12
BHAGYANAGAR GAS LIMITED (A JOINT VENTURE OF HPCL & GAIL) BID DOCUMENT FOR Tender for Engaging Consultancy Services for Civil & Electrical Works for Construction of CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11 VOLUME-II of II

BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

Embed Size (px)

Citation preview

Page 1: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS LIMITED (A JOINT VENTURE OF HPCL & GAIL)

BID DOCUMENT FOR

Tender for Engaging Consultancy Services for Civil & Electrical Works for Construction of

CNG Retail Outlets in Andhra Pradesh

UNDER LIMITED DOMESTIC COMPETITIVE BIDDING

Bid Document No.: BGL/121/2010-11

VOLUME-II of II

Page 2: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 2 of 12

CONTENTS

VOLUMEN II OF II

SECTION 7 - Special Conditions of Contracts

SECTION 8 - Scope of Work SECTION 9 - Schedule of Rates

Page 3: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 3 of 12

SECTION – 7

SPECIAL CONDITIONS OF CONTRACT

Page 4: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 4 of 12

LOCATION/SITE INFORMATION:

It is understood that before quoting the rates, the contractor will make

him/ herself acquainted fully and understand the nature and quantum of the job to be carried out. Ignorance of this will not be considered after award of work. The contractor will be responsible to complete the entire

job in all respects.

1. The consultant has to design CNG stations as per the latest edition of OISD 179, guidelines of PESO (CCoE), as per the requirement for

local clearance from district collector, district fire officer, traffic/ police etc., PNGRB T4S Standards (Technical Standards and

specifications including safety Standards), relevant National/ International Codes & standards, Indian Electricity Act, Indian Electricity Rules and Factories Act or any statutory bodies etc.

2. BGL will be constructing CNG stations at APSRTC bus depots, BGL’s own plots, Retail outlets of HPCL, IOCL & BPCL within the

authorized charge areas at Hyderabad, Vijayawada & Kakinada of Andhra Pradesh. So rest of Andhra Pradesh means Vijayawada & Kakinada as of now. In future, other cities of Andhra Pradesh may

come up.

3. Civil & electrical consultancy jobs for construction of CNG stations in Hyderabad, Vijayawada, Kakinada and Rest of Andhra Pradesh are to be done on urgent basis and the works shall be done continuously. Civil & electrical consultancy jobs may be carried out

in multiple CNG stations in Hyderabad, Vijayawada, Kakinada and Rest of Andhra Pradesh simultaneously at any time.

4. The bidder must mobilize adequate manpower for/ at all the sites

and as and when desired by BGL.

5. Individual release order for each site shall be released by BGL

Engineer –In – Charge.

6. All manpower, machineries Tools and tackles, Equipments, tools/ tackles, machinery, labour, manpower etc for the work shall

be in the scope of contractor.

7. Validity of Contract Period: 1 year from date of award of work. The Quoted price shall be valid for the entire contract period.

8. COMPLETION TIME: Total duration for completing each SOR job as per the rate contract for each site is already indicated in

SOR from the date of release order or as communicated by BGL to be intimated through letter or email by BGL Engineer – In – Charge.

Page 5: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 5 of 12

9. MOBILIZATION PERIOD: Nil.

10. MOBILIZATION ADVANCE: Nil

11. DEFECT LIABILITY PERIOD : Nil.

12. Price Reduction Schedule (PRS/LD): The price reduction

schedule to be made applicable against individual release order

with specific completion period of each site. In case the CONTRACTOR fails to complete the WORK within the stipulated period, then, unless such failure is due to Force Majeure as defined

in article 3.12 of GCC; or due to EMPLOYER's defaults, the Total Contract price for each release order shall be reduced by ½ % per

complete week of delay or part thereof subject to a maximum of 5 % of individual release order, by way of reduction in price for delay and not as penalty. The said amount will be recovered from

amount due to the Contractor/ Contractor’s Contract Performance Security payable on demand.

The decision of the ENGINEER-IN-CHARGE in regard to applicability of Price Reduction Schedule shall be final and binding on the CONTRACTOR.

13. Security Deposit: Nil. However retention of EMD will be done

for the entire contract period.

14. Safety rules and regulation: Contractor shall adopt the safety

rules and regulation as per the prevailing practices.

15. Terms of Payments: Payment shall be made progressively

within 15 days to the contractor for the actual quantities of work executed as per the schedule of rates issued along with the

individual release order, against bill duly accepted/ approved by Engineer-In Charge. The payment shall be released through cheque /DD.

