BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17)

BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

BFN-19

Figures 9-2-1a and 1b

(Deleted by Amendment 17)

Page 2: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

BFN-16

Figure 9.2-2

Deleted by Amendment 7.

Page 3: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

5 3

H

G

t:-~::·==· T--·-·-··~·""' D Y~ •w•

AMENDMENT 27 STANDBYCASTllEATlilENT.t.RADIOACTIYEl.l.STEll.DC UNITO

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

RADWASTE SYSTEM FLOW DIAGRAM

FI GU RE 9. 2-Ja

c

B

A

Page 4: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

AMENDMENT 27

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

RADWASTE SYSTEM FLOW DIAGRAM

FIGURE 9. 2-Jb

Page 5: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

10

10

11 12

AMENDMENT 27

UNIT o EAR PLANT BROWNS FERRY :~;~ YSIS REPORT FINAL SAFETY

RAFDLWOA.,STl1 ASJRSATJM

FIGURE 9. 2-3c

Page 6: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

m:m.~"

---": ",.,

. ' -2--"',., .. . ' . -~i °"""'""." ~ """" "'-"'"' .... ,.

AMENDMENT 24 TUR81NEa.RAOIOACTIVEllASTEBUILDING UNITO

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

RADWASTE SYSTEM FLOW DIAGRAM

FIGURE 9.2-Jd

Page 7: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

r--- \~~'.Jl"'"'""~

I ·:.'."" ' .1 ..

""' """'"'"'" ' ·::: .. . , '

------ '" ------ ,,y-·

"f" .,.1 . .... ,

h

"f" "" :'"' " '

8

AMENDMENT 23 RE.<.CTORa.RAD ! O.<.CTl VE I AS TEBUI LD ING UNITS l - 3

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

G

c

B

RADWASTE SYSTEM A FLOW DIAGRAM

FIGURE 9 . 2-3e

Page 8: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

8 7 5

l i-

Llit4::

l"li.Mi.iiK~.11'11'1 ym,,. .•. "'-'="al:...'r" .. '~l.", .. .r..T.~-~­~.:5 rr"m"..r,.;.,M;~'M".:I'.: ;,:.r. :;:ii.

H

G

F

E

..-... :: ... -J:I ~;.::"' D

aii!iiisT·uiiiiiiifw::."""·=

AMENDMENT 27 ~CNoacnvE IASTE BUILDING

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

c

B

RADWASTE SYSTEM A FLOW DIAGRAM

FIGURE 9.2-31

Page 9: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

i-:::-::::::--1 l':'L,:'"~

! • "'',"':•!::' I ,~---~-----------,---2:'7

l],1·.:::"'~'

~--~~--~--~-~.,

"'''"""':::,

AMENDMENT 22 RADWASTEEVAPORATORBLDGll.RADIOACTIVEWASTEBLDG UNITO

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

RADWASTE SYSTEM FLOW DIAGRAM

FIGURE 9 ,2-3g

Page 10: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

FIGURE 9 .2-3h

Page 11: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

..- 6-onna -o ~ l9

' '

L

' ' ' ' ' ' ' ' ' ' '

"" __ II ' -='- i i

AM ENDMEN T 16 STANDBY G"S TREAT~ENT BUILDING U~ ! T 0

BROWNS FERRY NUCLEAR PL ANT F INAL SAFETY ANALYS I S REPOR T

RADWASTE SYSTEM FLOW DI AGRAM

FIGUR E 9 .2- 3 i

Page 12: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

ctOIH-Ll.-OLIJLt-0 I'll LI

~ I

.---...l

TABLE B

1~;!-i!a!!J:ii-1118 TAILEC

5

ltVi~.:~~~l'i1 <DI' __ ,.,.,....,..,...,..., ..

