers , Ltd. an d is le ase d to Be aver W ood , w ho also le ases the pr op er ty ne ar the w ell

    w her e the biom ass fac ili ty has bee n p ro po se d . Th e we ll w ill serv e as th e so ur ce of po tabl ew a ter fo r the em ploy ees and office s taff o f th e p rop o sed Be aver W oo d biom ass project.

    T yp ic al ly, the w a ter sys tem w ou ld se rve a p op u lati o n of abo ut 4 1 em p loy e es. Well

    c on st ruc ti on an d y ie ld cha racte risti c s of th e w ell a re p re se nt ed in Ta b le 1. The d rille rs we llco m pl et ion repo rt is inc lude d on p age 1 of th e Ap p en d ix.

    (gpm)*

    T a ble1:

    S um m ar y of W el l C ha ra ct er ist ic sW e l1S tatic I P um p W ell I S c ree no tal IW a te r Di ame ter Inta k e . Sc reen

    Slo to urc e ID D epth L ev el L (in) Se tti ng S etti n gSiz eIt) (ft) (It) ft )(in)

    B eav erW oo d

    67 13 1 8 57 52-67 0.120 6 26G ra ve l IW ell

    I I

    gpm = g a llon s p e r mi nu te

    B E AV E R WO O D E N ER GY P OW NA L, L L C.W SI D # 25 S 5S OU RCE PR OTE CTI ON P LA N : G rave l W eJI 2

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    45/116

    I2.0 W e llh ea d P r o t e c t io n Are aA We lihea d P rote ctio n A rea (WH PA) has been d es ig nat ed fo r the Gra vel Well. The W H PA

    Ma p a nd the Pot e ntia l So urce s o f C on tam in ati on (PSOC) M a p show ing Zon es 2 an d 3 of th eW H PA , th e we ll, an d p rop erty pa rcels a re loc ated o n pag e s 3 an d 4 of th e A p pe n dix ,

    resp ecti v ely . T hese ma ps are pr es en ted to pr ov id e th e o v era ll W H PA de li nea ti ons o n U.S.Ge ol og ic al S u rve y to po gr ap hi c (pag e 3 of th e A pp endi x ) an d U.S. De p artm ent of

    A g ric ul tur e N ati o nal A gric u ltur e Imag ery P rog ram (N AI P ) ae rial pho togr a ph s (p age 4 ofthe Ap p end ix).

    T he W elih ead P rote c tion Ar ea w as h ydro geol ogic ally d elin e ate d ba se d o n inf orm a tion f ro mpri o r p um p te sting con d uct ed o n the w ell. A lthou gh th e pr o po se d d em a nd for the pub licN T N C p ota b le w ate r sy stem w ou ld be only 1.1 gp m , a d e line ated so u rce pro tecti o n a re a

    ba sed on a 500 g pm pum ping rate w as u sed to rep re se nt a wo rs t-c a se scena rio in w hic h th ew ell w oul d al so be us ed as a pro cess wa ter sour c e. In suc h a s itua ti on, the to tal p u mp in grat e of the w ell shou ld be cons idere d in th e sou rc e p rote c tion a re a de lin ea tio n , be c au se th eq ual ity o th e pot able w a te r w o ul d be aff ec te d b y an y pot entia l sou rces of co ntam inat ion

    w ithin the enti re zone of inf lu en ce . P ro v idi ng a fa ct or of sa fe ty, th e 500 g pm de si gnpu m pin g ra te is h ig he r tha n th e p rop o sed b iom a ss p lan ts n orm al w ate r con sum p tion rate

    of 321.6 gpm , or the pe ak c on su mp ti on ra te of 465.2 gpm (ba sed on a re v ise d w ate r b ala nc ean aly s is, Se p tem ber 29, 2010).

    The W e llh ea d P rote ction A rea Z on e 2 w a s d e lin ea ted b y Li ncol n A pp li ed Ge o log y bas e d onthe 1994 pum p tes t to repr e sen t th e ca p tur e zone of th e exis tin g well pum pin g a t 50 0 gp m,

    du ri ng s tead y.st a te con d itio ns (i.e. con stan tly pum pin g at 500 gp m until the c one ofd ep re ss io n h as rea ched eq ui li bri um and ha s s to pp ed ex pan ding ). This z o ne 2 ind ic at es th ew ells a re a of in flu en c e, wh e re g roun dwa ter leve ls w ou ld be aff ecte d by th e w ell.

