BEIS INNOVATION PROGRAMME:GREEN DISTILLERIES
Up to £500k funding available to procure SBRI projects to develop fuel switching and fuel switch enabling technologies for distilleries in the UK.
1
Today’s Agenda
2
Item Subject Timing Who
1. Introduction and objectives of the session 10:00 Chris Windle
2. Overview and objectives of innovation funding 10:05 Mark Taylor
3. The Green Distilleries Competition, structure, SBRIs and eligibility
10:15 Chris Windle
4. Technology Scope, timeline and application process 10:25 Shak Choudhury
5. Coffee Break 10:45
6. General procurement procedure 11:00 Julie-Anne De Thomasis
7. Next steps / wrap up 11:10 Shak Choudhury
8. Final Q&A session 11:15 Chris Windle & Shak Choudhury
End 11:30
IntroductionObjectives of the session
• Introduce Energy Innovation at BEIS• Outline the Green Distilleries Competition• Explain how to apply and how the competition will work• Outline the next steps• Collect questions
3
Energy Innovation Introduction
Dr Mark Taylor
Deputy Director for Energy Innovation - DeliveryScience and Innovation for Climate and EnergyBEIS
4
HMG Strategies
5
• Target of Net Zero by 2050 – in June 2019 the Government Committed to Net Zero by 2050
Energy Innovation Support Landscape –Organisation Overview
6
BEIS(UK Energy Strategy &
Policy)
UKRI
Innovate UK
Energy System Catapult
Knowledge Transfer Network
Research Councils(EPSRC =
Energy Lead)
SICE (Science and Innovation
for Climate and Energy)
Devolved Administrations
Scottish Government
Welsh Government
Northern Ireland
Assembly
Other Government Departments
BEIS Energy Innovation Programme
7
£180m Nuclear
Driving down costs and
building new UK supply chains and
skills
£15mRenewables
Driving down the cost of low carbon electricity at
scale
~103mIndustry &
CCUS
Low carbon options for industry, lowering
energy costs
£90m Built Environment
More cost effective energy
efficiency and low carbon
heating
£70m Smart Systems
Scaling up flexibility and looking for
new storage options
SICE Energy Innovation Programme - £505 millionAccelerating the commercialisation of innovative cheap, clean, and reliable energy technologies by the mid 2020s-2030s.
£50m Cross-CuttingSupportingdisruptive
innovations (particularly for
SMEs), inc.innovative
finance.
Hydrogen Supply
£33m
CCUS Innovation
£22m
Industrial Fuel Switching
£20m
IEEA
£10m
ACT CCUS
£13m
CCUDemo
£5m
Industry and CCUS competitions
8
Industrial Fuel Switching (£20 million)• Aim: to stimulate early investment in fuel switching processes and technologies• Phase 1 – 1 market engagement study complete• Phase 2 – 7 feasibility studies complete• Phase 3 – 4 demonstration projects in delivery
• HyNet North West – fuel switching several key industrial processes from natural gas to hydrogen
• State-of-the-art fuel mix for UK cement production to test the path for net zero
• Alternative fuel switching technologies for the glass sector
• Hydrogen alternatives to natural gas for calcium lime manufacturing
Industry and CCUS competitions
9
Industrial Energy Efficiency Accelerator (£10 million)• Aim: to increase the number of energy efficiency technologies available to industry to help reduce energy
consumption and cut carbon emissions• Phase 1 – 7 projects in delivery
• Including low carbon cements, energy storage, hygiene systems, steam boilers and water treatment• Phase 2 – 9 projects in delivery
• Including plastic manufacturing, waste processing, data centre cooling and water treatment
CCU Demonstration (£5 million)• Aim: to design and construct carbon capture and utilisation (CCU) demonstration projects.• Phase 1 feasibility – 14 feasibility studies complete• Phase 2 FEED – 2 studies complete• Phase 3a – 1 project in delivery (Tata Chemicals)
Industry and CCUS competitions
10
• Green Distilleries Competition • Focusing on fuel switching and enabling technologies• Driving the UK towards achieving Net Zero• Providing leadership ahead of COP 26 (Nov 2021)• Seeking a flagship industry to lead and demonstrate Net Zero Solutions
11
BEIS INNOVATION PROGRAMME:GREEN DISTILLERIES
Supporting Innovation – Green Distilleries
12
The UK Distilleries industry has grown by
20% in 2019, with funding in low carbon innovation
this growth can be enhanced further. This competition focusses
on fuel switching with the aim to demonstrate, at
pilot scale, a range of fuel switching processes and enabling technologies.