4 2

.. r~~~:.=.t~~~~-• 111in111~-· G

.. ~i1i~il1iir~~~ •· ~~~a..~;_::;:~"'T '·lt«ll'-....... """'·+• :: ~~:;;:_-;_;;;:-:_r~ '· 'L....,..m"ifil:'i=&,,~"/iU;"lf."1'"'~ ™' r-. ......... , .... -..- ..... -.. ,,_.,.....,_, ... , .. ,., .......... . ... ~~- -· ----- _.....,..,.,_.,_, ,._ ... ,_.,. __ , __ , .......... --.. :::!'!'~llllllllRWl.ll.-·-- L.IOIC

17. E"miii':i~-""1'.llL'=~=-·.=.·it.., .... 10.IDIJLIO-Lm:ICl•Ll .. f11'•, .. rr1.

AMENDMENT 27

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

RADWASTE SYSTEM MECHANICAL CONTROL DIAGRAM

FIGURE 9.2-JJ

D

c

8

A

Page 13: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

SLO~Z-LL-0~93Lt-O VII

lo-730E934-40 h

~ 77-26

I I I

2s-11A (HS\ 77-26 ..._,

*~ ::==== ..... _ _J

L9

. <

N m N

' Z~ N -<~ ' ~ 0 CN -

"' ~ !;:

"'

TO WC TK

.... ~ ""'~ <-U - ,_ , .. ' .. ~ .. ~·~ oo' o-o _..,_ <DN<D ~~~ ~~~ ...... ' ' ' -N~

~---1-- FROM CATION FLOC ~ ~ CHARGING PUMPS 1.1.1 (THIS DWG,F1) ~~

"' ,_ . V> N

~ . I -~

~~ ~ z ~ =>

25-162 (HY\ 77-27A

VENT

VENT rt-lrr7L....IF s F sv)\__rnrrt-Ti 4...L.u-5,11-27 A- - - i- - - 77 -27r-5 u...yu

25-162 25-162

..,,..--:----:--"'tllfl'[T~H~I~S~D~W~G~,£D7'!...) FROM FLOOR AND RADWASTE BUILDING { ~

I I

r--~~ *--------OFF-GAS CONDENSATE --, DRAIN SUMPS CONT 0-47E610-77-1

VENT

FLOOR DRAIN COLLECTOR TANK

LT 77-28

77-27A 1 ,.Jc< 7!_:37A 'RL--------TYP 3 PLACES

1 ~25-17 /~ _____ ..J I _______ _J

0

TO SAMPLE STATION

25-17 r _____ _{FT\_ ________ _

77-52 ..._,

0 "' ' .. ~ ~ ~ 0 ~

25-73

PI 77-33;---t ..._,

~~ ~ ~c: 25-100 (fiS\_ "1_ I l'

77-34A -;- - -ilit" ..._, I GIR

I "").!(""' 25-1~ 25-17 I (HS\

L_....fFRcsL.../FA\ I 7~4c 77-52 77-52 r---1-, y' ..._,

\ I Y,;<'@f 25-162 (HY\ 77-278

\ I /~/' \. ------..l.--~25-17 r 11-348 ..._,

AIR COOLER

25-73

FLOOR DRAIN FILTER HOLDING PUMP

25-11

PDT 77-44

, PI .)----1 ... -.....,-, r-r-1 7.,!:35

(fiS\_ 77-45 ,

2s-1oe-- I

,c:-.,.2 5-11 1 el \ 77-43

25-161

VENT

FLOOR DRAIN FILTER

x

-----------, ---------1 I

I I I I I I

I y : :©:~ :©:~: I ID-730E934-60 ~.J :©:ili r-----------

1 I I I

I 25-17 25-100 I

I (HS\ (HS\ I r--1><1---1---------.... E>A PI I 77-32A 77-328 I

25-17 MCC '~ 77-29A I y I I ~l(fffi\_ ..._,25-69 I I LA \ HS / ' I I I

77-28A I n-28A-0i ___ f ---+-- -:i::-1 t 25-111 I ..._, '@f 'W: I (Fsv\ I L__ -----J--"----,

L-fS~----1~ I I 25-17 ;; ,G, I I 77-2681 I I h~28i1 I ~ ,:. 25-1;..i..._ 25-1?:J-.. s I r----+ I - I r 77-28 ~ (HS\ ( 1s'i I 25-161 I

I ....__... 1.1.1 77-2BA-A 77-28A o r:-:-. I ~ -- y g 25-161 I HV ' I

lo-730E934-38f--, ,1... I ~ 25 17 ~ 77-32 I I (LRS\.J ____ "' _____ fe----+---- --- - ---~ ::: I 1 1aa --R-w--, 11-2a • 1 o 1 I 25-17 7 ~ ~ I y I I I ~ I I ;::!; ~s-11 I I o I