    Z o ne 3 of the W e llh e ad P ro te cti o n A rea re pr es en ts la n d tha t is o utsid e of the we lls area ofinf lu en ce , b ut tha t lik e ly c on tr ibu te s rech arge w ate r to the we ll . G ro un dw a te r from Zo ne 3

    .Vm lass fJIan gP n Bn s s tiin m r

    B EA V E R WO O D EN E RG Y PO W NA L, L L C .W SI D # 2 58 5

    S O UR CE P ROT EC T ION P L AN : G ra ve l W el l 3

    __ ____ __

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    46/116

    pas sive ly flow s by gr avity to th e a rea of in flu en ce , w h ere th e dr awd own ca use d by th e

    we lls op e rat io n wo u ld cause gro und wate r to flow in to th e w ell. VHB d e line a ted Z one 3 as

    all land are a to p ogr aphi c ally up sl op e f rom th e are a of in flue n ce.

    T he p ro pe rt y p ar ce l m ap p ing for th e area e n com pas sed by th e W H P A is p re se nt ed on the

    P S OC m ap in clu d ed on p age 4 of the A pp endi x . A to tal of 13 p rop e rty o wne rs are in clu d ed

    wit h in the W HP A , one of w hi ch is the p roj ec t p arc e l (see p age 5 of th e A p pen dix for a list ofla ndo w ne rs w ith in the W HP A). Priv ate lan do w ne rs a nd Prog ress Par tner s , Ltd. o wn m os t

    of the la nd enc o mp asse d w it hin the SPA . P rese n t lan d use s w it hi n th e WH PA inc lude theacce ss road s to the fo rm er GM RT gran dsta n ds tha t ho s t a var iety of eve n ts suc h as car and

    b ike sho ws, co nc er ts , and oth er la rge eve n ts, US R ou te 7, an d the B o sto n & M aine Rai lr oa d.

    Res iden tial b ui ld ing s are cu rre n tly lo cate d in the W H P A H isto rica lly, lan d w ithin the

    W H PA wa s m ain ly a gr icu lt ur al, re side n tial , and for es ted . The GM RT w as in op erat ion

    d urin g the 1960s thr o ug h the 1990s. P ag e 6 of the A pp en di x p ro vi de s a list of ab u tti ng

    p rop erty ow ners .

    I

    3 .0 P o te n t i al S ou rc es of C on ta m in ati on

    The PSO Cs w it h in the WH PA w e re id en tif ied thr ou gh si te res ea rc h and in sp ec ti on , and are

    d isc u sse d be lo w. All PSOC s ar e id en ti fie d on the PSOC ma p on p age 4 of th e A p pe nd ix .

    P ag e 7 of the A p pe nd ix lists PS O C iden tific a tion an d ow ner inf o rma tion . Tab le 2 pro v ide s a

    b ri ef s um m ar y of the PSO Cs.

    T able 2: PS O C S um m ar yISO C ID PS OC Des crip tion

    1

    Ri sk Le v el

    P5 CC 1 Un derg roun d S to ra ge T an ks LowP5C C 2 Hist oric Lea chfi e ld L o w

    P5 C C3 Mu n icip al Se w er L ine Low

    P 5C C 4 U S. R ou te 7 Lo wP5 C C 5 R ail ro ad LowP S OC 6 St or m wa te r P ond LowP 8C C 7 L o vet t Ya rd C emet ery Low

    C

    BE A V E R WO OD EN ER G Y POW NA L L LC .W SI D #2 5 55

    S OU R CE PR O TE CTI O N f lA N : G rav e l W el l 4

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    47/116

    T a ble 2: PS O C S um m ar yP SOC ID P S OC De scrip tion Ri sk L evel

    r P SO C 8 Grav e] P it L ow

    As de scrib ed be lo w , all PSO Cs p ose a lo w l ev el of r isk to th e g rave l w e ll.