The decarbonisation of distilleries has the
potential to cut almost 0.5 MtCO2e/y by 2050.
Committed up to £10m funding to
support distilleries going green up to
2023.
The technology must be applicable to the distillation sector,
including from maltings through to
maturation.
Distilleries Competition – Aims & Objectives
13
Green Distilleries Objective: to identify, support and then develop credible fuel switching technologies/enabling technologies that can bring about a step change in their development.
Aims:
• To produce cost estimates for developing particular fuel switching and enabling technologies, whilst also identifying the market potential, cost reduction, energy use and carbon saving
• To demonstrate a range of innovative fuel switching and enabling technologies across the distillation industry
• To reduce the risks associated with fuel switching to lower carbon fuels.
Distilleries Competition – Aims & Objectives
14
• To disseminate the findings from the demonstrations, increasing the confidence across a range of industry sectors that fuel switching is a credible solution to decarbonisation and increasing awareness in industry of the potential options.
• To improve BEIS understanding of the challenges and costs associated with decarbonising industry/providing low carbon fuel across the UK including in remote locations ; and provide more detailed, robust evidence about the likely extent of and potential for industrial fuel switching across the UK.
Distilleries Competition Phases
• The competition consists of two phases• The ITT and application form to be published 14th September 2020
are for Phase 1 (feasibility)• A separate ITT and application will be provided for Phase 2 – this
is only open to applicants who were successful in Phase 1 and who have completed the feasibility study
• We are planning to run Phase 2 in April/May 2021 subject to receiving applications of sufficient quality
15
Distilleries Competition – Phase 1
Phase 1: Feasibility Study (£500k) – 7th December 2020 – 15th March 2021• Complete a feasibility study for novel Green Distilleries solution• Split into two Lots
Lot 1 (£300k): will focus on fuel switching of the process and onsite power production
Lot 2 (£200k): will focus on innovation around fuel switching enabling technologies such as fuel conversion, transport and storage
• Maximum £75k funding available per project• Projects to be completed by 15th March 2021
16
Distilleries Competition – Phase 2
17
Phase 2: Demonstration Study (£9m) – April/May 2021 – 31st March 2023• Complete a demonstration study enhanced by the feasibility study for novel
Green Distilleries solution
• Only those applicants who been successful for Phase 1 and have completed their feasibility studies can apply for Phase 2
• Maximum £3m funding available per project
• Projects to be completed by 31st March 2023
SBRI Procurement ProcessWhat is an SBRI?• Small Business Research Initiative;• Pre-commercial procurement – aimed at solutions which are not yet ready for the commercial market;
• Sharing of risks and benefits –suppliers receive financial support and retain arising IP (certain rights of use retained by BEIS). SBRI contracts are therefore expected to be priced below market rates, reflecting these benefits to the supplier;
Terms and Conditions• Suppliers retain the rights over any IP arising from the project;
• BEIS reserves the right to take up arising IP if it has not been commercially exploited by the supplier within 5 years of contract commencement.
• Phase 1 and Phase 2 projects will be signed under separate contracts• Standard public sector termination clauses will apply (including termination at convenience by either party
with 28 working days’ notice)• For Phase 1 only - Liability is limited to twice the contract value (Except in relation to death or personal injury)
18
Distilleries Competition – Eligibility for Funding
19
Item Subject Eligibility
1. Location Over 50% of the work must be carried out in the UK and led by a UK based company
2. Technology readiness level level at the start of the project 4 – 7
3. Retrospective work BEIS in unable to fund retrospective work on projects
4. Organisation type Includes both SMEs and large organisations; organisations from the public, private and third sectors; academic and research organisations may be consortium members but cannot be lead applicants
5. Additionality Evidence must be provided to show that innovation would not progress without public funding
6. Contract size Maximum funding requested must be £75k or below for Phase 1 and £3m or below for Phase 2. Private investment is also welcome.