VENT 25 162 ~ (HS'\ 25- 17 1 (IS\ __ ..J ~I I ~

I I

x \ I T I L L.., 1

:©:ili (HS\_ - -77-37 "'t , 25:T00 I I

25-161 (HY\ 77-37

VENT

rt-rn""Tl_....1 - I ::l 11-288-A I 11-280 r 25-69 25-69 11-210 1 I 17~':,~d I 4-LL_,.s,;i-215i 'O I I j I (Pl\ (Pl\ t:p._-.._,7': l--

I (fffi\_ __ 0 --...l---l-r---L-,11-290 11-21 J 1

I I ____ _J L--jo-730E934-601 TO WASTE

1'1_.,~8ACKWASH RECEIVER TANK

x-, T I I I I I I I I

VEN

lo-730E934-60 t--, I

VENT

I L , , 25-100 I

I ~ (HS\_-4---L __ ~ 7J.39

25-1D8

(HY\ 77-39

VENT

25-17 I 77~-0 MCC~-- I -- I (iC\_ I ?-t-+..LNl-l>~l.f\j.L.l._.L .... -+-""T-T"""------t./·+----...-..._------------+-------.., ,----------------'

~ 77-275 1 '--i>::i------------... E> I x x ....------------- I

TO WBR TANK

11-21s 25_17 ~ _1_25_17 a 1 PRECOAT ~Si~~~~~STE 1 r--;8J,(Hs' I I o-+7E610-77-3.G1 FD SUMP J

_J ~77 275 FLOOR DRAIN I r-------------- r- R ....:..,.. COLLECTOR PUMPS ~ 25-73 - - - ....J (FG\',G • 77'-s2v69 I I TO WASTE BACKWASH PS

RECEIVER TANK ~----!77-275 -----; I 1?..:.!J5 (0-47E610-77-5) s SEAL WATER -- I I x

IASTE FILTER HOLDING PUMP

25-72 rri t-~. PI I ~ }!Y,

7!32 I ~25-17 lj;{._ I ( HS\ (HS\ /~I

MCC I 77-738 77-73C 'r;<(_ I I ..._, k,

- ~--~--,------~ STANDBY GAS TREATMENT BLDG·--------------... NO. 2 SUMP 0-47E610-77-11

L-~<3---->---'i><J--(0-47E856-1,A6 25-108 I I ~ ,-------...l--------~-----_J I r---------* I ..__.. r--------------_J I

0 I I I

___ J ~ L-jo-730E934-601

~ 25-10B DRAIN SUMPS ------------

::: I 25-175 I I 77-73A

I ,-----

~ I (HY\ VENT I I ' I 77-68A-A I r---------------- I ---------

..._, __________________ J FROM EQUIPMENT {

CONT 0-47E610-77-1 -----------.. VENT 25-175 25-17 );;{_ ~_&:---, 11 64 11 64 Yc;< I

s I ~,~-,I Yo-73DE934-40 II I ~--~11

I I VENT I I FRO• UNITS

I I 1,2.1.3 ff-_.!."• ~-CLEANUP

SYSTEM VENT

25-175 ° I I I (FA\,25-11 I

rHITT-n_s....1;;_2 7+---, I I I 77-91 I I I I I ~5-17 y I AIR

25_ 1~ 25 _1J.l.. I r--jo-730E934-4ol L---'i::;}----_J I COOLER r--~(Hs\ (1c\ I '!' I I ~11-211 11-211 I I I '--r--------------+ r- R ..._, ..._, I ~------1 I I-

I I ------, I r - ------------1 _, _ _J ---------r--:----txx:1--:l-:l--,----------t::~---, I I I 25-115 I I I

I 0 I I ' r:-:-. I I I 25-108 I ,------ -,-1-1 FSV 7~-~~A~8 I I ~ VENT 25-161 I __/HS\ : : ~T.HJ.s c°A,10in 1 1 1 1 77- BA- : 1 11 _11 i 7e.J"

~ 77-277

25-10B r-- R ~ I '(HS\ I ..Ja< 11-16

r~ y ~----- - _..!.!.... ___ ---+--jo-730E934-60 I II I . . I I 11 ,..l...25-161 I I (FSV\

I 11-16 TI I s

I I

I I

I I

I I

I I

1.

