Upload
khishigbayar-purevdavga
View
223
Download
1
Embed Size (px)
Citation preview
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
1/14
BEHRE DOLBEARGROUPINC.STATEMENT OFQUALIFICATIONS
CORPORATE OVERVIEWSCOPING, PRE-FEASIB IL IT Y, AND
FEASIBILITY STUDIES
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
2/14
Behre Dolbear Group Inc.
Statement of Qualifications
Corporate Overview
Behre Dolbear2
Behre Dolbear Group Inc. (Behre Dolbear or the Company) is one of the oldest, continuously
operating, mineral industry advisory firms in the world. Since 1911, we have specialized instudies for commercial and multilateral financial institutions, mining companies, governments
and governmental agencies, legal firms, and other parties with interests in the minerals industry.Behre Dolbears global experience covers the full spectrum of technical, operational, and
financial issues in a broad range of commodities including base and precious metals, coal,industrial minerals, diamonds and gemstones, ferrous metals, and construction materials.
Our worldwide network of offices allows us to be a truly global company. Behre Dolbearoperates from offices in 12 of the mining worlds most important cities:
Denver Chicago Beijing Guadalajara Hong Kong London
New York Santiago Sydney Toronto Ulaanbaatar Vancouver
We design each project team to specifically meet our clients needs, using professionals with thespecific experience needed to successfully complete assignments. For this reason, each office can
draw upon personnel from the other offices to assure that the best-qualified professionals areassigned to a client.
Behre Dolbear is known internationally as a businessmans consultant. Our people have first-hand experience in senior management and executive-level positions, giving them practical and
insightful knowledge and skills. They are commercially experienced mineral industryprofessionals.
The Company possesses unparalleled credibility with the worlds major finance organizations
and is familiar with the intricacies of project development, financing, mergers, acquisitions, andprivatizations. The international mining and financial communities recognize our reports as
being among the most accurate and reliable documents in the industry. By engaging BehreDolbear, our clients gain access to a world-class consulting group, whose studies and reportshave international credibility and acceptability.
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
3/14
Behre Dolbear Group Inc.
Statement of Qualifications
Corporate Overview
Behre Dolbear3
Behre Dolbear brings to every project a breadth and depth of experience that encompasses the
technical, financial, and managerial aspects of the industry. Some examples of Behre Dolbearsadvisory and consulting services follow:
Technical Advisory
Services
Financial Advisory
Services
Management and Business
Advisory Services
Conceptual, scoping,prefeasibility, and feasibilitystudies
Planning and monitoring ofmineral exploration programs
Technical evaluations andconsulting for:
Resource and reservereports
Mine plans, includingequipment selection
Metallurgical andmineral processing flowsheets and equipment
Chemical facilities
Environmental andsustainability program
development and evaluation
Optimization reviews ofoperations to identifyopportunities for productivity
improvements and costreductions
Expert witness testimony fortechnical issues
Due diligence reviews insupport of financings,investment decisions,
acquisitions, dispositions,and mergers
Valuation of mineralproperties, reserves,mines, mineral processing
facilities, and chemicalplants
Independent and ownersengineer services
Preparation of technicaldocuments required forlistings on the various
global stock exchanges,including the U.S.,
Canadian, London, AIM,Australian, and HongKong stock exchanges
Preparation of pro-formacash flow projections
Risk assessments,including political,
financial, and technical
Privatization ofgovernment-ownedmining companies
Strategic business plansfor mining companies andindividual operations
Development ofcorporate, operating,engineering, and human
resource policies,procedures, andorganizational structures
Development andrestructuring of nationalmining laws
Market surveys formineral products
Strategy formulation inconnection withpreparation or negotiation
of contractualagreements, such as
mergers, acquisitions, andmineral sales contracts
We Know the Business ofMining
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
4/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear4
Behre Dolbear and our Associates have extensive backgrounds in the management, preparation,
and review of scoping, pre-feasibility, and feasibility studies. We understand the important rolefeasibility studies play in securing both debt and equity financing, and we have a strong
understanding what the financial community requires of a bankable document. Our extensivebackground in conducting due diligence audits and technical reviews of feasibility studies also
gives us insight into the requirements of a feasibility study.