16. SERVICE TAX: The Quoted price/rates should be inclusive of

all taxes and duties EXCEPT SERVICE TAX. It may be noted that

the responsibility of payment of Service tax lies with the Service Provider only. Incase of Service tax is applicable for the tendered

work, the contractor shall claim the service tax indicating rate of abatement/deduction allowed as per “ Service Tax Act “ in the 1st Invoice itself. Contractor providing taxable service shall issue an

Invoice/Bill serially numbered and shall contain the following:-

a) Name and address and Service tax Registration No of service

provider b) Name and address of the taxable service receiver,

Page 6: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 6 of 12

c) Description, Classification and value of taxable service provided, d) Service tax amount

The above details are required to enable BGL to avail Cenvat credit for the service tax payment.

Payments to Service provider for claiming service tax amount will be made provided above formalities are fulfilled only. Incase of any

statutory variation in Service tax during the currency of the contract, the contractor shall submit a copy of Government notification to evidence the rate as applicable on the date of submission of bid and

on the date of revision. Claim for payment of service tax/statutory variation in service tax, should be raised within two(2) months from

the date of issue of Government Notification for payment of differential service tax, otherwise claim in respect of above shall not be entertained for payment of arrears.

17. The Engineer In charge shall have the power to :-

A) issue the further necessary instruction to the contractor from time to time during the progress of the work for the purpose proper and adequate execution of it and the contractor shall carry out and be

bounded by the same B) Order the contractor to remove or replace any workmen whom the

company considers incompetent or unsuitable on the opinion of the

company’s representative as to the competence of any workman engaged by the contractor. The decision of EIC shall be final and

binding on the contractor.

18. All the tender papers must be stamped and signed

Page 7: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 7 of 12

SECTION – 8

Scope of Work

Page 8: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 8 of 12

It is understood that before quoting the rates, the contractor will make him/ herself acquainted fully and understand the nature and quantum

of the job to be carried out. Ignorance of this will not be considered after award of work. The contractor will be responsible to complete the entire

job in all respects.

1. The consultant has to design CNG stations as per the latest edition of OISD 179, guidelines of PESO (CCoE), as per the requirement for

local clearance from district collector, district fire officer, traffic/ police etc., PNGRB T4S Standards (Technical Standards and specifications including safety Standards), relevant National/

International Codes & standards, Indian Electricity Act, Indian Electricity Rules and Factories Act or any statutory bodies etc.

2. BGL will be constructing CNG stations at APSRTC bus depots, BGL’s own plots, Retail outlets of HPCL, IOCL & BPCL within the authorized charge areas at Hyderabad, Vijayawada & Kakinada of

Andhra Pradesh. So rest of Andhra Pradesh means Vijayawada & Kakinada as of now. In future, other cities of Andhra Pradesh may

come up.

3. Civil & electrical consultancy jobs for construction of CNG stations in Hyderabad, Vijayawada, Kakinada and Rest of Andhra Pradesh are to be done on urgent basis and the works shall be done continuously. Civil & electrical consultancy jobs may be carried out in multiple CNG stations in Hyderabad, Vijayawada, Kakinada and

Rest of Andhra Pradesh simultaneously at any time.

The bidder must mobilize adequate manpower for/ at all the sites and as

and when desired by BGL.

More scope of work is provided in Section – 9: Schedule of Rates.

Page 9: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 9 of 12

SECTION – 9 SCHEDULE OF RATES

Page 10: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 10 of 12

SCHEDULE OF RATES (SOR)

Sl.

No. Job Description Unit Qty

Rate Inclusive of

all taxes &

duties except

Service Tax

(In `)

Execution

Period for

each SOR

item

1

Carryout detailed Survey of the site for the

details of existing arrangement of land and

RO facilities along with site block levels with reference to the Road and existing buildings.

Job includes the details of boundaries,

sewerage, Electrical lines, and surroundings

roads facilities - Including the transport

facility required for execution the work

1.1 Survey with manual & dumpy level instrument

a) Site within or Boundaries of the Hyderabad city

i)

For longitudinal and cross sections along the

stretch of road, railway line, sewer line, etc.,

including distances and levels at required

intervals as per BGL requirements.

Rmt 70 7 Days

ii)

For areas in plain/rocky/jungle/bushes,etc.,

terrains showing all the important details like

boundaries, levels, angles, utilities, surroundings, etc., complete as per BGL

requirements.

Sq.M 56 7 Days

b) Any where in Andhra Pradesh

i)

For longitudinal and cross sections along the

stretch of road, railway line, sewer line, etc.,

including distances and levels at required

intervals as per BGL requirements.

Rmt 30 15 Days

ii)

For areas in plain/rocky/jungle/bushes,etc., terrains showing all the important details like

boundaries, levels, angles, utilities,

surroundings, etc., complete as per BGL

requirements.

Sq.m 24 15 Days

1.2 Survey with Total station (electronic Survey

Equipment)

a) Site within or Boundaries of the Hyderabad city

i)

For longitudinal and cross sections along the stretch of road, railway line, sewer line, etc.,

including distances and levels at required

intervals as per BGL requirements.