2.

3.

4.

5.

6.

7.

DEMINERALIZED WATER 0-47E856-1,C3

{R(MCC

'I' i../HS1

77-278C - 25-17

~-~--,__,CATION FLOC (HS\ MIXING TANK 77 _278A-A (NOTE 7) I

r--1

~ 77-278

s

25-11 I (iC) j_ _ __/HS\

77-278B I 77-~A-B

I I I 25-17 I

______ J.._(i'C\ I 77-278A I

'\ I \ I -

\ I d511 ~ \ (HS\ (HS\ \ I 77-278B-A 77-278B-B

r--~11Yf ____ J 77-278

I y I : r--J L-jo-73DE934-16I

I I I I

TO WASTE A COLLECTOR

L_;~::r'."'"'."'"r+~l-,r+~+-~TANK );:;{_ 1 (THIS DWG,D7)

MCC _>v;--f I TO CATION L_..J --+--.... ~ FLOC MIXING

TANK (THIS DWG.H2)

TO FLOOR DRAIN

L~-=1--:-"'T+il .... ..L.+il .... -1~COLLECTOR TANK );;{_ I (THIS DWG,FB)

MCC )1'.,c--f I TO CATION L ..J ,1':}-----;~ FLOC MIXING -- TANK

CATION FLOC (THIS DWG.H2) CHARGING PUMPS (NOTE 7)

FOR GENERAL NOTES AND REFERENCE DRAWINGS SEE 0-47E610-77-1 a. -4.

THE CONTROL ASSOCIATED WITH PROCESSING OF THE WASTE SYSTEM IS ESSENTIALLY MANUAL START-AUTOMATIC STOP. THE WASTE-COLLECTOR ANO FLOOR DRAIN SYSTEMS ARE MANUALLY INITIATED AFTER PROPER VALVE ALIGNMENT BY STARTING THE RESPECTIVE COLLECTOR TANK PUMP. WHEN THE COLLECTOR TANK LOW LEVEL IS REACHED. THE PUMP IS AUTOMATICALLY STOPPED AND PROCESSING CEASES. SAMPLE TANK RECIRCULATION IS MANUALLY INITIATED AND STOPPED. SAMPLE TANK DISCHARGE IS MANUALLY STARTED ANO AUTOMATICALLY STOPPED ON TANK LOW LEVEL. THE LOW CONDUCTIVITY, VARIABLE RADIOACTIVE WASTES ACCUMULATED IN THE WASTE-COLLECTOR TANK ARE ROUTED FROM THE WASTE-COLLECTOR PUMP THROUGH THE WASTE-COLLECTOR FILTER TO REMOVE THE INSOLUBLE MATERIALS, THEN THROUGH THE WASTE DEMINERALIZER TO REUOVE THE SOLUBLE IMPURITIES. AFTER PRCX::ESSING, THE HIGH PURITY WASTE IS BATCH SAMPLED AND EITHER PUMPED BY A WASTE SAMPLE PUMP TO CONDENSATE STORAGE THROUGH FCV-77-110 OR -114 FOR REUSE IN THE PLANT, TRANSFERRED VIA FCV-77-111 OR -115 ANO FCV-77-58 AND FCV-77-59 TO THE DISCHARGE CANAL. RECYCLED THROUGH VALVE FCV-77-112 OR -116 TO THE WASTE SAMPLE TANK, OR RETURNED TO THE WASTE-COLLECTOR TANK OR WASTE SURGE TANK THROUGH FCV-77-111 OR -115 VIA THE OFF-STANDARD RECYCLE ROUTE. THE t.+OOERATE CONDUCTIVITY. LOW RADIOACTIVE WASTES ACCUMULATED IN THE FLOOR DRAIN COLLECTOR TANKS ARE ROUTED FROM THE FLOOR DRAIN COLLECTOR PUMP THROUGH THE FLOOR DRAIN FILTER TO REMOVE THE INSOLUBLE MATERIALS. THE FILTERED WASTE MAY THEN BE BATCH-SAMPLED AND ROUTED TO THE DISCHARGE CANAL WHERE IT IS DILUTED BY THE CONDENSER CIRCULATING WATER, OR IF ITS CONDUCTIVITY LEVEL INDICATES IT CAN BE ECONOMICALLY PROCESSED IN THE WASTE DEMINERALIZER OR ITS RADIOACTIVITY LEVEL IS TOO HIGH FOR CANAL DISCHARGE, THE WASTE IS ROUTED TO THE WASTE-COLLECTOR TANK. FOR DISPOSITION OF THE WASTE FROM THIS POINT REFER TO NOTE 2 ABOVE. BOTH THE WASTE-COLLECTOR FILTER ANO FLOOR DRAIN FILTER ARE SIZED SO THAT ONE MAY BE SUBSTITUTED FOR THE OTHER IF ONE IS TEMPORARILY OUT OF SERVICE. WHEN THE DIFFERENTIAL ACROSS A FILTER REACHES A PREDETERMINED AMOUNT, IT IS BACKWASHED AND PRECOATED. FILTER AID MATERIAL IS ADDED THROUGH THE FILTER AID PUMP. FILTER BACKWASHING IS ACCOMPLISHED AUTOMATICALLY AFTER MANUAL INITIATION; PRECOATING IS AUTOMATIC AFTER MANUAL INITIATION. FILTERS ARE RECYCLED AT ALL TIMES VIA A HOLDING PUMP IN THE RECYCLE LINE. THE HOLDING PUMP IS STARTED AUTOMATICALLY DURING THE TIMED PRECOATING OPERATION. FILTER AID IS MANUALLY INITIATED AND STOPPED AUTOMATICALLY WITH AUTOMATIC LINE FLUSHING WHEN THE FILTER FLOW DROPS BELOW A PREDETERMINED RATE. ALL INSTRUMENTS ARE PREFIXED UNIT "o-· UNLESS OTHERWISE NOTED.