Conceptual or scoping-level studies tend to have levels of accuracy of 50 percent, while final,bankable feasibility studies tend to have levels of accuracy of 10 to 15 percent. Regardless ofthe variation in the level of accuracy between the different levels of study, each study generally
encompasses the same disciplines, which include:
geology, mineral resources and reserves; mining systems, mine plan(s), mine capital and operating costs;
processing systems, flow sheets, plant capital and operating costs; infrastructure requirements and capital costs; markets and pricing for the product(s) produced; manpower requirements and organization; environmental permits and issues; financial analysis; and risk analysis.
The accompanying table presents an outline of the level of detail for each type of study.
Behre Dolbears approach to performing feasibility studies is based on the internal capabilities
within the Company. Behre Dolbear does not claim to be an engineering and design firm;typically, that work is sub-contracted to firms that specialize in such work. Our approach,
accordingly, is to oversee and manage the feasibility effort to assure that the work performedmeets accepted industry and financing standards. A senior-level professional from Behre Dolbearis assigned to each discipline within the study to coordinate the work performed by Behre
Dolbear and sub-contracted professionals.
Recent feasibility-type studies undertaken and completed by Behre Dolbear include:
APDR Paz del Rio coal mine (851014) Mustavaara magnetite, vanadium and ilmenite mine, Finland (848928) Hollister gold mine, Nevada, United States (847943) Sutter gold mine, California, United States (847388) Anzas zinc project, Australia (846028) Avebury nickel project, Tasmania (845346) El Arco copper project, Mexico
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
5/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear5
Gallatin lime mine, Kentucky, United States (845470)
Golden Grove Mine, Australia (786680) Gleneagles gold project, Australia (781181) Sydvaranger iron ore mine, British Columbia, Canada (779308) Amessmesa gold mine, Algeria (314078) Atlanta gold mine, Idaho, United States (312600) Angangueo silver, lead, zinc project, Mexico Sunshine silver mine, Idaho, United States (847511) Mount Emmons molybdenum project, Colorado, United States (845594)
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
6/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear6
Potential Areas of Investigationfor Scoping, Pre-feasibility, and Feasibility Studies Property Information
Location, topography, and climate
Land ownership and royalties
Property history
Current status
Geology and Resources
Geological description
Mineralogy
Drilling, sampling, and assaying
Evaluation techniques
Mineral resource estimate
Mining
Ore reserve estimate
Mining method and plans
Mining equipment
Material handing
Material handling equipment
Historical and forecast production
Consumables
Mining capital estimatesMining operating cost estimates
Processing
Ore sampling and test work
Processing method
Other required processes
Process equipment
Historical and forecast production
Consumables
Processing capital estimates
Processing operating cost estimates
Infrastructure
Industrial infrastructure facilities
Social infrastructure facilities
Utilities, power, and water
Infrastructure capital estimates
Infrastructure operating cost estimates
Management and Labor
Management organization requirements
Labor requirements
Products, Markets, and Sales
Products
Markets
Prices
Sales
Environmental and Permitting
Permit list
Environmental impact
Compliance costs
Compliance cost timing
Reclamation expenses
Financial Issues
Taxes
Royalties
Fees
Licenses
Development Costs and Schedule
Development cost estimate
Development schedule
Development methodology
Political and Social Considerations
Economic benefits and costs
Government considerations
Other issues
Project Economics
Economic parameters
Discount rate determination
Cash flows
Investor returns
Debt analysis
Sensitivities
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
7/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear7
Comparison of Scoping, Pre-feasibility, and Feasibility Study Content
Category ConceptualStudy/Scoping
Study
Pre-feasibilityStudy
Feasibility Study
Introduction
Location, Topography and
Climate
Site location map
Ownership and Royalties
Claims list
Claims map
Current Status and History
Historical chronology
Information on pastproduction, if any
Yes
No
No
No
No
Yes
No
Yes
No
No
Yes
Yes
Yes
Yes
Yes
Geology and Resources
Geological Description
Geological map
Geological cross-sections
Drilling, Sampling and Assaying
Parameters
Drill hole location map
Sampling/assaying flow
diagram and assessmentAssay check assessment
and graph
Mineral Resource Estimate
Resource methodology
determination and
approach
Geologic model limits
Lithology/tonnage
factors/code
Cumulative frequency of
samples verses gradeVariograms
Resource Estimate
Yes
No
Yes
Yes
No
No
Yes
Yes
No
No
No
Industry Standards
(SME, AUSMIN,
etc.)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Industry Standards
(SME, AUSMIN,
etc.)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Industry Standards
(SME, AUSMIN,
etc.)