    PS O C #1, P u lled U nde rgro u nd S to ra ge T anks , low r is k: R ua n aid h Re a lty C orp o rati o n is th e

    r e spo n sib le pa rty f o r fou r u nde rgro u nd st o rag e ta nks (USTs ) that we re re mov ed fr o m the

    fo rme r Gr ee n M o un ta in Ra ce Tra c k site o n N ove mbe r10 an d 11, 1993. Th ree of th e pu ll ed

    US Ts w ere lo cated w ithin Z on e 2 of the WH IA , an d th e cl o ses t UST w as l oc ate d

    a pp ro xi m ate ly 185 fe et aw ay from th e gr avel we l l.Init ia l g roun d wa ter and PID te st res ults

    sh ow e d elev ated lev e ls of vo latil e o rga n ic co m po un ds (VOC ), ben ze ne , t ol uen e ,

    e th ylb e nze n e, an d x yle n e (BT EX) , and m et hy l te rtia ry bu tyl eth e r (M TBE) in the im med iate

    vi c init y of th e US Ts. As a res u lt, the site w as de si gna ted as V erm ont Ha z ard o us Site #9 3-

    1511. G roun dwa ter sam ple s co lle c ted the follo win g y e ar b efo re , d ur in g, and af te r a 7 -da y

    lo ng pu mp test at th e G M R T we ll an d six ins talle d m o ni to rin g wel ls conta ined no dete ctabl e

    c onta m in a nt co nce ntra tion s . Du e to th e ab senc e of c o nta m ina tion , the ha za rd ou s site w as

    c lo se d, a n d th e Ver m on t DE C issu ed a Si te M an age m en t A ct iv iti es C o mp lete (SMA C)

    d ete rmin atio n o n M ay 2, 1995 . Add ition ally , th e g rave l we ll w as te st ed fo r all co n tam inan ts

    re qu ir ed fo r an N T NC w ate r sou rce an d no VO Cs w ere dete cted in sa mp les col lecte d from

    th e gr avel we ll on Au gust 24, 2010. R isk of con ta m in ati on to th e g ra ve l well is low be ca us e

    n o V OC s h ave b een de te ct ed in gro und wate r at the site.

    P 5C C #2 , Hi stor ic L ea ch fie ld, lo w risk: T he GMRT for merl y op erat ed a le ach fi eld th a t

    ser v ed the tra ck m an ager s o ffic e and w as locat ed ap p rox im a te ly 530 feet awa y f ro m the

    gra v el we l l. T he le achf ield is no n -o pe rat io na l, a nd g roun dwa ter sa m pl es co llect ed on Ju ne

    4, 2010 an d Aug ust 24, 2010 co nt ai ne d lo w con c ent ra tio n s of n itrat e m eas u rin g 0.36 m g/ L

    an d 0.4 0 m g/L , respe ctiv e ly. Th e n it rat e c o nce n tra ti ons are w e ll b elo w th e V erm on t

    D ri nk in g W ater M ax im um C o nt am in a nt Leve l (M CL ) of 10 mg / L (AN R 2005) and are

    J{a r nas s eJk z ngc nfiri s fll& In c

    BE A V E R W OOD EN E R G Y POW NA L, L LC .W S ID # 25 8 5

    SOU RC E PR O TE C rI O N PL A N : Gra vel W e ll S

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    48/116

    ty pi cal of n atu ra l am b ien t le v els in gr ou nd w ate r. Th er efo re, this PS OC is a lo w ri sk of

    co n tam ina tio n to th e gra v el we ll.

    P 5 CC #3 , M uni c ipal S ew er Line , lo w r isk : T he T o wn of Pow nal ope rates an d m a int a ins an

    exis ting se w er l ine alo ng US Ro ute 7 th at cro sse s thro u gh Zon e 3 the W H P A, pa ssin g w ith in

    950 fee t of the w ell a t the c lo se st p oin t. R is k is low bec ause of th e s igni f ican t d istan ce to th e

    w ell an d b ecau se the sew er line w as c ons truc te d in 2006 fo llow ing c u rre nt s tand a rds.

    Gro undw ate r sam p les co llec ted o n Jun e 3, 2010 an d A u gu st 24 , 2010 con tain ed low

    c o nc en tra ti on s of w aste wat e r in dica tors such as ni trate . See PSOC #2 ab ove.

    P 5C C #4, U s R o ute 7, lo w risk : US R o ute 7 is a p ri nc ip al a rt eri a l h ig hw a y alo ng the w estsi de of V er m on t t ha t cr os se s thr ou gh Zon e 3 the W HP A , p as si ng w ithin 950 Fe et of the w e ll

    a t the c loses t po in t. Pot entia l le ak s and sp ill s fro m v eh ic les , a long wit h road sal t

    ap pli c atio n , are po tent ial co n tam inat io n sou rc es. The risk of co n tam ina ti on to the gra v el

    w ell is mi n ima l du e to th e dist a nce fro m the we ll. Th e lo w c o nce n tra tion of ch lorid e of 35

    m g /L w as d ete ct ed in grou ndw ater samp les col le cte d o n Ju ne 3, 2010 . T his low ch lo rid e

    co n ce nt rat io n is wel l bel ow the seco nda ry dri n kin g w a ter MCL of 250 m g /L (A NR 2005).

