Page 1 of 8 Revised 2/16/17 Becker Township Septic Tank / Drainfield / Holding Tank Permit Application Date: Permit # : PID #: Septic Fee $: Soil Verification Fee $: LUP Refund $: Other Fee ( ) $: Total Permit Fee $: City / Township Use Only PLEASE PRINT CLEARLY The Applicant Is: Owner Installer Site Address: City: State: Zip Code: Property Owner: Name: Phone: Address: City: State: Zip Code: Installer: Company Name: Cert . #: Lic. #: Address: City: State: Zip Code: Contact Person: Phone: Cell: System Designer: Company Name: Cert . #: Lic. #: Address: City: State: Zip Code: Contact Person: Phone: Cell: Type: Residential Commercial Check One: New Replacement Type of System: I II III IV V Garbage Disposal: Yes No Dispersal /Treatment: Trench Mound At-Grade Holding Tank Bed Other: Number of Tanks: Size of Tanks: Separation from Water Well (feet): (Required distance is 50’ from deep well and 100’ from shallow well.) I hereby apply for a septic tank, drain field and /or holding tank permit. I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of Becker Township and with the Minnesota Health Codes; that I understand this is not a permit but only an application for a permit and work is not to start without a permit; that the work will be in accordance with the approved plan. Signature of Contractor/ Responsible Party Print Name Date Approved by Building Inspector / Signature Print Name Date

Becker Township Septic Tank / Drainfield / Holding Tank

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Becker Township Septic Tank / Drainfield / Holding Tank

Page 1 of 8

Revised 2/16/17

Becker Township Septic Tank / Drainfield / Holding Tank Permit Application

Date: Permit # : PID #:

Septic Fee $: Soil Verification Fee $: LUP Refund $:

Other Fee ( ) $: Total Permit Fee $:

City / Township Use Only

PLEASE PRINT CLEARLY

The Applicant Is: Owner Installer

Site Address:

City: State: Zip Code:

Property Owner:

Name: Phone:

Address: City: State: Zip Code:

Installer:

Company Name: Cert . #: Lic. #:

Address:

City: State: Zip Code:

Contact Person:

Phone: Cell:

System Designer:

Company Name: Cert . #: Lic. #:

Address:

City: State: Zip Code:

Contact Person:

Phone: Cell:

Type: Residential Commercial Check One: New Replacement

Type of System: I II III IV V Garbage Disposal: Yes No

Dispersal /Treatment: Trench Mound At-Grade Holding Tank Bed Other:

Number of Tanks: Size of Tanks:

Separation from Water Well (feet): (Required distance is 50’ from deep well and 100’ from shallow well.)

I hereby apply for a septic tank, drain field and /or holding tank permit. I acknowledge that the information above is complete and accurate; that the work will be in conformance with the ordinances and codes of Becker Township and with the Minnesota Health Codes; that I understand this is not a permit but only an application for a permit and work is not to start without a permit; that the work will be in accordance with the approved plan.

Signature of Contractor/ Responsible Party Print Name Date

Approved by Building Inspector / Signature Print Name Date

Page 2: Becker Township Septic Tank / Drainfield / Holding Tank

Page 2 of 8

Revised 2/16/17

BEKER TOWNSHIP CHECKLIST

Septic Tanks / Drainfields / Holding Tanks

This handout is a guide only and does not contain all of the requirements of the Minnesota

State Building Code or Township Ordinances.

Becker Township and the City of Becker work together to simplify your building project permit process. Permitting

time will depend on the complexity of the work and the completeness of the document submittals. Please allow

up to three weeks for review and issuance of the permit. If you have questions or concerns regarding

Minnesota Pollution Control Agency (MPCA) rules, Metro West (763-684-0383) will be happy to speak with

you to answer questions.

The following documents are required at time of permit submittal so that all departments can complete their

plan reviews and grant approval for your project:

Completed and signed Septic / Drainfield / Holding Tank Permit application (page 1). Application must

be signed by the existing homeowner or system installer not the system designer or home builder.

Certificate of survey (recommended) or site plan (see pages 3-4) showing the existing structures, well

location, names of all abutting streets, proposed tank location, proposed drainfield, proposed alternate

system location, dimensions and distances to property lines and any other structures.

Approved Land Use Permit (LUP) from Sherburne County. If you have wetlands on your property or

are on a lot within a river shoreland or scenic river district you will be required to obtain this permit. If

there are no wetlands on your property the LUP is not required. Staff can help you determine if one is

required. If required, you will need to submit a Land Use Permit application (see pages 5-6) to

Sherburne County. Land Use Permits are $100, which is refunded off the price of the building

permit. Cash or check is the only accepted form of payment at Sherburne County. Sherburne

County will forward the LUP to the City on your behalf.

Two sets of proposed design.

As-built survey or site plan of the installed septic system (see pages 7-8) showing the existing

structures, well location, names of all abutting streets, tank location, drainfield location, dimensions and

distance to property lines and any other structures.

Electronic submission of all documents larger than 8 ½ x 11 to [email protected]. The subject line

of the email shall include the Property address / PID # and Builder Name.

_____________________________________________________________

Contact City of Becker with any questions (763-200-4239)

Submit completed building permit applications to:

City of Becker, 12060 Sherburne Ave SE, Becker MN 55308

Hours: Monday – Friday, 8:00AM – 4:30PM

Becker Township Website: www.beckertownship.org

Page 3: Becker Township Septic Tank / Drainfield / Holding Tank

Page 3 of 8

Revised 2/16/17

SITE PLAN For Septic Tanks, Drainfields and Holding Tanks

This sheet is used so you, as the applicant, are aware of the requirements for the property being reviewed and to more efficiently review your application. This sheet shall be completed and submitted in

conjunction with all other requirements for a building permit. If it is not, the review will be placed on hold.

Please contact the City (763.200.4239) to obtain any of this information.

Street Address: ___________________________________________ Acreage of Property: ___________

For Septic Tanks, Drainfields and Holding Tanks:

Required Setbacks* Front: ft Side: ft

Rear: ft

Closest Structure (building, deck, patio, porch) ft

Closest Structure (building, deck, patio, porch) ft

Well: ft

Proposed Setbacks* Front: ft Side: ft

Rear: ft

Closest Structure (building, deck, patio, porch) ft Closest Structure (building, deck, patio, porch) ft

*Proposed setbacks cannot be less than the required setbacks

*Setbacks are from property lines not from street / curb edges

If a survey is not available, please draw the site plan in this location.

Page 4: Becker Township Septic Tank / Drainfield / Holding Tank

Page 4 of 8

Revised 2/16/17

SAMPLE SITE PLAN

(This does not need to be a computer generated drawing.)

Page 5: Becker Township Septic Tank / Drainfield / Holding Tank

Page 5 of 8

Revised 2/16/17

Page 6: Becker Township Septic Tank / Drainfield / Holding Tank

Page 6 of 8

Revised 2/16/17

Page 7: Becker Township Septic Tank / Drainfield / Holding Tank

Page 7 of 8

Revised 2/16/17

AS-BUILT DRAWING For Septic Tanks, Drainfields and Holding Tanks

This sheet shall be completed and on-site at the final inspection. If it is not, the inspection will be placed on hold.

Please contact Metro West (763.200.4239) with any questions.

Property Owner :

Street Address:

City: State: Zip Code:

Installer Name: Cert . #: Lic. #:

If a survey is not available, please draw the site plan in this location.

Page 8: Becker Township Septic Tank / Drainfield / Holding Tank

Page 8 of 8

Revised 2/16/17

SAMPLE AS-BUILT

(This does not need to be computer generated)

30’