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
8/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear8
Comparison of Scoping, Pre-feasibility, and Feasibility Study Content
Category ConceptualStudy/Scoping
Study
Pre-feasibilityStudy
Feasibility Study
Mining
Ore Reserve Estimate
Reserve and resource
calculation parameters
Cutoff grade equations
Reserve and resource
estimate
Mining Method and Plans
Mining parameters
Hydrology/geotechnical
parameters
Mining equipment list
Consumables list
Material handling systems
Material handling
equipment
Personnel list
Surface mining
Final pit and dump
outlines
Incremental pit and
dump outlines
Underground mining
General mine
development
Mining approach
(stoping, cut & fill,etc.)
Production Schedule
Historical production,
Annual ore and waste
tonnage and grade
Assumed Values
No
Industry Standards
Yes, minimal
engineering basis
No
No
No
No
No
No
Yes, simple
outline
No
Yes, general
outline
Yes, general
approach
Yes, if any
Yes, division of
total
Test-Based Values
Yes
Industry Standards
Yes, some
geotechnical data
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes, if any
Yes
Test-Based Values
Yes
Industry Standards
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes, if any
Yes
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
9/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear9
Comparison of Scoping, Pre-feasibility, and Feasibility Study Content
Category ConceptualStudy/Scoping
Study
Pre-feasibilityStudy
Feasibility Study
Mining Capital and Operating
Cost Estimates
Mining operating cost
estimates
Mining capital cost
estimates
Yes, factored
45%
Yes, factored
45%
Yes, 30%
Yes, from
engineering
manuals 30%
Yes, 15%
Yes, from vendor
quotes & take-offs
15%
Processing
Ore Sampling and Test work
Test work data
Processing Methods and Plans
Processing methods
Processing parameters
Equipment list
Consumables list
Personnel list
Material balance
Flow diagram
Site plan
General arrangement
drawings
Production Schedule
Historical production
Annual production
tonnage and grade
Off-site Processing Cost
EstimatesConcentration charges
Smelting and refining
charges
Other Charges
No, assumedvalues
Yes, general
approach
Yes, minimal
engineering basis
No
No
No
No
Yes, simple block
diagram
No
No
Yes, if any
Yes, division of
total
No
No
No
No, preliminarydata
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
No
Yes, if any
Yes
Yes, preliminary
estimate
Yes, preliminary
estimate
Yes, preliminary
estimate
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes, if any
Yes
Yes, quote
Yes, quote
Yes, quote
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
10/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear10
Comparison of Scoping, Pre-feasibility, and Feasibility Study Content
Category ConceptualStudy/Scoping
Study
Pre-feasibilityStudy
Feasibility Study
Material handling and
transport
Insurance and sales
charges
Processing Capital & Operating
Cost Estimates
Processing operating costestimates
Processing capital cost
estimates
No
No
Yes, factored45%
Yes, factored
45%
Yes, preliminary
estimate
No
Yes, 30%
Yes, from
engineering
manuals 30%
Yes, quote
Yes, quote
Yes, 15%
Yes, from vendor
quotes & take-offs
15%
Infrastructure
Industrial Infrastructure
Facilities
Facilities list
Power and water
parametersFull site plan
Social Infrastructure Facilities
Facilities list
Housing
Schools
Hospitals
Other
Infrastructure Capital &
Operating Cost Estimates
Consumables listPersonnel list
Infrastructure operating
cost estimates
Infrastructure capital cost
estimates
Yes, with
minimum detail
Yes, preliminary
No
Yes, with
minimum detail
