BHP Billiton Iron Ore – Western Australia Mining Operations Iron Ore Phil Price – Vice President Integrated Planning

BHP Billiton Iron Ore – Western Australia

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BHP Billiton Iron Ore – Western Australia

BHP Billiton Iron Ore – Western AustraliaMining Operations

Iron OrePhil Price – Vice President Integrated Planning

Page 2: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 2

Visitors Safety Induction – Office Area

1. In an emergency - a siren will sound

2. Stay with your escort at all times

3. Evacuate building through main entrance

4. Muster point is in car park adjacent to front door

5. We have a no-smoking policy inside buildings

Page 3: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 3

Summary• 7 mines producing

approx 106 Mtpa;

• 6 mines contract operated: BHP Billiton WAIO performs mine planning and scheduling -Contractor provides statutory role of Registered Manager;

• Total productive movement ~ 300 Mtpa;

• 2800 mining employees (inc. 1700 full time contractors);

• Integrated system: mine/rail/port.

OB 18OB 18

Page 4: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 4

Continuous Improvement in Safety Performance• Continued development of One

Business approach to HSEC systems and processes.

• Focus areas:- Leadership- Behavioural based systems

• Programs & actions:- Take 5/JHA’s- Stop for safety- Risk assessments- Fit for work/life (fatigue management)

- 15 HSEC Standards

• 40% reduction in TRIFR during FY06 – last quarter was a record low of 7.9.

Safety - 12 Month Rolling TRIFR22

21

16

12

20

0

5

10

15

20

25

2004 2005Jul-05 Sep-05 Nov-05 Jan-06 Mar-06 May-06

Actual2006 YTD

Page 5: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 5

Production History since 1966 - Million Wet Tonnes OFR

0102030405060708090

100

19661968197019721974197619781980198219841986198819901992199419961998200020022004

Whaleback+OB29/30/35 Bene OB23/25 Jimblebar Yandi Goldsworthy Area C

Page 6: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 6

Total Integrated System Approach

Dynamic simulation modelling is necessary to understand, optimise and improve our integrated process

Models developed and enhanced over a period of about 14 years

Mines Rail Dumping to Stacking ShippingReclaiming

To Shiploading

Stockpile Surge

Stockpile Surge

Queue ofOre cars

Queue ofVessels

Page 7: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 7

MAC19%

Yandi39%

Newman35%

Goldsworthy7%

BHP Billiton WA Iron Ore Production Distribution

1.92.4LOI0.0570.070Phos1.31.95Alumina3.03.7Silica65.464.0Fe

LumpFinesDwt %YEJ 2005 Sales Total = 104Mt (100% basis, wet metric tonnes)

Page 8: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 8

Integrated Production Process – Creating the Perfect Blend

Fe %

50%

55%

60%

65%

70%

75%

MINE RAIL PORT

Page 9: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 9

8 High Quality Products From Numerous Ore Sources

Rail to Nelson Point

Yandi 1 Yandi 2 OB 25 Whaleback Jimblebar

Fines Fines & Fines &Lump

High Grade Ore -100mm

Bene Ore-100mm

Crushing and Screening

LRP

Fines Fines Lump

Rail to Nelson Point

Rail to NelsonPoint

Yarrie Nimingarra

Crushing and

Screening

Fines Lump

Rail to Finucane Island

MACTM

Fines Lump

LRP

Fines LumpLump

Lump

LRP

OB 29/30 OB 18

Crushed Ore -100mm

Crushed Ore -150mm

Crushed Ore -150mm

BLEN

DING

Page 10: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 10

Newman Joint Venture Process FlowWHALEBACK

CRUSHING

-100MM Ore -100MM Ore

WHALEBACK HIGH GRADELOADOUT STOCKPILES

CONTACT ORE

CRUSHING &SCREENING

HIGH GRADEOREBODY

23/25 JIMBLEBAR

LOADOUTSTOCKPILES

LOADOUTSTOCKPILES

-100MM OreLump & Fines

-6.3MM 31.5 X 6.3MM

OREBODY29/30/35

HIGHGRADE FINES

STOCKPILE

MIN

ERA

ILPO

RTSH

IP

BENE PLANT

CRUSHING &SCREENING

CRUSHING &SCREENING

CRUSHING &SCREENING

LUMP RESCREENINGNelson Point

OREBODY 18

LOADOUTSTOCKPILES

-125MM Ore

CRUSHING

Continuous Stockpile Management System

HIGHGRADE LUMPSTOCKPILE

Page 11: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 11

Continuous Stockpile Management System

• Diverse ore grades at mines

• Computerised decision support system

• Intelligent sequencing of trains from mines

• On-grade lump & fines stockpiles at port

Continuous Stockpile GradeShipping Limits

Time (two month period)

%Al

2 O3

Lum

p

Continuous Stockpile GradeShipping Limits

Time (two month period)

%Al

2 O3

Lum

p

Continuous Stockpile GradeShipping Limits

Most Recent

Page 12: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 12

Long Term Approach to Quality Control

• Quality control starts up to 25 years before mining

• BHP Billiton has consistently met customers’ quality expectations – through 40 years of experience and leading edge mining practices

• Blending starts at the mine planning stage and includes ore types and their physical and chemical properties.

Quality Control Systems

Iron Making Testwork

Customer Samples

Mine Planning

Orebody Modelling

Winzing

Infill Drilling

Exploration

Up to 5 years

Up to 10 years

Up to 25

years

Work Completed

Page 13: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 13

• RGP2: Completion expected mid 2006

– OB18 & OB25

– Port & Rail

• RGP3: Approved October 2005

– Area C

– Port & Rail

• RGP4 & Feasibility Study expected to be complete Beyond in 2007. Evaluating a range of further

options for expansion beyond 152mtpa

Growth Projects

OB18

Area C

Page 14: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 14

• The Petroleum and Minerals sectors are worth around A$40 billion to Western Australia;

• With a value of more than A$11 billion, Iron Ore is the largest individual sector, recently taking over from crude oil and condensate;

• BHP Billiton Iron Ore is a significant contributor to Australia and WA:

A$ million*– Federal Business Tax 451

– State Royalties & Taxes 136

– Local Rate Payments 2.3

– Payments to Local Contractors 658

– Community Contributions 3.7

– TOTAL 1,215

Iron Ore - Crucial to the Nation and the State

*H1 FY2006

Page 15: BHP Billiton Iron Ore – Western Australia

17 July 2006Page 15

• Expect to invest more than A$100 million in the Pilbara over next decade – based on internationally recognised social research

• Service Delivery:– Developed MOUs with WA Government to address service

issues (>A$12 million)

• Local Infrastructure:– Newman Community Planning Process – Look to 2020– A$3 million to improve local infrastructure, ie: playgrounds,

parks, footpaths, etc.

• Alternative Economic Development & Capacity Building:– Indigenous arts skills program – developing retail

businesses and export opportunities– Upgraded Newman Visitor’s Centre

Developing Partnerships to Enhance Newman

Page 16: BHP Billiton Iron Ore – Western Australia