    Lik ewi se , the so d ium co nc e ntra tion of 14 m g/L is su bst antia lly lo w er than the 25 0 m g /L

    seco n da ry MCL, indi c atin g tha[ road sa lt app li cat io n doe s n o t sign ific an tly affect th e

    g roun dwa ter q ua li ty in the w ell.

    P5C C #5 , R ai lro ad , low ris k : Th e Bo ston & M a ine Rai lroad ow n ed by P an Am So u the rn ,

    LLC. c ros ses th roug h Z one 3 of th e W HP A , pa ss in g w it hi n 950 feet of th e we ll at its cl o ses t

    p oin t. The risk of po te nti al c on ta m ina ti on is m inim al be ca us e the ra il sys tem has lim ited

    activities th at cou ld co n tam inat e g rou n dw a ter. G roun dwa ter sam ples co ll ect ed from the

    gr avel w e ll c ont a ine d n o dete ctab le pest icide s, h erbi cide s, or sy nth etic org anic com pou n ds

    (SOCs), in d ica ti ng th at h e rbic ide ap pli c atio n alo ng the tr ack s ha s n o t af fe cte d the

    g rou n dw a ter .

    B E AV ER W OOD EN E R G Y PO WN AL, L LC .W SI D # 25 8 5S OU RC E P R 0T E c rlo N P LA N: G rav e l We ll 6

    PSOC #6 S torm w at e r Po n d low risk : An e i ti g d th t f ll d

  • 8/8/2019 Beaver Wood Pownal 248 Filing: No. 8D - Pre-Filed Testimony of Meddie Perry SD

    49/116

    PSOC #6, S torm w at e r Po n d, low risk : An e xi sti ng po nd th at w as for m all y u sed as a

    sto rm w at er p ond is own ed by P ro g ress Par tners , L td . Th e p ond is lo cated in Z on e 3 of th eW H P A wi th in 275 feet of th e w ell at its c lose s t p oin t. T he w ell has be en d ete rm in e d by th e

    VT DEC to be n ot u nde r th e d irec t in flu en ce of su rfac e w ater . Th e p ond s lo cat io n in Z on e 3and the u nc o nta m ina ted n a ture of sit e run off ma k e it a low risk of c on ta m in ati on to th ewell.

    PS O C #7, Lo ve tt Y ard C eme te ry : The Lo ve tt Yar d C em etery loca ted in Zo ne 3 of th e W HP Aand ap pr ox im at el y 1300 fee t from th e w ell is ow ned an d m a int ai ne d by th e T ow n ofPow nal. Ce m ete ries nor m al ly d o n o t po se a s ig nif ic an t risk of c o nta m in at ing gro u nd w ate r

    b ecau se pr o pe r b uria l pra ctice s inv o lve ade q ua te v er tic al se p ara ti on abo ve the w ate r tab l e .Th e po ssib le h isto ri cal an d c u rre n t app licat ion of her b icid es for gro u nd s m ainte nanc e alsom ake s th e c eme tery a po tent ial so urce of c o nta m ina tion . The age and sma ll size of th ec e me tery ma ke th is a low ris k to the gr av el we ll .

    PS O C #8, G rav e l Pit, lo w risk : A por ti on of th e graveL p it is loca ted w ithi n Zon e 3 of theW H P A a pp ro xi m ate ly 2000 fe e t a wa y from th e wel l at its clo se st poi n t. Po ss ib le

    c on ta m ina n t ris k s inc lude p ot en ti al sp ill s of fue l, lub rica ting oil, an d fl u ids fro m m ac hi ner y .The risk is low be caus e g rave l ext racti on is be ing con d uct e d abo v e th e w ate r table. NoV OC s h ave bee n d e tect e d in th e g rav e l we ll so it pos e s a low ri sk of cont amin atio n.

    4. 0 M a n a ge m en t P lan

    Ma n ag e men t of PS OC s w ith in th e W H P A is