No
No
No
No
NoNo
Yes, factored
45%
Yes, factored
45%
Yes
Yes
Yes
Yes
Yes, preliminary
Yes, preliminary
Yes, preliminary
Yes, preliminary
YesYes
Yes, 30%
Yes, from
engineering
manuals 30%
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
YesYes
Yes, 15%
Yes, from vendor
quotes & take-offs
15%
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
11/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear11
Comparison of Scoping, Pre-feasibility, and Feasibility Study Content
Category ConceptualStudy/Scoping
Study
Pre-feasibilityStudy
Feasibility Study
Management, Labor and
Administration
Personnel
Personnel lists
Training requirements
Personnel Capital & Operating
Cost Estimates
Consumables list
Personnel operating costestimates
Personnel capital cost
No
No
No
Yes, factored45%
Yes, factored
45%
Yes
Yes
No
Yes, 30%
Yes, 30%
Yes
Yes
Yes
Yes, 15%
Yes, 15%
Markets, Products and Sales
Markets, Products & Sales
Products
Volume
Prices
Sales organization
Sales Related Capital &Operating Cost Estimates
Personnel list
Consumables list
Sales related operating
cost estimates
Sales related capital cost
estimates
Yes, preliminary
Yes, preliminary
Yes, preliminary
No
No
No
Yes, factored
45%
Yes, factored
45%
Yes
Yes
Yes
Yes, preliminary
Yes
No
Yes, 30%
Yes, 30%
Yes
Yes
Yes
Yes, preliminary
Yes
No
Yes, 15%
Yes, 15%
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
12/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear12
Comparison of Scoping, Pre-feasibility, and Feasibility Study Content
Category ConceptualStudy/Scoping
Study
Pre-feasibilityStudy
Feasibility Study
Environmental and Permitting
Environmental
Permit list
Environmental Impacts
Environmental Compliance Cost
Estimates
Personnel list
Environmental related
operating cost estimatesEnvironmental related
capital cost estimates
No
Yes, preliminary
No
Yes, factored
45%Yes, factored
45%
Yes
Yes
Yes
Yes, 30%
Yes, 30%
Yes
Yes
Yes
Yes, 15%
Yes, 15%
Development Schedule and
Costs
Development Schedule
Development
methodology
Development schedule
Development Costs
Personnel listDevelopment related
operating cost estimates
Development related
capital cost estimates
Yes, preliminary
Yes, preliminary
No
No
No
Yes
Yes
Yes
Yes, 30%
Yes, 30%
Yes
Yes
Yes
Yes, 15%
Yes, from vendor
quotes and take-
offs 15%
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
13/14
Behre Dolbear Group Inc.
Statement of Qualifications
Scoping, Pre-feasibility, and Feasibility Studies
Behre Dolbear13
Comparison of Scoping, Pre-feasibility, and Feasibility Study Content
Category ConceptualStudy/Scoping
Study
Pre-feasibilityStudy
Feasibility Study
Project Economics
Financial Issues
Taxes
Royalties
Fees
Licenses
Economic Issues
Economic parameters
Discount ratedetermination
Cash flows
Investor returns
Debt analysis sensitivities
Yes, preliminary
Yes, preliminary
Yes, preliminary
Yes, preliminary
Yes, preliminary
Yes, preliminary
Yes, preliminary
Yes, preliminary
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes, preliminary
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Summary and
Recommendations
Operational Parameters
Title and ownership
GeologyOre reserves
Mining and processing
rates
Development period and
mine life
Metal/mineral recoveries
Sales
Operating cost estimates
Capital cost estimates
Financial Parameters
Cash Flows
NPV, IRR & ROI
Mostly assumed
and factored
YesYes
Yes
Yes
Yes
Yes
Yes
Yes
Mostly assumed
and factored
Yes
Some engineering
basis
YesYes
Yes
Yes
Yes
Yes
Yes
Yes
Some engineering
basis
Yes
Some engineering
basis
YesYes
Yes
Yes
Yes
Yes
Yes
Yes
Some engineering
basis
Yes
7/30/2019 Behre+Dolbear+Feasibility+Studies+SOQ
14/14