BW/MEL/097/AFD/007-08/ R0 Dt.:11.02.08
M/s. Mata Energy Ltd.,Mellacheruvu, Nalgonda, A.P.
Kind Attention: Mr. K.S.N. Raju, Chairman. Dear Sir,
Sub: Offer for Dense Phase Pneumatic Ash Conveying System for 8.0 MW Coal Based C.P.P.
We are thankful for your enquiry and are pleased to quote as under. Please find our offer as per following Annexures.
o Technical write-up on Pneumatic Conveying ( Annexure 1)o Field Information / Data Sheet ( Annexure 2)o Scope of Supply ( Annexure 3)o Common Facilities ( Annexure 4) o Price Schedule ( Annexure 5) o Exclusions and Sub Vendor ( Annexure 6)o Commercial Terms and conditions for sale ( Annexure 7)
We hope you will find the above inline. If you have any question regarding this proposal, please do not hesitate to contact us on details given below. Looking forward to working with you to your satisfaction. Thanking you and assuring you of our best services.
for Bevcon Wayors Pvt. Ltd.
Suresh. T Head - Airforz Division
Land : 040 65971145Mobile : 9246260344 / 9246260341E-mail : [email protected]
Annexure – I
Significant Features, General Principles and Operations of “Bevcon - Airtec Dense Phase Pneumatic Conveying System”
1. We, through years of active involvement, working experience and extensive R&D, have perfected the dense phase pneumatic conveying technology for bulk material handling like coal, ash, cement, sand, minerals, chemicals, rejects and many other materials.
2. Dense phase pneumatic conveying system is totally enclosed and is devoid of any sort of leakage’s and ensures most clean working environment free from any obstruction and dust nuisance.
3. Our dense phase pneumatic conveyors are Amazingly simple equipment completely free from Complicated linkages or prime mover which requires regular and costly maintenance.
4. Conveying material moves through the pipe line slowly as a coherent slug at a low velocity which ensures minimum wear and tear.
5. The inlet valve of the conveying vessel is heavy-duty full flow type providing unrestricted opening into the vessel for filling cycle ensuring free fall of material.
6. The inlet valve has a unique rubber seal to ensure complete leak proof once the vessel is pressurized and it is so placed that it does not come in the material flow line.
7. The above aspect ensures longer life of inlet valve and also its maintainability is given due importance. It hardly needs 30 to 45 minutes to remove the valve from its Installed position and place it back after replacement of seal, ensuring down time of less than one hour.
Annexure – II
Field Information / Data sheet for AFBC Boiler Fly Ash Conveying System
No. of Boilers One No.
Capacity of Boiler Not Specified
Fuel Fired Grade ‘F’ Coal
Total ash collected ( Max.) 6000 Kg / Hr
Fly Ash Bulk Density 800 Kg/m3
Details of each Boiler Bank Tubes ECO AHP ESP
No. of Ash Collecting Hoppers 1 1 1 3
Ash Temperature (deg C) 375 275 175 140
Ash collected Kg / Hr 1500 1500 1500 2000
Conveying distance (Mts) (H + V) 60 Mtrs. Approx.
Mode of conveying Dense Phase Pneumatic Conveying.
Discharge to Ash Silo.
No. of bends / Line 3 Nos. (90 deg.) / Line
No. of conveying system 2 No.
No. of conveying transporter 6 Nos.
Transporter size 50 Ltrs = 6 Nos,
Conveying line size 50 NB
Inlet Valve size 150 mm
Air Consumption 148 cfm
Annexure – III
Scope of Supply with technical specifications for boiler
1.0 One No. – Bank Tubes, Eco, APH Zones – 3 Discharges.
Item Description Quantity
50 ltrs capacity conveying vessel with inflatable seal Inletvalve of 150NB with electro pneumatic controls.
3 nos
50NB M.S. heavy duty conveying pipe line with Flanges, Gaskets, Fasteners, & U-Clamps.
One lot
50 NB 45 º long radiuses Alloy C. I. Flanged Bend of Hardness 400 – 450 BHN. One lot
150 NB expansion joint and spool piece 3 nos
150 NB Hand wheel operated plate valve. 3 nos
25NB MS pipe for airline One lot
50NB Terminal End unit. One lot
Bye-pass unit 3 nos
Auxiliary Hoppers 2 nos
2.0 System II – Application: ESP Zones – 3 Discharges.
Item Description Quantity
50 ltrs capacity conveying vessel with inflatable seal Inletvalve of 150NB with electro pneumatic controls.
