17
BEYOND COAL INITIATIVE COAL DOWNSTREAM AS PTBA’S STRATEGY OF ENERGY TRANSITION Fuad I. Z. Fachroeddin 27 October 2020 Konferensi Virtual 31 Tahun APBI-ICMA

BEYOND COAL INITIATIVE

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BEYOND COAL INITIATIVE

BEYOND COAL INITIATIVE

COAL DOWNSTREAM AS PTBA’S STRATEGY OF ENERGY TRANSITION

Fuad I. Z. Fachroeddin

27 October 2020

Konferensi Virtual 31 Tahun APBI-ICMA

Page 2: BEYOND COAL INITIATIVE

RESOURCES AND RESERVES

COAL RESERVES

1. OMBILIN• Resource : 0.10 billion ton

• Reserve : 0.02 billion ton

2. PERANAP• Resource : 0.63 billion ton

• Reserve : 0.28 billion ton

3. TANJUNG ENIM• Resource : 4.63 billion ton

• Reserve : 2.82 billion ton

4. LAHAT• Reserve : 2.48 billion ton

5. TAMBANG IPC – BANTUAS• Resource : 0.02 billion ton

• Reserve : 0.005 billion ton

6. TAMBANG IPC – TABALONG• Resource : 0.29 billion ton

• Reserve : 0.11 billion ton

COAL PORT

A. TELUK BAYUR• Stockpile : 90,000 ton

• Throughput : 2.5 million

ton per year

• Vessel : 40,000 DWT

B. KERTAPATI• Stockpile : 100,000 ton

• Throughput : 3.7 million

ton per year

• Barging : 8,000 DWT

C. TARAHAN• Stockpile : 1,000,000 ton

• Throughput : 25 million ton

per year

• Capesize : 210,000 DWT

8.28billion ton

Total Resources Total Reserves

A

B

C

3

2

1

4

6

5

93,962 ha

Total Mining Area License

3.23billion ton

2

Page 3: BEYOND COAL INITIATIVE

BUSINESS DEVELOPMENT FOCUS

Power Plant• Coal Fired Power Plant

• Renewable-Energi Power Plant

Coal to Downstream Industries

Coal Transportation Expansion• Expansion of Coal Railway capacity

• Development of alternative coal transportation options

• Coal to Chemicals (DME)

• Coal to Activated Carbon

Towards world class energy

company and beyond coal

aspiration

Page 4: BEYOND COAL INITIATIVE

Baturaja

Prabumulih

TUKSTarahan 1

Kertapati Barging Port

Tambang Tanjung Enim

TUKSTarahan 2

New Port & Railway Project : Development to Southern Lampung Tarahan 2

Capacity : 20 Mtpa (Q2 2025)

Existing Railway and Port (Upgrade)

TE – Kertapati : 5 Mtpa (2020) ;

7 Mtpa (2022)

Railway and Port Existing (Upgrade)

TE – Tarahan 1 : 25 Mtpa (Dec 2020)

Kramasan Barging Port (by PT KAI)

New Port & Railway Project : Development to Northern

South Sumatera to Kramasan Port (PT KAI)

Capacity : 20 Mtpa (2024)

Expansion of Coal Railway Capacity & New Ports, 72 mn in 2025

*Mtpa : million tons per annum

Page 5: BEYOND COAL INITIATIVE

OUR DEDICATION FOR THE COUNTRY

meaning that PTBA is not only engaged in

mining business and just selling the coal

however, it has been transformed into an

energy company by developing energy-based

business in addition to coal products – such as -

electricity services, renewable energy,

plantation products, mining services and other

services, including coal to chemical plant as a

part of its coal-downstream-initiatives

creating value-added from coal and other

potential attractive business that may not

directly related to the coal

5

Page 6: BEYOND COAL INITIATIVE

BUSINESS DEVELOPMENT FOCUS

Coal Transportation Expansion• Expansion of Coal Railway capacity

• Development of alternative coal transportation options

Coal to Downstream Industries

Power Plant• Coal Fired Power Plant

• Renewable-Energi Power Plant

• Coal to Chemicals (DME)

• Coal to Activated Carbon

Towards world class energy

company and beyond coal

aspiration

Page 7: BEYOND COAL INITIATIVE

SUMSEL-8 With its Capacity of 2 x 620 MW

The Largest Mine Mouth Coal Fired Power Plant in Indonesia

Page 8: BEYOND COAL INITIATIVE

8

Renewable Energy

PTBA –AP2

Page 9: BEYOND COAL INITIATIVE

9

Page 10: BEYOND COAL INITIATIVE

10

PTBA Commitment in Renewable Energy

Page 11: BEYOND COAL INITIATIVE

Development Project – Power Plant

Sumsel-8 CFPP 2x620MW

Central Banko

5.4 Mtpa

Location:

Coal

Consumption:

COD:

PTBA:

Investment:

2021/22

45%

USD 1.68bn

Banjarsari CFPP 2x110 MW

Location:

Coal Consumption:

COD:

PTBA:

Banjarsari, Lahat

1.0 Mtpa

Since 2015

59.75%

Tanjung Enim CFPP 3x10 MW

Usage:

Coal Consumption:

COD:

PTBA:

Internal mine sites

0.15 Mtpa

Since 2012

100%

Tarahan Port CFPP 2x8 MW

Usage:

Coal Consumption:

COD:

PTBA:

Internal port sites

0.10 Juta Mtpa

Since 2013

100%

Total Power Plants ~ 1,500 MW

Legend:

Under Construction Operated

Note:1. Currently the solar-generated power plants is under testing and will commence its full operation on October 1, 2020

Rooftop Solar PV AP II 241 kWp

Location:

COD:

PTBA:

Investment:

Soekarno Hatta

Airport

2020

50%

USD 194,400

*Mtpa : million tons per annum

Page 12: BEYOND COAL INITIATIVE

BUSINESS DEVELOPMENT FOCUS

Coal Transportation Expansion• Expansion of Coal Railway capacity

• Development of alternative coal transportation options

Power Plant• Coal Fired Power Plant

• Renewable-Energi Power Plant

Coal to Downstream Industries• Coal to Chemicals (DME)

• Coal to Activated Carbon

Towards world class energy

company and beyond coal

aspiration

Page 13: BEYOND COAL INITIATIVE

COAL BENEFICIATION ROUTE

Combustion

Carbonization

Gasification

Liquefaction

Coke

Syngas

Power

Smelting Iron

Chemicals

Fertilizer

Fuel

Coal

COAL TO CHEMICALS

COAL TO LIQUID

COAL TO DOWNSTREAM INDUSTRY

Downstream

Processing/Refining

Page 14: BEYOND COAL INITIATIVE

COAL TO CHEMICALS INDUSTRY DEVELOPMENT

SYNGAS

METHANOLGasification

COAL TO DME PLANT

BATUBARA 6 mtpa

DME

1.4 mtpa

*mtpa : million tons per annum

Tanjung Enim

As an alternative energy source to

substitute LPG

To reduce dependency on imported

energy (~70% of domestic LPG is

imported)

To improve national energy resilience by

utilizing local energy sources

To create added value for our coal in Tanjung Enim, South Sumatera, PTBA in cooperation with Pertamina and

strategic partner initiated the development of Coal to Chemicals industry in Tanjung Enim

Strategic Partner

14

Page 15: BEYOND COAL INITIATIVE

INTEGRATION IN COAL BASED INDUSTRIAL ESTATE

BACBIE

Total Area : ±585 ha

Existing Tenant:

• Crude Palm oil Mill (operational)

• 2 x 620 MW Minemouth Coal Fired

Power Plant (in construction - COD

2021)

• Coal to Chemicals (in development)

PTBA is developing

Bukit Asam Coal Based Industrial Estate (BACBIE) in

order to support the first integrated coal

based industrial complex in Indonesia

Open opportunity:

• Coal to

Chemicals

(Methanol, MEG,

Olefin, etc.)

• Coal to Liquid

(HSD, Oil, etc.)

• Coal to …..

Palembang

Page 16: BEYOND COAL INITIATIVE

OPEN FOR PARTNERSHIP

STRATEGIC PARTNERSHIP

WE OFFER TO POTENTIAL STRATEGIC PARTNERS

FOR BUSINESS OPPORTUNITY IN INDONESIA

3.23 billion tons

Coal Reserves

585 ha

Industrial Estate

BECOMING NEAR FUTURE TENANT IN

BUKIT ASAM COAL BASED INDUSTRIAL ESTATE(BACBIE)

• Coal to Hydrogen

• Coal to Other Chemical Products

Page 17: BEYOND COAL INITIATIVE

THANK YOU

Menara Kadin Indonesia, 15th Floor

Jl. H.R. Rasuna Said Blok X-5 Kav.2-3

Jakarta

T: +62 21 525 4014

F: +62 21 525 4002

Tanjung Enim

Jl. Parigi No. 1 Tanjung Enim

Muara Enim, Sumatera Selatan

T: +62 734 451 096

F: +62 734 451 095