Distilleries Competition – Eligibility for Funding
20
Item Subject Eligibility
7. Eligible project costs Set out in Annex 2 of the ITT, projects requesting funding for commercialisation activities are not eligible. Funding only available for R&D activities.
8. Project end date Phase 1 final reports must be submitted before 15th March 2021Phase 2 demonstration studies must be completed by 31st March 2023
9. Risk benefit sharing Projects receive financial support and retain any intellectual property generated, with certain rights of use retained by BEIS. Project outputs are also expected to be shared widely and publicly and project teams are not permitted to include profit in the eligible project costs
10. Applicants and projects team make-up
An application must be submitted by a lead project member
Distilleries Competition – Technology Scope
21
The range of technologies considered for innovation funding includes but is not limited to:
• Electrification - Novel high temperature heat pumps• Hydrogen - Both a blend and pure hydrogen are being considered, as well as hydrogen burners
for both directly fired distillation and for steam generation• Biomass and waste - Conversion and use of a range of biomass/waste products produced
across the distillation sector• Power generation – Utilisation of waste products (oils and biomass) for power generation,
hydrogen fuel cells (with a focus on production of both electricity and heat) and integration of local renewables
• Fuel Transportation and Storage – Liquid organic hydrogen carriers, hydrates and ammonia• Biomethane/Synthetic Methane – Only eligible for Lot 2
The focus of the competition is to provide the opportunity for the Distilleries sector to decarbonise
Distilleries Competition – Technology Exclusions
Exclusions: Funding will not be provided for projects where the technology development focuses on:
• CCS (Carbon Capture and Storage)
• Energy efficiency (apart from Heat Pumps which are in scope)
• Switching of feedstocks, (except where feedstock provides chemical energy to drive the process)
22
Distilleries Competition – Phase 1 Timescales
23
Application
• Publication of ITT - 14th September 2020• Mandatory Registration for Phase 1 Green Distilleries Competition - 12pm noon BST 2nd October 2020• Submit proposal by email to [email protected] by 12pm noon BST, 12th October 2020
Assessment
• Eligibility check and technical assessment and moderation - by 6th November 2020• Inform Applicants of the outcome of their application – 23rd November 2020
Contract award
• Contract award and projects start – 7th December 2020
Phase 1 Competition
• Feasibility study completed and submitted to BEIS monitoring officer for approval by 12pm noon GMT, 15th March 2021
Distilleries Competition – Phase 2 Timescales
24
Application
• Publication of ITT - April 2021• Proposal for competition to be submitted - May 2021
Assessment
• Eligibility check and technical assessment and moderation - May/June 2021• Inform Applicants of the outcome of their application - June 2021
Contract award
• Contract award and projects start - June 2021
Phase 2 Competition
• All projects to be completed by 31st March 2023
Distilleries Competition – Application Process• Registration Email to [email protected] using the subject title Phase 1 – Green Distilleries
Registration [Lead Applicant Name] with a short summary of Green Distilleries solution – 12pm noon BST 2nd
October 2020 - You must register to be entered bid/application for the Phase 1 – Green Distilleries Competition.
• Confirmation email and provide you with a unique project reference number
• Submission of Proposal to [email protected] – 12pm noon BST 12th October 2020 using the subject title Phase 1 – Green Distilleries Submission [Unique Project Reference] - Completed application form, with any supporting documents and signed declarations
Further details will be provided in the ITT
25
Distilleries Competition – Applicants• Lead organisations may only enter one bid into each lot as the project lead
• Consortium members/Subcontractors may be part of multiple bids, however it is the duty of the lead organisation to manage any arrangements with regards to conflict of interests with sub-contractors/consortium members where those sub-contractors/consortium members are part of other bids
• Bids from consortia are welcome. They may only enter one bid into each lot,all consortium partners are required to sign the completed application form.