3 nos
50NB M.S. heavy duty conveying pipe line with Flanges, Gaskets, Fasteners, & U-Clamps.
One lot
50 NB 45 º long radiuses Alloy C. I. Flanged Bend of Hardness 400 – 450 BHN. One lot
150 NB expansion joint and spool piece 3 nos
150 NB Hand wheel operated plate valve. 3 nos
25NB MS pipe for airline One lot
50NB Terminal End unit. One lot
Bye-pass unit 3 nos
Annexure - IV
Common Facilities for above:
Item Description QuantityClient Scope
Bevcon Scope
Air Receiver of capacity 1.5 Cu. M suitable for working pressure upto 7.0 Kg./Sq cm complete with Pressure Gauge, Pressure Relief Valve and Drain vent.
One no ×
Compressed air & instrument air piping downstream to AirReceiver. ( Air Receiver shall be provided at a convenientlocation near to Pneumatic Conveying System).
One lot ×
Fly Ash Storage Silo One no ×
Reverse Pulse Jet bag filter on fly ash storage silo top. One no × ‘High level’ Switch on fly ash storage silo. One no × PLC panel for ash conveying system. One no × RAV below ash silo One no × Ash Conditioner (Single paddle type) with drive. One no × Control and Instrument Cables and cable trays.(Instruments to JB). One no × Local Control Panel for equipments below ash silo. One lot ×
Air Compressors (1 no. working + 1 no. standby). * Two nos ×
Air Filter- Regulator units. Six nos × Telescopic Chute ( Manual). One no × ×
Fluidizing Pads Excluding Roots Blowers For Ash Silo. * One set × Knife Gate valve below ash silo. One lot × Pipe racks epoxy painted One no ×
* Air Compressors and Roots Blowers are excluded from our scope of supply but we will provided technical specifications of the same so that these can be purchased by the customer.
Annexure - V
Price Schedule:
Item Material Description Qty. Unit Price per unit Amount
1.0
Manufacture, Procurement & Supply of Dense Phase Pneumatic Conveying System for Ash as detailed under Annexure-III pertaining to Scope of Supply.
One set Rs. 17,10,000/- Rs. 17,10,000/-
2.0Single paddle Ash conditioner with geared motor drive with water piping Jet Nozzles etc.
One no Rs. 1,50,000/- Rs. 1,50,000/-
3.0RAV, dia 300mm, with drive ( Below Ash Silo)
One no Rs. 72,000/- Rs. 72,000/-
4.0 Fluidizing Pads & Accessories (Silo) One set Rs. 1,60,000/- Rs. 1,60,000/-
5.0 Air receiver 1.0 m3 capacity. one no Rs. 85,000/- Rs. 85,000/-
6.0 Bin Vent for Ash Silo one no Rs. 1,05,000/- Rs. 1,05,000/-
7.0Knife Gate Valve (manual), Level Sensor & Equipments Control Panel for Ash Silo.
One set Rs. 1,15,000/- Rs. 1,15,000/-
9.0 Erection & Commissioning Supervision - - - Rs. 1,25,000/-
Annexure – VI
Exclusions from the offer
Any kind of civil work
RCC Ash Silo
Electrical power for erection, testing and commissioning
Fire fighting system and pollution control system
RAV’s for all discharge point
System and Equipment earthing below ground
Power supply to our panel
List of sub vendors for major items:
Sl. NO. ITEM MAKE
MECHANICAL
1 Gear boxes Greaves / Shanthi / NAW / Elecon
2 Geared motors Bonfiglioli / IC / PBL
3 Compressor ELGI / Ingersoll Rand
4 Plummer blocks SMR
5 Pulley bearings FAG / NTN
6 Couplings Fenner / Elecon
7 Roots Blower SWAM Pneumatics.
8 Hardware Unbroko / TVS etc.
ELECTRICAL
1 Motors Crompton / ABB / Siemens
2 Push Button Stns Cutler Hammer / L&T
3 Starter Switches L&T / Siemens
PNEUMATIC
1 Transporters BEVCON
2 (Electronic Panel)- PLC. Schnider / Allen Bradely / Siemens
3 Conveying Pipes TATA / JINDAL
4 Binvent Bevcon
5 CI Long Radius Bends Bevcon
6 Air Filter & Regulator unit Veljan
Annexure-VII
Commercial Terms and Conditions for Sale
1. Price:
The prices quoted above are on the basis of ex-works, Uppal. Crate packing and forwarding charges
with sea worthy painting will be extra. The equipment will be dispatched on freight to pay basis unless
otherwise mentioned. Octoroi and insurance charges shall be extra to your account. In the event of
customer covering the transit insurance he will intimate the name of the insurance company and the
policy number while placing the order.