NOT IN SERVICE.

REFERENCE DRAWINGS: 0-45E775-3 THRU -7,-10,-11 ,-12 a. -14 .. WIRING DIAGRAM 480V AUXILIARY

POWER SCHEMATIC DIAGRAM 1-471610-2-3., .. , ..................... MECHANICAL CONTROL DIAGRAM

CONDENSATE DEMINERALIZERS SYSTEM 2-,3-47E610-2-3 ....................... MECHANICAL CONTROL DIAGRAM

CONDENSATE DEMINERALIZERS SYSTEM I 0-47E610-24-3 ......................... MECHANICAL CONTROL DIAGRAM RAW COOLING WATER SYSTEM

I 1 ,2,3-47E610-66-1 ..................... MECHANICAL CONTROL DIAGRAM OFF-GAS SYSTEM

1 ,2,3-47E610-69-1 ..................... MECHANICAL CONTROL DIAGRAM REACTOR WATER CLEANUP SYSTEM

LIT r---- 77-66A"-CKl--I IASTE COLLECTOR TANK

J I FLOC CHARGING I I I I I I I 77-75 .,. __ - I PUMPS I I I I I

~ 25-11 I - ~ TO WASTE I I ,.,.!,, I I VENT I TO IS-77-92

.. -------I 1-47W610-75-1 ......................... MECHANICAL GONTROL DIAGRAM CORE SPRAY SYSTEM

77-7 1125-161

,,.) j(HV) I ..._, I I I

25-17 I I I (PX\ I 77-66A

I I L.----...l-------,--

25-17 I

(LA\ I 77-66A-A

25-11 y I (C;\_ ___ ..J __ _:::;11_L

77-66A-B ~25-17 TLRS\ ...._... ( LA \.... 77-66

77-668-8_ j_ - ---,...-..._, _u5-11 I

VENT

IASTE SURGE TANK

(LA\ I 77-668-A I

..._, I +---

25-17 I (PX\_ I 77-668 , ..._, I

I I I I I

f--£><1--1, LI T 77-668 ..._,

t---i7~i,r--~~g~re~~ TANK 1 1 J.s£ (H's):@t-----, 1r*'i lo-730E934-6of-r---l-1D-47Es1D-11-3.c5) x ..._.... {0-47E610-77-5) I L~ 77-68A(;'{_ I ~ 25-70 I ~ A ...._... A -1 77-68A-B ~ PS 'FCV\ _.J;:::( J_25-17