26
Distilleries Competition – Assessment Criteria
Criterions
1 Description of Novel Technology, Technical Feasibility and Performance of Green Distilleries solution
2 Development Plan, Carbon Saving and Dissemination
3 Project Financing
4 Project Delivery/Teams
27
To be eligible for funding – Applicants must score 60% or higher in their application
Distilleries Competition - Review and Moderation
• All bids will be assessed and moderated internally with BEIS using third party external support for the assessment of the applications only
• Applicants that fail any part of the eligibility criteria will not be assessed further
• Feedback to applicants will be provided by 23rd November 2020
28
Distilleries Competition - KPIs
29
Ref. Performance Metric Phase 1 Phase 2
KPI 1 Number of Energy Innovation projects supported-completed X X
KPI 2 Number of projects that have successfully met objectives
X X
KPI 3 Number (and size) of Organisations supported to deliver project (Lead Partner and Other Organisations as named on grant offer/ contract) X X
KPI 4 Number of active Business Relationships and Collaborations supported (Formal and Informal, Overall and New)
X X
KPI 5 Advancement of Low Carbon Solutions-Technology Readiness Levels X
Ref. Performance Metric Phase 1 Phase 2
KPI 6i Initial Financial Leverage from private sector to deliver project
KPI 6ii Follow-on Funding to take project further forward XKPI 7i A. Reduced Unit Cost of energy- LCOE
B. Potential Reduced Unit Cost up to 2032KPI 7ii A. Increased Energy Efficiency/ Reduced Energy
DemandB. Potential Increased Energy Efficiency up to 2032
KPI 7iii A. Increased energy system flexibilityB. Potential Increased Energy System Flexibility up to 2032
X
KPI 8 Number of products (and services) sold in UK and Internationally
X
KPI 9 Potential reduction in CO2 emissions savings of project up to 2032
X
These KPIs will not be measure the success of the projects, but the success of the Green Distilleries Competition itself
We will be monitoring these KPIs throughout Phase 1 and Phase 2 for up to 5 years after the end of the competition
30
BREAK
15 minutes
Dates for Distilleries Phase 1
31
Proposed Tender Timeline Dates (may be subject to change)
Advert and full invitation to tender issued 14th September
Deadline for questions relating to the tender 25th September
Responses to questions published 2nd October
Deadline for receipt of tender 12 pm noon BST, 12th October
All suppliers alerted of outcome 23rd November
Contract award on signature by both parties 4th December
Contract start date 7th December
Dates for Distilleries Phase 2
32
Proposed Tender Timeline Dates (may be subject to change)
Advert and full invitation to tender issued April 2021
Deadline for receipt of tender May 2021
All suppliers alerted of outcome June 2021
Contract award on signature by both parties June 2021
Project completed March 2023
Transparency
• In the interests of fairness, today’s information will be anonymised and shared with all bidders, including those unable to attend today.
• Includes Q&A from today and the supplier 1-2-1s (published in an anonymised form).
33
Terms and conditions
• Although BEIS SBRI T&Cs are expected to form the basis of the contract, we will publish the final version of the T&Cs at the time of the ITT.
• They will be final and any bids submitted on condition that T&Cs are amended will be effectively submitting a non-compliant bid.
• If you have questions about the T&Cs you can ask them today or during the ITT Q&A window.
• All Q&A raised during the ITT publication period will be anonymised and shared with all bidders.
34
Next Steps• The Q&A from this session will be published in the ITT
• Further Q&A received before 5pm BST 25th September will be published by 2nd October
• For those who consent, delegate name, email and organisation shared with attendees to aid networking.
• Mandatory registration to [email protected] using the subject title Phase 1 – Green Distilleries Registration [Lead Applicant Name] with a short summary of Green Distilleries solution – 12pm noon 2nd October
• Application submission to [email protected] using the subject title Phase 1 – Green Distilleries Submission [Unique Project Reference] with all required documents and signed agreements - 12pm noon BST 12th October
• Feedback to be provided by 23rd November
Note: dates are indicative
35