Rmt 14 7 Days

ii)

For areas in plain/rocky/jungle/bushes,etc.,

terrains showing all the important details like

boundaries, levels, angles, utilities,

surroundings, etc., complete as per BGL requirements.

Sq.M 8 7 Days

b) Any where in Andhra Pradesh

i)

For longitudinal and cross sections along the

stretch of road, railway line, sewer line, etc.,

including distances and levels at required

intervals as per BGL requirements.

Rmt 14 15 Days

Page 11: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 11 of 12

Sl.

No. Job Description Unit Qty

Rate Inclusive of

all taxes & duties except

Service Tax

(In `)

Execution

Period for

each SOR item

ii)

For areas in plain/rocky/jungle/bushes,etc.,

terrains showing all the important details like

boundaries, levels, angles, utilities,

surroundings, etc., complete as per BGL

requirements.

Sq.M 8 15 Days

2

Preparation of Preliminary Drawings of the

stations/buildings/works, etc., based on BGL Requirements

Each 10 7 Days

a) Each Revision Each 30 1 Day

3

Soil Testing with three bore points 150 mm

dia and 10 m depth including test report by

Engineering college

Job 10 15 Days

a) Additional Bore Point Each 10 15 Days

4 Preparation of BOQ/ SOR for Civil &

electrical works for each station Each 10 6 Days

5

Preparation of Tender Document Book for

Civil & electrical works with detailed specifications of all the items of work,

including the approved makes execution

procedure, etc., two copies

Each 10 10 Days

a) Each Additional Copy Each 10 1 Day

6 Preparation of approval drawings without

ammonia prints

6.1 For NHAI as per the MORT&H rules and other

acts as applicable.

a) Site within or Boundaries of the Hyderabad City Each 1 7 Days

b) Any where in Andhra Pradesh Each 1 10 Days

6.2

For Municipality/ HMDA approvals showing details of all the builtup areas, all utilities

provided as per the norms and guidelines of

the department.

a) Site within or boundaries of the Hyderabad city Each 1 5 Days

b) Any where in Andhra Pradesh Each 1 8 Days

6.3 For CCOE approvals as per the guidelines of

OISD 179 or CCoE/ PESO

a) Site within or Boundaries of the Hyderabad city Each 7 5 Days

b) Any where in Andhra Pradesh Each 3 8 Days

6.4

a) Ammonia Prints A0 size Each 1 1 Day

b) Ammonia prints A1 size Each 200 1 Day

c) Ammonia prints A2 size Each 1 1 Day

7 Preparation of Rate Analysis for Civil works Each 10 7 Days

8

Providing QC charts, Bar chart and Log Book

per site incorporating all necessary inputs required at the site.

Each 10 10 Days

9 Providing working drawings & BOQ for any

other RCC Buildings Sq. M 10 15 Days

Page 12: BHAGYANAGAR GAS LIMITED - CNG, Auto LPG, … II of II 121.pdf · CNG Retail Outlets in Andhra Pradesh UNDER LIMITED DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/121/2010-11

BHAGYANAGAR GAS

LIMITED

Tender for Engaging Consultancy Services for Civil &

Electrical Works for Construction of CNG Retail Outlets in

Andhra Pradesh

Bid Document No. BGL/121/2010-11

VOLUME

I OF II

Page 12 of 12

Sl. No.

Job Description Unit Qty

Rate Inclusive of all taxes &

duties except

Service Tax

(In `)

Execution

Period for each SOR

item

10 Providing working drawings & BOQ for any

other Canopy structures Sq. M 10 15 Days

11

Providing periodical supervision of civil

works including contractors RA Bill

verification Maximum of 10 visits fee based

on percentage of final executed project cost

for civil, electrical & mechanical works as per site conditions.

a) Site within or Boundaries of the Hyderabad City Perce

ntage 7

As per

requireme

nt of BGL

during

Project Execution

b) Any where in Andhra Pradesh Perce

ntage 3

11.1 Each Additional site visit by site Engineer

a) Site within or Boundaries of the Hyderabad City Each 7 As per

requireme

nt of BGL

during

Project

Execution

b) Anywhere in Andhra Pradesh Each 3

12

Providing working drawings for all civil works

including two copies fee based on percentage

of final executed project cost for civil,

electrical & mechanical works as per site

conditions.

Perce

ntage 10

As per requireme

nt of BGL

during

Project

Execution

a) Additional Copy Each 20 2 Days

Service Tax @ ____________ %

Note:

1) Bidder to indicate the percentage of Service tax applicable.

2) For SOR item sl nos. 11.a, 11.b, 12; final project cost of Rs. 55.9 lac per RTC depot/

standalone depot are to be taken for evaluation purpose only which will be multiplied with the percentage quoted by the individual bidder.