25_70 I 1 I r PI, 11-211 11-11 r~ (Hs"\ x (Pl\ I TO sA•PLE 1 L__ 77 - 69A I l.5-73 I ~ 77-71A 77-67 I STATION I I - - _J IA ...__.... I L____ I I ___ _J

IASTE COLLECTOR PUMP

/ / 77-76 ( ( I I

VENT TO WASTE BACKWASH RECEIVER TANK

',..__J~~'-~-1'-~~~;--~~~.l...-~~~~~~~--1/l-~~---,r-~.L...~~~-1SJ--L~~'-~-l/'+-~~~ ....... ~~~~~~ ...... ~~~~~~~~~--~-111<. MCC~- 1 -w* x ,----- -:- _____________ _J x 1

1 1@-t-~~:-11 L-t----------------------- :----- -:- ---------------------------- --------------------------------_l_--,

25-~;- [g_ii·~~ii'!;7-JJ~~------------- i ------------------:®: ill_J------ J {Ls\_ _______ ':( ________________ ~-----, R G I 11-66 I ' I ,..__,., I ~15-11

( / I I I HS l---l------1 25-175 I 77~A I

I 25-11 I 7@_A I I I ~ I I TO JS-77-92 ,J._25-1D8

_J 7Q6 -1 VENT I ~-47E610-77-3.B5 ~-_/Is\_ ___ _ 25-17 I I · · 7c;J4

(iS\__~ I ~-----, I 7~8 +-------, R lGL- I

I s 25-175 I ~ 1 I I FCV FSV _____ ..J I ..JHS\25-17

lo-730E934-32 f-..J 77-688-A 77~-A r 7~8 r---~---,...-: --------------- ---:~ J'R1: HQ ..-J.....25-100 I

I --------------- ---1---::Y' ! >J1}Jb'c : 25-175 VENT ~' I

f--r.J_,, 0 1®-0 lo-73DE934-6of-.J

I >sZ /~ I ~25-11

~ ~ ..JHS\ (HS L--+ -77~-A 77~-B I 25-70

-i§j MCC ,C:-.,. ,,--._/ ' f PI \

77-69

TO SAMPLE--tcQ--1 STATION ~

77-68B-B

---------..,

MCC

* -I

TO FILTER AID TANK

-----------------------------------, w;;l;l FILTER AID .. DUST I ,.c,1;--'t--::r;:1, ,~,l.!Q_ I AGITATOR " EVACUATOR 25-100 I }9),..®_ I ,@_~ ~ 125-108 ~ I ' "' l-1-_,- --' HS\ I 25-17 I 25-108

7Z2]1 7z.:!]O I (HS\ (HS\ ---, : I 7~3A : 7~JC

w~::: CONDENSATE 1 • • ,~,(B), I I FILTER 25-67 r---~---l---+-----_J ~ 25-17 I I AID LIS _J I ~ 7 ~~ 2f- -4- - __J TANK 7?..::}.}2 - A25-1 DB

......._. (IS\ 25-67 77-123

FIC ....,.....

IASTE FILTER AID PUMP

1e,y2 I 25-100 I

~--~-108---------~

~5-10B

( IC\_ FSV ~-i 11-119 1- 1 -11s.L5 x ..__, _J

~---__/HS\ : ,-.!..... 7C!J a I

(FSV\ ~ 11-110 rrcv, I

s 11-111 I I

~--.... f---,....>---L--P'<J--~DE•IN I '-~~~~~~-1>-::i--~~~....1.~~~~~-1><1-~..-E>

____________ _J_J

-------------r-~s-10B I (HS'

x WTR I

8 7

IASTE SURGE PUIF

6

I 11-119 x I ..._,

L!~

5

I

-~~~----~----------J lo-730E934-60 f-....1

COMPANION DRAWINGS: FLOOR DRAIN FILTER 0-47E610-77-1. -3 THRU -11 AID PUMP

3 2

2-,3-47E610-75-1 ...................... MECHANICAL CONTROL DIAGRAM CORE SPRAY SYSTEM

0-47E610-78-1 ......................... MECHANICAL CONTROL DIAGRAM FUEL POOL COOLING ~ DEMINERALIZER SYSTEM

2-47E610-9D-1 ... ,.,.,,., .. , ........... MECHANICAL CONTROL DIAGRAM RADIATION MONITORING SYSTEM

I 2,3-47E804-1 .......................... FLOW DIAGRAM CONDENSATE 2,3-47E814-1 .......................... FLOW DIAGRAM CORE SPRAY SYSTEM 0-47E830-6 ............................ FLOW DIAGRAM RADWASTE