Note: The insurance is to be covered by you directly on advice of the dispatch of the equipments. In
case it has to be covered by Bevcon Wayors (P) Ltd, additional 1 % shall be applicable towards
insurance charges. In case the consignment is to be dispatched by us on freight paid basis and duly
insured, then as per new excise rules, the excise duty and sales tax are to be levied on the freight and
the insurance premium paid by us.
2. Excise duty:
Excise duty extra as applicable at the time of supply will be charged. The present rate is 16.48 %.
3. Sales ax:
Central sales tax @ 3 % against declaration Form `C’ or, local Andhra Pradesh general sales tax shall
be charged extra.
4. Delivery:
Shall be approx. 12 weeks. The delivery time will commence from the date of receipt of technically and
commercially clear purchase order. The delivery schedule is also linked with the receipt of official
order, advance payment, clarification of all commercial and technical details, whichever is later. Date
of inspection shall be the deemed date of delivery. In case you need a faster delivery, don’t hesitate to
contact us.
5. Penalty:
We will not be in a position to accept any penalty clause. However, we shall make every endeavor to
supply the material within the stipulated period without any undue delay.
6. Payment terms:
35 % advance along with the order
65 % against Proforma Invoice.
7. Placement of order:
The original and duplicate copy must be sent to:
Bevcon Wayors Pvt. Ltd.
Ground Floor, Kavya Deluxe Complex,
Madhura Nagar, Hyderabad-500 038,
Andhra Pradesh, India.
Phones: 040 - 23747643 / 23732628
Fax: 040 – 23750435 / 66603588
The offer is valid for a period of 30 days.
9. Road permit:
Whenever applicable.
10. Changes \ Cancellation:
Any technical changes made in the order subsequent to acceptance and processing of the order will
attract an additional cancellation / amendment charges in addition to the costs of the new instruments
added.
Any arbitrary cancellation of the order after acceptance and processing will also attract a compulsory
30% cancellation charge on the P.O. value.
11. Price escalation clause
If the cost of the basic raw materials increase / rise during the contract period, then the escalation in
the price should be borne by you.
12. Offer evaluation and sustainability
While we take utmost care in selection of the equipments and MOC of the equipments for the
application, we earnestly request you to browse through the offer closely to check the correctness.
This is essential, as you being the master of your process parameters, would be placed in a better
position to ascertain in the MOC compatible to the service and suitability of the specified operation
ranges / limits of the instruments selected for the service. Please do not hesitate to take any
assistance you may need from our experience, available promptly from our head office or the nearest
regional office.
13. Warranty \ Guarantee
The items are covered under warranty for a period of 12 months from the date of dispatch against
faulty material and/or manufacturing defects. During this period, we shall repair/replace free of cost
defective materials, if he items are returned to us at your cost. Does not cover normal wear and tear of
the items during operation. Does not extend to damages or losses caused during transit. Does
not include consumable items such as lubricating oils, greases etc. Does not cover deterioration or
rusting due to atmospheric condition. Where ever we have agreed to commission the equipment’s, our
guarantees valid for a period of 18months from the date of dispatch or 12 months from the date of
erection and commissioning, whichever is earlier, provided the terms and conditions in our offer are
complied with.
14. Force majeure:
Every effort will be made to deliver the goods within the scheduled delivery period, but we take no
responsibility for any delay occasioned by causes beyond our control known as “Force Majeure”.
Delayed delivery will not be the reason for the cancellation of the contract. No claim for refund of
deposits /advance or damages will be entertained.
15. Jurisdiction
All contracts between buyers and ourselves are deemed to be entered in Hyderabad and are therefore
subject to Jurisdiction to the courts in Hyderabad.
16. Erection and commissioning:
Bevcon shall install the complete Ash Handling System / equipment at the site of M/s. Maata Energy
Ltd., Nalgonda, A.P. Bevcon Wayors Pvt. Ltd. will test and commission the complete system /
equipment up to the entire satisfaction of the customer. If any problem or defects are noticed during
commissioning / testing period, the same will be rectified / replaced by Bevcon Wayors Pvt Ltd.
PS: Please visit our website: http//www.bevconwayors.com for more information on our range of
products.