India/DAE - BARC
Bhabha Atomic Research Centre Centre for Design and Manufacture
Status Update – Jan 28, 2021
SSR1 Tuner
• Production of Tuner has been completed
• Tuners are packed and is ready for shipment
• Process for shipping has been initiated; File currently with purchase department for
further processing
2
SSR2 Cavity
• Cavity Forming
– Quotation has been invited from vendors
– Opening of tenders by end of January
• Nb-Ti Weld
– Samples has been welded
– No indication of defects in RT
– Tensile Test was conducted on Sample 1
• Failure happened in Nb and not in Weld
• Tensile Strength:163.5 MPa
3
Back Side Front Side
Sample 1
4
Back Side Front Side
Sample 4
Sample 5
Back Side Front Side
Sample 6
Back Side Front Side
Sample 7
Back Side Front Side
HT—Heat Treatment at 650ᵒ C for 10 hours.
Test to be carried out on welds
Description Requirements Applicable Standard
Dimensional inspection Fit up and after welding dimensions -
Leak tightness of joint Full weld
For Discontinuities
Dye penetrant test Full weld
Radiography test Full weld
Metallurgical
Pictures by digital
microscopeBefore and after HT, 4 nos.
ASTM E3 for sample
preparation
Grain size Before and after HT, 4 nos. ASTM E 112
Energy-dispersive X-ray
spectroscopy
Ti diffusion into Nb-- Before and after HT, 4
nos.
Mechanical Tensile Test
Base metal, Nb3 nos. – Before HT
3 nos. – After HTASTM E8
Base metal, Ti-23 nos. – Before HT
3 nos.-- After HTASTM E8
Weld sample4 nos. – Before HT
4 nos.-- After HTASTM E8
• Sketch-1
Sketch-2
SSR1 and SSR2 Cryomodule
• CAD files for SSR2 and SSR1 Cryomodules were successfully downloaded
• Meetings need to be scheduled for discussing SSR2 Cryomodule Design
• Update on Nb and Ti Shipment to BARC
11
SSR2 Tuner
• Drawing are ready to be released for manufacturing
• Currently available version: F10119103 Rev - ; (CAD updated on Jun 03,2020)