I 0-47E856-1 ............................ FLOW DIAGRAM DEMINERALIZED WATER 2-47E2847-7 ........................... MECHANICAL INSTRUMENTATION AND

I CONTROLS FLOW DIAGRAM CONTROLS AIR SYSTEM

G.E.DRAWINGS: 2-730E937-23 .. ,., ..................... ELEMENTARY DIAGRAM RESIDUAL

HEAT REt.«JVAL SYSTEM

AMENDMENT 27 POWERHOUSE UNIT 0

BROWNS FERRY FINAL SAFETY

NUCLEAR PLANT ANALYSIS REPORT

RADWASTE SYSTEM MECHANICAL CONTROL DIAGRAM

FIGURE 9.2-3k

H

G

F

E

D

c

B

A

Page 14: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

10 11

m ~

-~ ---- J.~r I [---f/i' ii ~ :i

FIGURE 9.2-JI

10

12

Page 15: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant
Page 16: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

AMENDMENT 27 l'Ol'EltHCUSE UNITD

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

MECHANRIAgAwtscTJNTSRYOSLTEDMIAGRAM

FIGURE 9. 2-3n

Page 17: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

', • l , , l 900~ 9- LL- O L9 3Lt- O l'I !9

,,k.,, \§)

AMENDMENT 23 POWERHOUSE UNITO

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYS I S REPORT

RAOWASTE SYSTEM MECHA NICA L CON TROL DIAGRAM

FIGURE 9. 2-30

Page 18: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

tliiJT"=

;---~~.:~"" l -~::·1-~:; ....

",:;i;'1it"

L

AMENDMENT 24 POWERHOUSE UNITO

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

RADWASTE SYSTEM MECHANICAL CONTROL DIAGRAM

FIGURE 9,2-Jp

Page 19: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

5

M,1ENDMENT 1 6

BROWNS FERRY NUCLEAR PLANT FINAL SA.FE TY ANALYSIS REPORT

FIGURE 9 .2-3q

G

c

Page 20: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

~---~

5

~;, i __ j_ I_

!

I

J I •

·~·vi

c

M,1ENDMENT 1 6

BROWNS FERRY NUCLEAR PLANT

FIGURE 9 .2-3r

Page 21: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

M,1ENDMENT 1 6

BROWNS FERRY NUCLEAR PLANT FINAL SA.FE TY ANALYSIS REPORT

FIGURE 9 .2-3<>

Page 22: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

I I I I I I I I I I I I I ~ I " " 1 I I <;;OO~L l - LL - 0 l93L t - o l " 1 a 1

CONDENSATE PVi~i TUNNEL SUMP 8

I I j I I

~ ,, l ,,,, ~ ,,,, I , " ' I ' 'I

STANDBY GAS TRE~t~I·~ENT BLDG NO. 2 SUMP

I I I I

I

I

I, I, I I , 12

~\ll:I.\' ,""'""

AMENDMENT 25 POWERHOUSE U~IT 0

BROWNS FERRY NUCLEAR PLANT FINAL SAFETY ANALYSIS REPORT

RADWASTE SYSTEM MECHANICAL CONTROL D IAGRAM

FIGURE 9. 2-3t

Page 23: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

BFN-22

Figure 9.2-4(Deleted by Amendment 22)

Page 24: BFN-19 Figures 9-2-1a and 1b (Deleted by Amendment 17) · final safety analysis report radwaste system flow diagram fi gu re 9. 2-ja c b a . amendment 27 browns ferry nuclear plant

BFN-16

Figures 9.2-4a through 9.2-4f

Deleted by Amendment 9.